PRE-SUBMITTAL CHECKLIST
Project Name: Casarez
Project Proposal: 4 lot subdivision
Case Number: PRE20074-000'pz'1 i
, Project Address: 475 35th street
Assessors Map and Tax Lot Number(s):17-02-31-24 TL 1800
Zoning:, Low Density Residential (LDR)
')
,Overlay District(s): ' Drinking Water Protection (DWP)
Applicable Refinement Plan: Mid-Springfield
Refinement Plan Designation: Low Density Residential (LOR)
Metro Plan Designation: Low Density Residential (LDR)
Pre-Submittal Meeting Date: November 16, 2007 .
Application Submittal Deadline: May 16, 2008
Associated Applications: none
IY'CI;l;yjOF.iSF!RINGFIE'i!i)~DEVEa.:OP.MEN~IREVIEW.~T:EAM~i.J'~:tiii:tli;%lIr~"~11i\~~"1li\~t__
1 POSITION
I Proiect Planner
'I
I
I
I Deputy Fire "Marshal
1 Community Services Manaqer '
REVIEW OF
Land Use Planning
Transportation
Utilities
Sanitary & Storm Sewer
1 Fire and Life Safety
1 Building
NAME
Steve Hopkins '
Gary McKenney'
I PHONE 1
726-36491
1 726-4585 1
1 1
1 I
1 726-2293 1
1 726-3668 I
Gilbert Gordon
Dave Puent
tAP'Bl:IICANf",S3DEVEITOeMEN:NREV:tEW:J!!tE~MW!~I\l;;t{~*f~~1B:11lt.\\'~_'ll't~t_'\IJ'B.."
Owner Engineer
Jerry Casarez Branch Engineering
1611 Lawnridge AVe 310 Fifth St
Springfield OR 97477 Springfield
11/16/07
1
,
TENTATIVE LAND DIVISION APPLICATION
PRE-SUBMITTAL CHECKLIST
PLANNING
o Application Fee discuss the applicable fees
o One additional copy of the Land Division Plan reduced to 8'h"x 11"
Complete Incomplete See Planning
Note(s)
,r;;:il
~
~""
",:;91'
.,-,
8 'I," x 11" Copy of Land Division Plan
o Copy of the deed and a preliminary title report issued within the past 60 days
documenting ownership and listing all encumbrances. If the applicant is not the property
owner, written permission'from the property owner is required.
Complete Incomplete See Planning
Note(s)
,
Deed and Preliminary Title Report
~ ~
o Tentative Land Division Plan
Complete Incomplete See Planning
Note( s)
~
ffilj",
"~.I.
.p"
r71M
I.!5::J
f$j
~
Prepared by an Oregon Licensed Land
Surveyor in accordance with ORS 92
All existing and proposed easements
Dimensions and size of each parcel and the
approximate dimensions of each building site
indicating the top and toe of cut and fill
slopes to scale,
Location, widths and names of all existing
and proposed streets, alleys, dedications or
other right-of-ways within ,or adjacent to the
proposed land division
Location of existing and required traffic
control devices, fire hydrants, power poles,
transformers, neighborhood mailbox units
and similar public faciliti,es
Location and width of all existing and
proposed sidewalks, sidewalk ramps,
pedestrian access ways and bike trails
Location, size and type of plantings and
street trees in any required planter strip
~
l3lJ
R'll,'
~
rm;l
~
[9;l
l!2.J
r;;;;l
~
~'.
")~-"
-,.:r,..
Iiii'l
~
rBTI
~
[]I'"
.,
.'.'.!
r:'Fl
~
I,
11/16/07
2
~
r;;;J
l.:jJ
Location and size of existing and proposed
utilities on and adjacent to the site including
sanitary sewer mains, stormwater
management systems, water mains, power,
gas, telephone, and cable TV.. Indicate the
proposed connection points.
o Phased Development Plan required if redivision is proposed. The plan must include
the boundaries and sequencing of each proposed redivision. Any redivision must
progress in a sequence promoting street connectivity between the various phases of the
development and accommodating other required public improvements.
Complete
Incomplete See 'Planning
Note(s)
"'l
L::\lli
rc:;;]',",
LSifJ
Phased Development Plan.
Planning Notes:
1.
Additional comments not related to the completeness of the application:
.
"
11/16/07
;:}
3
ANY REQUIRED ADDITIONAL MATERIALS, APPLICATIONS OR
PERMITS
, IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENTISSUES MEETING OR THE PRE-
APPLICATION REPORT FOR MORE DETAILED INFORMATION:
Applicable
Not'
Applicable
@]
~.".
';\'..
"'-1
r;;;;l
u2J
[]!],~
"~~.\i,
.'~'
~
f]'il'
l..:EJ
[1]
I'i:1
~
CID Q:ID
.~~. "Hll:
~ ~
,_"f
,/;;1<
00 ~
~;a~; f,"{
~
l.i:!:.I
[$;;),"1
~
~
rw;]
Ilili:J
[!41
~
11/16/07
,
Proposed deed restrictions and a draft of any I-jomeowner's
Association Agreement
Additional plans:and documentation forsubmittal of a Cluster
Subdivision proposal as sp,ecified in SDC Section 16.100(3)
Riparian Area Protection Report For properties located within 150
feet of the top of bank of any Water Quality Limited Watercourses
(WQLW) or within 100 feet of the top of bank of any direct
tributaries of WQLW
A Geotechnical Report prepared by an engineer must be
submitted concurrently if there are unstable soils and/or a high
water table pres'ent '
Where the development area is within an overlay district
applicable, address the additional standards of the overlay district
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified in SDC Article 38 .
A wetland delineation approved by the Oregon Division of State
Lands must be submitted concurrently where there is a wetland
on the property
Any required federal or state permit must be submitted
concurrently or evidence the permit application has been
submitted for review
Where any grading, filling or excavating is proposed with the
develop'ment, a Land and Drainage Alteration permit must be
submitted prior to development
, Where applicable, any Discretionary Use or Variance as specified
, in SDC Article 10 or 11
4
THIS APPLICATION IS:
~OMPLETE FOR PROCESSING
o INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
<7-0! . "JILL In
City Planner / - Date
This is not a decision on your application.' Springfield Development Code Sections
3.050(3)-(6) and Oregon Revised Statutes. 227.178 require the City take' final action on a
limited land u'se decision within 120 days after the application is deemed complete. The 120-
day processing period forthis ap'plication begins when all the missing information is
submitted or when you request that the City proceed without the information. You must
indicate by either signing this form or by submitting a written response to the City within
seven days of the date of this form asserting your intentions regarding the provision of the
missing information. If you indicate herein or in your written response that the missing
information will be submitted, then you have 180 days from the date the application was
submitted for Pre-Submittal Review to provide the City with. the missing information. If you
refuse to submit the missing information, then upon receipt of the full application packet and
processing fee, the City will deem the application complete for purposes of starting the 120-
,
day clock and begin processing the application. No new information may be submitted after
the start of the 120-day,period unless accompanied by a request for an extension of the
120cday processing time. Upon receipt of-a request for extension/the City may extend the
120-day period for a reasonable period of time. The City may also require additional fees if
the new information is submitted after the Notification to Surrounding Property Owners is
sent out and a second notification is required or if the new information substantially affects
the application proposal and additional rev,1ew isrequired.
I, the owner/applicant, intend to submit all missing items indicated herein to the
City within the lSD-day timeline.' ,
Owner/Applicant's Signature
11/16/07
5
TENTATIVE LAND DIVISION APPLICATION
PRE-SUBMITTAL CHECKLIST
,
Deputy Fire Marshal: Gilbert Gordon
Case #: PRE2007-00d77
FIRE
o Tentative, Land Division Plan
Complete Incomplete See Fire
Note(s)
~
~
Location, wid~hs aM names of all, existing and
proposed streets, alleys, dedications or other right-of-
ways within or adjacent to the proposed land division
Location of existing and required fire hydrants
~
[]I
Fire Notes:
1. Need to verify Public Wo~ks Engineering if pavement depth as proposed will meet the
, 80,000 lb. imposed load requirement of 2007 Springfield Fire Code Appendix
D102.1 with regards to the proposed 3 inch asphalt over 9 inch thick compacted
1.5 inch compacted crushed base rock. '
2. Proposal to sprinkler the structure 'on Lot 4 in lieu of fire department turnaround is
allowed per SFC 503.1.1, Exception 1. Note, however, that the residence will
have to be sprinklered throughout and not be allowed to have the exq~ptions to
sprinkler coverage normally allowed in NFPA 13D.
3. "No Parking-Fire Lane" signs shall be posted on both sides of the panhandle fire
apparatus access road per SFCS03.2.1, 503.3, and Appendix,D103.6.
4.
Additional comments not related to .the completeness of the application:
.
,
Revised 9/24/07
'.
'TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Engineer: Jesse Jones Case#: PRE2007-00077
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete
Em
~
~
~
~
L?S$I
~
~
~
~
~
Revised 1O{25{07 '
Incomplete See PW
N~te(s)
I!:i!l
I!:i!l
III
J;iil
~
~
1!lIJl,
!itA'i
,Wi"',
Iil'I
~
~
Prepared by an Oregon licensed Landscape Architect
or Engineer
Vicinity Map
The name, location, and dimensions of all existing site
features including buildings, curb cuts, trees and
impervious surface areas, clearly indicating what is
remaining and what is'being removed. For existing
structures to remain, also indicate present use, size,
setbacks from property lines, and distance between
'buildings
The name, location, dimensions, direction of flow and
top of bank of all watercourses and required riparian
setback that are shown on the Water Quality Limited
Watercourse Map on file in the Development Services
Department
The 100-year floodplain and f100dway boundaries on
the site, as specified in the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of Map
Amendment or Letter of Map Revision
The Time of Travel, Zones, as specified in SDC 3.3-200
and delineated on the Wellhead Protection Areas Map
on file in the Development Services Department
Physical features including, but not limited to trees 5"
in diameter or greater when measured 4 '12 feet above
the. ground, significant clusters of trees and shrubs,
riparian areas, wetlands, and rock outcroppings
Soil types and water table information as mapped and
specified in the Soils Survey of Lane County. A
Geotechnical Report prepared by an Engineer must be
submitted concurrently if the Soils Survey indicates'
the proposed development area has unstable soils
and/or a high water table
o Improvement and Public Utilities p'lan must be in compliance' with the regulations of
SDC Sections 5.17-100, 4.1-100, 4.2-~00, and 4.3-100 and must include the following
information: ' -
Complete Incomplete, See PW
Note(s)
~
~
~
~
fll
'Ill
II)
~
fIl;..;
. ~"."
,,=..
o Grading and Paving Plan.
Complete Incomplete See PW
Note(s)
~
~
fIl
fIl
~
1'<71
Li:lSI
~
fIl
fIl
fIl
~
i!l
~
i!l
Prepared by an Oregon licensed Civil Engineer
Location and, width of all ,existing and proposed
easements
Location of existing and required power poles,
transformers, neighborhood mailbox units, and similar
public facilities
Location and size of existing and proposed utilities on
and adjacent to the,site, including sanitary sewer
mains, stormwater'management systems, water
mains, power, gas, telephone, and cable TV.
Indicate the proposed connection points
)
Prepared by an Oregon licensed Civil Engineer
Planting plan prepared by an Oregon licensed
Landscape Architect where plants are proposed as
part of the stormwater management system
Roof drainage patterns and discharge locations
Pervious and imperVious area drainage patterns
The size and location of stormwater management
systems components, includin'g but not limited to:
drain lines, catch basins, dry wells and/or detention
ponds; stormwater quality-measures; and natural
drainageways to be retained
Existing and proposed spot elevations and contours
lines dra~n at 1 foot intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
intervals)
Am.ount of proposed cut and fill
,0 Stormwater Management System Study - provide four (4) copies of the study with
the completed Stormwater Scoping Sheet attached. The plan, calculations, and
documentation must be consistent with the Engineering Design Standards and
Procedures Manual.
Complete Incomplete
iii lIil
Revised 10/25/07
See PW
Note(s)
Scoping Sheet and attached Stormwater Management
System Study