HomeMy WebLinkAboutNotes, Work PLANNER 2/26/2008
"
City of Sprihgfield
Development Services Department
225 Fifth Street .
Springfield, OR 97477 .
,
. LAND DIVISION PLAT
PRE-SUBMITTAL CHECKLIST
subdivision
Project Name: HoeraufSubdivision
Project Proposal: Pre-submittal for Subdivision Plat for 6-lot subdivision
Case Number: PRE2008-00014
. Project Address: 1290 F Street, Springfield
Assessors Map and Tax Lot Number(s): 17033622 TL 6000
. Zoning: Low Density Residential (LDR) .
Overlav District(s): N/A
Applicable Refinement Plan: N/A
Refinement Plan Designation:, N/A
Metro Plan Designation: Low Density Residential (LDR)
Tentative Decision Date: November 9, 2006
Pre-Submittal Meeting Date: February 26, 2008
Application Submittal Deadline: November 9, 2008
Associated Applications: PRJ2006-00055, ZON2006-00031, PRE2006-00077, SUB2006-
00057
II'GIm.Y1!QFllSJ:!rUNGf:IEUDIDEV:El!aBMENTiR.eVtEW:litlE~~~~~J1!'"
I POSITION REVIEW OF I NAME PHONE I
I Proiect Planner Land Use Planninq I Mark Metzqer 726-3775
I Transportation Planninq Enqineer Transportation Gary McKenney 726-4585 I
I Public Works Civil Enqineer Utilities I Eric Walter 736-1034 I
I Public Works Civil Enqineer Sanitarv & Storm Sewer Eric Walter 736-1034 I
I Deputy Fire Marshal Fire and Life Safety I Gilbert Gordon 726-2293 I
I Communitv Services Manaqer Buildinq I Dave Puent I 726-3668 I
, . '''''',' . - . '1llIllIIIIII!!!...
IrARRI!Ie~NTliSjD,EVEI.!QRM'ENiI"!!R.EVlEWAimEi'M '
Applicant/Owner
Gordon Hoerauf
638 McKenzie Crest Dr.
'Springfield, Oregon 97477
Engineer
Dan Nelson
Branch Engineering, Inc.
310 Fifth Street
Sprinqfield, OR 97477
2/26/2008
10f6
The items needed to make the application complete for review are incorporated below.
, "
NOTE:
. Conditions of Approval - taken from Notice of Decision dated: 11/9/2006
. Applicant Response - taken from: 2/26/2008
Condition #1: The applicant shall record an irrevocablejoint use access easements for Lots 1,
2,3, 4and 5 prior to Final Plat approval.
Applicant Response: A copy of the proposed easement document is included for review in this
submittal.
Staff Finding: A Joint Use Easement document is enclosed in the submittal. The joint
easements for lots 1, 2 'and lots 3, 4, and 5 show on the final,plat. The eas,ement documents
will be recorded with the Final Plat.
Condition #2: Execute and record an Improvement Agreement for street lighting on 'F'Street.
Applicant Response: A copy of the requested document is included for review in this submittal.
Staff Finoing: The Improvement ~greeri1ent is enclosed and will be recorded with the Final Plat.
Condition #3: The applicant shall repair the damaged portion of the existing sidewalk prior to
Final Plat approval.
'Applicant Response: Field inspection and discussion with contractor has presented repair
concerns. A discussion is requested 'at the pre-submittal meeting to address these concerns.
Staff Finding: A staff person from PW Maintenance inspected the tree and sidewalk on 2/25/08
and has indicated thatthe sidewalk has been lifted more than 2" and cannot be ground down.
The slab must be removed and replaced .with one or more slabs to allow for slope and drainage.
A professional arborist should be called after the slab has been removed to examine the root
structure causing the uplift and to recommend howb,estto resolve the sidewalk issue.
Condition #4: All electrical lines shall be placed underground for both new and existing homes
on-site
Applicant Response: The contractor has stated that all electrical lines have been placed
underground and SUB has connected to the power grid. '
Staff Finding: There is evidence of electrical service to the site.
Condition #5: Maintain 20 feet clear widths on the panhandle driveway per 2004 Springfield
Fire Code, 503.2.1.
Applicant Response: This was addressed with the approved construction plans;
Staff Finding: The panhandle driveway meets the 20 ft. clear width requirement.
Condition #6: Prior to signing of the Final Plat, the applicant shall install "No Parking-Fire Lane
signage" posted on both sides of the proposedJoint access driveways for Lots 1,
2,3 and 4 per SFC 503.3 and SFC Appendix 0103.6.
Applicant Response: The contractor will be installing the signs before submittal of mylars to
prevent vandalism.
Staff Finding: Signs have not been installed.
2/26/2008
20f6
Condition #7: Fire apparatus access roads shall support an 80,000 lb. imposed load per 2004
, Springfield Fire Code 503.2.3 and SFC Appendix 0102.1.
Applicant Response: This was addressed with the approved construction plans.
Staff Finding: The driveway and .joint access driveway were built to meet the standard.
Condition #8: Prior to Final Plat approvai, the applicant shall execute and record joint-use
access easements as proposed to support shared driveway accesses.
Applicant Response: A copy of the proposed easement document is included for review in this
,submittal.
Staff Finding: The Joint Use Access Easement is enclosed with the submittal. The document
will be recorded with the Final Plat.'
Condition #9: The app;icant shall pave the existing graveled driveway serving Lot 6 prior to
approval of Final Plat. .
Applicant Response: Field inspection has shown this completed. Please refer.to the enclosed
picture dated 2/19/08.. '
Staff Finding: The ioint access drlvewav has not been built to the desian reoresented in the
aooroved tentative olat, The drivewav must becomoleted accordina to submitted alan for final
aooroval.
Condition #10: Provide and maintain adequate vision clearance triangles at the corners of all
lot driveways per SOC 32.070. '
Applicant Response: This restriction is noted on the plat.
Staff Finding: The vision triangle requirement is shown as Note #2 on the Final Plat.
Condition #11: Prior to Final Plat approval, the proposed joint use access easements shall be
paved. ' '
Applicant Response: Field inspection has shown this completed. Please refer to the enclosed
pictures dated 2/i9/08. '
Staff Finding: Staff has verified that the joint access driveway has been paved. It is apparent
that the joint access driveway has not been built to the
Condition #12: The applicant shall apply for an LOAP from the City of Springfield priorto
undertaking any fill and/or grading for road improvements and/or building
construction on site.
Applicant Response: This was addressed at the tim~ building permits were issued.
Staff Finding: No record of an LDAP (No Tidemark record) could be found at this writina.
Condition # 13: The applicant shall apply for a ,tree felling permit prior to felling more than 5
trees on the site with 5 inch dbh or greater (within a consecutive 12-month
period). '
Applicant Response: At this time, less than 5 trees with 5" DBH or greater have been felled.
Staff Finding: There was no evidence, that trees were inappropriately removed.
Heads Up Comments:
1.
2/26/2008
30f6
THIS ApPLICATION IS:
o COMPLETE FOR PROCESSING
~ INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
City Planner
Date
THIS IS NOT A DECISION ON THE PLAT. The plat pre-submittal meeting shall be held within
one year of the date ofthe Land Division Tentative approval. A complete Land Division Plat
application shall be submitted within 180 days of the-pre-submittal meeting. If the applicant has
not submitted the Land Division Plat application within these time frames, the Land Division
Tentative approval shall become null and void and re-submittal of the Land Division Tentative
application shall be required per SDC 5.2-140. .
I, the owner/applicant, intend to submit all missing items indicated herein to the City
, within the ISO-day timeline.
Owner/Applicant's Signature
Date
"
2/26/2008
4 of 6,
Land Division Plat ,Application Process (see next page for a diagram of this process)
1. Applicant Submits a Land Division Plat Application f~r Pre-Submittal
. The application must conform to the Land Division Plat Pre-Submittal Requirements
Checklist on pages 5 & 6 of this application packet. '
. The purpose of pre-submittal, is to ensure the applicant has all items necessary for a
complete submittal.
. A pre-submittal meeting to discuss completeness is mandatory.
. Pre-submittal meetings are conducted every Tuesday and Friday, from 10:00am -
noon.
. We strive to conduct the pre-submittal meetings within five to seven working days of
receiving the application.
2. Applicant and the CitY Conduct the Pre-Submittal Meeting
. The applicant, owner, and design team are strongly encouraged to attend the pre-
submittal meeting.
. The meeting is held with representatives from Public Works Engineering and
Transportation, Community Services (Building), Fire Marshall's office, and the Planning
Division. '
. The meeting is scheduled for 30 to 60 minutes.
. The Planner provides the applicant with a Pre-Submittal Checklist at the end of the
, meeting specifying the items required to make the application complete if it is not
already complete.
. The applicant will then have 180 days to make the application complete for submittal
and acceptance by the City.
3. Applicant Submits a Complete Land Division Plat Application
. When the applicant has addressed all items on the Pre-Submittal Checklist and the
City, Surveying Section has notified the applicant's surveyor that the plat and other
documents are sufficiently refined, the applicant can submit a complete application to
the City Survey Section located in the NW Quad of City Hall.
. The application must conform to the Land Division Plat Submittal Requirements,
Checklist on page 6 of this application packet. -
,
. If the submittal is deemed complete, the City Survey Section will sign-off on the City
Survey approval sheet and send the applicant to the Development Services
Department for application submittal and fee collection.
. Planning staff checks and signs the mylars.
4. Applicant Records Plat at Lane County &. Submits Plat and Documents to City
. After Planning staff checks and signs the mylars, the plat may then be recorded by the
applicant's surveyor at Lane County.
. After plat has been recorded at Lane County, applicant submits five (5) recorded,
rolled paper copies ofthe plat and three (3) copies of required documents to the
Development Services Department prior to the issuance of building permits. ,
I
LAND DIVISION PLAT APPLICATION PROCESS
Applicantsubmits land division plat application for pre-submittal
(See LAnd Division Plat Pre-Submittal Requirements Checklist)
1
City departments review application for completeness and hold pre-submittal meeting to
discuss completeness issues with applicant and applicant's representatives.
~~
Applicant addresses incomplete items. I
City Surveyor checks application and returns
comments to applicant's surveyor.
..-
Applicant's surveyor corrects plat
and returns to City Surveyor.
City Surveyor conducts field check and
returns, comments to applicant's surveyor
~
/
Applicant's surveyor sets new monuments
and flags existing ones.
1
, Once no errors appear on the plat and a current title report is submitted, applicant's
surveyor is given ok to submit complete land division plat application.
1
--.
After ok given from City Surveyor and applicant has addressed all incomplete items from
pre-submittal, applicant submits complete application to the City SurVey Section
(See Land Division Plat Submittal Requirements Checklist) ,
1
CitySurvey Section signs-off on City Survey approval sheet and sends the applicant to the
. '
Development Services Department for application submittal and fee collection.
1
Planning' staff checks and signs mylars and notifies applicant's surveyor of approval.
, .
1
Applicant takes plat and accompanying documents to Lane County forrecording. I,
1
I, AppliCfmt brings copies'Of recorded plat and documents to Development Services Department.
Revised 9/26/07 Moliy Markarian
60f6
~!
WRITTEN STATEMENT
FOR THE FINAL SUBDIVISION PLAT ApPLICATION
This application is a submittal of the final subdivision plat for the property located at
1290, 1:306 & 1324 'F' Street. The subdivision was granted conditional approval on November
9th, 2006 under Case Number SUB2006-000057.
The following is a discussion of how, the [mal plat conforms to the conditions of approval
placed on the tentative subdivision application:
The applicant shall te.c~t an irrevocable joint use access easement for Lots 1, 2, 3, 4 arid :S)'
prior to Final Plat appro .
A copy of the proposed easement document is included for review in this submittal. VI!I ,~-;c9--
'~l~ ~ fl~
Execute and record an Improvement Agreement for street lighting on 'F' Street.
A copy of the requested document is includedfor review in this submittal, 4/f<.l/k~
1)
2)
3)
The applicant shall repair the damaged portion of the existing sidewalk prior to Final Plat
approval. ~
(Field inspection and discussion with contractor has presented repair, concerns,
V..iscussion is requested at the pre-submittal meeting to address these concerns.
4)
All electrical lines shall be placed underground for both new and existing homes on-site.
The contractor has stated that all electrical lines have been placed underground and SUB
has connected to the power grid. (v/,
5)
Maintain 20 feet clear widths on the panhandle driveway per 2004 Springfield Fire Code
503.2.1.
l!hiS was addressed with the approved construction plans.', W'"
6) Prior to signing of the Final Plat, the applicant shall install "No Parking-Fire Lane signage"
posted on both sides of the proposed joint access driveways for Lots 1, 2, 3, and 4 per SFC
503.3 and SFC Appendix Dl03.6. '
the contractor will be inStalling the signs before submittal of mylars to prevent vandalism1 ~
7) Fire apparatus access roads shall support an 80,000 lb. imposed load per 2004 Springfield
Fire Code 503.2.3 and SFC Appendix Dl02.1. '
~hiS was addressed with the approved construction plan:) ~
8) Prior to' Final Plat approval, the applicant shall execute and record j6int-use access
easements as proposed to support shared driveway accesses.
~
A copy of the proposed easement document is included for review in this submittal.
9) The applicant shall pave the existing graveled driveway serving Lot 6 prior to approval of
Final Plat.
(Field inspection has shown this completed. Please refer to the enclosed picture dated'
G19/08, if ' J
10) Provide and maintain adequate vision clearance triangles at the comers of all lot driveways
per SDC 23.070.
This restriction is noted on the plat,
~,
~ t\<SJ-b-+t z..
II) Prior to Final Plat approval, the proposedjointuse access easements shall be paved.
(~ield inspection' has shown this completed. Please refer to the enclosed pictures daled)
\!./19/08. ~ ' , , ' ,
12) The applicant shall apply for an LDAP from the City of Springfield prior to undertaking
any fill and/or grading for road improvements and/or building construction on site.
thiS was addressed at the time building permits were issued.) frp
13) The applicant shall apply for a tree felling permit prior to felling more than 5 trees on the
site with 5 inch dbh or greater (within a consecutive 12-month period).
(At this time, less than 5 trees with 5" DBH or greater have befmfelled)
1JY