HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2008-10-28 .. ~ftl RECEIVED Dei 2 8 7~n8 Page 1 of 1 Geotechnical & ConstrucOOn Services Daily Field Report 11~'II~t~;"I~lro'~~.IIII~'_ Client: Mr, Joe Hawes Project: International Way Development Date: 10-22-08 Hawes Investments, LLC Package A , '0 Project No.: 2087024 2892 Crescent Avenue 400 International~Way' Report No.: E-21606 Eugene, Oregon 97402 :Springfield, Oregon Inspector: M, Meyer, ID No.: 0877905 ICC Inspection of: Ceiling Grid Weather: Inside < Continuous Inspection: 0 Contractor: Chambers Construction BPNo.: pOM2007-01851 " Periodic Inspection: 0 ~ Performed inspection on the completed drop-ceiling grid installation in third floor room number 321; second floor room numbers 213, 222 (line 4 to 6), 241, 243 and 285 thru 289, The "T" suspension system for the Armstrong 2' x 2' and 2' X 4' tiles was anchored to 7/8" wall molding along two (2) adjoining walls with pop-rivets, BERC 2 perimeter clips were installed on the opposite walls at each "T" intersection, Support wires are anchored to roof support members andlor roof deck, and to perimeter walls within 8',' of wall face, Seismic struts using 1" conduit encircling a support wire attached to roof and ceiling grids were installed at :!: 12 feet on center, Rod Carothers (Chambers Construction) was asked to notify our office when additional services are needed, To the best of our knowledge, the work inspected was in accordance with approved submittal package from Haas Contracting, Inc, dated 06-30-08, package C addendum 1 prints dated 06-18-08 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: 11. y{.~ Michael L. ~eA'r Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (email) Coughlin, Porter Lundeen - BobbiFisher (email) Eric Hall Architects - Ted Corbin (em ail) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material'evaluated. As such, information contained herein shall riot be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. . . ' 7m WI CaneIIAvenue' O:xvaIIis, Oregm 97330, phooe(541) 757-4698, fax (541) 757-2991 29540 B Airpat Road ' Eugene, Oregm 97402 ' phcre (541) 684-3849 ,fax (541) 684-3851 830m Cv."u,a.c Place, Suite 2' Bend, Oregon 97701, phone (541)382-4844' fax (541) 382-4846 S.. ,..Pt .'. .p .:r~ RECEIVED OCT 2 7 111118 Page 1 of 1 11:"'llflrf;.lf.~~~.IIII~1W!I Geoted1nical & Construction Services Daily Field Report Client: Mr. Joe Hawes Project: International Way Development Date: 10-21-08 Hawes Investments, LLC Package A' Project No;: 2087024 2892 Crescent Avenue 400 International Way Report No;: E-21578 Eugene. Oregon 97402 Springfield, Oregon Inspector: M, Meyer 10 No.: 0877905-88 ICC Inspection of: Reinforced Concrete ' . Weather: Overcast Continuous Inspection: 0 Contractor: Chaml:>ers Construction BPNo.: COM2007-01851 Periodic I~'spection: 0 ~, Performed inspection on the reinforcing steel in the monolithic sial:> for I:>ike shelter. Rel:>ar was checked for size, grade. lap,' spacing, quantily and supports. where applical:>le, Ol:>servation of 20,0 yds, of Eugene Sand and Gravel 4500 psi concrete, Concrete was. , placed directly from truck and was mechanically consolidated, Cast four (4) 4" x 8" compressive strength cylinders and performed field tests on load 1 as follows: concrete temperature 71 F; air temperature 45F; slump 3 1/2", Dave Krull (Chaml:>ers Construction) was advised and was asked to notify our office when additional services are needed, ' To the I:>est of our knowledge, the work inspected was in accordance with drawing dated 05-16-08 and applicable workmanship provisions of the I.B,C., except if noted al:>ove,' Reviewed By: )1J .7-;/hi--: Michael L. ~eytl' Technical Manager c: Chaml:>ers Construction - Dave Bakke (email) Chambers Construction - John Shay (em ail) Coughljri;'Porler Lundeen-Bol:>l:>iFisher (em ail) , Eric Hall 'Architects - Ted Corl:>in (email) City of SpringfleJd" ..., ..l>,~ -r' J.~' MLM:sc _~ '- This report andler enclosed t~st data is the confidential property of the client to whom iUs addressed and pertains to ~he specific < process andlor material evaluated. As such, inforrmi:tion contained herein shall not be reproduced in part,or full and/!?, any part , thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. ' 7fIJ t-NV Cornell Avenue' CavalfIS, Oregon 97330, phone (541) 757-4698 'lax (541) 757-2991 . 29540 B Airport Road ' Eugene, Oregon 97402 . phone (541) 684-J849 'lax (541) 684-3851 : 630fIJ Corporate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382-4844 ' fax (541) 382-48:46 ~......~ ~ttl RECEIVED OCT? 7 7nns Page 1 of 1 ":'1Imrt;.'f~'~l"I'JI'.1l.1l. Geotechnical & Crnstrudion Servioos Daily! Field Report Client: Mr. Joe Hawes Project: International Way Development Date: 10-21-08 " Hawes Investments, LLC Package A Project No:: 2087024 2892 Crescent Avenue 400 International Way Report No:: E-21579 Eugene, Oregon 97402 Springfield, Oregon Inspector: M, Meyer 10 No.: 0877905-88 ICC Inspection of: Reinforced Concrete Weather: Clear Continuous Inspection: D Contractor: Chambers Construction BPNo.: COM2007-01851 Periodic lri~pection: ' ~ Performed inspection on reinforcing steel in continuous fountain retaining wall footings on south side of site, Rebar was checked for size, grade, lap, spacing, quantity, supports, ties and clearances, where applicable, ,Observed placement of 19,0 yds, of Eugene Sand and Gravel 4500 psi concrete- 3000 psi required (Mix 314568), Concrete was placed' direclly from truck and was mechanically consolidated, Cast four (4) 4" x 8" compressive strength cylinders from load 1 and performed field tests as follows: slump- 4 1/4"; concrete temperature- 69F; air lemperature- 47F, Dave Krull (Chambers Construction) was advised .and was asked to notify our office when additional services are needed, To the best of our knowledge, the work inspected was in accordance with drawing dated 05-16-08, email from AOR dated 10-07-08 and applicable workmanship , provisions of the I.B,C" except if noted above, Reviewed By: Ih.';(,~ Michael L. Mellr ' Technical Manager c: Chambers Construction - Dave Bakke (em ail) Chambers Construction - John Shay (em all) Coughlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (email) City of Springfield MLM:sc p This report and/or enclosed test data is the conf.idential property of the client to whom it is addressed and pertains to the specific , process and/or,material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization, 7fIJ rw Cornell Avenue' Cavallis, Oegan 97330 ' phcre (541) 757-4698 ,fax (541 )757-2991 ,: ' 29540 BAirpat Road, Eugene, Oegan 97402, phone (541)684-3849 'fax(541)684-3851 ,: 63050 Corporate Place, Suite 2 'Bend, Oregon 97701 'phone(541)382-4844' fax(541) 382-4846