Daily Field Report
11~'IUlfl;tm,'~a'IlII~.m.
Client:
Project: _l:TDGateway Mall Station
, 3000 Gateway Street ,
, '. Spring!ie,ld"Oregon .'-
Date:
Project No,:
Report No,:
Inspector:
ID No.:
Mr. Joe McCormack
Lane Transit District
PO Box 7070
Eugene, Oregon
Inspection of: Reinforced Concrete
Contractor: Brown Contracting
Weather: Partlygloudy-.,
BP No.: COM2008-O,0440".
,.
Continuous Inspection: 0
Periodic Inspection: 0
Performed inspection on the reinforcing steel in the column pedestals at lines C20 thru
C26, Rebar was checked for size, grade, iap, quantity, spacing, clearance and
supports, Anchor bolts and vertical rebar were secured in previously placed footing
concrete,
, Observed placement of 2,5 yards of Eugene Sand and Gravel 3000 psi concrete,
Concrete was placed directly from truck and was mechanically consolidated, Cast four
(4) 4" x 8" compressive strength cylinders and performed field tests as follows: slump-
3 1/2"; concrete temperature- 63F; air temperature- 50F, Mark Abeyta (Brown
Contracting) was advised and was asked to notify our office when additional services
are needed,
To the best of our knowledge, the work inspected was in accordance with plans dated
03-12,08 and applicable workmanship provisions of the I.B,C" except if noted above,
Reviewed By:
:!a~I~~
Technical Manager
c:
Rowell Brokaw- Mark Young (emall)
Ang Engineering- Jok Ang (email)
Balzhiser Hubbard- Tina Guard (email)
Brown Contracting- Adam Hughes (em all)
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be di~closed without FE! Testing & Inspection, Inc.'s written authorization.
7f:IJ NoN ComellAvenue' Cavallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991
29540 B Airport Road 'Eugene, Oregon 97402' phone (541) 6B4-3849 'fax(541 )684-3851
63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382-4844 ' fax (541) 382-4846
10-14-08
2087170
E-21528
M, Meyer
0877905-88
ICC
11a.'mlrt;"U~'~I'I[IJIW
Geotechnical & Construclion Services
RECEIVED
OCT 2 0 7008
Compressive Strength of Concrete
(ASTM C 39)
, ~\~.....~
~rtl
CLIENT
Mr, Joe McCormack
Lane Transit District
PO Box 7070
Eugene, Ore9on 97403
PROJECT
L TO Gateway Mall Station
3000 Gateway Street
Springfield, Oregon
DATE
PROJECT NO,
REPORT NO.
10-14-08
2087170
6051
B.P.NO.
COM2008-00440
DATE CAST 10-07-08 CAST BY M, Meyer DATE RECEIVED 10-08-08
STRENGTH REQUIRED 3000 psi SPECIMEN SIZE 4" x8"
STRENGTH PLACED 3000 psi SACKS SUPPLIER ESG
PRODUCT CODE 313065 CEMENT MAX SIZE AGG, 3/4"
ADDITIVES AEA AIR CONTENT
LOAD,NO, 1 TICKET NO. 58005326 SLUMP 5"
CONCRETE TEMP 67' F YARDAGE 3,5 OF 3,5 TIME, 9:25 AM
AIR TEMP 58" F WEATHER Overcast SPECIMEN STORAGE ASTM C31
POUR LOCATION Column pedestals at lines C27 thru C36,
AVERAGE
TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF
DATE (DAYS) (IN.') (LBSl LOAD (LBSl STRENGTH (PSn (PSn TEST FRACTURE-
10-14-08 7 12,56 8,5 32500 I 2590 2:30 PM 6
11-04-08 28 I
11-04-08 28
Hold I
**1 - End Cones 2 - Cone/Split
3 - Columnar
4 - Diagonal
5 - Side (top and bottom)
6 - Side (top or bottom)
REMARKS: Mark Abeyta (Brown Contractin9) was advised of on-site test results,
Reviewed By:
;1J.';(.~
Michael L Meyer
Technical Manager
c:
Rowell Brokaw- Mark Young (email)
Ang Engineering- Jok An9 (em ail)
Balzhiser Hubbard- Tina Guard (email)
Brown Contracting- Adam Hughes (email)
City of Springfield
MLM:sc
This reportand/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, lnc.'s Written authorization.
750 tfN CanelIAvenue' Cavairls, Oregon 97330, phone (541 ) 757-4698, fax (541) 757-2991
29540 BAirportRoad' Eugene, Oregon 97402, phone (541 )684-3849' fax (541) 684-3851
63050 Corporate Place, Sutte 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846
~.....,
~yrt
11~'IU"t:4llt\l'~:II[thl.m.
RECEIVED
nCT 2 0 2008
Geotechnical & Construclion SeNices
Compressive Strength of Concrete
(ASTM C 39)
CLIENT Mr, Joe McCormack PROJECT L TD Gateway Mall Station DATE 10-09-08
Lane Transit District 3000 Gateway Street ' PROJECT NO. 2087170
PO Box 7070 Springfield, Oregon REPORT NO. 6044
EUgene, Ore9on 97403
B,P, NO, COM2008-00440
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO,
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 2 SAMPLED
"
:'Ti:ST
. DATE
10-09-08
10-30-08
10-30-08
Hold
AGE
(DAYS)
7
28
28
10-02-08 CAST BY A. Fenstermacher DATE RECEIVED
3000 psi SPECIMEN SIZE
3000 psi SACKS ' SUPPLIER
313065 ' , CEMENT MAX SIZE AGG,
AEA, WRA AIR CONTENT
2 TICKET NO, 58005243 SLUMP
70" F YARDAGE 8,25 OF 33,0 TIME
62" F WEATHER Showers SPECIMEN STORAGE
Pedestrian walkway column footin9s at lines C20 thru C26 and C28,
1" lift of footing at C21,
AREA
(IN.')
12,56
WEIGHT
(LBSl
8,3
AVERAGE
STRENGTH
(PSI)
TIM E OF
TEST
11:20AM
TOTAL
LOAD (LBS)
32500
COMPRESSIVE
STRENGTH (PSI)
2590
3 - Columnar
5 - Side (top and bottom)
6 - Side (top or bottom)
**1 - End Cones 2 - Cone/Split
4 - Diagonal
REMARKS: Adam Hughes (Brown Contracting) was advised of on-site test results,
Reviewed By:
/h. '7f,~
Michael L, Mey.{l
Technical Manager
c:
,Rowell Brokaw-, Mark Young (email)
'An9 Engineering- Jok An9 (em ail)
. Balztiiser Hubbard- Tina Guard (em ail)
,Brown Contracting- Adam Hughes (em ail)
City of Springfield
MLM:sc
10-03-08
4" x8"
ESG
3/4"
4"
9:15AM
ASTM C31
TYPE OF
FRACTURE"
6
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEl Testing & Inspection, Inc.'s written authorization.
7f:IJ ~ CaneII Avenue' CoIvaIIis, Oregon 97330' phone (541) 757-4698, fax (541) 757-2991
29540 BAirportRoad' Eugene, Oregon 97402, phone (541)CY. 33~:1' fax (541 )684-3851
63050 Corporate Place, Suite 2 'Bend, Oregon 97701, phone (541)382-4844 'fax (541)382-4846
~fE)
Geotechnical & Construclion SeNices
RECEIVED
Gt! .2 {l i.\l1lB
Field Density Test Results - ASTM D 2922
Page 1 of 1
11~"lh'I";.h''''':'~'IlIH.w!I
Client: Mr. Joe McCormack
Lane Transit District
PO Box 7070
Eugene, Oregon 97403
Project: L TD Gateway Mall Station
3000 Gateway Street
Springfield, Oregon
Date:
Project No.:
Report No.:
B.P. No.:
10-01-08
2087170
E-21417
COM2008-00440
Tests performed at finished grade of base rock under asphalt paving,
Remarks: Adam Hughes (Brown Contracting) was advised of test results,
Reviewed By:
;11. ';f.~
Michael L. M{Ar-
Technical Manager
c:
Rowell Brokaw- Mark Young (email).
Ang Engineering- Jok Ang (email)
Balzhiser Hubbard- Tina Guard (email)
Brown Contracting- Adam Hughes (email)
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, infonnation
contained herein shall not be reproduced in part offul! and/or any part thercofbe disclosed without FE! Testing & Inspection. Inc. 's written authorization.
750 NW G:mdJ A""",' CcrwIIis, Oregon m30' j:brne(541) 7574698' fux (541) 757-'2!'f) 1
2954GB AiIportRoOO' ~e, Oregon 97402 'phooe(54I)684-3849' fux(s,lI)684-3851
63050 CollX'rate Place, Suite 2, Bend, Oregon 97701 . phone (541) 382-4844 ' fax (541) 382-4846
" {~ft'
11~'lIm'I;.I~~'~;.lllli.m.
Gcu~ " .;caJ & ConstrucOOn SeNices
Compressive Strength of Concrete
(ASTM C 39) .
CLIENT
Mr, Joe McCormack
Lane Transit District
PO Box 7070
EUgene, Ore9on 97403
PROJECT
L TD Gateway Mall Station
3000 Gateway Street
Springfield, Ore9on
DATE
PROJECT NO.
REPORT NO,
10-07-08
2087170
6040
B,P. NO,
COM2008-00440
DATE CAST 09-30-08 CAST BY A, Fenstermacher DATE RECEIVED
STRENGTH REQUIRED 3000 psi SPECIMEN SIZE
STRENGTH PLACED .. '3000'psi SACKS" SUPPLIER
PRODUCT CODe 313065 CEMENT ,. . -, " ..~' MAx SIZE AGG:
ADDITIVES AEA, WRA AIR CONTENT
LOAD NO, 1 TICKET NO, 58005188 SLUMP 2"
CONCRETE TEMP 710 F YARDAGE 10,0 OF 40,0 TIME 9:30 AM
AIR TEMP 620 F WEATHER Overcast SPECIMEN STORAGE ASTM C31
POUR LOCATION Pedestrian walkway canopy footin9s at lines C26, C28, C29, C30, C31, C32, C33, C35 and C36,
10-01-08
4" x8"
ESG
3/4"
"
LOAD 1 SAMPLED
Footing at lines C33,
TEST
DATE
10-07-08
10-28-08
10-28-08
Hold
AGE
(DAYSl
7
28
28
AREA
(IN.')
12,56
WEIGHT
(LBSl
8.4
TOTAL
LOAD (LBSl
38700
COM PRESSIVE
STRENGTH (PSI)
3080
AVERAGE
STRENGTH
(PSI)
TIME OF
TEST
3:20 PM
TYPE OF
FRACTUREH
6
H 1 - End Cones 2 - Cone/Split
3 - Columnar
4 - Diagonal
5 - Side (top and bottom)
6 - Side (top or bottom)
REMARKS: Adam Hughes (Brown Contracting) was advised of on-site test results,
Reviewed By:
jJJ. X /J.-uJ-..--
Michael L. Mel6l
Technical Manager
c:
.Rowell Brokaw' Mark Young (em ail)
Ang Engineering- Jok Ang (em ail)
'Balzhiser,Hubbard- Tina Guard(email) ,.
Brown Contracting- Adam Hughes (email)
City of Springfield
...1.....::#.,.
,"'-" .,,",~' ,..."..,
_ ,~;_CEIVEIJ
OCT 1 5 Z008
MLM:sc
This report and/or. enclosed test data is the confidential property of the client 10 whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part orfull and/or any part.
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
7fJJ NoN Cornell Avenue' Cavallis, Oregon 97330, phone (541 ) 757-4698, fax (541) 757-2991
29540 BAirport Road, Eugene, Oregon 97402, phone (541 )684-3849' fax (541 )684-3851
63050 Corporate Place, Suite 2 'Bend, Oregon 97701, phone (541) 382-4844, fax (541) 382-4846
j'
&It~ ~
..:fd..a.
u=11lll.tt:"'1t..'~~'I\llt~
Page 1 of 1
Geotechnical & ConstrucIion SeM:Es
Daily Construction Report .
Client: Mr, Joe McCormack Project: L TD Gateway Mall Station Date: 10-D3-08
Lane Transit District 3000 Gateway Street Project No,: 2087170
PO Box 7070 Springfield, Oregon Report No.: E-21418
Eugene, Oregon Inspector: M, Meyer
ID No,:
Inspection of: Sitework Weather: Overcast & Clear Continuous Inspection: 0
Contractor: Brown Contracting B.P. No. COM2008-00440 Periodic Inspection: 0
09-26-08- Met on-site with Adam Hughes (Brown Contracting) to observe exposed
subgrade soils in the previous landscape island area directly east of the southeast
mall entrance, Area has been cleared of vegetation and cut to proposed finished
subgrade approximateiy 13" below existing surrounding pavement grades,
Exposed materials appear relatively firm and stable, at this time, Mr. Hughes stated
placement of fabric and crushed rock base course would begin later today,
(Weather: overcasU61 "),
09-29-08- Observed exposed subgrade soils in two (2) previous landscape islands
near Umpqua Bank, and one (1) area south of lines C28, Soils appear firm and
stable with the following exceptions: very soft unstable soils were encountered at
the southwest corner of the area west of the bank building, and in the northeast
corner of the area west of the bank drive-up lane, Both areas were over excavated
to between 6 and 12 inches below proposed subgrade elevation, Dennis Cacn
(Brown Contracting) was advised that fabric and rock placement operations can
now proceed in all three (3) areas observed this date, (Weather: overcasU71 ").
10-02-08- Observed completed fcioting excavations at lines C37 and AS thru A1S,
With the exception of A6, soils at base of excavation are firm and stable, at this
time, Mr, Cacn was advised to excavate additional material from A6 excavation
(anticipated to be 6" to 12") to ensure previous fill and man-made debris is removed
and footing will bear on firm, stable soiis, Mr, Cacn was asked to notifiy our office
when remaining excavations are completed, (Weather: clear/60"),
Reviewed By:
A. .,(,~--
Michael L ~ey,tf'
Technical Manager
c:
Rowell Brokaw- Mark Youn9 (email)
Ang Engineering- Jok Ang (email)
Balzhiser Hubbard- Tina Guard (email)
Brown Contracting- Adam Hughes (em ail)
City of Springfield
MLM:sc
This report and/or enclosedtesl data is the confidential property of the clienl to whom It is addressed and pertains to the specific process andlor material evaluated. As
such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEl Testing & Inspection, Inc.'s written authorization:
( ,
700 NW CareIIAvenue' Corvallis, Oregon 97330' phcre(541 )757-4698: fax (541) 757-2991
29540 BAirpat Road ' E'-'}nl, Oregon 97402, phcre (541) 684-3849 ,fax (541 )684-3851
63()fD Capaale PIa:e, Suile2' Ba1d, Oregon 97701 'phcre(541)382-4844' fax (541) 382-4846
Sf E)
11;"lllltl;"IN.'l~~'IIII~.ffi.t!I
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED'
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 1 SAMPLED
TEST
DATE
10-07-08
10-28-08
10-28-08
Hold
AGE
(DAYS\
7
28
28
Geotechnical & Constn.dion SeIvices
Compressive Strength of Concrete
(ASTM C 39)
09-30-08 CAST BY A. Fenstermacher DATE RECEIVED
3000 psi SPECIMEN SIZE
3000 psi SACKS SUPPLIER
313065 CEMENT MAX SIZE AGG,
AEA, WRA AIR CONTENT
1 TICKET NO. 58005186 SLUMP 2"
71' F YARDAGE 10,0 OF 40,0 TIME 9:30 AM
62' F WEATHER Overcast SPECIMEN STORAGE ASTM C31
Pedestrian walkway canopy footin9s at lines C26, C28, C29, C30, C31, C32, C33, C35 and C36,
10-01-08
4" x 8"
ESG
3/4"
FoOtin9 at lines C33,
AREA
{IN.'l
12,56
WEIGHT
(LBSl
8.4
TOTAL
LOAD (LBSl
38700
COMPRESSIVE
STRENGTH (PSIl
3080
AVERAGE
STRENGTH
(PSIl
TIME OF
TEST
3:20 PM
TYPE OF
FRACTURE~
6
.*1 - End Cones 2 - Cone/Split
3 - Columnar
4 - Diagonal
5 - Side (top and bottom)
6 - Side (top or bottom)
REMARKS: Adam Hughes (Brown Contracting) was advised of on-site test results,
Reviewed By:
jJJ. x: iJwL _
Michael L Me...st -
Technical Manager
c:
Rowell Brokaw- Mark Young (em ail)
Ang Engineering- Jok Ang (em ail)
Balzhiser Hubbard- Tina Guard (email)
Brown Contracting- Adam Hughes (email)
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specifiC
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FE! Testing & Inspection, Inc.'s written authorization.
700 NW CaneI Awnue' Ccxvai5s, Oregoo 97330, phcre(541) 757-4698, fax (541) 757-<991
29540 B Airp:xt ROOd ' Eugene, Oregoo 97402 ' phcre (541) 6B4-J849' fax (541) 684-3851
63050 Corpcrate Place, Suite 2, Bend, Oregon 97701 'phone (541) 382-4844, fax (541) 382-4846
~.....
~t!:l
RECEiVED
ocr 2 0 Z6llll
Page 1 of 1
11~'"HfI:lIl~,,'~a'lllli_
Geotechnical & COnstruction SeNices
Daily Field Report .
Client: Mr, Joe McCormack Project: L TD Gateway Mall Siation Date: 10-07-08
Lane Transit District 3000 Gateway Street Project No.: 2087170
PO Box 7070 Springfield, Oregon Report No.: E-21467
Eugene, Oregon Inspector: M, Meyer
ID No,: 0877905-88
ICC
Inspection of: Reinforced Concrete Weather: Overcast Continuous Inspection: 0
Contractor: Brown Contracting BPNo.: COM2008-00440 Periodic Inspection: 0
Performed inspection on the reinforcing steel in the column pedestals at lines C27 thru
C36, Rebar was checked for size, grade, lap, quantity, spacing, clearance and
supports, Anchor bolts and vertical rebar were secured in previously placed footing
concrete,
Observed placement of 3,5 yards of Eugene Sand and Gravel 3000 psi concrete,
Concrete was placed directly from truck and was mechanically consolidated, Cast four
(4) 4" x 8" compressive strength cylinders and performed field tests as follows: slump-
5"; concrete temperature- 67F; air temperature- 58F, Mark Abeyta (Brown Contracting)
was advised and was asked to notify our office when additional services are needed.
To the best of our knowledge, the work inspected was in accordance with plans dated
03-12-08 and applicable workmanship provisions of the I.B,C" except if noted above,
Reviewed By:
(1."i.~
Michael L Mey{J
Technical Manager
c:
Rowell Brokaw- Mark YOUn9 (email).
Ang Engineering- Jok Ang (em ail)
Balzhiser Hubbard- Tina Guard (em ail)
Brown Contracting- Adam Hughes (em ail)
City of Springfield
MLM:sc
This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FE1 Testing & Inspection, Inc.'s written authorization.
700 NoN ComeII Avenue' Cavallis, Oregon 97330 ' phone (541) 757-4698 ,fax (541) 757-2991
29540 BAirport Road, Eugene, Oegon 97402, phone (541)684-3849' fax (541 )684-3851
63050 Corporate Place, Suite 2 ' Bend. Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846