HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2008-10-13 ~ftl Geoledmical & Construction SeNices II :"111 Irt;lIl~lio' ~~.III11''Im!I Client: Project: International Way Development F.'ackage,A ,~_ I 400 International Way '--..---- - - - ,- Springfield, -Oregon Mr. Joe Hawes Hawes Investments, LLC 2892 Crescent Avenue Eugene, Oregon 97402 Inspection of: Masonry Contractor: Chambers Construction Weather: Clear/ 630 ~ BP No.: ; Cm..,2007-01851" RECEIVE[ OCT 2 0 7nnq Page 1 of 1 Daily Field Report Date: Project No.: Report No.: Inspector: ID No.: 10-13-08 2087024 E-21516 M, Meyer 0877905-84 ICC Continuous Inspection: 0 Periodic Inspection: 0 Performed inspection on the reinforcing steel in the top two (2) courses of the generator enclosure walls, Rebar was checked for size, grade, lap, quantity, spacing and clearances, where applicable, Vertical bars are in place and anchored from previous pour and horizontal bond beam steel in top course has been installed, Mike Helms (Hap's Masonry) stated grout placement is scheduled for later this afternoon, Mr. Helms was asked to notify our office when additional services are needed, To the best of our knowledge, the work inspected was in accordance with RFI #144 dated 08-26-08 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed-By: (fJ.'-i.~- Michael L Meltr Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (email) Coughlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (em ail) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection. Inc.'s written authorization. 7fJJ NoN ComeII Avenue' Corvallis, Oregon 97330 ' phone (541) 757-4698 ,fax (541) 757-2991 29540 B Airport Road ' Eugene, Oregon 97402 ' phone (541) 684-3849 ,fax (541) 684-3851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 RECEIVED OCT 2 0 70nB Sf;) 1I~'I"lrt;."'lmUl",II"," Geotechnical & Construction SeNices Page 1 of 1 Report of Inspection Services Welding/High-Strength Bolting Client: Mr, Joe Hawes Hawes Investments, LLC 2892 Crescent Avenue Eugene, Oregon 97402 Project: International Way Development Package A 400 International Way Springfieid, Oregon Date: Project No.: Report No.: Inspector: ID No.: Inspection of: Fabricator or Erector: Contractor: Welding re-inspection West Side Iron Chambers Construction Shop: 0 Weather: BPNo.: 1 0-09-08 2087024 E-21475 C, Walpole 5114210-85 ICC Field: 0 Overcast COM2007-01851 Arrived on-site to perform re-inspection on the lower truss connection at line C,3/1 that was noted in FEI report E-20813 dated 08-05-08, Fit up was re-worked to make the connection using fillet welds per plans, Welds were checked for size, length, profile and location, While on-site witnessed truss bracing being installed by a certified welder using FCAW process, Welding was not completed during the time of inspection, John Shay (Chambers Construction) was asked to notify our office when additional services are needed, To the best of our knowledge, the work in-progress is in conformance with structural drawings and applicable AWS D1, 1 code, except if noted above, Reviewed By: Ih.'i,~ Michael L. Meyer Technical Manager c: Chambers Construction - Dave Bakke (emaH) Chambers Construction - John Shay (email) Coughlin, Porter Lundeen - Bobbi Fisher (em ail) Eric Hall Architects - Ted Corbin (em ail) City of Springfield MLM:sc This report andlor enclosed test data is the confidential property of the-client to whom it is addressed and pertains to the specific process -and/or material evaluated. As such, information contained herein shall not be-reproduced in part or full and/or any part thereof be disclosed'without FEI'Testing & Inspection, Inc.'s written aut~orjzation. 7f:IJ NW Comell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 B Airport Road 'Eugene, Oregon 97402, phone (541) 684-3849 'fax(541)684-3S51 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 {!)f;J r.:-:r~:\'ED I' QO?OOB Page 1 of 1 Gov~ Ulical & Construction SeNices Daily Field Report .1~'lImt:<!II/~'~:.IIII/.III. Client: Mr, Joe Hawes Project: Hawes Investments, LLC 2892 Crescent Avenue Eugene, Oregon 97402 Date: Project No.: Report No.: Inspector: ID No.: International Way Development Package A 400 International Way Springfield, Oregon 10-10-08 2087024 E-21494 M, Meyer 0877905-84 ICC Inspection of: Masonry, , ' , Contractor: Chambers Construction ,Weather:. OV,ercast " BP No.: . COM2007-01851 ;~~ . Continuous Inspection: 0 Periodic Inspection: 0 10-09-08: Performed inspection on the reinforcing steel in the 8" CMU generator enclosure walls (ftg, to 4'), Rebar was checked for size, grade, lap, quantity, spacing and clearance, where applicable, Cells were relatively clean and free of excess mortar projections, Observed placement of 2,5 yards of Knife River 7,Osk grout. Grout was placed by pump and was mechanically consolidated, Grout slump- 9" +; grout temperature- 65F; air temperature- 54F, Walls were grouted solid, Three (3) compressive strength prisms were also grouted during today's pour, Mike Helms (Jones Masonry) scheduled the next site visit for tomorrow morning, 10-10-08: Inspected rebar in second lift of enclosure walls (4' to 8') and observed placement of 2,5 yards of Knife River 7,0 grout by pump, Grout slump- 8" +; grout temperature- 61 F; air temperature- 44F, Mr. Helms was asked to notify our office when additional services are needed, To the best of our knowledge, the work inspected was in accordance with RFI #144 dated 08-26-08 and applicable workmanship provisions of the LB,C" except if noted above, Reviewed By: (JJ ~.Ilo--- Michael L Meyer ' Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (email) Coughlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (email) City of Springfield '-." .'-; ", ... . MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. . I 'I .. ..... . , 750 NoN ComeIIAvenue' CavaIIis, Oregon 97330 'phone(541) 757-4698, fax (541) 757-2991 29540 BAirportRoad' Eugene, Oregon 97402, phone (541) 684-3849 'fax(541)684-3851 63050 Corporate Place, Suite 2 'Bend, Oregon 97701, phone (541) 382-4844, fax (541) 382-4846 (j~t)P"'1 ''ill' tr -- 1I:Irl'II~lrt;<lII~~'lfUI1IJIII~ld RECEIVE!:; OCT 2 0 Z008 Compressive Strength of Concrete (ASTM C 39) Geotechnical & Construction SeNices PROJECT DATE PROJECT NO, REPORT NO. Mr. Joe Hawes Hawes Investments, LLC 2892 Crescent Avenue EUgene, Ore90n 97402 International Way Development Package A 400 International Way Springfield, Ore90n COM2007-01851 CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO, CONCRETE TEMP AIR TEMP POUR LOCATION TEST DATE 10-15-08 11-05-08 11-05-08 Hold AGE (DAYS) 7 28 28 **1 - End Cones B.P,NO. 10-08-08 4000 psi 4500 psi 314568 CAST BY A, Fenstermacher DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG, AIR CONTENT SLUMP TIME SPECIMEN STORAGE SACKS CEMENT 1 TICKET NO. 740F YARDAGE 660 F WEATHER Riparian overlook wall. 60008440 7,5 OF 7,5' Overcast AREA (IN') 12,56 WEIGHT (LBSl 8,5 TOTAL LOAD (LBSl 57400 COMPRESSIVE STRENGTH (Psn 4570 AVERAGE STRENGTH (Psn TIME OF TEST 8:25 AM 10-15-08 2087024 6054 10_09-08 4" x8" ESG 314" 5 314" 1:30 PM ASTM C31 TYPE OF FRACTURE- 6 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) REMARKS: John (Chambers Construction) was advised of on-site test results, Reviewed By: fJJ .'-i.~ Michael L Meye9' Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (em ail) Coughlin, Porter Lundeen - Bobbi Fisher (email), Eric Hall Architects - Ted Corbin (email) EUgene Sand and Gravel ' City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be.disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 NoN cOmeil Avenue' Corvalis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 B Airpat Road ' Eugene, Oregm 97402 ' phone (541) 684-3849 ,fax (541) 684-3851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382-4844 ' fax (541) 382-4846 (~FEI RECEIVED OCT 2 0 200B Compressive Strength of Concrete Geotechnical & Construction.SeNices (ASTM C 39) . 11~'mlrf;'I~~'~atUlliU1J PROJECT DATE PROJECT NO, REPORT NO. Mr, Joe Hawes Hawes Investments, LLC 2892 Crescent Avenue EUgene, Ore9on 97402 Intemational Way Development Package A 400 Internationai Way Sprin9field, Oregon COM2007-01851 CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO, CONCRETE TEMP AIR TEMP POUR LOCATION TEST DATE 10-08-08 I 10-29-08 I 10-29-08 I Hold I AGE (DAYS) 7 28 28 **1 - End Cones B.P,NO, 10-01-08 3000 psi 3500 psi 313568 CAST BY DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG, AIR CONTENT SLUMP TIME SPECIMEN STORAGE M, Meyer SACKS CEMENT 1 TICKET NO. 58005229 74" F YARDAGE 6,5 OF 71" F WEATHER Overcast Continuous footing for riparian overlook wall. 6,5 AREA (IN,') 12,50 WEIGHT (LBSl 8.7 TOTAL LOAD (LBSl 46600 COMPRESSIVE STRENGTH (PSn 3730 AVERAGE STRENGTH (PSn TIME OF TEST 9:05 AM 10-08-08 2087024 6043 10-02-08 4" x 8" ESG 3/4" 4" 1:15 PM ASTM C31 TYPE OF FRACTURE- 2 2 - Cone/Split "3 - Columnar 5 - Side (top and bottom) 6 - Side (topor bottom) 4 - Diagonal REMARKS: Dave Krull (Chambers Construction) was advised of on-site test results: Reviewed By: f/J.';(.~. Michael L, Me~ Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (email) COU9hlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects _ Ted Corbin (email) Eugene Sand and Gravel City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnc.'s written authorization. 700 NoN Camel Avenue' CotvaIlis, Oregon 97330, pi1one(541) 757-4698, fax(541) 757-2991 29540 BAirport Road' Eugene, Oregon 97402, phone (541 )684-3849' fax (541 )684-3851 . 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382-4844 ' fax (541) 382-4846 RECEIVE[ OCT 2 0 7001 Page 1 of 1 ~ftJ Geotechnical & Construction SeNices Daily Field Report . 11:"IJNct;4m.'~~all'I~JIlli!I Client: Mr. Joe Hawes Project: International Way Development Date: - 10-14-08 Hawes Investments, LLC Package A Project No.: 2087024 2892 Crescent Avenue 400 International Way Report No,: E-21523 Eugene, Oregon 97402 Springfield, Oregon Inspector: M, Meyer ID No.: 0877905-88 ICC Inspection of: Reinforced Concrete Weather: Clear Continuous Inspection: 0 Contractor: Chambers Construction BPNo.: COM2007-01851 Periodic Inspection: 0 Performed inspection on reinforcing steel in continuous planter box wall footings on south, side of building, Rebar was checked for size, grade, lap, spacing, quantity, supports, ties and clearances, where applicable, Observed placement of 15,0 yds, of Eugene Sand and Gravel 4500 psi concrete- 3000 psi required (Mix 31468), Concrete was placed directly, from truck and was mechanically consolidated, Cast four (4) 4" x 8" compressive strength cylinders from load 1 and performed field tests as follows: slump- 3"; concrete temperature- 72F; air temperature- 66F, Dave Krull (Chambers Construction) was advised and was asked to notify our office when additional services are needed, To the best o(our knowledge, the work inspected was in accordance with email from AOR dated 10-07-08 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: j7J. ';?(. ~ Michael L Meyg{ 'Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (email) Coughlin, Porter Lundeen - Bobbi Fisher (em ail) Eric Hall Architects - Ted Corbin (email) City of Springfield" ,!",';-:"', .~",~', , "..;c , "';'0" ". . ~~ .Ij _.".. . ~.; j , ,-,",,, MLM:sc,--- -- _' This report and/or enclosed test data is the confidential property of the client to whom-it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall notbe reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. . 7'3J NoN ComeIIAvenue' Corvallis, Oregon 97330, phone (541) 757-4698 'fax(541)757-2991 , -' 29540 B Airport Road ' Eugene, Oregon 97402 ' phone (541) 684-3849 ' fax (541) 138<k3851 63050 Corporate Place, Suite 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 . ~ftJ RECEIVED OCT 2 0 ZOOB Page 1 of 1 1Ia,,'II~lf'i;.I~.'~lIl!ll~_ Geotechnici31 & Construction SeNices Daily Field Report . Client: Mr. Joe Hawes Project: Internationai Way Development Date: 1 0-08-08 Hawes Investments, LLC Package A Project No.: 2087024 2892 Crescent Avenue 400 International Way Report No.: E-21460 Eugene, Oregon 97402 Springfield, Oregon Inspector: A, Fenstermacher ID No.: 525882-49 ICC Inspection of: Reinforced Concrete Weather: Overcast .' Continuous Inspection: 0 Contractor: Chambers Construction BP No.: COM2007 -01851 Periodic Inspection: 0 Performed inspection on the reinforcing steel for riparian overlook wall. Reinforcing steel was checked for size, grade, laps, quantities, locations, ties, clearance and supports, Observed the placement of 7,5 cu/yds, of Eugene Sand and Gravel 4500 psi concrete (Mix 314568) into areas noted above, Concrete was placed directly from truck and was mechanically consolidated, Cast one (1) set of four (4) 4" x 8" concrete test cylinders, Notified John (Chambers) of on-site results, Concrete temperature- 74F; air temperature- 66F; slump- 5 3/4", John was asked to notify our office when additional services 'are needed, To the best of our knowledge, the work inspected was in accordance with drawing L 1 dated 05-16-08, EOR email dated 09-10-08 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: /h.'-i,~ Michael L M~yerr:J - Technical Manager c: Chambers Construction - Dave Bakke (em ail) Chambers Construction - John Shay (email) Coughlin, Porter Lundeen - Bobbi Fisher (em ail) Eric Hall Architects - Ted Corbin (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom iUs addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEl Testing & Inspection, lnc,'s written authorization. 7f:IJ NoN ComeIIAvenue' CavaUis, Oregon 97330' phone (541) 757-4698' fax (541) 757-2991 29540 BAirportRoad' Eugene, Oregon 97402 'phone(541)684-3849 'fax(541)684-3851 63050 Corporate Place, Suite 2 'Bend, Oregon 97701 __ phone (541)382-4844' fax (541) 382-4846 , ' ~ftl RECEIVED OCl 2 0 7U08 Page 1 of 1 11:"lm~;'wI~..'~~.IIII~_ G.:..,.,M ",ical & Construclion SeNices Daily Field Report . Client: Mr, Joe Hawes Project: International Way Development Date: 1 0-08-08 Hawes Investments, LLC Package A Project No.: 2087024 2892 Crescent Avenue 400 Interna'tional Way Report No.: E-21471 Eugene, Oregon 97402 Springfield, Oregon Inspector: M, Meyer ID No,: 0877905 ICC Inspection of: Ceiling Grid Weather: Inside Continuous Inspection: 0 Contractor: Chambers Construction BPNo.: COM2007-01851 Periodic Inspection: 0 Performed inspection on the completed drop-ceiling grid installation in third floor room numbers 320, 322, thru 325, 330 thru 340 and 364 thru 377, The 'T suspension system for the Armstrong 2' x 2' and 2' x 4' tiles was anchored to 7/8" wall molding along two (2) adjoining walls with pop-rivets, BERC 2 perimeter clips were installed on the opposite walls at each 'T intersection, Support wires are anchored to roof support members and/or roof deck, and to perimeter walls within 8" .of wall face, Seismic struts using 1" conduit encircling a support wire attached to roof and ceiling grids were installed at:!: 12'feet on center. John Shay (Chambers Construction) was asked to notify our office when additional services are needed, To the best of our knowledge, the work inspected was in accordance with approved submittal package from Haas Contracting, Inc, dated 06-30-08, package C addendum 1 prints dated 06-18-08 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: fL~~ Technical Manager c: Chambers Construction - Dave Bakke (em ail) Chambers Construction - John Shay (em ail) Coughlin, Porter Lundeen - Bobbi Fisher (email) . Eric Hall Architects - Ted Corbin (em ail) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property ofJhe client to whom it is addressed and pertains to the specific' process and/or material evaluated. As such, information contained herein shall nalbe reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7ffJ NoN cOrnell Avenue' Corvat~, Oregon 97330' phone (541) 757-4698, fax (541) 757-2991 29540 B Airport Road ' Eugene, Oregon 97402, phone (541) 684-3849' fax (541)684-3851 63050 Corporate Place, Suite 2 'Bend, Oregon 97701 'phone (541)382-4844.' fax (541) 382-4846 ~pr. ,,"7rt~ RECEIVED OCT 2 0 100B Compressive Strength of Concrete <k~,,;cal&ConstruclionSeNices (ASTM C 39) 11;r.'IlNrf;"h\t.'~~llllmU1!l CLIENT PROJECT DATE PROJECT NO, REPORT NO, Mr. Joe Hawes Hawes Investments, LLC' 2892 Crescent Avenue Eugene, Oregon 97402 International Way Development Package A 400 International Way Springfield, Oregon COM2007-01851 B,P, NO. DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION 09-30-08 4000 psi 4500 psi 314568 CAST BY A, Fenstermacher SACKS CEMENT 1 TICKET NO, 60008180 7r F YARDAGE 10.25 OF 25,0 68" F WEATHER Clear HVAC pad at east side and generator slab at north side,. LOAD 1 SAMPLED From 1" lift in generator slab, TEST DATE 10-06-08 10-28-08 10-28-08 Hold AGE (DAYS) 6 28 28 AREA (IN.') 12,56 WEIGHT (LBSl 8,6 TOTAL LOAD (LBS) 45200 COMPRESSIVE STRENGTH (PSI) 3600 DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG, AIR CONTENT SLUMP TIME SPECIMEN STORAGE AVERAGE STRENGTH (PSI) TIME OF TEST 2:00 PM 10-06-08 2087024 6038 10-01-08 4"x8" ESG 3/4" 53/4" 1:20 PM ASTM C31 TYPE OF FRACTURE" 6 **1 - End Cones 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) REMARKS: John (Chambers) was advised of on-site test results, 6 day break requested by Dave Krull (Chambers), Reviewed By: /'7.-i~ Michael L M r Technical Ma ager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John ,Shay (email) Cou9hlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - red Corbin (email) Eugene Sand and Gravel City of Springfield MLM:sc This report and/or enclose_d test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall notbe reproduced in part or full and/or any part . - thereof be disclosed without FEI Testing & Inspection" Inc.'s written authorization. . 750 NoN Cornell Avenue' CoIvaIlis, Oregon 97330, phone (541 ) 757-4698, fax (541) 757-2991 29540 B Airport Road 'Eugene, Oregon 97402 'phone(541)684-3849' fax (541) 684-3851 63050 Corpcrate Place, Suite 2 ' Bend, Oregon 97701 'phone (541) 382-4844 . fax (541) 382-4846 ~rP~j _J 11~'IIII..:.",'mlllll~1Jl!I Geotechnical & Construc!ion Services Page 1 of 1 Report of Inspection Services Welding/High-Strength Bolting Client: Mr. Joe Hawes Hawes Investments, LLC 2892 Crescent Avenue Eugene, Oregon 97402 Project: International Way Development Package A 400 International Way Springfield, Oregon Date: Project No,: Report No.: Inspector: ID.No.: 10-08-08 2087024 E-21449 C, Walpole 5114210-85 ICC Field: 0 Clear COM2007-01851 Inspection of: Fabricator or Erector: Contractor: Welding Re-Inspection West Side Iron Chambers Construction Shop: 0 Weather: BPNo.: Arrived on-site on 09-30-08 to perform re-inspection of the items noted in FEI report E-21312 dated 09-24- 08, All items were completed and/or repaired, except the shear tabs that were backwards at line A,8/3 which has not been repaired and the bolted connections along line 3 with four (4) bolts in lieu of five (5) is awaiting engineer's approval. John Shay (Chambers) was notified of the above conditions. To the best of our knowledge, the work checked is in conformance with structural drawings dated 01-29- 08, AISC manual and applicable AWS D1, 1 code, except as noted above, Reviewed By: '\ /IJ,<-;(~ Michael L Meyer Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (email) Coughlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (email) , City of Springfield MLM:sc This report and/or enclosed test data is the confidential propertyof the client to lNhom itls addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part , thereof be disclosed without FEI Testing '& Inspection, Inc. 's wr!t!en authorization. 750 NoN ComellAvenue' Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 BAirport Road' Eugene, Oregon 97402, phone (541)684-3849' fax (541)684-3851 63050 Corpcrate Place, Suite 2 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 A~..... ~ ~rtl 11:..'mlri;"I~\Il'~~'lIm.I~LII ~~ " ,ical & Construction SeNices Compressive Strength of Masonry Prisms ASTM C 1314 CLIENT Mr. Joe Hawes Hawes Investments, LLC 2892 Crescent Avenue EUgene, Ore90n 97'402 PROJECT Intemational Way Development Package A , 400 International Way Sprin9field, Oregon BP NO. COM2007-01851 DATE PROJECT NO, REPORT NO, 10-16-08 2087024 6055 DATE CONSTRUCTED DATE GROUTED SOLID XX DESIGN (F'M) SPECIMEN STORAGE LOCATION 10-08-08 10-09-08 HOLLOW 1500 ASTM C1314 8" CMU generator enclosure walls (slab to 4'), FEI REP, M, Meyer DATE RECEIVED PRISM I.D. TIME WEATHERfTEMP. 10-10-08 8"x8"x16" Ground Face 1:15 PM Partly Cloudy/54" MORTAR: PSIITYPE 1800 GROUT: PSI 2000 SAND 5- 5 9allon buckets AGG, SIZE 3/8" CEMENT 1,0 sk, CEMENT 7,0 LIME 0,5 sk, ADDITIVE OTHER Dry block additive SLUMP 9" + TEMP. TEMP. 65" SOURCE/I.D, Job mix SOURCE/I,D. KR/247KG3ROOO TICKET NO. 3224058 SPEciMEN SPECIMEN SPECIMEN NET CROSS- COMPRESSIVE AVERAGE TEST AGE HEIGHT LENGTH WIDTH SECTIONAL TOTAL STRENGTH STRENGTH DATE (DAYS) (IN,) (IN,) (IN,) AREA (IN.') LOAD (LBS) (PSI) (PSI) 10-16-08 7 15,75 7,625 8,5 84,81 154700 2390 11-06-08 28 11-06-08 28 REMARKS: Mike Helms (Jones Masonry) was advised of on-site test results, Reviewed By /7/ . ';(, tl7"L;.~ Michael L. Meyer(! Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (email) Coughlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, loco's written authorization. 7ffJ NoN CaneIIAvenue' CorvaITIS, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 BAirport Road, Eugene, Oregon 97402 'phone(541)684-3849' fax (541) 684-3851 63Of:IJ Corporate Place, Suite 2, Bend, Oregon 97701 'phone(541) 382-4844' fax (541) 382-4846 RECEIVED ~ftl arp'T ? 11 7rfr1D age' 0 eil m~'IIHrI;'I~.'~:'lllli*h'Ilii11 . Geotechnit;:al & ConStruction SeNices Daily Field Report Performed inspection on the completed drop-ceiling grid installation in third floor room numbers 305, 306, 309, 310, 350, 351, 353 and 357 (except at patio door/window); second floor room numbers 206, 218 (except at window), 219, 222 to line 6 (except at window near line 8), 234 (except at window), 235, 236, 250, 281, 282 and 284 (except at window), The ''T'' suspension system for-the Armstrong 2' x 2' and 2' x 4' tiles was anchored to 7/8" wall molding along two (2).adjoining walls with pop-rivets, BERC 2 perimeter clips were installed on the opposite walls at each "r intersection, Support 'wires are anchored to roof support members and/or roof deck, and to perimeter walls within 8" of wall face, Seismic struts using 1" conduit encircling a support wire attached to roof and ceiling grids were installed at':!: 12 feet on center, Advised by Brett Stutz (Chambers Construction) that seismic joints are not required in large rooms, Rod Carothers (Chambers Construction) was asked to notify our office when additionai services are needed, To 'the 'best of our knowledge, the work inspected was in accordance with approved submittal package from .Haas Contracting, Inc, dated 06-30-08, package C addendum 1 prints dated 06-18-08 and applicable workmanship provisions of the 1.B,C" except if noted above, Reviewed By: A . '-;(. fJ ,/J"--' Michael L. Me~r Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction.c-,John Shay (em ail) Coughlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (em ail) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom.it is addressed and pertains to the specific process and/or material evaluated. As such: information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc;'s written authorization. 7fJJ NoN ComeII Avenue , Corvallis, Oregon 97330 'phone(541)757-4698' fax(541) 757-2991 ' 29540 BAirport Road, Eugene, Oregon 97402' phone (541)684-3849 ,fax (541 )684-3851 63050 Corporate Place, Surte 2 ' Bend, Oregon 97701 'phone (541) 382-4844 ' fax (541) 382-4846