October 17, 2008 CC8#176269
Springfield School District
525 Mill Street
Springfield, OR 97477
Date:
B,P, No,:
P,Q. No.:
Cast By:
Project No.: 722-80174-80
Proj. Name: Maple Elementary School
P0271-255-0809
Verlyn Bearden
Location:
c1) rL(3 ~
2109 J Street
Springfield, OR
Field Test Data
6
3/4"
Placement Data:
Tilt up panels 10, 12, 15, 19,20,21, 22A and 22B
Materia];' Concrete
Slump (in,): ASTM C143
Max. Aggr. Size:
A.ir Content: ASTM C231
Air Temperature (F):
Material Temp, (F): ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pct): ASTM C138
Time Cast: 8:40 AM
A.dditives:
Results Reported To:
Contractor
LocatioliSampled At:
Panel #2
Dale Cast:
Ticket No.:
3223378
09/17/08
IM~~~~~OFM
DesiRn StrenRth (psi):
Cylinder No. Test Date
'08,2718 9/24/2008
08-2719 10/15/2008
08-2720 10/15/2008
08-2721
Hold
57'
71'
Date Rec'd: 09/18108
Weather:
koad:
Total:
Supplier:
Knife River
Yardage_-
3
8,75/90
4x8
Curing Conditions:
1 day field cure, remainder ASTM
Clear
required 6,000
Compressive Strength Data ASTM C39
placed 6,000
Age (days) Field Cure
(days)
7
28
28
H 1
Lab Cure Diameter or Cross Sect. Area Cyllnder,WT. Camp. Strength F t T H Capping Method
Dimensions Max. Load (Ibs.) Test Time.
(days) (inches) (s.i.) (Ibs,) (psi) rac ure ype
C617-0J C12J1-0J
6 4,00 12,57 8,4 62,230 4,950 2 1:38 PM X
27 3,99 12,51 8,4 81,470 6,510 2 10:24 AM X
27 3,99 12.51 8,4 84,440 6,750 3 10:29 AM X
H
;.~ 1 - Cone -(both ends) :2 - Con~Nertical Cracks (one end)
Remarks:
c:
- 3 - Columnar
4 - Diagonal w no craking at encs
5 - Side fractures (at top of bot om) 6 - Top fractures (same as J5 but end of cylinder is pointed)
Respectfully Submitted,
t!::.JiUClf;;;;S Industries, Inc,
Raymond Aliperti
Project Manager
KPFF - ugo,costa@kpff,com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead,us
Mahlum - rberndt@mahlum,com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood,com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda,bird@sps.lane,edu
City of Springfield
THIS REPORT is PROVIDED FOR THE INFORMATION OF THE CLlENTONL Y. THE REPRODucnON OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT. IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
i" itf!!i. ., lriformation
,.,.... 7bBuildOn
~_II"" ,.1. "'0.1.. ~. 'JMIIIJg
Client:
Address:
Springfield School District
525 Mill Street
Springfield, OR 97477
COMPRESSION REPORT
Project No.: 722-80174-94
Proj. Name: Maple Elementary Schoof
Location: 2109 J Street
Springfield, OR
Placement Data:
'Concrete placed at tilt up panel #14 (decorative)
Material: Concrete
Location Sampled"At:
Same-as above
Oate Cast: 10/06/08 Date Rec'd:
Ti~~~~~~~ I~~~~~AOFM Weather:
10/07/08,
Overcast
Desi!'jn Stren!'jth (psi!:
Cylinder No.
08-3009
08-3010
08-3011
08-3012
Remarks:
required 6,000
Test Date
10/13/2008
11/3/2008
11/3/2008
Hold
I Yardage
Load: 1
ITotal: 8,75/12
ISUPPlier:
Knife River
"Slump (in,): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
.Specimen Size:
Unit Weight (pel): ASTM C13B
Time Cast: 7:45 AM
Additives:
Res-ults Reported To:
. Compressive Strength Qata ASTM C39
placed 6,000
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
October 15, 2008 CCB#176269
Date:
B.P. No.:
P,O, No.:
Cast By:
P0271-255-0809
Dale Russell
Field Test Data
5"
3/4"
3.1%
59'
69'
69'
66'
4,,8
5,720
Contractor
Curing Conditions: .
ASTM
Gross Sect. Area Cylinder WT. Max. Load (Ibs.) Compo Strength Fracture Type .. Test Time
(s.!-) (l!Js.) (psi) .
8,5
71,530
Field Cure Lab Cure Diameter or
Age (days) (days) (days) Dimensions
(inches)
7 6 3,99
28 27
28 27
H 1 H
12,51
c: KPFF - ugo,costa@kpff,com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates _- doug@milstead,us
Mahlum.- rberndt@mahlum,com
Robertson/Sherwood Architects c dguadagni@robertsonsherwood,com
Springfield School District - jsaracen@sps,lane.edu
Yolanda Bird - yolanda,bird@sps,lane.edu
City of Springfield
Capping Me.thod
C617C03
C1231-0J
2
12:55 PM
x
THIS REPORT is PROVIDED FOR THE INFORMATION OF THE CLiENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
l..~..Information
,.,~. 7b Build On
6tfI. ..... . c~ II 11116.... . 7MtIntr
Client:
Address:
Springfield School District
525 Mili Street
Springfield, OR 97477
Placement Data:
Tilt-up wall panels #47, 27,1,6 & 11,
SPRINGFIELD OFFICE
COMPRESSION REPORT
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649.. (541)746-7163 fax
October 13, 2008 CCB#176269
Project No.: 722-80174-73
Proj. Name: Maple Elementary School
Location: 2109 J Street
Springfield, OR
Date:
B.P. No.:
P.O. No.:
Cast By:
P0271-255-0809
Glenn Meek Jr
koad:
Total:
Supplier:
Knife River
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp, (F): ASTM Cl064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pel): ASTM C138
Time Cast: 9:15 AM
A.dditives:
Results Reported To:
Field Test Data
51/4"
,3/4"
Material: Con.crete
Location Sampled At:
Tilt up wall panel #27
Date Cast: 09/10/08 Date Rec'd: 09/11/08
Ticket No.: \MiX No.: Weather:
3159407 60W5AOFM Clear
Desi!'ln Stren!'jth (psi!: reQuired 6,000
Cylinder No. Test Date Age (days) Field Cure Lab Cure
(days) (days)
08-2567 9/10/2008 7 1 6
08-2568 10/1/2008 28 27
08-2569 10/1/2008 28 27
08-2570 Hold H H
540
690
4x8
Yardage
2
61
Curing Conditions:
1 day field cure, remainder ASTM
Contractor
Compressive Strength Data ASTM C39
placed 6,000
Diameter or Cross Sect. Area Cylinder WT. Compo Strength F T'" Capping Method
Dimensions Max. Load (Ibs.) Test Time
(Inches) (5.1,) (lb5,) (psi) raclure ype
C617-0J C1231-0J
3,99 12,51 8,55 74,570 5,960 3 12:55 PM X
4,00 12,57 8,6 87,005 6,920 3. 12:13 PM X
4,00 12,57 8,6 86,950 6,920 3 12:19 PM X
5 - Side fractures (at top of bottom) 6 - Top fra-c1ures (same as #5 but end of cylinder is pointed)
Respectfully Submitted,
r<::)U~s Industries, /nc,
Raymond Aliperti
Project Manager
.. 1 - Con~ (both ends) 2 - ConeNertical Cracks (one end) 3 - Columnar 4 - Diagonal w no craking at ends
Remarks: Set 1
c: KPFF - ugo,costa@kpff,com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead,us
Mahlum - rberndt@mahlum,com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood,com
Springfield School District - jsaracen@sps.lane,edu
Yolanda Bird - yolanda,bird@sps,lane,edu
City of Springfield
THIS REPORf IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL v. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMlrrAL TO A THIRD PARTYBY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRlrrEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
...~..Information
ll!!_~~, 7b Build On
BngJIIJ.......... ~. Ii" "..I,.,]
Client:
Address:
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
October 13, 2008 CCB#176269,
COMPRESSION REPORT
Project No.: 722-80174-79
Proj. Name: Maple Elementary School,
Location: 2109 J Street
Springfield, OR
Springfield School District
525 Mill Street
Springfield, OR 97477
Placement Data:
Tilt up wall panels 49, 29 and 30
'locatioh Sampled At: ~
Tilt up wall panel # 29
:Oale Cast: 09/11/08
Ti~~~~~~~ IMi~O~~~FM
Desi~n Stren9t~ (osil:
Cylinder No.
08-2595
08-2596
08-2557
08-2598
Test Date
9/18/2008
10/9/2008
10/9/2008
Hold
Material: Concrete
Dale Rec'd: 09/12/08
Weather:
Yardage
3
8 3/4 / 54
Clear
Load:
Total:
S,upplier:
Knife River
Date:
B.P. No.:
P,O, No.:
'Cast By:
P0271-255-0809
Glenn Meek Jr
'Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
.Air Temperature (F):
'Material Temp, (F): ASTM C1064
Max Temp IF):
,Min Temp IF):
;Specimen Size:
'Unit Weight (pet): ASTM C138
Time Cast: 10:45 AM
,
.Additives:
'Results Reported To:
Field Test Data
51/4"
3/4"
73"
7r
4x8
144,94
Curing Conditions:
ASTM
Contractor
required 6,000
Compressive Strength Data ASTM C39
olaced 6.000
Age (days)
Field Cure
(days)
Lab Cure Diameter or
(days) Dimensions
(inches)
6 4,00
27 4,00
27 4,00
12,57
12,57
12,57
Cross SecL Area Cylinder WT.
(0,1.) (Ibo,)
7
28
28
H
H
.. 1 .- Corie"(botti"E!ndS)' 2 - 'Cor eNertical Cracks (one end)
Remarks:
c:
3 ~Columnar 4- Diagonal w no craking at enl..S
KPFF - ugo,costa@kpff,com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates" doug@milstead,us'
Mahlum - rberndt@mahlum,com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood,com
Springfield School District - jsaracen@sps,lane,edu
Yolanda Bird - yolanda,bird@spsJane,edu
City of Springfield
Max. Load (lbs.) comp(, s~r)ength Fracture Type *' Test Time
po,
Capping Meth~d
C617-03 C1231-03
8,5 60,685 I 4,830 2 2:03 AM X
8,6 75,645 I 6,020 I 3 12:18 PM X
8,6 77,080 I 6,132 .1 3 12:22 PM X
I I
5 - Side fractures (at top of bottom) 6 - Top fractures (same as #5 but" end of cylinder 'is pointed)
Respectfully Submitted,
RdJ~es Industries,/nc,
RaymondAliperti
Project Manager
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS-REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY Ely ANY MEANS EXCEPT IN FULL, IS
PROHIBITED WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. . . ,
l~~;lInformation
",..,. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
October 6, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-91
Project Location:
Maple Elementary School
2109 J Street
Springfield, OR
Project Name:
B.P, No.:
Type of Inspection:
COM 2008-00438
Concrete
P,O, No.:
Weather:
P0271-255-0809
Overcast
Field Observations and Comments
Performed visual inspection during placement of concrete in the following locations: concrete placed at tilt panel #14
(decorative), Concrete was placed by pump truck and hand screeded consolidated with vibratory methods, Cast one (1)
set of four (4) (4x8) concrete test cylinders, Contractor was asked to notify our office when additional services are
needed, To the best of our knowledge, the work inspected above was in accordance with the building department
approved design drawings, specifications and applicable workmanship provisions of the International Building Code,
Iyn.. nf Material Set #1
Supplier Knife River
Mix # 2460W5AOFM
Slump 5"
Air Content 3,1%
Ambient Temperature 59"
Material Temperature 69"
Time Placed 7:45 AM
Design Strength (psi) 6000
Number of Samples 4
Total YardaQe Placed 12
Inspector: Dale Russell, ICC #01140789
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649,
Respectfully Submitted,
Professional Service Industries, Inc.
~~
Raymond Aliperti
Project Manager
c: KPFF - ugo,costa@kpff,com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead,us
Mahlum - rberndt@mahlum,com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood,com
Springfield School District - jsaracen@sps,lane,edu
Yolanda Bird - yolanda,bird@sps.lane,edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMA TION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 974n. Phone 541fi46-9649. Fax 541n46-7163
l..~. J Information
~"'!!'.ITo Build On
a..,lIrIa...."_ . e.,., rI rJl6.... . JNtIIIg
Client:
Address:
Springfield School District
525 Mill Street
Springfield, OR 97477
COMPRESSION REPORT
Project No.: 722-80174-82
Proj. Name: Maple Elementary School
Location: 2109 J Street
Springfield, OR
Placement Data:
Tilt up panels # 39, 40, 41 and 58
Material:" Concrete
Location Sampled At:
Till up panel #58
Oate Cast: 09/1 B/08
Ti~~~~~~; IM~~~~~OFM
Oesi!01n Stren!01th (psi):
Cylinder No.
08-2742
08-2743
08-2744
08-2745
Test Date
9/25/2008
10/16/2008
10/16/2008
Hold
Date Rec'd: 09/19/08
Weather:
Overcast
reauired 6,000
Age (days) Field Cure
(days)
7 1
28 1
28
H 1
Lab Cure
(days)
6
27
27
H
,
u 1 _ Cone (both ends) 2 - ConeNertical Cracks (one end)
Remarks:
c:
3 - Columnar
Yardage
2
83/4
Load:
Total:
Supplier:
Knife River
Slump (In,): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM Cl064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 9:00 AM
Additives:
Results Reported To:
Compressive Strength Data ASTM C39
placed 6,000
Diameter or
Dimensions
(Inches)
Cross Sect. Area Cylinder WT.
(sJ,) (Ibs,) ,
Max. Load (Ibs.) comPip~~;ength Fracture Type.< Test Time
C1231-D3
3,99
3,99
4,00
12,51
12,51
12,57
8,6
8,6
8,6
63,165
88,400
86,045
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
October 17, 2008 CCB#176269
Date:
B,P, No,:
P.O. No.:
Cast By:
P0271-255-0809
Glenn Meeks
Field Test Data
43/4"
3/4"
2.2%
550
68"
4x8
144.74
Curing Conditions:
ASTM
Contractor
Capping Method
C617.0J
5,050 2 111 :19 AM X
7,060 3 110:31 AM X
6,850 3. 110:38 AM X
1
6 - Top fractures (same as #5 but end of cylinder is pointed)
Respectfully Submitted,
~v~~es Industries, Inc,
Raymond Aliperti
. Project Manager
4 - Diagonal wIno craking at em 5 5. Side fractures (at top of boLom)
KPFF - ugo,costa@kpff,com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead,us
Mahium - rberndt@mahlum,com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood,com
Springfield School District - jsaracen@sps,lane,edu
Yoianda Bird - yolanda,bird@sps,lane,edu
City of Springfieid
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND fTS TRANSMITTAL'TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSfON OF PROFESSIONAL SERVICE INDUSTRIES.
l.n <<!!-.J Infonnation
1"'!',~.'To'Build On
II!!nglne.riI.., . eo..uIfInrI . n...tIng
Client:
Address:
, "
COMPRESSION REPORT
-; ~."
SPRINGFIELD OFFJCE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
October 9, 2008 CCB#176269
Springfield School District
525 Mili ~treet
Springfield, OR 97477
Fpface'ment Data:
.,
Slab on grade grid lines B to D @ 2 to 5
Material: Concrete
Location'Sampled Af:;~.- t~
S,O,G, B,5 10 C @ 2 '165,"
Date Cast: 09/10/08 Date Rec'd: 09/11/08
Ti~~~~~~,; IMi:::;~20~ Weather:
'Project No.: 722-80174-74.
Proj, Name: Maple Elementary School
Location: 2109 J Street
Springfield, OR
load:
Total:
15uPPlier:
Knife River
Yardage
3
10/40
Compressive Strength Data ASTM C39 .
placed 4,000
Cross Sect. AreiJ Cylinder WT. Camp Strength I
Max. Load (Ibs.) ('po"1 Fracture Type *, Test Time
(,.1.) (Ib,,) _
Clear
Design Strength (psi):
Cylinder No.
08-2571
08-2572
08-2573
08"2574
reauired 4,000
Test Date
. Age (days)
Field Cure
(days)
Lab Cure Diameter or
(days) Dimensions
(inches)
6 3,99
27 3,99
27 3,99
9/1712008
10/8/2.008
10/8/2008
Hold
'7
28
28
H
H
4 - Diagonal wIno craking'-at en( 5
5 - Side fractures (at lop of bo'Uom) :
11:33AM
I 11:38AM I
I I
6 - Top fractures {same as #5 but end of cylinder is pointed)
Respectfully Submitted,
P fession Ser ices Industries, /nc,
H 1 - Cone (both ends) 2 - ConeNertical Cracks (one end)
Remarks:
c:
. 3 ~ Columnar
12,51
12,51'
12,51
KPFF - ugo.costa@kpff,com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates _ doug@milstead.us
Mahlum - rberndt@mahlum.com .' 1
Robertson/Sherwood Architects - dguadagni@robertsonsherwood,com
Springfieid School District - jsaracen@sps,lane,edu
Yolanda Bird - yolanda,bird@sps,lane,edu
City of Springfield
Date:
B,P, No,:
P,O. No,:
Cast By:
P0271-255-0809
Glenn Meek Jr
Field Test Data
Slump (in,): ASTM Ct43 51/4"
Max, Aggr, Size: 3/4"
'Air Content: ASTM C231 N/A
,Air Temperature (F):' 50"
.Material Temp. (F): ASTM Cl064 660
Max Temp (F):
,Min Temp (F):
Specimen Siz"e: 4x8
Unit Weight (pet): ASTM C138
Tim'e.Cast: 8:00 AM . Curing C;::onditions: ASTM
:Additives:
Results Reported To: . Contractor
-
Capping Method
C617-03
C1231-03
8,6
, 8,6
, 86
70,825
82,390
81,760
5,660
6,590
3
12:52 PM
x
3
x
6,540
3
x
THIS REPORT IS PROVIDED FOR nfE INF:ORMATlON OF mE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL. IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES