Eugene, Oregon
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 4 SAMPLED
Geotechnical & CoosUucfun SeIviCes
Compressive Stre.ngttl of Concrete
, (ASTM C 39)
PROJECT
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon
10-01-08
2087168
6007
DATE
PROJECT NO.
REPORT NO.
B.P. NO.
Pending
09-03-08 ' CAST BY A. Fenstermacher DATE RECEIVED 09-04-08
4000 psi SPECIMEN SIZE 4" x 8"
4000 psi SACKS SUPPLIER Knife River
40-SE7 CEMENT MAX SIZE AGG. 3/4"
AEA, super plasterizer AIR CONTENT 5.0%
4 TICKET NO, 3159287 SLUMP 81/2"
76" F YARDAGE 10.0 OF 55.0 TIME 12:30 PM
65~ F WEATHER Clear SPECIMENSTORAGE ASTM C31
Contact basin east buttresses, east perimeter wall and east two-thirds of North perimeter wall. (ground
Level to bottom of slab elevation)
Bottom lift in north wall. approximately40' from'west side. '
AVERAGE
TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF
DATE (DAYS) (IN.') (LBSl LOAD (LBS) STRENGTH (PSI) (PSI) TEST FRACTURE-
f 09-10-08 7 I '12.56 8.4 58000 4620 8:35 AM 5
10-01-08 28 12.56 8.5 75400 6000 3:15 PM 5
I 10-01-08 28 I 12.56 8.5 74700 5950 5975 3:20 PM 5
I Hold I
*"1 - End Cones 2- Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom)
REMARKS: . Jake (Wildish) was advised of on-site test results.
Reviewed By: ,
:!:~~
Technical Manager '
c:
EWEB- Mike Stickling (em ail)
EWEB- Wally McCulloU9h (email)
OBEC- Pete Slocum (email)
Wild ish Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (email)
City of Springfield
Knife River
MLM:sc '
~~L ~dm~\
~6)~'L~ ,"
This report and/orenclosed test data is the confidential property of the client to whom iUs addressed and pertains to the specific
process andlor material evaluated. As such, information contained her~in shall not be reproduced in part or full andler any part
thereof be disclosed without FEI Testing & Inspection,.lnc.'s writt~n authorization.
7ffJ NN ComeIIAvenue' CavaIis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991
29540 BAirpat Road . Eugere, Oregon 97402 . phone (541) 684-3849 . fax (541) 684-3851
63050 Corporate Place, Suite 2 . Bend. Oregon 97701. phone (541) 382-4844 . fax (541) 382-4846
SfiJ
Page 1 of 1
11:"II~I~:.I~~':'A'IIIUIII~llJl
Geotedlnical &. Construction Servires
Daily Field Report
Client: EWEB Project: Hayden Bridge Water Filtration Date: 09-15-08
500E. 4th Ave. Plant Expansion Project No.: 2087168
Eugene, Oregon Springfield, Oregon Report No.: E-21209
Inspector: A, Fenstermacher
ID No.: 5258882-49
ICC,
Inspection of: Epoxy Anchors and
Reinforcing Steel Weather: Clear Continuous Inspection: 0
Contractor: Wildish BPNo.: Pending Periodic Inspection: 0
Performed continuous Inspection during the installation of four (4) 3/4" x 24" horizontal
stainless steel all thread anchors into existing buttress at the south east corner. Prior
to installation, the predrilled holes were cleaned with compressed air and a brush.
Verified minimum embedment of 7". Anchors 'were secured with Epcon A7 (ICC~ES
ESR-6582, expiration date 11-07-09).
Performed preliminary inspection on the reinforcing steer for slab numbers 1 and 2.
Reinforcing steel was checked for size, grade. laps, quantities, locations, ties,
clearance and supports, Note: additional slab top reinforcement at north buttress
is not in place. A final inspection will be performed prior to concrete placement.
Jake (Wildish) was asked to notify our office when additional services'are needed.
To the best of our knowledge, the work inspected was in accordance with plans dated
02/2008 and applicable workmanship provisions of the !.B.C., except if noted above.
Reviewed By:
;11, t~
Michael L. Meyer
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (em ail)
Wildish Building Co.- Kevin Fitzjarrell (em ail)
Wildish Building Co.- Jake Stucky (email)
City of Springfield
RECEIVED
E>(\Dt ~~
0..0.'t'Lt?:J "
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process andlor material evaluated. As such, infonnation contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc. 's written authorization.
7ffJ NVV ComeIIAvenue' OwaJtis, QegJn 97330, phore(541) 757-4698, fax (541) 757-2991