Report of Inspection Services
Weldina/Hi~h-Strenath Boltina
Client: Mr. Jae Hawes
.Hawes Investments, LLC
. 2892 Crescent Avenue
Eugene. Oregan 97402
. praject:
Internatianal Way D~velapment
. Package A
400 International Way
. Springfield, Oregan.
Date:
Praject Na.:
. Repart Na.:
Inspectar:
ID Na.:
IIIl:;pectian af:
Fabricatar ar Erectar:
Cantractar:
Welding/HSB
West Side Iron
Chambers Canstructian
Shap: 0
Weather:
BPNa.:
09-24-08
2087024
E-21312
C. Walpale
5114210-85
ICC
Field: 611
~2~07-01~
Arrived an-site to. perfarm visual inspectian af roof level framing between grid lines 1 and 4, fram A to. H.
Campleted welds were checked far size, length, profile and lacatian, Verified high strength baits were
braught into. tensian. The follawing items were nated and will require campletian and/ar engineers
appraval far as-built canditians:
. at grid line A.8/3 the shear tabs an the calumn are backwards leaving the W12" x 14" beam a two. bait.
cannectian in iieu.af 3 per 6/S5.2. .
..there is a machine bait in the W8" x 10" beam near E/4.
. the through-bait is nat installed in the beam to. calumn cannectian at line E/2.2 (reference detaii 4/S5.5).'
. high laad cannectians have nat been welded alang line 4.
. beam to. calumn nat welded at iine C/2.5 (reference 27/S5.5). '
. beam to. beam cannectians alang line 3, fram D to. H shauld have five (5) baits far W18" x 35" per
6/S5.2. Cannectians have anly faur (4). .
Jahn Shay (Chambers Canstructian) was nati.fied af the abave canditians:
To. the best af aur knawledge, the wark checked is in canfarmance with structural drawings dated 01-29-
08, AISC manual and applicable AWS D1.1 cade, except as. nated abave.
. Reviewed By:
A. 'ftJrr-
Michael L. Meyer .
Technical Manager
c:
Chambers Canstructian - Dave Bakke (email)
Chambers Canstructian - Jahn Shay (email)'
Caughlin, Parter Lundeen - Babbi Fisher (emall)
Eric Hall Architects - Ted Carbin (email)
City af Springfield
RECEIVED
OCT 0 6 2008
MLM:sc
This report and/or enclosed te.st data is the confidentiai property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part .
t~ereof be disclosed without FEI Testing & Inspection, In~.'s Written authorization.
750 NWComellAvenue' Corvallis, Oregon 97330, phane (541) 757-4698' fax (541)757-2991
29540 BAirpart Raad' Eugene, Oregan 97402. phane (541) 684-3849 . fax (541) 684-3851
63050 Corparate Place, Suite 2 . Bend, Oregan 97701 . phane (541 )382-4844 ' fax (541) 382-4846
(I... t~~.
._,
Page 1 of 1
11a..'IUlrl-:.ll'.':.'lIl(II~.ltl.
Geotechnical & Construction SeIVires
Daily Field Report
, Client: Mr. Joe Hawes Project: Intlirmitional Way Development Date: 09-30-08
Hawes Investments, LLC Package A Project No.: 2087024
2892 Crescent Avenue . 400 International Way. Report No.: E-21358
Eugene, Oregon 97402 Springfield, Oregon Inspector: A. Fenstermacher
ID No.: 5258882-49
Inspection of: Reinforced Concrete Weather: Clear Continuous Inspection: 0
Contractor: Cham bers Construction BPNo.: COM2007-01851 Periodi.c Inspection: 0
. Performed inspection on the reinforcing steel for generator slab on grade at rear of
building, Reinforcing steel was checked for grade, size, laps, quantities, locations, ties,
clearance and supports.
, .. .
Obse,ved the placement'of 25 cu/yds; of Eugene Sand and Gravel 4500 psi (4000
required) concrete (Mix 314658) into areas noted above. Concrete.was placed directly
from truck and was mechanically consolidated. Cast one (1) set of four (4) 4" x 8"
concrete test cylinders. Notified' John (Chambers) of on-site test results: Concrete
temperature 77F; air temperature 68F; slump 5 3/4':. .
John was asked to notify our office when additional services are needed.
. ..
To the best of our knowledge, the work inspected was in' accordance ~ith RFI #107
dated 07_11-08 and applicable workmanship provisions of the'I.B,C" except if noted
above. .
Reviewed By:
.lh.--1~~
Michael L Mey/! . ,
, T.echnical Manager
c: Chambers Construction - DaveSakke (em ail)
Chambers Construction - John Shay (em ail)
Coughlin, Porter Lundeen - Bobbi Fisher (email)
Eric Hall Architects - Ted Corbin (em ail)
. City of Springfield .
MLM:sc
This report and/orenclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As'such, information contained herein shall not be reproduced in part Of full andlor any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s 'Nfitten"authorization. .
, 700 tm CrnleiIAvenue' CavaIIis, CXegJn 97330. pIme(541) 757-4698. fax (541) 757-2991
29540 B Airpat Road . Eugene, CXegJn 97402. pIme (541) 684-3849 . fax (541) ~1
.63000 Corporate Place, Suite 2 . Bend, Oregon 97701 ' phone (541) 382-4844 . fax (541) 382-4846
SfEJ
1I.'I".....".l~lll'"'."". Geotechnical & Construclion Services
Page 1 of 1
Report of Inspection Services
WeldinQ/HiQh-StrenQth BoltinQ
Client: Mr. Joe Hawes
Hawes Investments, LLC
2892 Crescent Avenue
Eugene, Oregon 97402
Project:
International Way Development
Package A
400 International Way
Springfield, Oregon
Date:
Project No.:
Report No.:
Inspector:
ID No.:
09-26-08
2087024
E-21335
K. Green
8003776
AWS
Field: 0
Inside
COM2007-01851
Inspection of:
Fabricator or Erector:
Contractor:
Welding .
Metalsome
Chambers Construction
Shop: Ii1f
Weather:
BPNo.:
Performed visual' inspection of the following fabricated structural steel frame assemblies: (4) 301-C.
Completed welds were checked for size, length, profile and location.
Rich (Metalsome) was asked to notify our office when additional services are needed.
To the best of our knowledge, the work checked is in conformance with shop drawings and applicable
AWS 01.1 code, except if noted above. .
Reviewed By:
/fJ.'1.~
Michael L MePer
Technical Manager
c: Chambers Construction - DaveBakke (email)
Chambers Construction - John Shay (email)
Coughlin, Porter Lundeen - Bobbi Fisher (em ail)
Eric Hall Architects - Ted Corbin (email)
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andfor any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s w.ritten authorization.
750 NW Comell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991
29540 BAirport Road, Eugene, Oregon 97402. phone (541) 684-3849 . fax (541) 684-3851
6~050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541 )382-4844 . fax (541) 382-4646
~'r"~.
~._l
Geotechnical & Construclion Servires
Compressive Strength of Concrete
. (ASTM C 39)
11~'IUlrf;4U~'~~'IIIJ~.m.
CLIENT
Me. Joe Hawes
Hawes Inv,estments, LLC
2892 Crescent Avenue
EUgene, Oregon 97402
PROJE'CT International Way Development
Package A .
400 International Way
Springfield,.()regon .
B.P. NO, (c.oM200io1851::S
DATE
PROJECT NO.
REPORT NO.
09-19-08
2087024
5999
DATE CAST 08-22-08 CAST BY J. Keller DATE RECEIVED 08-23-08
STRENGTH REQUIRED 4000 psi SPECIMEN SIZE 4" x a"
STRENGTH PLACED 4500 psi SACKS SUPPLIER ESG
PRODUCT CODE 314568 CEMENT MAX SIZE AGG. 3/4"
ADDITIVES Fiber Yellow AIR CONTENT
LOAD NO, 1 TICKET NO. 60006600 SLUMP 5"
CONCRETE TEMP 810 F YARDAGE 7.0 OF TIME 1:10 PM
AIR TEMp. 750 F WEATHER Clear SPECIMEN STORAGE ASTM C31
POUR LOCATION Balcony slab, 2"' floor, south end between lines B to C.
LOAD 1 SAMPLED Near center of east side,
TEST AGE AREA WEIGHT TOTAL COM PRESSIVE
DATE (DAYS) (IN.') (LBS\ LOAD (LBS) STRENGTH (PSI)
08-29-08 7 12.56 8.6 56100 4470
09-19-08 28 12.62 8.6 75500 5980
09-19-08 28 12,62 8.6 82600 6550
Hold
AVERAGE
STRENGTH
(PSn
6265
TIME OF
TEST
8:05 AM
8:00 AM
8:05 AM
TYPE OF
FRACTURE"
6
3
5
**1 - End Cones
2 - Cone/Split
3 - Columnar
4 - Diagonal
5 - Side (top and bottom)
6 - Side (top or bottom)
REMARKS: Rod (Chambers) was advised of on-site test results.
Reviewed By:
;1l.~~
Michael L. Me./lr
Technical Manager
c: Chambers Construction - Dave Bakke (email)
Chambers Construciion - John Shay (email)
Coughlin, Porter Lundeen - Bobbi Fisher (email)
Eric Hall Architects - Ted Corbin (email)
Eugene Sand and Gravel
City of Springfield
-'."
MLM:sc
. This report and/or enclosed test data is the confidential property of the client to whom it is addressed and'pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be~ reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
. 7fiJ tw Cornell Avenue' CavaDis, 0regJn 97330 . phone (541) 757-4698, fax (541) 757-2991
29540 BAirport Rood . Eugene, 0regJn97402. phone (541) 684-3849 'fax(541)~1 .
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846