HomeMy WebLinkAboutPermit Field Test & Inspection Report 2008-8-20
fJ
l"~;lInformation
fI~. .To Build On
E, ..'~ , . .ling . Consulting. Testing
DAILY FIELD REPORT
Date Performed:,
Client:
August20,2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80173-42
Project Location:
Thurston Elementary School
7345 Thurston Road
Springfield, Oregon
Project Name:
Buildin9 Permit No.:
Type of Inspection:
COM2008-00437
Reinforcing Steel & Concrete Forms
P.O. No.:
Weather:
P0272-334-0809
Cioudy with Showers
Field Observations and Comments
Performed visual inspection of reinforcing steel and embeds at the following locations: 8" tilt up wall panel reinforcing in
panel'#2, 6, 66 and 65, Reinforcing steel was checked for grade, size, lap. placement and clearances where applicable,
Reinforcing steel was secured using tie wire and supported on concrete dobie blocks and plastic chairs. , Reinforcing
steel was placed in accordance with 'approved design drawings and specifications with latest revisions ,dated 5/1/08.
Contractor was asked to notify our office when additional services are ,needed, To the best of our knowledge, the work
inspected above was in accordance with. the building department approved design, drawings, specifications and,
applicable workmanship ~rovisions of the International Building Codes,.
Inspector: Glenn Meeks Jr, ICC# 5071538-49
CCB #176269
,
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
~s\fal Service Industries, Inc,
DavidSmit~W~
Branch Manager
c: Springfield School District - jsaracen@sps.lane.edu
Miistead & Associates - angus@milstead.us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps.lane,edu
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT. BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
PrOfessi~nal Service Industries, Inc. .1Q40-A Shelley Street. Springfield, OR 97477. Phone 541(746-9649-. Fax 541(746-7163
.0--
L~~;lInfonnation
,.,..,. .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
August 15, 2008
Springfield School District
525 Mill Street
Springfield. OR 97477
Report Number:
722-80173-38
Project Location:
Thurston Elementary School
7345 Thurston Road
Springfield. Oregon
Project Name:
Building Permit No.:
Type of Inspection:
COM200S-00437
Reinforcing Steel & Concrete Forms
& Embeds
P.O. No.:
Weather:
P0272-334-0809
Clear
Field Observations and Comments
Performed visual inspection of reinforcing steel and embeds at the following locations: tilt panels 5, '1, 4, 3, 7, 58A, 6z,
61, and 2, Reinforcing steel was checked for grade, size, lap, placement and clearances where applicable, Reinforcing
steel was secured using tie wire supported on plastic chairs. Reinforcing steel was placed in accordance with approved
design' drawings, specifications, Meadow Burke Engineering dated 7/11/08 and embed shop drawings 5&6 dated 7/25/08
and with latest revisions dated 5/1108, Additional Comments: #5 check clearance and add embeds, #1 add embeds
#7 inside face to have 2 #5 erection rebar and 3A embed, #61 add embeds, and #2 add 3A embeds. Contractor
was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected,
above was in accordance with the building department approved design, drawings, ,specifications and applicable
workmanship provisions of the International Building Codes,
Inspector: David Smith, ICC #0877340-88, OBOA# 442
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
ofession~ S~ne~tries, Inc.
David mith V ~(f.:,,,:J
Branch Manager ,.
c: Springfield School District - jsaracen@sps.lane,edu
Milstead & Associates - angus@milstead.us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood,com
Yolanda Bird - yolanda,bird@sps.lane.edu
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
Prof~ssional Service Ind~stries, Inc. . 1 040-A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649 . Fax 541/746-7163
B.
l..~ _ZIn/ormation
,.,~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
August 15, 2008
Springiield School District
525 Mill Street
Springiield, OR 97477
Report Number:
722-80173-37
Client:
Project Name:
Thurston Elementary School
7345 Thurston Road
Springfield, Oregon
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyland
MetalSome
Welding
P,O, No.:
Shopl Field:
Weather:
P0272.334-0809
Shop
Clear
Field Observations and Comments
Periormed continuous visual inspection of the following items: multiple pass fillet weldmentsfor part #3H-T. Fit-up of
weld joints where inspected for workmanship, In-progress welding was m'onitored to the fabricators, FCAW welding
procedure specifications. Weldmentswere inspected for size, len'gth, profile and 'locations. To the best of our
knowledge, the work inspected is in conformance with approved drawings, specifications and applicable AWS 01.1,
01,3.01 A codes, .
'Inspector: Chris McDonald, Certification #5298238-52
eCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746.9649,
Respectfully Submitted,
~~nal Service Industries, Inc,
DavidSmi~WJ
Branch Manager
c: Springfield School District - jsaracen@sps.lane,edu
Milstead & Associates - angus@milstead,us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps.lane.edu
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. IS PROHIBITED.
Professional Service Ind~stries, Inc. .1040-A Sh~!Iey Street. Springfield, OR 97477. Phone 541n46-9649. Fax 541f746-7163
>f
l rf/j ~;lInfonnation
,.,..,. .To Build On
Engineering. Consulting . Testing
DAILY FIELD RE:PORT
Date Performed:
Client:
August 11, 2008
Springfield School District
525 Mill Street
Springfield,OP97477
Report Number:
722-80173-35
Project Location:
Thurston Elementary School
7345 Thurston Road
Springfield, Oregon
Project Name:
P0272-334-0809
Slab on Grade
Reinforcing Steel & Reinforced
Concrete and Concrete Forms
Field Observations and Comments
Performed visual inspection 6f reinforcing steel at the following locations: slab on grade reinforcing prior to piacement of
concrete at gridlines A to D at 5 to 8 and D to E at 2.5 to 505. Also inspected footings at grid line A at 2 to 4.5 and A to B
at 2 prior to placement of concrete, Reinforcing steel was checked for grade, size, lap, placement and clearances where
applicable. Reinforcing steel was secured using tie wire arid supported on concrete dobie blocks', Reinforcing steel was
placed in accordance with approved design drawings and specifications with latest revisions dated 5/1/08, Performed
visual inspection during placement of concrete in the locations listed above. Concrete was placed by tru'ck boom pump
and mechanically consolidated, Cast tWo (2) sets of four (4) (4x8) concrete test cylinders. , Contractor was asked to
notify our office when additional services are needed. '
1)10<> of Material Set #1 Set #2
Supplier Knife River Knife River
Mix # 40N15200 40N15200
Slump 2 3/4" 3 3/4"
Air Content 1,7% 1.8%
Ambient Temperature 61' 66'
Material Temperature 73' 78'
Time Placed 8:00 AM 10:30 AM
Design Strength (psi) 4,000 4,000
,Number of Samples 4 4
Total Yardage Placed 181 1/2 181 1/2
Inspector: Glenn Meeks Jr ICC# 5071538-49
CCB# 176269
P.O. No.:
Type of Structure:
Type of Inspection:
Permit No.:
Weather:
COM2008-00437
Clear
If you have any questions regarding this report, please feel free to contact us at 541-746-9649,
Respectfully Submitted,
tt~~\J(nn:;:~ies, Inc
~mit~
Branch Manager
c: ,Springfield School District - jsaracen@sps.lane,edu
Milstead & Associates - angus@milstead.us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood,com
Yolanda Bird - yolanda,bird@sps.laneedu
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.- 1040-A Shelley Street - Springfield, OR 97477 - Phone 5411746-9649 - Fax 5411746-7163
J.J.
l... 6!!&;' Information
"''''.lIb Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
August 8, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80173-34
Project Location:
Thurston Elementary School
7345 Thurston Road
Springfield, Oregon
Project Name:
Building Permit No.: COM2008-00437 P.O. No.:
Type of Inspection: Reinforcing Steel & Concrete Forms Weather:
P0272-334-0809
Clear
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: slab on grade line A to 0 from 5 to 8 and line D
to E from 3 to 5,5, except .for pour back strip. Reinforcing steel was checked for grade, size, lap, placement and
clearances where applicable, Reinforcing steel was .secured using tie wire, Reinforcing steel was placed in accordance
with approved design drawings and specifications with latest revisions dated 5/1108. Additional Comments: Dowels at
stair will be,epoxied at a later date. Dobie will be placed as concrete is 'placed. Contractor was asked to notify our
office when additional services are needed, To the best of our knowledge, the work inspected above was in accor'dance
with the building department approved design, drawings, specifications and applicable workmanship provisions of the
International Buildinp Codes
Inspector: David Smith, ICC #0877340-88
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
~vaf Service Industries, Inc.
David Smit~~()
Branch Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - angus@milstead.us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda,bird@sps.lane.edu
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS. EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc. .1Q40-A Shelley Str~et. Springfield, OR 97477. Phone.5411746-9649. Fax 5411746-7163
5:f
l...~ ;ZInjonnation
,.,..,. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed: August 7, 2008 Report Number: 722-80173-33
Client: Springfield School District Project Name: Thurston Elementary School
525 Mill Street
Springfield, OR 97477 Project Location: 7345 Thurston Road
Springfield, Oregon
Contractor: John Hyland P.O. No.: P0272-334-0809
Fabricator: MetalScime Shopl Field: Shop
Type of Inspection: Welding Weather: 'Clear"
Field Observations and Comments
'Performed periodic visual inspection of the following items: Embed 3FcT-2 (1), 3K-T-1 (12), and 3F-T-2 (1). Threaded
studs replaced with A-307 bolts through embed plates and welded'on head side 4 plates of bolt head, Nelson studs
exhibited 360' flash. Weldments were inspected for size, length, proiile and locations, To the best of our knowledge,
the work inspected is in conformance with ,approved drawings, specifications and applicable AWS 01.1 codes, The
,followin!l item's were in non-conformance: Need engineering approval for as built condition for welded 'bolts.
Inspector: David Smith, Certification #0877340-85
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
~~,seNice Ind:;es, Inc.,
David Smith ~
Branch Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - angus@milstead.us
Hyland Construction - markb@jhconsLcom
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood,com
Yolanda Bird - yolanda.bird@sps.lane.edu
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, 1$ PROHIBITED.
Professional Service Industries,_ Inc. . 1 040-A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649 . Fax 541/746-7163
IP~il~nJ;:::;:~n
. lIng';, . . 1. ,j . ContIuIfIng . 1'NtIng
FIELD DENSITY REPORT
SOIL AND SOIL-AGGREGATE
Client: John Saraceno
Address: Springfield School District
525 Mill Street
Springfield, OR 97477
Project No.: 722-80054-48
Project: Thurston Elementary
Project 7345 Thurston Road
Location: Springfield, Oregon
Equipment: Troxler: 3430 SN: 30230
Date Performed:
P.O. No.:
B.P. No.:
Technician:
S5
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
CCB #176269
August 4, 2008
COM2008-00437
Anthony Deluca
Laboratory Soil / Aggregate Data.
Moisture Density Relationship of 144 IbsJcu.ft.. at 8% moisture, is from our report number 722-80055-31. dated 6/30/2008 for Springfield Quarry 3/4" -0 (T-180),
Test No.
Approximate Test Location
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 572 DS 2188)
Slab
Approximate T~st
Elev.
Probe
Depth
on Grade
2
Bat 7 - 5' southeast
Bat 6.10' east
6"
FRG
FRG
6"
3 10' west or Cat 8. eRG 6"
----.-,.
4 Cat 5,5 FRG 6"
Tests performed at finished grade of base rock at the slab on grade for locations listed' above,
Tests were reported to Mark with Hyland Construction, .
c: John Sacaceno - jsaracen@sps.lane,edu
Rene Berndt - rberndt@mahlum,com
Ugo Costa - ugo..costa@kpff.com
Dave Guadagni - dguadagni@robersonsherwood,com
Angus Eastwood - angus@Milstead,us
Bill Hirsh - billhirsh@comcoast.net
Wet Density
LBS/CU.FT.
147,6
143.0
143,6
147,3
Dry Density Percent
LBS/CU.FT. Moisture
-----
142,0 4,0
137.4 4,0
-
,138,2 3,9
141,8 3.8
Percent
Compaction
Required
Compaction
Comments
98.6
95.4
95%
95%
96.0 95%
98.5 95%
Respectfully Submitted
Q:;J' ~NO::ldustries, Ine
David F, smi~~~d
Branch Manager
THIS REPORT /s PROV/DED FOR THE INFORIvIA nON OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS
PROHIBITED WI/HOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, .
5.J
L... ~;, Infonnation
"~.lTo Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
P0272-334-0809
Slab on Grade
Reinforcing Steel & Reinforced
Concrete and Concrete Forms
Field Observations and Comments
. Performed visual inspection during placement of concrete at the following locations: slabs for gym classroom wing,
admin building and library entry, Reinforcing steel was previously inspected on 8/1/08, Concrete was placed by pump
and mechanically consolidated, Cast two (2) set's of four (4) (4x8) concrete test cylinders, C,>ntractor was asked to
notify our,office when additional services are needed, To the best of our knowledge, the work inspected above was in
accordance with the, building department approved design drawings, specifications and applicable workmanship
provisions of the International Building Code.
TVIlf! of Material
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yardage Placed
Inspector: Verlyn Bearden, ICC #01080077
'~'CCB#'176269~:-:-=~-~_-=n__--~----'_.:-~~ -- 'n.._~_ ..___,_~_______n_
Date Performed:
Client:
August 4, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
P.O. No.:
Type of Structure:
Type of Inspection:
Set #1
Knife River
2440N15200
41/2"
490
720
6:45AM
4000
4
182
Report Number:
722-80173-31
Project Name:
Thurston Elementary School
7345 Thurston Road
Springfield, Oregon
Project Location:
Permit No.:
Weather:
COM2008-00437.
Clear
Set #2
Knife River
40N15200
4 1/2"
610
730
9:25 AM
4,000 '
4
182
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
POession:, 0e~Vice Industries, Inc,
D~~h ~~)
Branch Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - angus@milstead.us
Hyiand Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps,lane,edu
THIS REPORT IS PROVIDED FOR THE INFORMA TION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SE,~VICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc. . 1040-A Shelley Street. Springfield, OR 97477 . Phone 541/746-9649. Fax 541/746.7163
Sf
l..~ ;ZIn/ormation
,.,..,. .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
August1,2008
Springfield School District
525 Mill Street
Springfield,OR-97477
Report Number:
722-80173-28
Project Name:
Thurston Elementary School
7345 Thurston Road
Springfield, Oregon
Project Location:
Contractor:
Fabricator:
Type of Inspection:
John Hyland
MetalSome
Welding
P.O. No.:
Shop! Field:
Weather:
P0272-334-0809
Shop
, Inside
Field Observations and Comments
'Performed periodic visual inspection of the following items: Nelson stud and single pass fillet weldments for part #'s 4MT
(3), 4HT, 4KT (10), 5MT (11), 3FT 92), 5AT (4), 4AT1(8), 6BT1 (8), 6ATI (31), 6DT1(5), 6CT1 (25), 3MT (26), 3AT1
(177),4BT1 (21), 4DT1 (24), 4DT (36),4BT (16), 6BT1 (21), 6FT1 (5), and 4FT1 (8). Weldments were inspected for
size, length, profile and locations, 'To the best of our knowledge, the work inspected is in conformance with approved
drawings, specifications and applicable AWS .01.1' codes. Fabricator was asked to notify our office when additional
services are needed,
Inspector: Chris McDonald, Certification #5298238-52 ,
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
profess~nal Service Industries, Inc, ,
~mi~(j
Branch Manager
c: Springfield School District - jsaracen@sps,lane,edu
Milstead & Associates - angus@milstead.us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps.lane.edu
THIS REPORT 1$ PROVIDED FOR THE INFORMATION OF THE CLIENT QNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED. .
Professional..Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. Fax 541/746-7163
liii"6.;. Information
1.~~~J.To Build On
/Ilng" . , ;" . CGfJGuIfIng . 'RI8Ung
FIELD DENSITY REPORT
SOIL AND SOIL-AGGREGATE
Client: John Saraceno
Address: Springfield School District
525 Mill Street
Springfield, OR 97477
Projeet No.: 722-80054-47
Project: Thurston Elementary
Project 7345 Thurston Road
Location: Springfield, Oregon
Equipment: Troxler: 3430 SN: 30203
Date Periormed:
P.O. N~.:
B.P. No.:
Technician:
-)J
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746.9649. (541)746-7163 tax.
CCB #176269
August 1, 2008
Chris McDonald
Laboratory Soil / Aggregate Data:
Moisture Density Relationship of 144 ibs.!cu.!!., at8% moisture. is from our report number 722-80055-31. dated 6/30/2008 for Springfield Quarry 3/4"-0 (T-180),
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM 03017)(Standard Count: MS 572 OS 2235)
Test No.
Approximate Test Location
Approximate Test Probe Wet Density Dry Density Percent Percent Required
Elev. Depth LBS/CU.FT. LBSfCU.FT: Moisture Compaction Compaction
Comments
A.S at 2.3 footing rock base
2 A at 2.5 footing rock base
Tests performed at finished grade of fill materiaL at listed locations above.~
Tests were reported to James with Hyland Construction,
FRG
FRG
144,3
145,3
136,8 '
136,1
6"
6"
c: John Sacaceno - jsaracen@sps.lane,edu
Rene Berndt - rberndt@mahlum,com
Ugo Costa - ugo..costa@kpff.com
Dave Guadagni - dguadagni@robersonsherwood,com
Angus Eastwood - angus@Milstead,us
Bill Hirsh - billhirsh@comcoas!.net
5,5
6,8
100.2 95%
100.9 95%
Respectfully Submitted _
Professional Service Industries, Inc.
~F~~ ('~d '
Branch Manager
TillS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONt y, THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
S5
''''~ _,Information
I."'~. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed:
Client:
August 1 , 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80173-27
Project Location:
Thurston Elementary School
7345 Thurston Road
Springfield, Oregon
Project Name:
Buildin9 Permit No.: COM2008-00437 P.O. No.:
Type of Inspection: Reinforcing Steel & Concrete Forms Weather:
P0272-334-0809
Partly ,Cloudy
Field Observations and Comments
Performed visual inspection of reinforcing steel at the following locations: slab on grade line E to H from 5 to 8, line H to
J from 4,8 to 6.2 and line' LA to J from 3'to 5 except for pour back strip, Reinforcing steel was checked for grade, size,
lap, placement-and clearances where applicable, Reinforcing steel was secured using tie wire. Reinforcing steel was
placed inaccordimce with approved design drawings and specifications, Additional Notes: dobies will be placed at time
of concrete pour, Contractor was asked to' notify our office when additional services are needed. To the best of our
knowledge, the work inspeded above was in accordanc~ with the building department approved d'esign, drawings,
specifications and applicable workmanshi[J orov/sions of the International Building Codes,
Inspector: David Smith, ICC #0877340-88, OBOA# 442
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
~S~i;~(~1J
Branch Manager
c: Springfield School District - jsaracen@sps.lane.edu
Milstead & Associates - angus@milstead.us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@rober'tsonsherwood,com
Yolanda Bird - yolanda.bird@sps.lane.edu
THIS REPORT IS PR.OVIDED FOR THE INFORMATION OF THE CLIENT ONL y, THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMfSSION OF PROFESSIONAL SERVICE INDUSTRJES, JS PROHIBITED,
Professional Service. Industries, Inc. .1040-A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. F9-x 541n46-7163
fj
l"~;lInformation
,.,..,. .To Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
Date Performed:
Client:
July 25, 2008
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80173-19
Project Name:
, Thurston !::Iementary School
7345 Thurston Road
Springiield, Oregon
Project Location:
P.O. No.:
Type of Structure:
Type of Inspection:
P0272-334-0809
Footings/Columns
Reinforcing Steel & Reinforced
Concrete
Permit No.:
Weather:
COM2008-00437
Clear
Field Observations and Comments
'Performed visual inspection of reinforcing steel at the following locations: Inspected reinforcing at slab on grade G.5 to
Eat 1 to 5, G,5 to H at 2 to 5, H to J at 5 to 8, and footing at G at 6, Inspected and tested concrete placed at footings, G
at 6,C at 6, c.at 2, B at 7, B at 6 and C at 4, Reinforcing was inspected in footings prior to placement of concrete,
Performed visual inspection 'during placement of ,concrete listed above, Reinforcing steel was checked for grade, size,
lap, placement and clearances where applicable. Reinforcing steel was secured using tie wire and supported .on
concrete dobie blocks, Reinforcing steel was pla'ced in accordance with approved design drawings and specifications
with latest revisions dated 05-01-08, Concrete was placed by mixer chute and mechanically consoiidated, . Cast one (1)
set of 4 (4 x 8) concrete test cylinders, Additional Comments: Engineer was contacted concerning trim bars at
slab on grade openings. Plans do not call for trim bar and engineer. is confident trim bars do not need to be
added.
Tv".. of Material
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
. -~-'---Design'Strength:(psi)--
Number of Samples
Total Yardage Placed
Inspector: Glenn Meek Jr., ICC# 5071536-49
CCB# 176269
Concretell1-
Knife River
40N15200
3
720F
800F
1:20 PM
- -- --- -4000-..-.-
4
7
If you have any questions regarding this report, please feel free to contact us at 541c746-9649,
Respectfully Submitted,
~y~;;&" loc.
Branch Manager .
c: Springfield School District - jsaracen@sps,lane,edu
Milstead & Associates - angus@milstead,us
Hyland Construction - markb@jhconstcom
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood,com
Yolanda Bird - yolanda.bird@sps.lane,edu
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT QNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANYMEAN$, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OFPROFESSIDNAL SERVICE INDUSTRIES, IS PROHIBITED
Professional Service'lndustries, Inc.. 1Q40-A Shelley Street. Springfield, OR 97477. Phone 541n46-9649 .'Fax 541n46-7163
nlifj....IInfomwtion
1~~~lToBuild On
illig" . .. ,;'.. . c-dffng . 1loafIng
FIELD DENSITY REPORT
SOIL AND SOIL-AGGREGATE
Client: John Saraceno
Address: Springfield School District
525 Mill Street
Springfield, OR 97477
Project No.: 722-80054-45
Project: Thurston Elementary
Project 7345 Thurston Road
Location: Springfield, Oregon
Equipment: Troxler: 3430 SN:
, ,
Date Performed:
P.O. No.:
B.P. No.:
Technician:
38785
Laboratory Soil / Aggregate Data:
Moisture Density Relationship of 144lbs.lcu,ft" at 8% moisture. is from our report number 722-80055-31, for Springfield Quarry 3/4"-0,
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 716 DS 2698)
cr
1040 - A Shelley Street
Springfield, Oregon 97477
, (541)746.9649 - (541)746-7163 fax
CCS #176269
July 24, 2008
COM 2008-00437
Glenn Meeks
Test No.
Approximate Test Location
Approximate Test Probe. Wet Density Dry Density Percent Percent Required
Elev. Depth lBS/GU.FT. LBS/CU.FT. Moisture Compaction Compaction
Comments
2
Gridline K,5 at 7
Gridl;ne L,5 at 7,2
:J Gridline L5 at 6,5
4 GridlineK.5 at 6,5
5 Gridline K,5 at 4
6 S.W. corner of storm drain line I
Tests performed at finished grade of base rock at listed locations above.
Tests were reported to James Miller.
F,G, 8" 153.4 143.2
F.G, 8" 149,3 138,3
-
,F.G, '8" 154,9 ' ,- ,145,3
F,G, 8" 146.4 137,5
F,G, 8" 152,0 137,0
F,G, 8" 150,7 136,7
c: John Sacaceno - jsaracen@sps.lane.edu
Rene Berndt - rberndt@mahlum,com
Ugo Costa - ugo..costa@kpff,com
Dave Guadagni - dguadagni@robersonsherwood.com
Angus Eastwood - angus@Milstead,us
Bill Hirsh - billhirsh@comcoast.net
7,1
8,0
6,6
6,5
9,5
10,3
99.5
96,1
95%
95%
-100.9 ,I '95%
I
9S.2 I 95%
95.0 95%
Respectfully Submitted
Profe,ssion?J' Service Industri~s,Jnc.
~~~i~ (;~J
95.5
95%
retest
Branch Manager
TliIS REPORT IS PROVIDED FOR THE INFOR^,IA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS
PROHIBITED WITHOUT mE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES,
;,.;.jt il Infomzatwn
11:!!.~..To Build On
ling " ." [", . c--. . 1'lNItIng
~j
FIELD DENSITY REPORT
SOIL AND SOil-AGGREGATE
1 040 ~ A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
CCB #176269
Client: John Saraceno
Address: Springfield School District
525 Mill Slreet
Springfield, OR 97477
Laboratory Soil / Aggregate Data.
Moisture Density Relationship of 144 Ibs.lcu.ft, at 8% moisture. Is from our report number 722-80055-31. dated 6/30/2008 ior Springfield Quarry 3/4" .0 (T-180),
Project No.: 722-80054-44,
Project: Thurston Elementary
Project 7345 Thurston Road'
Location: Springfield, Oregon
Equipment: Troxler: 3430 SN: 30203
Date Performed: ,
P.O. No.:
B.P. No.:
Technician:
July 23, 2008
Pete Furlong
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 578 DS 2232)
Test No.
Approximate Test-location
Sanatary line in parking lot
Approximate Test
Elev.
Probe Wet Density Dry Density
Depth LBSICU.FT. LBS/CU.FT.
Percent Percent Required'
Moisture Compaction Compaction
Comments
65' North of man hate 3' BFG
2 40' North of man hole 3' BFG
3 1 g' North of man hole 3' BFG
Tests performed below finlshedgrade of trench backfill'at listed locations above.
Tests were reported to Mark with Hyland
8" 140.4 132.4
---------
8" 136,0 124.7
8" 141,5, 133,1
6,0
9,1
6,3
92.0 95%
86.6 95%
92.4 , 95%
Respectfully Submitted
Profess/anal Service Industries, Inc.
c:
John Sacaceno - jsaracen@sps.lane,edu
Rene Berndt - rberndt@mahlum.com
Ugo Costa - ugo..costa@kpff,corn
Dave Guadagnl - dguadagni@robersonsherwood,com
Angus Eastwood - angus@Milstead,us
Bill Hirsh - blllhirsh@comcoast.net
Q ~ L1\)(V~~(j
, ~~, s~r\
Branch Manager
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED
WITHOUT THE WRITTEN
. PERMISSION OF PROFESSIONAL SERVICE INDUSTRfES.
"
~f
l...~;z Information
,.,~. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed: July 23, 2008 Report Number: 722-80173-14
Client: Springfield School District Project Name: Thurston Elementary School
525 Mill Street
Springfield, OR 97477 Project Location: 7345 Thurston Road
Springfield, Oregon
Contractor: John Hyland P.O. No.: P0272-334-0809
Fabricator: MetalSome Shopl Field: Shop
Type of Inspection: Welding Weather: Clearllnside
Field Observations and Comments
Performed periodic visual inspection of the following items: embeds with nelson studs (69) 3A-T, (6) 3K-7, (2) 3M-T, (6)
4F-7, (8) 4B-T, (22) 4D-T, (1) 4D.T, (1) 4K-T, (2) 5F-T, (6) 5C-T, (1) 5H-T, (12) 5D-T, (3) 5M-T, (17) 6A-T, (4) 6C-T, (20)
6B-T and (1) 6D-T. Weldments were ins'pected for size, length, profile and locations,' To the best of our knowledge, the
work inspected is in conformance with approved drawings. specifications and applicable D1,1 codes. Fabricator was
asked to notify our office when additional services are needed,
Inspector: Curt Halstead, ICC #1060568-85 '
CCB #176269
If you have any questions regardin9 this report, please feel free to contact us at 541-746-9649,
Respectfully Submitted,
Professional Service Industries, Inc,
~~t~(w J
Branch Manager
c: Springfield School District - jsaracen@sps.lane,edu
Milstead & Associates - angus@milstead.us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood,com
Yolanda Bird - yolanda.bird@sps.lane.edu
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc. -1040-A Shelley Street. Springfield, OR 97477. Phone 541f746.9649. Fax 541f746-7163
.,,~ _lInformation
"",..,- .TO Build On
Engineering. Consulting. Testing
DAILY FiELD REPORT
Date Performed:
Client:
July 23, 2008
Springfield School District
525 Ivlill Street
Springfield, OR 97477
P.O. No.:
Type of Structure:
Type of Inspection:
Elevator Walls/Spread Footings
Reinforcing Steel & Reinforced
Concrete
Report Number:
Project Name:
Project Location:
Permit No.:
Weather:
>;r
722-80173-15
Thurston Elementary School
7345 Thurston Road
Springfield, Oregon
C01vl2008-00437
Clear
FieldObservations and Comments
. Performed visual inspection of reinforcing steel at the following locations: Elevator walls and Spread Footings on lines'
2.5 and 5,5 bet E and D, 5 bet E.2 and E,6, Reinforcing steel was checked for grade, size, lap, placement and
clearances where applicable, Reinforcing steel was secured using tie wire and supported' on concrete dobie blocks.
Reinforcing steel was placed in accordance with approved design drawings and specifications. Performed visual
inspection during placement of concrete in the locations listed above. Concrete was placed by truck shoot and
mechanically consolidated. Cast one (1) setal 4 (4 x 8)concrete test cylinders. Contractor was asked to notify our
office when additional services are needed, To the best of our knowledge, the work inspected above was in accordance
, with the building department approved design drawings, specifications and applicable workmansliip provisions of the
International Building Code.
Tvoe of Materia]
Supplier
Mix#
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
. _____... _. _De~ig!,_Strength (psi)
'N umber '6fSam pies;"-"
Total Yardage Placed
Inspector: Curt Halstead ICC# 5273553-49
CCB# 176269
Concreteli
. Knife River
2440N15200
4
67"F
72.30F
12:00 PIvl
4000
-----4.-.....- --------,..- -...-
11
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
~al Service Industries, Inc.
David sm~~ ~J
Branch Ivlanager
c: Springfield School District - jsaracen@sps.lane.edu
Ivlilstead & Associates - angus@milstead,us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps.lane.edu
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY. BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS f:>ROHIBITED.
. Professional Service Industries, Inc.. 1 040-AShelfey Street. Springfield, OR 97477. Phone 5411746.9649. Fax 5411746.7163
l 'fJ~;1 Infonnation
~.;jJi1f6 To Build On
Ilnglneertlg. ContIcIItInfI. 1I"."j l
ss
FIELD DENSITY REPORT
SOIL AND, SOIL-AGGREGATE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746.9649 - (541)746-7163 fax
CCB #176269
Client: John Saraceno
Address: Springfield School District
525 Mill Street
Springfield, OR 97477
Project No.: 722-80054-43
Project: Thurston Elementary
Project 7345 Thurston Road
Location: Springfield, Oregon
Equipment: Troxler: 3430 SN: 30203
Date Performed:
P.O. No.:
B.P. No.:
Technician:
July 22, 2008
COM2008-0437
Pete Furlong
Laboratory Soil! Aggregate Data:
M9isture Densily Relationship of 144 Ibs./cu.ft., at 8% moisture, is from our report number 722.80055-31, dated 6/30/2008 for Springfield Quarry 3/4" -O'(T-180),
, Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 573 OS 2250)
Test No. Approximate Test Location Approximate Test Probe Wet Density Dry Density Percent Percent Required Comments
Elev. Depth lBS/CU.FT. lBS/CU.FT, Moisture Compaction Compactjon
Gym and gym storage room - 8.2 and 2.1 FRG 6" 152.1 141,3 7,6 98.1 95%
2 Gym and gym storage room - G.75 and 3.8 FRG 8" 148.4 137.9 7,6 95.8 95%
3 Gym,and gY!ll storageroomFand 4 FRG 6" 145.9 137,3 6,3 95.4 95%-- '
----
4 Gym and gym storage room G and 4.5 FRG 6" 154,1 141.5 8,8 98,3 95%
5 Gym and gym storage room E.5 and 4.5 FRG 6" 154,2 143,3 7,6 99.5 95%
-------
6 Gym and gym storage room E.5 and 2 FRG 6" 147.2 138,9 6,0 96.4 95%
Tests performed finished grade of base rock at the slab on grade for locations listed above, RespectfUlly Submitted
Tests were reported to James with Hyland Construction, Pr fessional Service Industries, Inc,
c: John Sacaceno - jsaracen@sps,lane,edu
Rene Berndt - rberndt@mahlum,com
Ugo Costa - ugo..costa@kpff,com
Dave Guadagni - dguadagni@robersonsherwood,com
Angus Eastwood - angus@Milstead.us
Bili Hirsh - billhirsh@comcoast.net
THIS REPORT IS PROVIDED FOR THE INFORf\/A nON OF THE CLIENT GNL Y. THE REPRODUCTION .oF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN ,FULL IS
PROHIBITED WITHOUT THE WRITTEN
- PERMISSION Of: PROFESSIONAL SERVICE INDUSTRIES. -. .
.y-
l~r-;lInfonnation
f'I~. .To Build On
Engineering . Consulting. Testing
DAILY FIELD REPORT
Date Performed: July 17, 2008 Report Number: 722-80173-11
Client: Springfield School District Project Name: Thurston Elementary School
525 Mill Street
Springfield, OR 97477 Project Location: 7345 Thurston Road
Springfield, Oregon
Building Permit No.: COM2008-00437 P.O. No.:
Type of Inspection: Reinforcing Steel Weather: Clear
Field Observations and Comments
Re-inspected reinforcing at grade beam/footings the following locations: Pier caps at D at 2, D at 4.3 and B at 3,5, all on
dobies, tails in other pier caps are turned up per plans; Slab dowels installed at D at 2 to 3.5, B to D at 2 and B at 2 to 5
per'plan. Performed' visual inspection of reinforcing steel at the location listed above, Reinforcing steel was checked for
grade, size, 'lap placement and clearances where 'applicable. Reinforcing steel was secured using tie wire and
supported on concrete dobie blocks. Reinforcing steel was placed in accordance with the latest revisions dated 5/1/08,
To the best of our knowledge, the work inspected above was in accordance with the building department approved
Idesiqn drawinqs, specifications and applicable workmanship provisions of the International Building Code: '
Inspector: Glenn Meek Jr., IGG# 5071538-49
GGB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649"
Respectfully Submitted,
Professional Service Industries, Inc.
~~h ~~~)
Branch Manager
.-..-----.---------
c: Springfield School District - jsaracen@sps.lane,edu
Milstead & Associates - angus@milstead.us
Hyland Construction - markb@jhconst.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Yolanda Bird - yolanda.bird@sps,lane,edu
THIS REPORT /s PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS.TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc. . 1040-A Shelley Street. Springfield, OR 97477 . Phone 5411746-9649 . Fax 5411746-7163