Loading...
HomeMy WebLinkAboutCorrespondence SUB 1/2/2007 .~- .~ \ .~- '. SPRINGFIELD UTILITY BOARD WATER SERVICE CEi\'TEI{ 202 South 18th Street Springfield, OR 97477-5240 Tel 541.726.2396 Fax 541.747,7348 www.subutiJ.com December 29, 2006 Andy Limbird City of Springfield 225N, 5th Street Springfield, OR 97477 Dear Andy: SUBJECT: PARTITION TENT A TIVE #SUB2006-00069 FISCHER Tax Map 17-02-31-42, Tax Lot 7800, 285 South 37"' Street Listed below are our comments for the above referenced development proposal: I. The proposed development is within the Springfield city limits and will receive water service from the Springfield Utility Board (SUB). ":-.;' <;'J~;. :':. ',.".,;' 2, All neW, wa(ersystem, [acilities and modifications to wat~r syst~m facilities,both irs(de al:Jq .". . adjacent to.the proposedAevelopme~t ,shall. be plac~d in st.ree!Jight~of,~a{a.(,\l. fciSa.ti09,an'd.depth of bury that meets the standards of the SUB Water Division. ,- ,". .. . ...~ .. _ '5. ;)". ~, ~ " 3. All water facility materials shall be to a standard that must meet SUB Water Division specifications. 4. All workmanship shall be performed to meet or exceed SUB Water Division construction standards. 5. Size of waterline and other facilities, including water meters, inust meet the needs of the SUB Water Division and the long-range needs of the City. These needs include, but are not limited to, met'er-Iocat:on and acces-s, sizes of water distribution- and transmission lines, pumping facilities, and conununication,lines. 6. Please ask the developer to contact the SUB Water Division for detailed inf~rmation on the materials and construction standards, detailed costs for installing SUB water facilities, and a schedule of construction. Construction expenses may be reduced with good planning of required water facilities, good timing of facilities installation, and joint trench opportunities. ,'..- 7. All water l11eters will be placed in public right-of-way at a location identif1ed \,y the developer. Each lot or parcel must have its own water service. " . vI , , . , ., 8. Watenservigefacilities ,will be,installed uponcollectjon ofge."~I5'Pl1!.ent,cqa~ge~;,.-geyeI9pment . policies andcharges.identified in t,his letter are subject to;.C~a.J;,1g9. -AC!u31;cb%ge~,:r'W g,e :ifiose in' effect at the time water service is requested. . ,j-;. ;'- Date t{6ceived: //.z/.,lO07 Planner: AL I .... '.j Site Plan #SUB 2006-00069 285 S. 37th Street December 29, 2006 Page 2 of2 9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water comes from wells. In every instance, care shall be taken to prevent groundwater contamination. Contractors/developers/owners shall be responsible for the safe handling and storage of chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water runoff contamination. Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396. PLEASE NOTE: SUB development charges are paid directly to SUB Water Division and SUB Electric Division. Sincerely, Ztw- ~~ Rebecca Temp)in, P.E. Civil Engineer - Water Division RAT:mkm cc: Daniel Fischer, 325 South 43" Place, Springfield, Oregon 97478 Scott Morris, Olson & Morris, 380 Q Street, Suite 200, Springfield, Oregon 97477 \\svr-data\WSCEngnr\SITEPLAN\285 S 37th Street Partition Tentative 12-29-06.doc Oat.. i'<eceived: 1/2 /:Z<>07 Planner: AL 7 /