HomeMy WebLinkAboutNotes, Work PLANNER 2/1/2008
.':..
1.
a.
b. Exception to Metro Plan Chapter 3 Section D Policy 11
(New Bridge)
c. Possible Exception to Metro Plan Chapter 3 Section D
Policy 11 (Bridge Removal)
"
,
2. Trans Plan Amendment
3. Wiliakenzie Area Plan Amendment
A. Type Iii
B. Wiilamette Greenway Overlay
under Springfield Development Code 25.050 and
'. Planning Director Determination of Springfield Development Code
31.240(2)
D. Other?
.1. Facility Review
A. Type ill
B. Wiliamette River Greenway Eugene Code 9.8800-9.8825
,
. C. Standards Review Eugene Code 9.4913-9.4980
I'
I
D. Other?
1. Facility Review
To authorize a non-water-
dependent and non.water related
use within the established
Greenway setback.
To authorize the piacement of fili
within the' Greenway selba<;k for the
n.ew bridge.
Possible to authorize filineeded in
conjunction with removal of the
original 1.5 Wiilamette River bridge.
Tq include the bridge replacement
project in TransPlan's list of
authorized transportation
improvements.
To aliow structures and fili'
associated with the new 1.5 bridge
to be constructed within the.first 35
feet back from the top of the
riverbank within the Greenway in
the Willakenzie area.
The new bridge will have a
significant visual impact.
New bridge "diminish riparian
function" of affected riparian areas.
I
I
The replacement bridge is a
"development" within the Greenway
boundary.
The footprint of the replacement
bridge will extend outside the
footprint of the existinq 1-5 bridqe.
Eugene,
Springfield,
and Lane
County
Eugene,
Springfield,
and Lane
County
Eugene,
Springfield,
and Lane
County
Eugene,
Springfield,
and Lane
County
Eugene
Springfield
Eugene
-
~
.E5
_=:i4"--
Date Received
FEB 0'1 2008
Planner' ':lJ
.;
~
,
,
.~7:
~)
,~
A. Possible Facility Permit
8. Other?
A. Type III?
8. Planning Director Determination of Springfield Development Code
31.240(2)?
C. Other?
A. Type III?
8. Willamette River Greenway Eugene Code 9.8800-9.8825?
C. Standards Review Eugene Code 9.4913-9.4980?
~.
I). Other?
^. Any?
?
\';"'v\.J ~\e'>"'" tr ,.-..~tw\ -
G",,si ~? ~ (J \.Y..:/A L
I
Ie. ~01/1
I Vv'~ lAe;t<..C ~ ~ .
I \0< ~~,,-,,^vuk" ~IA ~
6< \?-A~ ,~<
Possible removal of the original
bridge "diminish riparian function" of
affected riparian areas. .
I
I
Eugene
Possible activities assoCiated with
the removal of the original 1.5
Willamette River bridge extend
outside the footprint of the existing
bridge.
I
Lane County
'Db 'WG ~~ IfIM. ~~N \" f7'M ~ 5 ~~
Date Received
FES 0 1 2008
Planner: BJ