Loading...
HomeMy WebLinkAboutNotes, Work PLANNER 2/1/2008 .':.. 1. a. b. Exception to Metro Plan Chapter 3 Section D Policy 11 (New Bridge) c. Possible Exception to Metro Plan Chapter 3 Section D Policy 11 (Bridge Removal) " , 2. Trans Plan Amendment 3. Wiliakenzie Area Plan Amendment A. Type Iii B. Wiilamette Greenway Overlay under Springfield Development Code 25.050 and '. Planning Director Determination of Springfield Development Code 31.240(2) D. Other? .1. Facility Review A. Type ill B. Wiliamette River Greenway Eugene Code 9.8800-9.8825 , . C. Standards Review Eugene Code 9.4913-9.4980 I' I D. Other? 1. Facility Review To authorize a non-water- dependent and non.water related use within the established Greenway setback. To authorize the piacement of fili within the' Greenway selba<;k for the n.ew bridge. Possible to authorize filineeded in conjunction with removal of the original 1.5 Wiilamette River bridge. Tq include the bridge replacement project in TransPlan's list of authorized transportation improvements. To aliow structures and fili' associated with the new 1.5 bridge to be constructed within the.first 35 feet back from the top of the riverbank within the Greenway in the Willakenzie area. The new bridge will have a significant visual impact. New bridge "diminish riparian function" of affected riparian areas. I I The replacement bridge is a "development" within the Greenway boundary. The footprint of the replacement bridge will extend outside the footprint of the existinq 1-5 bridqe. Eugene, Springfield, and Lane County Eugene, Springfield, and Lane County Eugene, Springfield, and Lane County Eugene, Springfield, and Lane County Eugene Springfield Eugene - ~ .E5 _=:i4"-- Date Received FEB 0'1 2008 Planner' ':lJ .; ~ , , .~7: ~) ,~ A. Possible Facility Permit 8. Other? A. Type III? 8. Planning Director Determination of Springfield Development Code 31.240(2)? C. Other? A. Type III? 8. Willamette River Greenway Eugene Code 9.8800-9.8825? C. Standards Review Eugene Code 9.4913-9.4980? ~. I). Other? ^. Any? ? \';"'v\.J ~\e'>"'" tr ,.-..~tw\ - G",,si ~? ~ (J \.Y..:/A L I Ie. ~01/1 I Vv'~ lAe;t<..C ~ ~ . I \0< ~~,,-,,^vuk" ~IA ~ 6< \?-A~ ,~< Possible removal of the original bridge "diminish riparian function" of affected riparian areas. . I I Eugene Possible activities assoCiated with the removal of the original 1.5 Willamette River bridge extend outside the footprint of the existing bridge. I Lane County 'Db 'WG ~~ IfIM. ~~N \" f7'M ~ 5 ~~ Date Received FES 0 1 2008 Planner: BJ