HomeMy WebLinkAboutComments PLANNER 8/26/2008
:City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
SITE PLAN REVIEW
PRE-SUBMITTAL CHECKLIST
Project Name: Children's Choice Montessori
Project Proposal: Place a day care center in HDR-zoned single-family dwelling
Case Number: PRE2008-00058
Project Address: 1942 5th Street
Assessors Map and Tax Lot Number(s): 17032624 TL 3000
Zoning: High.Density Residential (HDR)
Overlay District(s): Drinking Water Protection (DWpf 10-year Time of Travel
Applicable Refinement Plan: Q Street
Refinement Plan Designation: High Density Residential (HDR)
Metro Plan Designation: High Density Residential (HPR)
Pre-Submittal Meeting Date: August 26, 2008
Application Submittal Deadlin'e: February 26, 2009
Associated Applications: None
II~ImYwf.OFJSelUl....GI!IEl!Pl!Q:E~El!Oell!l:ENi1l.REYIEW.-e~lI!llll!i!I!!_IIIl11I1UI1!I_r.~___
I POSITION REVIEW OF NAME PHONE I
I Proiect Planner Land Use Planninq Lissa Davis 726-3632 I
I Transportation Enqineer in Traininq Transportation Jon Driscoll 726-3679 I
I Public Works Civil Enqineer Utilities Eric Walter 736"1034 I
I Public Works Civil Enqineer Sanitary & Storm Sewer Eric Walter 736-1034 I
I Deputy Fire Marshal I Fire and Life Safety. Gilbert Gordon 726-2293 I
L Community Services Manaqer I Buildinq Dave Puent 726-3668 I
rAe.pm~~N'I~SrI)EMEl!OeI'llEN'I.!RE~.IEWk1f.E~II!l~',
Owner / Applicant.
Lucas & Carla McQuillan
1942 5th Street
Springfield OR 97477
tlS$i'~. - _~);
, ~ 10ilti;ftxv'--
Date Received:
Planner: cb
81ulOG. _-i-
~(lQ~
Revised 10/25/07
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
pLANNING
o Application fee - discuss the applicable fees
o Copy of the Site Plan reduced to 8'h"x 11"
Complete Incomplete See Planning
Note(s)
~
~
Iill!lill
, 8 ';''' x f1" Copy of Site Plan
o Copy of the deed and a preliminary title report issued within the past 30 days
documenting ownership and listing all encumbrances. If the applicant is not the property
owner, written permission from the property owner is required.
Complete Incomplete
See Planning
Note(s) ,
~ IiJ
Deed and Preliminary Title Report
o Brief narrative explaining the purpose of the development, the existing use of the
property, and any additional information that may have a bearing in determining the
action to be taken. The narrative should also include'the proposed number of employees
and future expansion plans, if known.
Complete Incomplete See Planning
Note(s)
[2]
Brief Narrative
o Site' Plan
Complete Incomplete See Planning
Note(s)
l'32I
~
l'32I
~
~
Prepared by an Oregon Licensed Architect,
Landscape Architect, or Enginee~
Proposed buildings: location, dimensions,
size (gross floor area applicable to the
parking requirement for the proposed
use(s)), setbacks from' property lines, and
distance between buildings
Location and height of existing or proposed
fences, walls, outdoor equipment, storage,
trash receptacles, and signs
Location, dimensions, and number of typical,
compact, and disabled parking spaces;
including aisles, wheel bumpers, directional
signs, arid striping
Dimensions of the development area, as well
as area and percentage of the site proposed
for buildings, structures, parking and
~
[2] IiJ
[2] ~
~ lite Received' B htq\ o!() ,
Planner: CD S~ ~
Revised 10/25/07
vehicular areas, sidewalks, patios, and other
impervious surfaces
Observance of solar access requirements as
specified in the applicable zoning district
On-site I~ading areas and vehicular and
pedestrian circulation
"
Location, type, and number of bicycle
parking ~paces
Area anq dimensions of all property to be
conveyed, dedicated, or reserved for
common:; open spaces, recreational areas,
arid other similar public and semi-public uses
,
Locationi:of existing and proposed transit
, facilities ,I
o Phased Development Plan Where applicabl~, the:'Site Plan application must include a ,
phasing plan indicating any proposed phases for development, including the'boundaries
and sequencing of each phase, Phasing must progress in a sequence promoting street
connectivity between the various phases of the development and accommodating other
required public improvements, including but not limited to, sanitary sewer, stormwater
management, water, and electricity. The applicant must indicate which phases apply to
the Site Plan application being submitted.
Complete Incomplete See Planning N/A
Note(s)
[2]
~
~'
[g]
1
I'0'l
~
[2]
l!!I
[2]
III
~
Phased Development Plan
Planning Notes:
,
1. Site Plan must clearly delineate the proposed circulation for both vehicles and
pedestrians during drop off and pick up I
Additional comments not related to the completeness of the application:
o ' Please be aware of the new SDC and application forms.
Date Received: 0/l.&lov
Planner: L[) s,~. ~'&J--
Revised 10/25/07
j'
ANY REQUIRED ADDITIONAL MATERIALs, APPLICATIONS'OR
. I Ii
, ' PERMITS:
,
"
I'
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE-
,APPLICATION REPORT FOR MORE DETAILED INFORMATION:
Applicable
Not
Applicable
[2]
Iijil
tlE!I
[g]
r<:J'I
~
~
[2]
[2]
~
fiilll
~.
~
~
~
"'"
tli:EEJ
[2]
"0
~.
~
[2]
Revised 10./25/0.7
Where a multi-family development is proposed, any additional
materials to demonstrate compliance with SDC 3.2-240
i'
Ii
Riparian Area Protection Report, for properties located within 150
feet of the top of bank of any Water Quality Limited Watercourses
(WQLW) or within 100 feet of the top of bank of any direct
trioutaries of WQLW '
A Geotechnical Report prepared by an engineer must be submitted
, concurrently if there are unstable soils and/or a high water table
present
Where the development area is, within an overlay district, address
the additional standards of the overlay district
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified in SDC 5.19-100
A wetland delineation approved, by the Oregon Division of State
Lands must be submitted concyrrently where there is a-wetland on
the property
Any required federal or state permit must be submitted
concurrently or evidence the permit application has been submitted
for review
'Where any grading, filling or ex'cavating is proposed with the
development, a Land and Drainage Alteration permit must be
submitted prior to development
Where applicable, any Discretionary Use or Variance as specified in
r. .
SDC 5.9-100 and 5.21-100
An Annexation application, as specified in SDC 5.7-100, where a
development is proposed outside of the city limits but within the
City's urban service area and can be serviced by sanitary sewer
., '
,.
Date Received' fj)Ue/o'O
PIaMer: UD S~ rwpo:J-
THIS APPLICATION IS:
o COMPLETE FOR PROCESSING
'0-INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
L~bw\.~
9\Vo lo~
Date
City Planner
This is not a decision on your application. Springfie'id Development Code Section 5.4-
105 and Oregon Revised'Statutes 227.178 require the City take final action on a limited land
use decision within 120 days after the application is deerned complete. The 120-aay
processing period for this application begins when all the: missing information is submitted or
when you request that the City proceed without the information. ., You must indicate by either
signing this form or by submitting a written response to :\:he City within seven days of the
date of this form asserting your intentions regarding the ,provision of the missing information.
If you indicate herein or in your written response thatthe missing information will be
submitted, then you have 180 days from the date the application was submitted for Pre-
Submittal Review to provide the City with the missing information. If you refuse to submit
the missing information, then upon receipt of the full apRlication packet and processing fee,
the City will deem the application complete for purposes 'of starting the 120-day clock and
begin processing the application. No new information may be submitted after the start of
the 120,day period unless accompanied by a request for an extensioQ of the 120-day
processing time. Upon receipt of a request for extension, the City may extend the 120-day
period for a reasonable period of time. The City may also require additional fees if the new
information is submitted after the Notification to Surrounding Property Owners is sent out
and a second notification is required or if the new inform'ation substantially affects the
application proposal and additional review is required. i, I ..
I
I, the owner/applicant, intend to submit, all missing items indicated herein to the
City within the lSD-day timeline. '
Owner/Applicant's Signature
Date
uale t<eceived'
Planner. )J)
0!crlo!06 +
S~ (iubp QfL,
Revised 10/25/07
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Deputy Fire Marshal: Gilbert Gordon
. Case #: PRE2008-00058
FIRE
o Site Plan
Complete Incomplete See Fire
Note(s)
[2] ~ On-site vehicular circulation,
o Improvement and Public Utilities Plan
Complete Incomplete
Ijj:i;]
l!iliill
~
See Fire
Note(s)
1.
Location of existing and required fire hydrants and
similar public facilities
Fire Notes:
,.
. 1. Show or describe location of nearest fire hydrant.
Additional comments not related to the complf7teness of the application:
"
Date R~~ed: '8/U/08 -
PIanner::. t:-, UJh.. . ~1-i1.:.?~
Revised 9/24/07
. '1.
~I
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Transportation Engineer/Planner: Jon Driscoll Case#: .PRE2008-00058
Applicant: McQuilln
TRANSPORTATION
o Right-of-Way Approach Permit application must be provided where the property has
frontage on a Lane County or an Oreg(;m Department of Transportation (ODOT) facility.
Complete Incomplete See Transportation
Note(s)
l%I
~..~.
=::
*'"
Copy of ROW Approach Permit Application
o Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer in
accordance with SDC 4.2-105 AA. Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts'and mitigation of a development on the City's
transportation system. In general, a TIS must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
address, if needed, City, Metro Plan and state land use and transportation policies and
objectives.
Complete Incomplete See Transportation
Note(s)
l%I ~
=
0 Site Plan
Complete Incomplete See Transportation
Note(s)
l%I ~
,1liIT
Traffic Impact Study
Access to streets, alleys, and properties to
be served, including the location and
dimensions of existing and proposed curb
cuts and curb cuts proposed to be closed
o Improvement and Public Utilities Plan,
Complete Incomplete See Transportation
Note(s)
[2]
P}I. '
~
Location and type of existing and
proposed street lighting
~, Location, width, and construction material
of all existing and proposed sidewalks,
sidewalk ramps" pedestrian access ways,
and trails
:~I!'J;)f:)H ,.fir.;':" I / J,.,ocation, widths (of paving and right-of-
,,' -'I :10r5at~:Received: 8 _z-Ct _ D'rw",y) and names of all existing and '
, Planner: (jJ proposed streets, alleys, dedications, or
.,Jr~~
E!I
=,_1'01._
~"
~.. ...........1._..
Revised 10/25/07
~
~
1.=.1
other right-ot-ways within or adjacent to ,
, the proposed development, including
ownership and maintenance status, if
applicable
Location of existing and required traffic
control devices
Transportation Notes:
1. The proposed driveway is not clearly defined, nor, is it dimensioned (e.g. throat
width and driveway wings)
Additional comments not related to the completeness of the application:
. The parking lot does not provide room for turning around. See Table 4.6-1 in SDC
4.6-115.
. Is there a special reason that only three parking spaces are provided?
Revised 10/25/07
. Date Received: IJ b ~/ (J1j;.,
<~,~._,~. .,;..".i.",,:>j~lanner: r{)J ~.,.-
. --...~ ~-. ....\.,.'.*. ;;:;,JI.......\.. I
, ;!;'iiCiiiJrtl~ ' 0Yl
~
..,,'
.
~ .
TENTATIVE SITE PLAN REVI.~W APPLICATION
PRE-SUBMITTAL CHECKLIST
r
Engineer: Richard Perry Case#: PRE2008-00058.
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete
Incomplete See PW
Note(s)
[8]
~~'
1W'$,
\IDt
[2]
[gJ.
'~
[8]
~
~,
[8]
1
.~
1%?1...
16SJ
2
[8]
1%?1...
k01
~
, I .h<'I';',....'.t.'''.t.1 '
-...........,.............._.__.....1\'" '..~QJ " ;:1.;_....!
"1 ''':'.". }"I',.~.ht~:1
1I.'i~"Q.i Ii
Revised 10/25/07 ,
'. ,
'I'
'I
Prepared by an Oregon licensed 'Landscape Architect
or Engineer Ii'
Vicinity Map
.
Thenamej location, and dimensions of all existing site
features including buildings, curb cuts, trees and
impervious surface areas, clearly indicating what is
remaining and what is'being removed. For existing
structures to remain, also indicate present use, size,
setbacks from property lines; and distance between
buildings '
The name, location, dimensions, direction of flow and
top of bank of all .watercourses and required riparian
setback that are shown on the Water Quality Limited
Watercourse Map:on file in the Development Services
Department
The 100-year floodplain and floodway boundaries on
the site, as specified in the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of Map
Amendment or L~tter of Map Revision
The Time of Travel Zones, as specified in SDC 3.3-200
and delineated on the Wellhead Protection Areas Map
on file in the Dev~lopment Services Department
Physical features including, but not limited to trees 5"',
, , ,in diameter or greater when measured 4 Y2 feet above
the ground, significant clusters of trees and shrubs,
riparian areas, wetlands, and rock outcroppings
. . J .
Soil types and water table information,as mapped and
specified in the SiJils Survey:of LaheCounty. A
Geotechnical Report'prepared by a'ri Engineer must be
submitted concur~ently if the Soils Survey indicates
the proposed development area has unstablesoils
and/or a high water table
[Date Received: 812..&168
Planner: N.J) 7_~~
,.~~'
~~
,-
,
i
o Iml?rovement and Public Utilities Plan must be in compliance with the regulations of
SDC Sections 5.17-100, 4.1-100, 4.2-100, and 4.3-100 and must include the following
information: '
Complete Inc9mplete
[g] ~
[2] ~
[2]
~
~
~
See PW
Note(s)
3
o Grading and Paving Plan
Complete
Incomplete See PW
N.ote( s)
,3
N/A
~
~
Iiiiil..~. ..
~
~'"
fry!
-
~ [g] 4
~"''''.
~ ~ 4
~ ~ N/A
~-
I2ill
'liil
t.:::eI
P}I-
~
~
l!11J
N/A
Prep'~red by an Oregon licensed Civil Engineer
Location and width of all existing and proposed
, easements
Location of existing and required power poles,
transformers, neighborhood mailbox units, and similar
,public facilities
,Location and size of existing and proposed utilities on
and adjacent to the site, including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable TV.
Indicate the proposed connection points
Prepared by an Oregon licensed Civil Engineer
Planting plan prepared by an Oregon licensed'
Landscape Architect where plants are proposed as
part of the stormwater management system
Roof drainage patterns and discharge locations
Pervious and impervious area drainage patterns
The size and location of stormwater management
, ,
systems ,components, including but not limited to:
drain lines, 'catch basins, dry wells and/or detention'
ponds; stormwater quality measures; and natural
drainageways to be retained ,
Existing and proposed spot elevations and contours
lines drawn at 1 foot intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
intervals)
Amount of proposed cut and fill
o 'Stormwater Management'System Study - provide four (4) copies of the study with
the completed Stormwater Scoping Sheet attached. The plan, calculations, and
documentation must be consistent with the Engineering Design Standards and
Procedures Manual.
Complete Incomplete See PW
, , , . Note(s)
liil~!v'l/l' ....",.,) "'N"'/.A'
l~r"""'''~''::io'..I;""",.,~.,...:I....""",,.:;~.,...... ',.
.. ,,0"' ~"~.:'j!1rrG"~J
~";"::;'a.,..."
Revised 10/25/07
Scoping Sheet and attached StormwaE3r M1l1~~ent
System Study Date Received: 7--0.' (~
. Planner: &-\) 1=>L0 U~i~ l
~~ S{~2
-,
PW Notes:
1. Show the 100-year fioodplain and floodway boundaries on the site, as specified in the
latest adopted FEMA Flood Insurance Rate Maps or state the .status of the subject.,
property.
2. Show the Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the
Wellhead. Protection Areas Map on file in the Development Services Department
3. Due to the limited nature of this project, the requirement to have a Civil Engineer
approve the plan will be waived. However, should the nature of the project
change or requirements necessary for completion of the project change, an
approval by a licensed Civil Engineer may be required.
4. Show drainage patterns for impervious surfaces (driveways) and discharge locations
for all impervious surfaces. .
Additional comments not related to the completeness of the application:
.
,
Date Recelvecl:...al 14 tee .
Planner: UJ ?w t1~~:Ut?
~olL3 '
Revised 10/25/07
,