Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2008-9-22 HI LL & DALE EN<::;INEERING, LLC 1850 OAk STREET SUITEC EUGENE, QREGON 9740,1 541-868-0667 FAX: 541-896-9205 . rr;f0~ ~~\ V 09/22/08 Pacific Key Construction LLC 6750 Hwy 126 Florence, Oregon 97439 RE: 242 S 70th'Snrinpfiekl_ Compaction Inspection - Job #357c.08 As you requested, a compaction inspection was performed atthe above address on 09/22/08. The site preparation was performed with the installation ofJ/4" minus to approximately 24 inches, maximum, in depth in preparation for the foundation for the proposed manufactured home, The rock was placed with tracked excavation machinery and compa~ted with vibratory equipment. The compacted surface of the crushed rock is adequate for the proposed foundation and has' a ininimwn bearing capacity of 1500 psf. The compaction of the gravel surface is greater than 95% of a standard proctor. This report is limited to the compaction of the installed granular: fill at the above address. , Thank you for this opportunity to be of service. Services performed by the geotechnical engineer for' this project have been conducted with that level of care and skill ordinarily exercised by members of the profession currently practicing in this area. under similar budget and time restraints. No warranty, expressed or implied, is made. 'If you have questions regarding this report, contact me at 868-0667, ' Sincerely, , Pamela S. Hillstrom, P.E., G.E. - I EXPiRATION O/~TE: 6/30/0'1 I