Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2008-8-21 !:"'". f' , ~...p. ...yrt. . Page 1 of 1 .1:..'.INrI'....I~lio'~;.IIIII~..I\'I.. Geoted1nical & ConstrucOOn SeMoos Daily Field Report Client: Mr. Joe'Hawes Project: International Way Development Date: . 08-21-08 Hawes Investments, LLC Package A Project No.: 2087024 2892 Crescent Avenue 400 International Way Report No.: E-20964 Eugene, Oregon 97402 Springfield, Oregon Inspector: A. Fenstermacher 10 No.: 5258882-49 Inspection of: Epoxied Dowels . Reinforcing Steel Weather: Showers Continuous Inspection: 0 Contractor: Chambers Construction BPNo.: cefl,,2.uu7'.04.a51 Periodic Inspection: Ii:! C '6'~ 1iO Performed preliminary inspection on the reinforcing steel for second floor patio between lines 3.2 and 4, from B to B.8. Reinforcing steel was checked for size, grade, laps, quantities, locations, ties, clearance and supports. A final inspection will be performed . prior to concrete placement. Also, performed continuous inspection during the installation of twenty-seven (27) #4 x 30" horizontal dowels into second floor slab for patio tie in along line 4.1, from B to C and D to E.5. Prior to installation the predrilled holes were cleaned with compressed air and a brush. Verified minimum embedment of 4". Dowels were secured with Epcon A7 (ICC-ES ESR-5560, expiration date 01-20-09). . . John (Chambers) was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected was in accordance with plans dated 05:16~08and applicable workmanship provisions of the I.B.C., except if npted above. Reviewed By: (J1.~/4--. Michael L. Mey(l Technical Manager c: Chambers Construction - Dave Bakke (em ail) Chambers Construction - John Shay (em ail) Coughlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (em ail) City of Springfield MLM:sc. This report and/or enclosed test data is, the confidential property of the client to whom it is addressed:and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed Without FEI Testing & Inspection, Inco's written au~horization. 7m twV CaneII Avenue' COlvall~, CXega197330 . phJne (541) 757-4698 . fax (541) 757-2991 29540 BAirport Road. Eugene, CXega197402' phone (541) 684-J849 . fax (541)684-J851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 3824846 ,~ SFEI 1I~'Ii"Ii;.,,"mlil"."'" G.....,W " .:caJ & ConstrucIion Services Page 1 of 1 Report of Inspection Services Welding/High-Strength Bolting. Client: Mr. Joe Hawes Hawes Investments, LLC 2892 Crescent Avenue. Eugene, Oregon 97402 Project: International Way Development Package A 400 International Way Springfield, Oregon Date: Project No.: Report No.: Inspector: 10 No.: 08-25-08 2087024 E-20984 L. Postier/ K. Green 06120541 AWS CWI Field: 0 Inside COM2007-01851 Inspection of: Welding Fabricator or Erector: Metalsome Contractor: .Chambers Construction Shop: 611 Weather: BPNo.: Performed visual inspection ofthe following fabricated structural steel components: frames- 281-0, 282-A,' 283-A and 283-B; T.S. beams- 281-A and 281-C; tubes- (4) 281-B. Completed welds were checked for size, length, profile and location. James Heffner was asked to notify our office when additional services are needed. To the best of our knowledge, the work checked is in conformance with shop drawings dated 08-22-08 and applicabie AWS 01.1 code, except if noted above. Reviewed By: /JJ.i.~~ Michael L. ~;.: Technical Manager c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (email) Coughlin, Porter 'Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (email) City of Springfield MLM:sc This.report and/or enclosed test data is the confidential property of the client to whom it.is addressed and pertains to the specific process andfor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 NW COrnell Avenue. Corvallis, Oregon 97330 . phone (541) 757-4698 . fax (541) 757-2991 29540 BAirportRoad' Eugene, Oregon 97402' phone (541)684-3849' fax (541) 684-3851 63050 Corporate Place, Suile 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 3824846 .,er "' ~FEl Geoted1nical & ConstiudXJn Servires 11r.'llllrt;41lt..'~a'IlIJ~lImlll CLIENT PROJECT Mr. Joe Hawes Hawes Investments, LLC . 2892 Crescent Avenue . Eugene, Oregon 97402 B.P.NO. DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. ~ONCRETE TEMP AIR TEMP POUR LOCATION CAST BY SACKS CEMENT LOAD 1 SAMPLED Near center of east side. Compressive Strength of Concrete (ASTM C 39) Inlernational Way Development Package A . 400 International Way Springfield, Oregon COM2007-01851 DATE PROJECT NO. REPORT NO. 08-29-08 2087024 5999 08-23-08 4" x8" ESG 3/4" 5" 1:10 PM ASTM C31 AVERAGE TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF DATE (DAYS) (IN.') (LBs) LOAD (LBSl STRENGTH (PSI) (PSI) TEST FRACTURE~ I 08-29-0B 7 12.56 8.6 56100 4470 8:05 AM 6 I 09-19-08 28 I 09-19-08 28 I Hold 08-22-08 4000 psi 4500 psi 314568 Fiber Yellow 1 TICKET NO. 60006600 81" F YARDAGE 7.0 OF 75" F WEATHER Clear Balcony slab, 20d fioor, south end betweeillines B to C. *"'1 - End Cones 2 - Cone/Split 3 - Columnar REMARKS: Rod (Chambers) was advised of on-sile test results. Reviewed By: A,<t~---- Michael L~ey.v- . Technical Manager c: Chambers Construction - Dave Bakke (em all) ,Chambers Construction - John Shay (emall) COU9hlin, Porter Lundeen - Bobbi Fisher (emall) Eric Hall Architects - Ted Corbin (emall) Eugene Sand and Gravel City of Springfield MLM:sc J. Keller DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG. AIR CONTENT SLUMP TIME SPECIMEN STORAGE 4 - Diagonal 5 - Side (top and bottom) 6 - Side (top or bottom) 7fJJ ~ Comal Avenue' Cavallis, Oregon 97330. phore(541) 757-4698, fax (541)757-2991 29540BAirporlRoad' ELJgene, Oregon 97402 . phone (541)684-J849 'fax(541)684J851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlOf material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authoriZation. . ".J ~...~. ~t_l Page 1 of 1 11~'lltlrt;"lilio'~~'llfl~_ Geoted1nica1 & Construclion Servioes Daily Field Report Client: . Mr. Joe Hawes Project: International Way Development Date: 08-29-08 Hawes Investments, LLC Package A Project No.: 2087024 2892 Crescent Avenue 400 International Way Report No.: E-21 046 Eugene, Oregon 97402 Springfield, Oregon Inspector: A. Fenstermacher 10 No.: 5258882-49 ICC Inspection of: Epoxy Anchors Weather: Clear Continuous Inspection: 0 Contractor: Chambers Construction BPNo.: .COM2007-01851 Periodic Inspection: III Performed continuous inspection during the ,installation of eightY (80) #3 x 7" vertical hooked curb dowels, fortY'seven (47) into second floor break room balcony slab and thirty-three (33) into office #353 balcony slab. Prior to installation, the predrilled holes were cleaned with compressed air and a brush. Measured embedment at 3" to 4". Dowels were secured with Epcon A7 (ICC-ES ESR-556, expiration date 01-20-09). John (Chambers Construction) was asked to notify our office when additional services are needed. ' To the best of our knowledge, the work inspected was in accordance with plans dated 04-22-08 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: Ih.~.~ Michaei L. Meyer Technical Manager c: Chambers Construction -Dave Bakke (email) Chambers Construction - John Shay (em ail) Coughlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (email) City of Springfield RECEIVED . SfP 1 0 lf108 MLM:sc ThiS: report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 700 NoN CcmeII Avenue. CavaJrlS, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 . 29540 BAirpatRood' Eugene, Oregon 97402 . phone (541)684-3849 .fax(541)684J851 63000 Corporate Place, Suile 2. Bend, Oregon.97701 . phone (541) 3824844. fax (541) 382-4846 , , . ~~~. ~ ....I 11~'II~lrt;<!II~Il'n'1I11UII~ii ~~ lid & ConsIrucI:ion Services Page 1 of 1 Report of Inspection Services Weldina/Hiah-Strenath Boltin~ Client: Mr. Joe Hawes Hawes Investments, LLC 2892 Crescent Avenue Eugene, Oregon 97402 Project: International Way Development Package A 400 Internaiional Way . Springfield, Oregon Date: Project No.: Report No.: Inspector: 10 No.: 09-03-08 2087024 E-21061 C" Walpole 01040131 AWS CWI Field: 0 Clear COM2007-01851 Inspection of: Fabricator or Erector: Contractor: Welding West Side Iron Ch'ambers Construction Shop: D Weather: BP No.: Performed visual inspection of 3'd floor moment connections .per detail 27/S5.2 at line 4/E.2 and four (4) locations aiong line 4 between Band C. Completed welds were checked for size, length, profile and location. .' . Contractor was asked to notify our office when additional services are needed. To the best of our knowledge, the work checked is in conformance with structural drawings and applicable AWS D1.1 code, except if noted above. Reviewed By: ;1t.'i.~ Michael L..~e& . Technical Manger. c: Chambers Construction - Dave Bakke (email) Chambers Construction - John Shay (email) Coughlin, Porter Lundeen - Bobbi Fisher (email) Eric Hall Architects - Ted Corbin (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom iUs addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be,reproduced in part or flill and/or any part . thereof be disclosed without FEI Testing & Inspection, Inc.'s written authortzation. 750 NW ComellAvenue' Corvallis, Oregon 97330, phone (541) 7574698 . fax (541) 757-2991 29540 B Airport Road . Eugene, Oregon 97402. phone (541) 684-J849 . fax (541) 684-3851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 3824644 . fax (541) 3824646