DAILY FIELD REPORT
Date Performed: July 18, 2008. Report Number: 722-80193-4
Client: Ken Lafayette Project Name: Yolanda Elementary School
Advanced Mechanicallnc Boiler Addition
PO Box 397 Project Location: 3250 Yolanda Street
Brownville, OR 97327 Springfield, Oregon
P.O. No.: Permit No.: COM2008-00093
Type of Structure: ." Weather: '. Clear ....
Type of Inspection: Concrete'.
Field Observations and Comme~ts
Performed visual inspection of reinforcing steeLin the fol)owing 10catiDns: 8". CMU boiler room 2' 8" to 6' 8" from footing.
Reinforcing steel was checked for grade, 'size, lap" placement and clearances where applicable. Reinforcing steel. was
placed i~ accordance with the ap'proved 'designdrawings; details 1 and 2/04 dated 1/16/08. .AII cells were relati~ely
clean and mortar projections are within .the limits of the International Building Codes. Performed continuous inspection .'
during placement of grout'in the locations listed above. Grout was placed by pump arid inechanically.consDlidated', All
cells grouted solid. Contractor was asked.to'notify our office when additional services are needed.. To the best of our
knowledge, 'the work inspected above was in accordance with' the. building department approved design drawings,
specifications' and applicable wDrkmanship provision's of the International Building Codes. " . .
Tvoe of Materia] . Set #1 .
Supplier Knife River
Mix # 247HG3R100
Slump 8"
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi) .'
Number of Samples
Total. Yardage Placed 2.5
Inspector: David Smith, ICBO #0877340'34 OBOA# 442
CCB# 176269
78"
.,','
11:00AM
".'
.'
',.1
';"
If you haveany questions regarding this report, please feel free to contact us at 541-746-9649.
. .
'd.
.,..'
Respectfully su~~~;ted,
lSSSional s: ~~es, Inc.
David~ .' .
Branch Manager
..
,"
.......
c: Advance Mechanical - ken@advanc'emechanicalinc.com
Springfield School District - gjames@sps.lane.edu
Solarc Engineering - jacky@solar-ae.net
City of Springfield
.
."
".. ",' '. .'-. --' - . '. .
THIS REPORT 1$ PROVIDED FOR THE INFORMATION OF THE CLIENT ONI:.. Y. THE R~PRODUCTION OF THIS REPo'RT;aiANY,METH,OD, 'AND'ITS TR~NS"1ITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, W/THOUTTHE WRITTEN PERA1f~S/qN.o~ ~ROFESSIONAL SERViCE iNDUSTRIES, IS PROHIBITED.
Professional Service.lndustriE!s, Inc,. 1040-A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. Fax 541n46-7J63
L "'~;lInformation
,.,~. .To Build On
Engineering . Consulting . ~sting
DAILY FIELD REPORT
Date Performed: May 27, 2008 Report Number: 722-80193-3
Client: Ken Lafayette Project Name: Yolanda Elementary School
Advanced Mechanicallnc Boiler Addition
PO Box 397 Project Location: 3250 Yolanda Street
Brownville, OR 97327 Springfield, Oregon
P.O. No.: Permit No.: COM2008-00093
. Type of Structure: Weather: Clear
Type of Inspection: Concrete
Field Observations and Comments
Performed visual inspection of reinforcing steel in the following locations: 8" CMU exterior wall from top of footing to 2'
10".and top of slab to l' 4" at interiDr wall. Reinforcing steel was checked for grade,'size, lap, placement and clearances
where applicable. Reinforcing steel was placed.in accordance with .the approved design drawings; details 1 and 2/04
dated .1/16/08 (see comments). All cells were relatively clean and mortar projections are within the . limits of the
International Building Codes. 'Performed continuous inspection. during placement of. grout in the locations listed above. .
Grout was placed. by pump and mechanically consolidated..AII cells grouted solid. Additional Comments:
Specifications call out (2) #5's at bond beams, corners, and door jamb. (2).#4's placed as per' detail at bond.
beams, additional #4's placed at corners and jamb. Need Engineering approval for bond beam rebar. Contractor
was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected
above was in accordance with the building department approved design drawings, specifications and applicable
workmanship provisions of the International Buildin'g Codes, except as noted.
Iyoe of Material Set #1
. Supplier Knife River
Mix # 247HG3R100
Slump 8"
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yardar/e Placed 3
Inspector: David Smith, ICBO #0877340-34 OBOA# 442
CCB# 176269
67"
69"
2:00 PM
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.'
David Smith .
Branch Manager
c: Advance Mechanical - ken@advancemechanicalinc.com
Springfield School District - gjames@sps.lane.edu
Sol arc Engineering - jacky@solar-ae.net
City of Springfield
THIS REPORT 1$ PROVIDED FOR THE fNFQRMA TION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY. BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163
l...~;l Information
,.,..,. .To Build On
Engineering 0 Consulting on.stin'bAIL Y FIELD REPORT
Date Performed: May 14, 2008 Report Number: 722-80193-2
Client: Ken Lafayette Project Name: Yolanda Elementary School
Advanced Mechanical Inc Boiler Addition
PO Box 397 Project Location: 3250 Yolanda Street
Brownville, OR 97327 Springfteld, Oregon.
P.O. No.: Permit No.: COM2008-00093
Type of Structure: Weather: Clear
Type of Inspection: CDncrete
Field Observations and Comments
Performed visual inspection during the placement of concrete in the following locations: footings for boiler room building
on south east corner of school. Concrete' was placed by pump and mechanically consolidated. Cast one (1) set of three
(3) (4x8)'concrete test cylinders.. Conlractor was aSKed to notify'our office when additional services are needed. -To the
be'st of our knowledge, the' work inspected above was iri accordance with the' building department .approved design,
drawings, specifications and applicatileworkmanship provisions of ihelnternational Building Codes.
Tvop. of M~tp.ri~1 Set #1
Supplier' ES& G .
Mix# 314045
Slump 4.1/4"
Air Content 4.5%
Ambient Temperature 67'
Material Temperature 72'
Time Placed 2:05 PM
Design Strength (psi) 4,000
Number of Samples 3
Total Yardaqe Placed 7
Inspector: Verlyn Bearden. ICC #01080077
CCB# 176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully sUb1~~~dUi .
D~s~rv: C~ Inc.
David Smith I . .
Branch Manager
c: Advance Mechanical - ken@advancemechanicalinc.com
Springfield School District - gjames@sps.lane.edu
Sol arc Engineering - jacky@solar-ae.net
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFQRMA rlON OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND lTS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, 1$ PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Pho.ne 5411746-964~. Fax 5411746~7163
l...~.lillnfonnation
~~,,'.:!'. To Build On
1l!nfI,." ...... ~. 'JNtIng
Client:
Address:
Ken Lafayette
Advanced Mechanicallnc
PO Box 397
Brownville, OR 97327
COMPRESSION REPORT
Project No.: 722-80193-1
P . N Yolanda Elementary School'
rOJ. ame: Boiler Addition
Location: 3250 Yolanda Streel
Springfield, Oregon
Placement Data: Material: Concrete
Footing for boiler room building on south east corne of school
Location Sampled At:
4' south of northwest corner
Date Cast: 05/14/08 Date Rec'd:
TiC1~~:10';: IMiX 3N1~~45 Weather:
05/15/08
Clear
Desi!ln Stren!lth (psi):
Cylinder No.
08-0961
08-0962
08-0963
reauired 4,000
,
Test Date
Field Cure
(days)
Lab Cure
(days)
j Yardage
Load: 1
ITotal: 7
Supplier: .
Euaene Sand & Gravel
~
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): A$TM Cl064
Max Temp (F):
Min T."mo (F):
Specimen Size:
Unit Weight (pet): ASTM C138
Time Cast: 2:05 PM
A.dditives:
Results Reported To:
Compressive Strength Data ASTM C39
placed 4,000
,
Diameter or
Dimensions
(inches)
Cross Sed. Area . Cylinder WT.
(s.i.)' .(Ibs.)
Max Load (tbs I Compo Strength Fracture Type U Test Time
. . . (psi)
C12J1-0J
6
27
27
4.00
4.00
12.57
12.57
Age (days)
5/12/2008
6/11/2008
6/1 1/2008
7
28
28
4.00 I. 12.5i ..
4 -- Diagonal wIno crac~ing at ends'
d 1 - Cone (bcith ends) 2 - ConeNertical Cracks (one end)- "3 - Columnar-
Remarks:
c:
Advance Mechanical - ken@advancemechariicalinc.com
Springfield School District - gjames@sps.lane.edu
Solarc Engineering - jacky@solar-ae.nel
City of Springfield
. 8.4 49,070
8.4 68,235
8.5 69,245
5 - Side fractures (at top of bottom)
Dale:
B:P. No.:
P.O. No.:
Cast By:
Field TestData
41/4"
1/2"
4.5%
6r
720
4x8
Curing Conditions:
Conlraclor (Leon)
3,900
5,430
5,510
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
August 8, 2008 CCB#176269
COM200B-00093
Verlyn Bearden
I day F.e. Remainder ASTM
Capping Method
C617;OJ
3
3
3
9:16AM
2:34 PM
2:38 PM
x
X
X
6 - Top fra'ctures (same a"s #5 but end of ~ylin(fer is pointed)
. R t Jeclfully Submilled,
P ('SSiOnal fArVices Industries, Inc
. , \tv f tAli "---
Slillen E. Wilder
Laboralory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL y, THE REPRo'DUCTlON OF THIS REPORT BY ANY METHOD, AND ITS TRA'NSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS