HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2008-4-3 yS ~....., ' ;:,;~" ",,",..... Page 1 of 1 '1~'II~lrf;.yI~.':;~'IIII~.I~I. Geotechnical & Conslruclion Servires Daily Field Report Client: Mr. Jim Thomas Wildish Building Co. P.O. Box 7428 Eugene, Oregon 97401 Project: LCAFRC Complex- Phase II Operations Maintenance Shop 3110 Pierce Parkway Springfield, Oregon Date: Project No,: Report No.: Inspector: 10 No.: 05-14-08 2077102 E-19994 R. Marjama 5235029-X4 ICC Inspection of: Masonry Contractor: Wild ish Building Co. Weather: Partly.Cloudy BP No.: CSQ.~2007.:00052 Continuous Inspection: 0 Periodic Inspection: 0 Performed final inspection on the reinforcing steel in the 8" CMU walls on line A, from 8 to 9, on C, from 8 to 9, on 9, from A to C (top of slab to 40"), and on 8.6, from A to C (top of slab to 48"). Reinforcing steel was checked for grade, size, lap, placement and clearance'. Cells were relatively clean and free of excessiv,!3 mortar projections, Observed the piacement of 8.0 cu.lyds. of Eugene Sand and Gravel 2500 psi grout , (Mix 312531), Grout was placed by pump and was mechanically consolidated. Grout was sampled during placement and three (3) compressive strength prisms were grouted. Jim Haines (Haines Bros. Masonry) was advised of on-site test results: grout slump :1:9"; grout temperature 71 F; air temperature 70F. . Mr. Haines was asked to notify our office when additional services,are needed. 'I To the best of our knowledge, the work inspected was in accordance with plans dated 10-29-07 and applicable workmanship provisions of the I.B'.C., except if noted above. Reviewed By: {!a~~'/!? Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers,... (e-mail) Oregon Military Dept. - (e-mail) City of Springfield MLM:jw This report and/or enclosed test data is the confidential property of the client to wharf! it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shaU.not ~e reproduced in part. or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inco's written authorization. " 7fiJ NN CanE>J Avenue' CoIvaIlis, Oregon 97330 . phone (541) 757-4698, fax (541) 757.2991 29540 BAirpat Road 'Eugene, Oregon 97402, phone (541)6/34f3849 .fax(541)684-J851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 56 ...,,'.' ..r..,...."...',)' . ' . : . , ,-" --- .-..- , ":r" .,.... .,.,. ... '... .... '" ". .' .', . ....It."lIIlI Page 1 of 1 '1:"'IIHCW;.I~.'~lIllIJilllllllll Geotechnical & ConsIrudion Servires Daily Field Report Client: Mr. Jim Thomas Wildish Building Co. P.O. Box 7428 Eugene, Oregon 97401 Project: LCAFRC Complex Phase II Operations Maintenance Shop 3110 Pierce Parkway Springfield, Oregon Date: Project No.: Report No.: Inspector: 10 No.: 04-02-08 2077102 E-19532 A. Fenstermacher 5258882-49 ICC Inspection of: Reinforcing Steel Contractor: Wildish Building Co. Weather: CleaL. BP No.: :COM2007-00052 '---..~. ._- Continuous Inspection: 0 Periodic Inspection: 0 Performed preliminary inspection .on the reinforcing steel for OMS building slab on grade. Reinforcing steel was checked for grade, size, laps, quantities, locations: ties, supports and clearance. A final inspection will be performed prior to concrete placement. To the best of our knowledge, the work inspected was in 'accordance with plans dated 11-27-07 and applicable workmanship provisions of the I.B.C., except if noted above. , Reviewed By: ;;,. 'i./k,---- Michael L: ~.Ile;- Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. - (e-mail) City of Springfield MLM:jw This report and/or enclosed test data is the confidential' property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, loco's written authorization. " 7fiJ NN CarlaJAvenue' CoIvaIIis, Oregon 97330, phone (541) 757-4698' fax (541) 757-2991 29540 BAirport Road . Eugene, Oregon 97402 . phone (541)684,3849 . fax (541) 684-J851 63050 CorporatePlace, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 . <;-$ ...,.",.,.'.,"-.,.,....."..,). .' ".t~~. ...../ [~ Page 1 of 1 . .1~'IIIUUII~.'~:t.llludllUa Geotechnical & Conslruclion Servires Daily Field Report , Client: Mr. Jim Thomas Project: LCAFRC Complex Phase II Date: 04-03-08 Wildish Building Co. Operations Maintenance Shop Project No.: 2077102 P.O. Box 7428 3110 Pierce Parkway:, Report No.: E-19533 Eugene, Oregon 97401 Springfield, OregCln Inspector: A. Fenstermacher 10 No.: 5258882-49 ICC Inspection of: Reinforced Concrete Weather: Clear.. Continuous Inspection: D. Contractor: Wildish Building Co. B~No.: ICOM2007-00052 Periodic Inspection: 0 Performed final inspection on the reinforcing steel for OMS building slab on grade. A preliminary inspection was performed on 04-02-08 (ref.: F~I report no. E19532). Observed the placement of 75.0 cu.lyds. of Eugene Sand and Gravel 4000 psi concrete (Mix 314068) in areas listed above. Concrete was placed by pump and was mechanically consolidated. , Cast one (1) set of four (4) 4'; x 8" concrete test cylinders. . Ian (WBC) was notified of on-site test results: slump 5 1/2'; concrete temperature 64F; air temperature 34F. Ian was asked to notify our. office when additional services are needed.. To the best of our knowledge, the work inspected was in accordance with plans dated 11-27-07 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: i" A...t~- Michael L." Me.;:l--- Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. - (e-mail) City of Springfield MLM:jw RECEIVED APR 1 5 2008 This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process-and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnc;'s.written authorization. ! ".-- 7fiJ NN CarlaJAV!"1ue. CoIvaIIis, Oregon 97330, phcre (541) 701'-4698' fax (541) 757-2991 . 29540 BAirport Road . Eugene, Oregon 97402 . phcre (541) 684-3849 . fax (541) 684-J851 630fiJ Corporate Place, Suite 2. Bend, Oregon 97701 . phone (541) 382-4844. fax (541) 382-4848