Geotechnical & Conslruclion Servires
Daily Field Report
Client:
Mr. Jim Thomas
Wildish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Project:
LCAFRC Complex- Phase II
Operations Maintenance Shop
3110 Pierce Parkway
Springfield, Oregon
Date:
Project No,:
Report No.:
Inspector:
10 No.:
05-14-08
2077102
E-19994
R. Marjama
5235029-X4
ICC
Inspection of: Masonry
Contractor: Wild ish Building Co.
Weather: Partly.Cloudy
BP No.: CSQ.~2007.:00052
Continuous Inspection: 0
Periodic Inspection: 0
Performed final inspection on the reinforcing steel in the 8" CMU walls on line A, from 8
to 9, on C, from 8 to 9, on 9, from A to C (top of slab to 40"), and on 8.6, from A to C
(top of slab to 48"). Reinforcing steel was checked for grade, size, lap, placement and
clearance'. Cells were relatively clean and free of excessiv,!3 mortar projections,
Observed the piacement of 8.0 cu.lyds. of Eugene Sand and Gravel 2500 psi grout
, (Mix 312531), Grout was placed by pump and was mechanically consolidated. Grout
was sampled during placement and three (3) compressive strength prisms were
grouted. Jim Haines (Haines Bros. Masonry) was advised of on-site test results: grout
slump :1:9"; grout temperature 71 F; air temperature 70F. .
Mr. Haines was asked to notify our office when additional services,are needed.
'I
To the best of our knowledge, the work inspected was in accordance with plans dated
10-29-07 and applicable workmanship provisions of the I.B'.C., except if noted above.
Reviewed By:
{!a~~'/!?
Technical Manager
c: Barrantine Bates Lee - (e-mail)
kpff Consulting Engineers,... (e-mail)
Oregon Military Dept. - (e-mail)
City of Springfield
MLM:jw
This report and/or enclosed test data is the confidential property of the client to wharf! it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shaU.not ~e reproduced in part. or full andlor any part
thereof be disclosed without FEI Testing & Inspection, Inco's written authorization.
"
7fiJ NN CanE>J Avenue' CoIvaIlis, Oregon 97330 . phone (541) 757-4698, fax (541) 757.2991
29540 BAirpat Road 'Eugene, Oregon 97402, phone (541)6/34f3849 .fax(541)684-J851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846
56
...,,'.' ..r..,...."...',)'
. ' . : .
, ,-" --- .-..-
, ":r"
.,.... .,.,.
... '... ....
'" ". .' .',
. ....It."lIIlI
Page 1 of 1
'1:"'IIHCW;.I~.'~lIllIJilllllllll
Geotechnical & ConsIrudion Servires
Daily Field Report
Client:
Mr. Jim Thomas
Wildish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Project:
LCAFRC Complex Phase II
Operations Maintenance Shop
3110 Pierce Parkway
Springfield, Oregon
Date:
Project No.:
Report No.:
Inspector:
10 No.:
04-02-08
2077102
E-19532
A. Fenstermacher
5258882-49
ICC
Inspection of: Reinforcing Steel
Contractor: Wildish Building Co.
Weather: CleaL.
BP No.: :COM2007-00052
'---..~. ._-
Continuous Inspection: 0
Periodic Inspection: 0
Performed preliminary inspection .on the reinforcing steel for OMS building slab on
grade. Reinforcing steel was checked for grade, size, laps, quantities, locations: ties,
supports and clearance. A final inspection will be performed prior to concrete
placement.
To the best of our knowledge, the work inspected was in 'accordance with plans dated
11-27-07 and applicable workmanship provisions of the I.B.C., except if noted above.
,
Reviewed By:
;;,. 'i./k,----
Michael L: ~.Ile;-
Technical Manager
c: Barrantine Bates Lee - (e-mail)
kpff Consulting Engineers - (e-mail)
Oregon Military Dept. - (e-mail)
City of Springfield
MLM:jw
This report and/or enclosed test data is the confidential' property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part
thereof be disclosed without FEI Testing & Inspection, loco's written authorization.
"
7fiJ NN CarlaJAvenue' CoIvaIIis, Oregon 97330, phone (541) 757-4698' fax (541) 757-2991
29540 BAirport Road . Eugene, Oregon 97402 . phone (541)684,3849 . fax (541) 684-J851
63050 CorporatePlace, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846
. <;-$
...,.",.,.'.,"-.,.,....."..,).
.' ".t~~.
...../ [~
Page 1 of 1 .
.1~'IIIUUII~.'~:t.llludllUa
Geotechnical & Conslruclion Servires
Daily Field Report
,
Client: Mr. Jim Thomas Project: LCAFRC Complex Phase II Date: 04-03-08
Wildish Building Co. Operations Maintenance Shop Project No.: 2077102
P.O. Box 7428 3110 Pierce Parkway:, Report No.: E-19533
Eugene, Oregon 97401 Springfield, OregCln Inspector: A. Fenstermacher
10 No.: 5258882-49
ICC
Inspection of: Reinforced Concrete Weather: Clear.. Continuous Inspection: D.
Contractor: Wildish Building Co. B~No.: ICOM2007-00052 Periodic Inspection: 0
Performed final inspection on the reinforcing steel for OMS building slab on grade. A
preliminary inspection was performed on 04-02-08 (ref.: F~I report no. E19532).
Observed the placement of 75.0 cu.lyds. of Eugene Sand and Gravel 4000 psi
concrete (Mix 314068) in areas listed above. Concrete was placed by pump and was
mechanically consolidated. , Cast one (1) set of four (4) 4'; x 8" concrete test cylinders. .
Ian (WBC) was notified of on-site test results: slump 5 1/2'; concrete temperature 64F;
air temperature 34F.
Ian was asked to notify our. office when additional services are needed..
To the best of our knowledge, the work inspected was in accordance with plans dated
11-27-07 and applicable workmanship provisions of the I.B.C., except if noted above.
Reviewed By:
i"
A...t~-
Michael L." Me.;:l---
Technical Manager
c: Barrantine Bates Lee - (e-mail)
kpff Consulting Engineers - (e-mail)
Oregon Military Dept. - (e-mail)
City of Springfield
MLM:jw
RECEIVED
APR 1 5 2008
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process-and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, lnc;'s.written authorization.
! ".--
7fiJ NN CarlaJAV!"1ue. CoIvaIIis, Oregon 97330, phcre (541) 701'-4698' fax (541) 757-2991
. 29540 BAirport Road . Eugene, Oregon 97402 . phcre (541) 684-3849 . fax (541) 684-J851
630fiJ Corporate Place, Suite 2. Bend, Oregon 97701 . phone (541) 382-4844. fax (541) 382-4848