HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2008-4-10 >s .(. f) '''': .... PF'. c,... "r.,.~.I, '. .>~ .J! , , Page 1 of 1 .1a.'IIIU";41n~~;"lltl~.I\'11II Geotechnical & Conslruclion Servires . Daily Field Report Client: Mr. Jim Thomas Wildish Building Co. P.O. Box 7428 Eugene, Oregon 97401 Project: i' LCAFRC Complex" Phase II . Operations Maintenance Shop 3110 Pierce Parkw~y Springfieid, Oregon Date: Project No.: Report No.: Inspector: 10 No.: 06-12"08 2077102 E-20339 R. Marjama 5235029-X4 ICC Inspection of: Masonry Contractor: Wildish Building Co.' Weather: Clear. BP No.: ,. COM2008-00052 Continuous Inspection: 0 Periodic Inspection: 0 :1 Performed final inspection on the reinforcing steel in the 8:' CMU walls on line 8.6; from . I . . A to C and on 9, from A to C in middle portion of walls (approximately 27'4" to peak of roof at 33'4"). Reinforcing steel was checked for grade, size, lap, placement and clearance. Cells were relatively clean and free of excessive mortarprojections.. i . , Observed the placement of approximately, 1 cu.lyd. of Eugene Sand and Gravel 2500 psi grout (Mix 312531 ):. Grout was placed by pUfnP and was' mechanically consolidated. All cells' were fully grouted in one lift. Grout slump :1:9"; grout temperature 639F; air temperature 72F. Ii' Jim Haines (Haines Bros. Masonry) was asked to notify our office' when additional services are needed. To the best of ou(knowledge, the work inspected was in:1accordance with plans dated .10-29-07 and applicable workmanship provisions of the I.B.C., except If noted above. Reviewed By: Ih .--;(.~ Michael L: Meyer Technical Manager c: Barrantine Bates Lee - (e-m,ail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. - (e-mail) City of Springfield MLM:jw .1 This report and/orenclosed test data is the confidential property of the client to wh~m ifis add~essed and pertains to the specific processand/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEITesting & Inspection, Ine;'s: written authorization. 7fiJ NN ComeIIAvenue' CclIvaIiis, Oregon 97330. phone (541) 757-4698 . fax (541) 757-2991 . 29540 BAirportRoad, Eugene, Oregon 97402 . phone(541)~ .fax(541)684-J851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 ' phone (54"1) 382-4844 . fax (541) 382-4846 ~'r,"'=. kY....1 Geotechnical & Construclion Servires 11;"'II~lrf;.lI~~'liI;'llll~UL!I Client: Mr. Jim Thomas Wildish Building Co. . P.O. Box 7428 Eugene, Oregon 97401 ~ LCA RC Complex' Phase II Operations Maintenance Shop 3110 Pierce Parkway Springfield, Oregon Inspection of: Masonry Contractor: Wildish' Building Co. Weather: Overcast. _. . BP No.: IC?02g08-00052 f'i Page 1 of 1 Daily Field Report Da : oject No.: Report No.: Inspector: IDNo.: 06-03-08 2077102 E.20231 . D. Delatte 1080867-84 ICC Continuous Inspection: 0 Periodic Inspection: 0 Performed inspection on the reinforcing steel in the 8" CMU walls on line 8:6 and 9, between A 'and C (18'0" to 22'8"). Reiriforcing steel was,checked for grade, size, lap, placement and clearance. Cells were relatively clean arid free of excessive mortar projections. ' Observed the placement of 6.0 cu.lyds. of Eugene Sand and Gravel 2500 psi (2000 psi required) grout (Mix' 312531). Grout was placed by Rump and was mechanically consolidated. Walls were grouted solid. Grout slump :1:8"; grout temperature 70F; air temperature 54F.' " Jim Haines (Haines Bros. Masonry) was asked to notify our office when additional services are needed. . . To the best of our knowledge, the work inspected was in :accordance with plans dated 10-29-07 and applicable workmanship provisions of the I.B.C., except if noted above. ~ . 'I Reviewed By: fJJ.x,~ Michael L. Me/Z- Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers - (e~mail) Oregon Military Dept. - (e-mail) City of Springfield MLM:jw This report and/or enclosed test data.is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or' full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7fiJ NN ComeIIAvenue .CorvaDis, Oregon 97330, phone (541) 757-4698, fax (541)757-2991 29540 BAirpatRoad. Eugene, Oregon 97402, phone (541)684J849 'fax(541)684-J851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701. phone (541) 382-4844 . fax (541) 382-4846 . . 1 RECEIVED JUN 1 0 Z008 fS" f}':,P"', ',rr '."'.' -- Page 1 of 1 11:r.'lltlrf;.yI~~'\j;'II'Ji.I" Geotechnical & Construc1ion Servires Daily Field Report Client: . Mr. Jim Thomas' . Wildish Building Co. P.O. Box 7428 Eugene, Oregon 97401 Project: , LCAFRC Complex, Phase II Operations Maintenance Shop 3110 Pierce Parklf1(ay Springfield"Oregon Date: Project No.: Report No.: . Inspector: 10 No.: 05-30-08 2077102 E-20197 R. Marjama 5235029-X4 ICC Inspection of: Masonry Contractor: Wildish Building Co. Weather: Par:t1y..Cloudy. , . l . BP No.: (COM2008-QQ05? Continuous Inspection: 0 Periodic Inspection: 0 Performed final inspection on the reinforcing steel in the 8'; eMU walls on iine A, from 8 to 9, on C, from 8 to 9, on 9, from Ato C, and on '8.6, .from A to C (12'8" to 18'0"). '3einforcing steel was checked for grade, size, lap, placement and clearance. 'Cells were relatively clean and free of excessive mortar pr6jectio,ns. Observed the placement of 10.0 cu./yds. of Eugene Sand and Gravel 2500 psi grout (Mix 312531). Grout was placed by pump and was mechanically consolidated. Ail cells were fully grouted in one lift. Grout slump :1:9"; grout temperature 75F; air temperature 64F. " Jim Haines (Haines Bros. Masonry) was asked to notify our office when additional services are needed. ., To the best of our knowledge, the work inspect~d was in:!accordance with plans dated 10-29-07 and applicable workmanship provisions of the I.El.C., except if noted above. Reviewed By: l1~e~ /}:;r- Technical Manager / c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept. - (e-mail) City of Springfield MLM:jw. This report and/or enclosed test data is the confidential property of the client to wh9m it is address'ed and pertains to the specific process and/or material evaluated. As such, information contained herein'shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'~ written authorization. 7fiJ NN CanE>J Avenue' CoIvaIIis, Oregon 97330, phone (541) 757-4698. fax (541) 757-2991 29540BAirportRoad' Eugene, Oregon 97402 . phor1El(541)~ . fax (541)684-J851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (54,1) 382-4844 . fax (541) 382-4846 " flEE) 1""""'4""'''"i1''.'0LI1I Geotechnical & Cons1nx:lion Services ~ Compressive strength of Masonry Prisms ASTM C 1314 05-13-08 05-14-08 HOLLOW 1500 ASTM C1314 8" CMU walls on line A, from 8 to 9, on 9: from A to C"on C, from 8 to 9 (top of slab to 40") and on line 8.6, from A to C (top of slab to 4'0"). CLIENT PROJECT LCAFRC Complex Phase II Operations Maintenance Shop 31'10 Pierce Parkway Spring~,_Ore90n BP NO. : COM2008-00052 DATE PROJECT NO. REPORT NO. Mr. Jim ,Thomas Wild ish Building Co. P.O. Box 7428 Eugene, Oregon 97401 c.._______,._<._~ DATE CONSTRUCTED DATE GROUTED SOLID XX' DESIGN (F'M) SPECIMEN STORAGE LOCATION DATE RECEIVED PRISM 1.0. TIME WEATHER/TEMP. FEI REP. R. Ma~ama MORTAR: PSIITYPE 1800 psifType S SAND CEMENT LIME OTHER , TEMP. SOURCE/I.D. Spec Mix! Bagged GROUT: PSI AGG. SIZE CEMENT ADDITIVE SLUMP TEMP. SOURCE/I.D. TICKET NO. 05-22-08 2077102 5875 05-15-08 8" x 8" x 16" Smooth Face 1:50 PM Partly Cloudy/70" 2500 psi 3/8" f:9" 71" ESG/Mix 312531 60003334 SPECIMEN SPECIMEN SPECIMEN. NET CROSS- COMPRESSIVE AVERAGE TEST AGE HEIGHT LENGTH WIDTH SECTIONAL TOTAL STRENGTH STRENGTH DATE (DAYS) (IN.) (IN.) (IN.) AREA (IN.'! LOAD (LBS) (PSI) (PSI) 05-22-08 8 16.00 7.625 8.50 64.81 .176600 2720 06-11-08 28 06-11-08 28 REMARKS: Jim Haines (Haines Bros. Masonry) was advised of. on-site test results. Reviewed By: JJJ . '/,.~ ----- Michael L. Me~erU Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consuitin9 Engineers - (e-mail) Oregon Military Dept. - (e_mail) , City of Springfield MLM:jw This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproauced in part or full andlor any part thereof be disclosed without FEI Testing & ,Inspection, Inc.'s written authorization. 7fiJ NN CanelI Avenue' CoIvaIls, Oregon 97330, phone (541 ) 757-4698, fax (541) 757-2991 29540 BAirpatRoad . Eugene, Oregon 97402, phone (541) 684-3849- fax(541 )684-J851 63050 Corporate Place, Suite 2 " Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 , (I: ......., ,'., .",...,..... ,",..... Geotechnical & Construction Servic:.es 11:"lftl~;~I~..,:t:..rl'Jl'.mlJl Client: Mr. Jim Thomas Wildish Building Co. P.O. Box 7428 Eugene, Oregon 97401 LCAFRC Complex Phase II Operations Maintenance Shop 3110 Pierce Parkway Springfield, Oregon Project: Inspection of: Masonry Contractor: Wildish Building Co. Weather: Overgast BP No.: (COM2008-00052 51" Page 1 of 1 Daily Field Report Date: Project No.: Report No.: Inspector: 10 No.: 05-21-08 2077102 E-20077 R. Marjama 5235029-X4 ICC Continuous Inspection: 0 Periodic Inspection: 0 Performed final inspection on the reinforcing steel in the 8" CMU walls on line A, from 8 to 9, on 9, from A to Cand on 8.6, from A to C (8'0" to 12'8"). Reinforcing steel was checked for grade, size, lap, placement and clearance. C(llls were relatively clean and free of excessive mortar projections. Observed the placement of 9.0 cu.lyds. of Eugene Sand and Gravel 2500 psi grout (Mix 312531). Grout was placed by pump and was mechanically consolidated. All cells were fully grouted in one lift. Grout slump :1:9"; grout temperature 68F; air temperature 52F. . Jim Haines (Haines Bros. Masonry) was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected was in accordance with pians dated 10-29-07 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By. t!~~t f:t;;-- Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Depl. - (e-maii) City of Springfield MLM:jw This report and/or enclosed test data is the cO!lfidential property of the client to whom it is addressed and pertainstothe specific process and/or material evaluated. As such, information contained herein shall not'be reproduced in part or full and/or any part thereof be disclosed without FE! Testing & Inspection, Inc.'s written authorizatio.n. 7fiJ NN CanelIAvenue' CoIvaIls, Oregon 97330, phone (541) 7574598. fax (541) 757-2991 29540 B Aifpo;t Road . Eugene, Oregon 97402 . phone (541 )684-3849' fax (541 )684-J851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 0' ~P"l L7,:'P'" ,",.... Page 1 of 1 ,':"lImi;4Ihl.,:nIUII,I.IUI Geotechnical & 0:Jnstrucli0n Servires Daily Field Report Client: Mr. Jim Thomas Wildish Building Co. P.O. Box 7428 Eugene, Oregon 97401 Project: LCAFRC Complex Phase ,II Operations Maintei'nance Shop 3110 Pierce Parkway Springfield, Oregon Date: Project No.: Report No.: Inspector: 10 No.:. 05-20-08 2077102 E-20055 R. Marjama 5235029-X4 ICC Inspection of: Masonry Contractor: Wild ish Building Co. Weather: Overcast/Ught Rain BP No.: 'COM2008-00052 \ , .--~- Continuous Inspection: 0 Periodic Inspection: 0 Performed final inspection on the reinforcing steel in the 8" CMU walls on line A, from 8 to 9, on 9, from A to C (40" to 8'0") and online 8.6r from A to C (4'0" to 8'8"). Reinforcing steel was checked for grade, size, lap, plac'ement and clearance. Cells were relatively clean and free of excessive mortar projections. . . . ij 'I Observed the placement of 9.0 cu.lyds. of Eugene Sand and Gravel 2500 psi grout (Mix 312531). Grout was placed by pump and was mechanically consolidated. All cells were fully grouted in one lift. Grout slump :1:9"; grout temperature 71 F; air temperature 6tF. . Jim Haines (Haines Bros. Masonry) was asked to notifY our office when additional services are needed. To the best of our knowledge, the work inspected was in"accordance with plans dated 1 0729-07 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: M~a~~ Technical Manager c; Barrantine Bates Lee - (e-mail) kpff Consulting Engineers - (e-mail) Oregon Military Dept: - (e~mail) City of Springfield MLM:jw This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FE1 Testing & Inspection, Inc.'s: writte-n authorization. 7fiJ NNCanellAvenue' CoIvaIlis, Oregon 97330. phone (541 ) 757-4698, fax (541) 757-2991 29540 BAirport Road . Eugene, Oregon 97402 . phone (541)684-3849' fax (541) 684-J851 . 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 g . (f., '>",.,.',..',). ."rF:- .... .:'~ Page 1 of 1 11:tk'lltltl;"I~"':iI:'II.J\'.h'ltJ Geotechnical & Conslruclion Services Daily Field Report Client: Mr. Jim Thomas Wildish Building Co. P.O. Box 7428 Eugene, Oregon 97401 Project: LCAFRC Complex' Phase II Operations Maintenance Shop . 3110 Pierce Parkv'{ay Springfield, Oregon Date: Project No.: Report No.: Inspector: 10 No.: 05-12-08 2077102 E-19959 D. Delatte 1080867-88 ICC Inspection of: Epoxy Dowels Contractor: Wildish Building Co. Weather: Clear BP No.: [~()M2008-00052 Continuous Inspection: 0 Periodic Inspection: 0 Performed continuous inspection during theinstaliation of #5 vertical dowels at 16" on center on line 8.7, fro'm A to C for CMU wali to slab on grade .connection for new addition to operation maintenan,ce building. Prior to installation, the predrilled holes were cleaned with a brush and compressed air. Verified minimum embedment depth of 6". Dowels were secured with Hilti Hit Hy 150 Max epoxy (ICC ESR 1967, expiration date 07-08). ' Tony Dean (WBC) was notified of on-site observation and was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected was in~ accordance with plans dated 11-27-07 and applicable workmanship provisions of the I.~.C., except if noted above. Reviewed By: jJJ.~.~ Michael L. Meyer Technical Manager c: Barrantine Bates Lee - (e"mail) kpff Consulting Engineers - (e-maii) Oregon Military Dept. - (eCmail) City of Springfield MLM:jw This report and/or enclosed test data is the confidential property of the client to wh6m it is addressed and pertains tathe specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnc.i~ written authorization. 7fiJ NN ComeIIAvenue' CoIvaIlis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 B Airpat Road . Eugene, Oregon 97402 . phone (541) 684-3849 . fax (541 )684-J851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541 ) 382-4846 ii Compressive Strength of Concrete I . . (ASTM C 39) ..,.." .'..) .' . ,'.. -.... ,.. ,.. ": "..ft,...r . "":=.:' ;':,-;::.:~, <k.,~c...:',,1icaI & Cohsb'uction Servires .1~'llllfl;41~':fI.II'IIII1IH. CLIENT PROJECT LCAFRC Complex -'Phase II Operations Maintenance Shop 3110 Pierce Parkway Sprin9field, Oregon ;: ---_.-, B.P. NO. ,COM2008~00052 \.. '- DATE PROJECT NO. REPORT NO. Mr. Jim Thomas Wildish Building Co. P.O. Box 7428 Eugene, Oregon 97401 ~ 05-01-08 2077102 5806 DATE CAST 04-03-08 CAST BY A. Fenstermacher DATE RECEIVED 04-04-08 STRENGTH REQUIRED 4000 psi SPECIMEN SIZE 4" x8" STRENGTH PLACED 4000 psi SACKS SUPPLIER Knife River PRODUCT CODE 314068 CEMENT MAX SIZE AGG. 3/4" ADDIT1VES Hot Water AIR CONTENT LOAD NO. 2 TICKET NO. 60001744 SLUMP 51/2' CONCRETE TEMP 640F YARDAGE 11.0 OF 75:0 TIME 7:30 AM AIR TEMP 34"F WEATHER Clear :1 SPECIMEN STORAGE ASTM C31 POUR LOCATION OMS buildin9 slab on grade. LOAD 2 SAMPLED Along west side, approximately 15' south of north side.: TEST AGE AREA WEIGHT TOTAL COMPRESSIVE DATE (DAYS) tiN.') (LBS) LOAD lLBSI STRENGTHlPSI) 04-10-08 7 12.50 8.7 44900 3590 05-01-08 28 12.56 8.7 64300 5120 05-01-08 28 12.56 8.7 65000 5180 Hold AVERAGE STRENGTH lPSI) TIME OF TEST 12:20 PM 8:35 AM 8:40 AM 5150 .. A - Cone B - Cone/Split C - Cone Shear D - Shear ,E - Columnar REMARKS: Ian (Wildish Buildin9 Co.) was advised of on-site test results. Reviewed By: !!L~ ~1!:Jr- Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consulting En9ineers - (e-mail) Oregon Military Dept. - (e-mail) Knife River - (e-mail) City of Sprin9field . MLM:jw TYPE OF FRACTURE- D D D This report and/or enclosed test data is the cOnfidential property of the client to who~ it is addressed and pertains to the specific process and/or material evaluated. As such, information contained hereIn shall not be reproduced in part or full and/or any part thereof be-disclosed without FEI Testing & Inspection, Inc.'s r<<itlen authorizatio'.1. 7fiJ NN CarlaJAvenue' CavaIIis, Oregon 97330. phone (541) 757-4698, fax (541) 757-2991 29540 B Airpat Road . Eugene, Oregon 97402 . phCre (541) f384!3a49 . fax (541 )684-J851. 630fiJ Corporate Piace, Suite 2 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 ~,','",."',Rl ~"'- 11:il'lIflet;41hi~, In..II'I~.Ulll' a Geotechnical & ConstIudiln Servires Compressive Strength of Concrete (ASTM C 39) CLIENT Mr. Jim Thomas Wildish Building Co. P.O. Box 7428 EUgene, Oregon 97401 DATE CAST STRENGTH REQUIRED. STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 2 SAMPLED TEST DATE 04-10-08 05-01-08 05-01-08 Hold AGE (DAYS) 7 28 28. PROJECT LCAFRC Complex -; Phase il Operations Mainten~nce Shop 3110 Pierce Parkway Springfield, Ore90n ., B.P. NO. ,COM2008-0005i' , DATE PROJECT NO. REPORT NO. CAST BY 04-03-08 4000 psi 4000 psi . 314068 Hot Water 2 TICKET NO. 64"F YARDAGE 34'F WEATHER OMS building slab on grade. DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG. AIR CONTENT SLUMP TIME SPECIMEN STORAGE A. Fenstermacher" SACKS CEMENT 60001744 11.0 OF Clear i 75.0 Along west side, approximately 15' south of north side, WEIGHT (LBS) 8.7 I I I I COMPRESSIVE " STRENGTH (PSI)' 3590 I~ I ,I "I AVERAGE STRENGTH (PSI) TIM E OF TEST 12:20 PM AREA (IN.') 12.50 TOTAL , LOAD (LEiS) 44900 I I I .. A - Cone B - Cone/Split C - Cone Shear D - Shear E - Columnar REMARKS: Ian (Wildish Building Co.) was advised of on-site test results. Reviewed By: Ih . ~ /k...._ Michael L. ~eye/l- Technical Manager c: Barrantine Bates Lee - (e-mail) kpff Consultin9 En9ineers - (e-mail) Oregon Military Dept. - (e-mail) Knife River - (e-mail) City of Springfield MLM:jw 04-10-08 2077102 5806 04-04-08 4"x8" Knife River .3/4" . 5 1/2" 7:30 AM ASTM C31 TYPE OF FRACTURE- D This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnco's written authorization. 7fiJ NN CarlaJAvenue' CoIvaIIis, Oregon 97330, phme (541) 757-4698 'fax(541) 757-2991 29540 BAirpat Road . Eugene, Oregon 97402 . phme (541) 684J849. fax (541 )684-J851 630fiJ Corporate Place, Suite 2. Bend, Oregon 97701 . phone (54:1) 382-4844 . fax (541) 382-4846