Loading...
HomeMy WebLinkAboutPermit Building 2008-8-7 Carlson Testing, Inc. Main Office P.O. Box 23814 Tigard, Oregon 97281 Phone (503) 684-3460 Fax (503) 684-0954 Salem OlTice .4060 Hudson Ave.. NE Salem, Oregon 97301 Phone (503) 589-1252 Fax (503) 589-1309 Bend OlTice P.O. Box 7918 Bend. Oregon 97708 Phone (541) 330-9155 Fax (541) 330-9163 Daily Report of Structural Steel . Client: SAFEWAY STORES INC - BRIAN NORTH Project: SAFEWAY STORE #0311 REMODEL - SPRINGFIELD Address: 5015 MAIN STREET - SPRINGFIELD, OR Jurisdiction: cn representative B. PARRI SH OBOA 771 was on site this date Auo, 07, 2008 to perform Special Inspection for: Permit COM2008-00459 x 1. Work inspected was: [i] Completed D In progress 2. Completed work inspected was in compliance with W Appro.v'ed plans and specifications, 0 Sho'p drawings- D RFI D Design change . D Submittal D N/A Document #(s) S1. 0 Dated: 7-14-08 3. Noncompliance item(s) were noted this date, details on following page(s). DYes D No [i] N/A 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). DYes D No [i] N/A X D Conform 0 Remain in progress DFS #(s) SCOPE OF INSPECTION I. Checked in with superintendent, client or shop rep. Name: Company: BOOCO/IvlR STEEL 2. Inspection was "IBe" 0 Continuous [iJ Periodic 3. Work performed: [i] In the field D At fab shop 4. If shop inspection do they have fabrication and QC procedures? DYes D No [i] N/A INSPECTION Yes NoN/A 1. Reviewed previous inspection reports'? 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID . markings or other documentation. 3. Verified weld filler materials conform. 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and tolerances required. 15. Checked welded studs and structural connections were installed as required. 16. Verified high strength bolts and fasteners conform. /7. VerifIed the quality o.fwelds produced by welders, welding operators, and tackers conform. 8. Verified stec.l fram. e joint details for bracing, stiffening,", member locations, and application of joinl 'details at each X connection are in compliance by random sampling. I X I I I Ix WELDER INFORMATION Welders Name: DENNIS ROSE Certification #: 86-327 1. Verified the contractor's Welding Procedure Specifications are in confoffilancc with A WS requirements. 2. Verified the essential variables outlined in the Welding Procedure Specifications were employed during execution of the work. x 13. Verified the we\dability of reinforcing steel other than ASTM A 706. I I X X X X cn Job #: . SPRINGFIELD SOROS4'12, PO Number: Location of steel inspection [to include grid lines, elevations (floors) and drawing details): 1/4" FILLET WELDS ON FRAME FOR A NEW OPENING AT STORE FRONT. WELDS HOLD HEADER TO 121' COLUMNS. PROCESS IS SMAW E7018. ALL WELDS MEET.THE VISUAL ACCEPTANCE CRITERIA PER AWS D1,1 TO THE BEST OF MY KNOWLEDGE. I REPORT SUMMARY Report(s) findings were discussed and left with of Booeo / MR STEEL D See additional report page(s). X Based on the Code, approval is required from the Building Official before the .SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. D Distribute attachments. Page 1 of ....---l.. Daily Report of Structural Steel en Job #: S0805452. For: 08/07/2008 Project: SAFEWAY STORE #0311 REMODEL - SPRINGFIELD Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, . CARLSON TESTING, fNe. Reviewed By: Steven Dugger Review Date: 08/1 8/2008 BP!KK SAFE WAY STORES INC - BRIAN NORTH TO: CITY OF SPRINGFIELD BUILDING DEPARTMENT FROELICH CONSULTING ENGINEERS BOOCO CONSTRUCTION INC