SITE PLAN REVIEW
PRE-SUBMITTAL CHECKLIST
SPRINGFIELD
Oafr Coc""," 7Js/o('WiL' Ii
Plan.,,,,, I\/JIVI
City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
Project Name: Mayfield Mini-Storage Facilities
Project Proposal: Construction of mini-storage faCilitIes on vacant land near
Case Number: PRE2008-00047
Project Address: 921 S 28th Street
Assessors Map and Tax Lot Number(s): 18-03-01 TL 206
Zoning: Heavy Industrial (HI)
Overlay District(s): Drinking Water Protection (DWP)
Applicable Refinement Plan: N/A
Refinement Plan Designation: N/A
Metro Plan Designation: Heavy Industrial (HI)
Pre-Submittal Meeting Date: July 15, 2008
Application Submittal Deadline: January 16, 2009
Associated Applications:
Ict:nvIOFJSI!R1NGEIEUD!nEVEUO'BMENtiREWEWJiltEKM
I POSITION I REVIEW OF NAME PHONE
1 Prolect Planner Land Use Plannlnq Mark Metzqer 726-3775
I I Transportation Jon Driscoll 726-3679
1 UtilitIes Jesse Jones 736-1036
1 1 Sanltarv & Storm Sewer Jesse Jones 736-1036
1 Deputy Fire Marshal 1 Fire and Life Safety 1 Gilbert Gordon 1 726-2293
-I Community Services Manaqer 1 BUlldlnq 1 Dave Puent 1 726-3668
'fA:RemCAlII:J:4SmEVELiiOBMENrillRElttEWj,:1:U II_Hr,~"~__~IJl~I! d.ll1llll
Owner! Applicant Applicant's Representative
Bobby Mayfield DaVid Nichols
Ann and Mar LLC PaCific West Engineering Inc
921 S 28th Street 3610 Goodpasture Loop
Springfield, OR 97477 Eugene, OR 97401
ReVised 10{25{07
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
PLANNING
o Application fee - discuss the applicable fees
Date Received
Planner MM
7!t7/rJ(
I
o Copy of the Site Plan reduced to 8'h"x 11"
Complete Incomplete See Planning
Note(s)
IS!
o
8 V," x 11" Copy of Site Plan
o Copy of the deed and a preliminary title report Issued withIn the past 30 days
documenting ownership and listing all encumbrances If the applicant IS not the property
owner, written permission from the property owner IS required
Complete Incomplete See Planning
Note(s)
IS!
D
Deed and Preliminary Title Report
o Brief narrative explaining the purpose of the development, the eXisting use of the
property, and any additional Information that may have a bearing In determining the
action to be taken The narrative should also Include the proposed number of employees
and future expansion plans, If known
Complete Incomplete See Planning
Note(s)
IS!
o
Brief Narrative
o Site Plan
Complete Incomplete See Planning
Note(s)
o
[J
[gl
o
[gl
1
Prepared by an Oregon Licensed Architect,
Landscape Architect, or Engineer
Proposed bUlldln9s location, dimenSions,
sIze (gross floor area applicable to the
parking requirement for the proposed
use(s)), setbacks from property lines, and
distance between bUildings
Location and height of eXisting or proposed
fences, walls, outdoor equipment, storage,
trash receptacles, and signs
Location, dimenSIons, and number of typical,
compact, and disabled parking spaces,
including aisles, wheel bumpers, directional
signs, and striping
DimenSions of the development area, as well
as area and percentage of the site proposed
for bUildings, structures, parking and
l2?l
[gl 0
[gl 0
ReVised 10{2S{07
[gl D
[gl D 7~5)o(
~~
l2?l 0 ....1"'........1 I\IIM
[gl 0
[gl
o
vehicular areas, sidewalks, patios, and other
Impervious surfaces
Observance of solar access requirements as
specified In the applicable zoning district
gn-slte loading areas and vehicular and
pedestrian circulation
Location, type, and number of bicycle
parking spaces
Area and dimensions of all property to be
conveyed, dedicated, or reserved for
common open spaces, recreational areas,
and other similar public and semi-publiC uses
Location of eXisting and proposed transit
facilities
o Phased Development Plan Where applicable, the Site Plan application must Include a
phasing plan indicating any proposed phases for development, Including the boundaries
and sequencing of each phase Phasing must progress In a sequence promoting street
connectivity between the various phases of the development and accommodating other
required public Improvements, Including but not limited to, sanitary sewer, stormwater
management, water, and electricity. The applicant must Indicate which phases apply to
the Site Plan application being submitted
Complete Incomplete See Planning
Note(s)
IS!
r:'11
L..;:;I
o Landscape Plan
Complete Incomplete
t2J
[gl
D
[gl
[gl
[gl
See Planning
Note(s)
o
D
[gl
D-
--
-.
r:'11
~
r:'11
L..;:;I
See 1
o Architectural Plan
Complete Incomplete See Planning
Note(s)
D~
--
ReVised 1O{2S{07
~
Phased Development Plan
Drawn by a Landscape Architect
Location and dimenSions of landscaping and
open space areas to Include calculation of
landscape coverage
Screening In accordance With SDC 4 4-110
Written deSCriptIOn, including specifications, of
the permanent Irrigation system
Location and type of street trees
List In chart form the proposed types of
landscape materials (trees, shrubs, ground
cover) Include In the chart genus, species,
common name, quantity, Size, spacing and
method of planting
Exterior elevations of all bUildings and
IS! IS!
structures proposed for the development site,
Including height
Conceptual floor plans
o On-Site Lighting Plan
Complete Incomplete See Planning
Note(s)
Date Received
Planner. MM
7//5IDf
t2J
o
~
[gl
2
Location, orientation, and maximum height of
exterior light fixtures, both free standing and
attached
Type and extent of shielding, Including cut-off
angles and type of Illumination, wattage, and
luminous area
Photometric test report for each light source
w
IS!
Planning Notes:
1 Please show covered trash receptacle and screening If one IS to be placed on site
2 Please deSCribe cut-off angles for the fixtures IESNA full-cut off lighting IS required
Additional comments not related to the completeness of the application:
. Please be aware of the new SDC and application forms
ReVised 10{2S{07
ANY REQUIRED ADDITIONAL MATERIALS, APPLICATIONS OR
PERMITS
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE-
APPLICATION REPORT FOR MORE DETAILED INFORMATION "ll,JtJf
Date Recelyed ~
Applicable Not Planner MM -
Applicable
~
~
IiI
o
l2?l
Where a multi-family development IS proposed, any additional
materials to demonstrate compliance With SDC 3 2-240
Riparian Area Protection Report for properties located Within 150
feet of the top of bank of any Water Quality Limited Watercourses
(WQLW) or Within 100 feet of the top of bank of any direct
tributaries of WQLW
A Geotechnical Report prepared by an engineer must be submitted
concurrently If there are unstable SOils and/or a high water table
present
Where the development area IS Within an overlay diStrict, address
the additional standards of the overlay district
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified In SDC 5 19-100
A wetland delineation approved by the Oregon DIVISion of State
Lands must be submitted concurrently where there IS a wetland on
the property
Any required federal or state permit must be submitted
concurrently or eVidence the permit application has been submitted
for review
IiI
~
IiI
l2?l
l2?l
o
o
D
~
[gl
~
IiI
iii
[gl
l2?l
Where any grading, filling or excavating IS proposed With the
development, a Land and Drainage Alteration permit must be
submitted prior to development
Where applicable, any Discretionary Use or Variance as specified In
SDC 5 9-100 and 5 21-100
An Annexation application, as specified In SDC 5.7-100, where a
development IS proposed outside of the city limits but Within the
City's urban service area and can be serviced by sanitary sewer
ReVised 1O{2S{07
THIS APPLICATION IS:
o COMPLETE FOR PROCESSING
~ INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
7 J r1 / of Ii./,'
Date Received J1I'J I 0 I>
Planner. MM Il
City Planner
This is not a decision on your application. Spnngfield Development Code Section 5 4-
105 and Oregon Revised Statutes 227 178 require the City take final action on a limited land
use decIsion within 120 days after the application IS deemed complete The 120-day
processing period for thiS application begins when all the missing information IS submitted or
when you request that the City proceed without the information You must Indicate by either
signing thiS form or by submitting a written response to the City within seven days of the
date of thiS form asserting your Intentions regarding the provIsion of the missing Information
If you Indicate herein or In your written response that the missing Information will be
submitted, then you have 180 days from the date the application was submitted for Pre-
Submittal Review to provide the City with the miSSing Information If you refuse to submit
the missing information, then upon receipt of the full application packet and processing fee,
the City will deem the application complete for purposes of starting the 120-day clock and
begin processing the application. No new Information may be submitted after the start of
the 120-day period unless accompanied by a request for an extensIon of the 120-day
processing time Upon receipt of a request for extenSion, the City may extend the 120-day
period for a reasonable period of time The City may also require additional fees If the new
Information IS submitted after the Notification to Surrounding Property Owners IS sent out
and a second notification IS reqUired or If the new Information substantially affects the
applicatIOn proposal and additIOnal review IS reqUired
I, the owner/applicant, mtend to submit all missing items indicated herein to the
City within the ISO-day timeline.
Owner/Applicant's Signature
Date
Revised 10{2S{07
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Engineer: Richard Perry Case#: PRE2008-00047
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions Date ReceIVed ~ of
Complete Planner MM -
~
lEI
lEI
Incomplete See PW
Note(s)
o
o
0,
.,
lEI
o
Prepared by an Oregon licensed Landscape Architect
or Engineer
VICinity Map
The name, location, and dimensions of all eXisting site
features including bUildings, curb cuts, trees and
Impervious surface areas, clearly indicating what IS
remaining and what IS being removed For eXisting
structures to remain, also Indicate present use, Size,
setbacks from property lines, and distance between
bUildings
The name, location, dimensions, direction of flow and
top of bank of all watercourses and required rrparran
setback that are shown on the Water Quality Limited
Watercourse Map on file In the Development Services
Department
The 100-year floodplain and f100dway boundarres on
the site, as specified In the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of Map
Amendment or Letter of Map ReVISIon
The Time of Travel Zones, as specified In SDC 3 3-200
and delineated on the Wellhead Protection Areas Map
on file In the Development Services Department
Physical features Including, but not limited to trees 5"
In diameter or greater when measured 4 V2 feet above
the ground, significant clusters of trees and shrubs,
rrparran areas, wetlands, and rock outcropplngs
SOil types and water table Information as mapped and
specified In the SOils Survey of Lane County. A
Geotechnrcal Report prepared by an Engineer must be
submitted concurrently If the SOils Survey indicates
the proposed development area has unstable SOils
and/or a high water table
lEI
[J
t2J
o
t2J
EJ
t2J
[]
ReVised 1O{2S{07
o Improvement and Public Utilities Plan must be In compliance with the regulations of
SDC Sections 5 17-100,4 1-100,42-100, and 4 3-100 and must Include the following
Information
Complete Incomplete See PW
Note(s)
t2J Iji
f2g Iji
[gl Iji
~
t2J
1,5
1 Its'IDr
Date Received I .
Prepared by an Oregorfl~~~~~d~~11 Engineer
Location and width of all eXisting and proposed
easements
Location of eXisting and required power poles,
transformers, neighborhood mailbox units, and Similar
public faCIlities
Location and size of eXisting and proposed utilities on
and adjacent to the site, Including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable TV
Indicate the proposed connection pOints
0 Grading and Paving Plan
Complete Incomplete See PW
Note(s)
t2J Iji Prepared by an Oregon licensed CIvil Engineer
~
~ Iji Planting plan prepared by an Oregon licensed
Landscape Architect where plants are proposed as
part of the storm water management system
Iji f2g 2,3 Roof drainage patterns and discharge locations
l2?l ~ Pervious and Impervious area drainage patterns
~ ~ The size and location of stormwater management
systems components, including but not limited to
dram lines, catch basins, dry wells and/or detention
ponds, stormwater quality measures, and natural
dralnageways to be retained
f2g Iji EXisting and proposed spot elevations and contours
lines drawn at 1 foot Intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
Intervals)
~ t2J 4 Amount of proposed cut and fill
o Stormwater Management System Study - provide four (4) copies of the study with
the completed Stormwater Scoping Sheet attached The plan, calculations, and
documentation must be consistent with the Englneerrng Design Standards and
Procedures Manual
Complete Incomplete
See PW
Note(s)
~ ~
Revised 10{2S{07
Scoplng Sheet and attached Stormwater Management
System Study
PW Notes:
1 Improvement and public utilities plan shows a relocation of the eXisting power
service but does not indicate the proposed location Show Intended location
2 Building "C" has roof top runoff descrrbed as gOing Into "grassy swale" but has no
Indication of roof drains Show location of roof drains and direction of flow Into
grassy swale
3 Clarrfy piping connection between 8"SW and 6"RD at Intersection between
bUilding A and B
4 ProVide accurate cut and fill Information on final grading plan ~ I
5 Verrfy condition and flow line of public storm water system 7 /5 .-/
Date Received 0 0
Planner MM
Additional comments not related to the completeness of the application:
Proposed bUilding "C" IS located within an easement to Mountarn States Power Company
Clarrfy that this condition IS acceptable with grantee of this easement.
Proposed street lights on eXisting power poles and SW Treatment man hole may trrgger
a PIP (Public Improvement ProJect)
Revised 10{2S{07
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Deputy Fire Marshal: Gilbert Gordon
Case #: PRE200S-00047
FIRE
tr> ::{ecelVed. "'7J6~g
Planner MM~' -
o Site Plan
Complete Incomplete See Fire
Note(s)
~
On-site vehicular circulation
l2?l
o Improvement and Public Utilities Plan
Complete Incomplete See Fire
Note(s)
~
I!:I
Location of eXisting and required fire hydrants and
similar public facilities
Fire Notes:
1
Additional comments not related to the completeness of the application:
1 Provide "No Parking-Fire Lane" signs around the fire department turnaround (2007
Spnngfield Fire Code 503 3 and SFC Appendix D103 6)
2 The fire apparatus access roads shall support an SO,OOO Ib Imposed load per SFC
503 2 3 and SFC Appendix D102 1
3 Install a Knox keyed gate sWitch at the electnc gate for emergency access per SFC
506 1 Contact Deputy Fire Marshal Gilbert Gordon, 541-726-2293, for an application
Revised 9{24{07
-----,.-
J
Date Receivea.
Planner: MM
(J)
"TJ
(J)
-I
S 28TH ST
7/t,lor
I l
....
&'
D'
:I
I
6:
en
!
i
c:
:s
if
~
~
'"
~
1:-- -
l::e
.- :E
~
Q) L,;
D::Ol
OlC
_C
\Ill!!
00..
PRE2008-00047 Bobby Mayfield Storage Units
Aerial
~
~
>::e
-::e
~ ..
Q)...
cr:Q)
C
.!!lc
ro]!
00.
PRE200B-00047 Bobby Mayfield Storage Units
Aerial