Daily Report of Proprietary Anchors
ClIent SAFEWAY STORES INC - BRIAN NORTH
Project SAFEWAY STORE #0311 REMODEL - SPRINGFIELD
Address 5015 MAIN STREET - SPRINGFIELD, OR JUrisdIctIon
CTl representative E T WILLIAMS OBOA 374
was on Site thiS date Jul 29, 2008 to perform SpeeIallnspectIOn for
rermll COM2008-00459
DFS #(5)
SCOPE OF INSPECTION
Checked In with supermtendent or chent representative
Name RANS
Company BooeD CONSTRucrION
2 InspectIOn was "IBe" [i] Contmuous D Penodlc
3 Wor!. perfonned GJ In the field 0 At precast shop
4 If shop mspeetlOn do they have fabncatlOn and QC
procedures? 0 Yes 0 No GJ N/A
PROPRIETARY ANCHORS
Yes No N/A
xl
I
1
11 ReViewed prevIOus inspectIOn reports?
I 2 ReViewed evaluation report?
13 Venfied manufacturer's anchor use conforms
to acceptance cntena In report summary
VerIfied follOWing Items meet manufacturer's
publIshed mstallallon mstruetIOns
4 Ventled mlDlmum embedment depth ofthe
anchors
5 Venfied mstallatIOn of the anehors
6 Verified anchor diameter
17 Venfied steel grade
18 Venfied hole diameter
9 Venfied type ofdnll bit used
10 Verified c1eanlmess of hole and anchor
I I Venfied ddheslve applIeatlon
v
x
x
x
x
x
xl
xl
I x I
I x I
Evaluation report number 5193
Name of pro duet bemg mstalled HILTI BY 150
Bateh Number 051817 L2
ExpiratIon Date 1/09
CTI Job # S0805452
SPRINGFIELD
PO Number
Loeatlon ofpropnetary anchors mspecled [to melude gnd
lInes, elevations (floors) and drawmg details]
REBAR DOWELS INTO CONCRETE FOUNDATION FOR
BETROFITTING- 8 #5 REBAR- DOWELS
REPORT SUMMARY
Work mspected was [1J Compleled D In progress
2 Completed work mspected was m complIanee with
GJ Approved plans and speelfieatIOns D Shop drawmgs
D RFI D DeSign ehange D Submittal D N/A
Document #(5) EMAIL
Daled 7/29/8
3 NoneomplIance Item(s) were noted thiS date, details on
followmg page(s) DYes D No [1J N/A
4 NoneomplIance Item(s) were remspeeled thiS date, details
on followmg pagels) DYes D No [1J N/A
D Conform 0 Remam m progress
Report(s) findmgs were dlseussed and left with
RANS
of BOOCO CONSTRUCTION
Based on the Code approval IS required ITom the BUlldmg OffiCial before the SPECIAL INSPECTED Items noted above ean
be covered Carlson Testmg has no authonty to dIreet work of contraetors or subeontractors
D See additIOnal report pagelS)
D Dlstnbute attaehments
Page ~of _
Dally Report of ProprIetary Anchors
CTI Job #. S0805452
For
07129/2008
ProJect. SAFEWAY STORE #0311 REMODEL - SPRINGFIELD
Notes
ENGINEER IS GIVING APPROVAL BY EMAIL AND AND VERBAL TO USE HILTI HY 150 INTO UNRACKED CONCRETE
FOOTING
In some cases more than one box may be checked for a given Item on the front page
Our reports pertam to the material tested/mspected only InformatIon contamed herem IS not to be reproduced, except m
full, wIthout priOr authorizatIon from thiS office
If there are any further questions regardmg thIS matter, please do not hesitate to contact thiS office
Respectfully submItted,
CARLSON TESTING, INC
RevIewed By Steven Dugger
Review Date 08/01/2008
EW/KMF
SAFEWAY STORES INC - BRIAN NORTH
TO CITY OF SPRINGFIELD BUILDING DEPARTMENT
FROELICH CONSULTING ENGINEERS
BOOCO CONSTROCTION INC