Development Issues Meeting
Thielke/Hunley Zon2008-00015
April 1 0, 2008
Applicant
Jeff Thielke
1175 Ash Grove Loop
Creswell, OR 97426
Consultant/Applicant Representative
Krush and Associates
607 HIghway 99 North
Eugene, OR 97401
541-686-9211
Zoning
Low Density ResldentJal/ Urban TransitIOn Overlay
Dlstnct
SIte Address! Assessor's 10
367 Hayden Bndge Way
Spnngfield, OR 97477
Map#17-03-26-21 TL300
Mmlmurn density m the LDR zone IS 0-10 umts per
acre The densIty of the surroundmg neIghborhood IS
approximately 4 unitS per acre The proposed density IS
about 2 unitS per acre
Notes
The property IS outSide of the City lnruts but Wlthm Spnngfield's Urban Growth
Boundary and planmngJunsdlctlOn Nearby propertIes are fully developed to urban
standards
Background/Applicable PoliCies and Procedures
The applicant IS requestmg to parl1tlOn a 9 acre lot mto two lots (Parcels I and 2) There
IS an eXlstmg house on Parcell with access off Hayden Bndge Way The stated purpose
of the partltJon IS to create a second parcel (Parcel 2) and bUild a smgle-farmly reSidence
on It The new reSidence would take access from Lara Lee Street, a county road faCility
If approve, Parcell Will be 5 acres and Parcel 2 Will be about 46 acres m size
The zonmg on the eXlstmg lot IS LDR The partJtlOn Will make more effiCient use of the
subject property
The eXlstmg lot IS served by an mdlvldual wastewater dIsposal system (septJc), receives
water from Rambow Water Dlstnct and electnclty from SUB Both Parcels I and 2 Will
be served by mdlvldual wastewater dIsposal systems, and Will contmue to be served by
Rambow and SUB as mentIOned above
The subject lot IS located outSide the City limits but Wlthm the Spnngfield UGB
ProVISIOns of the Urban TranSitIOn Overlay Dlstnct apply to the property and are
evaluated m the "Fmdmgs" sectIOn below Comments In addItion to thIS reoort have
been submItted by varIOus Springfield Departments and localutlltties. These are
attached and should be revtewed and addressed in the appltcant's partitIOn submtttaL
ThIelke/Hunley Zon2008-000l5
ApnllO, 2008
Date Received ~( D (
Planner' MM z..... ~ 7
Findmgs
The proposed new parcells more than 300 feet away from eXlstmg City sewer
servIce IS not reqUired to hook-up and annex to the CIty (SDC 3 3-825 E) The
Lane County Sarutanan shall certifY that the proposed mdlVldual wastewater
dIsposal system meets DEQ reqUirements (SDC 3 8-825 B)
2 The surroundmg subdivIsIOns and development are also outside of the cIty limIts
and are served by seplic systems Bamng a public health Issue, It IS unlikely that
the subject site and the near-by development Will be reqUired to hook up to the
City sewer system m the foreseeable future
3 SectIOn 4 3-125 of the SDC states "Whenever possible, all ulility lmes shall be
placed underground The sectIOn goes on to cite cIrcumstances where overhead
service IS allowed Overhead and above ground service IS allowed
when "Exlstmg non-backbone dlstnbutlOn feeders located on eXlstmg streets on
developed or undeveloped land" The parent parcel and home are served by
eXlstmg overhead servIce from an eXlstmg pole on Hayden Bndge Way
4 The property IS outside of the CIty limits and Wlthm the Spnngfield UGB, thus It
IS subject to the Urban Transllion Overlay Dlstnct (SDC 3 3-800) The goal of the
overlay dlstnct IS to encourage a pattern of compact urban growth Wltlun the
UGB and to ensure that as future development and annexatIOns take place the
parlitlOns and subdivIsIOns of land allow for future mtegratlOn mto the fabnc of
the comrnuruty
5 ParlitlOns are a Type II procedure Wltlnn the UT Overlay Dlstnct (SDC 3 3-820)
A Land DlVlslOn Tentalive ApplicatIOn for Type II procedures shall be reqUired
(enclosed With tins report)
6 SectIOn 3 3-825 of the SDC states "In order to achIeve ullimate denSIties
provided m the Metro Plan, sltmg of smgle farmly homes on any lot/parcel
deSIgnated MDR or HDR, or any lot/parcel 5 acres or more m size and deSignated
LDR, shall reqUire approval of a Future Development Plan as specified m SectIOn
5 12-120 E" The subject property IS zoned LDR and IS less than 5 acres m size
and a Future Development Plan IS not therefore reqUired
7 SectIOn 512-125 (l)(2)(b)(ll) exempts propertIes less than 5 acres from the Future
Development Plan reqUirement when the maJonty of nearby propertIes are less
than 5 acres m size A review of the Assessor's map shows that the maJonty of
lots Wltlun 100 feet are much less than 5 acres m size The average lot size on
Lara Lee Street IS about 2 acres A Future Development Plan IS not therefore
requued
8 SectIOn 3 3-825 E states "Any property to be partllioned that IS Wltlnn the
dIstances specified m OAR 340-071-0160 (4)(A) for connectIOn to the CIty'S
Thielke/Hunley Zon2008-000l5
ApTlllO, 2008
2
0" '" Received ~( O{
Plf'nner MM 7 t ~ 7
sarutary sewer system shall be reqUIre annexatIOn to the CIty pnor to PartItIOn
TentatIve Plan Submittal The distance cited m OAR 340-071-0160 (4)(A) IS 300
feet The subject property IS more than 300 feet from available CIty sewer servtce
and thus the property shall not be reqUIred to annex before the submIssIOn of the
PartItIOn Plan TentatIve
Applicant's Questions
The Development Issues Meetmg IS mtended to antICipate some of the development
Issues that may be faced by the appl1cant The applicant IS encouraged to submit lus/her
specific questIOns about the development proposal for staff response The questIOns
below were submitted by the applicant's representatIve
Hammerhead adjoining Lara Lee St.
A hammerhead turn around WIll be reqUIred for the site Specific dimensIOns and sample
desIgns are available from the Department of FIre and Life Safety
The ownership of the hammerhead will be discussed Public Works has mdlcated an
mterest m havmg the applicant mamtammg ownerslup as opposed to dedlcatmg the
hammerhead to the City The owner would be responsible for mamtammg the
hammerhead
How much drain field needed to satisfy septic
The Lane County Sanltanan shall determme the sIze and type of wastewater disposal
system that IS appropnate for the site (SDC 3 8-825 B) The size and desIgn generally
depend on sOli conditIOns and other factors
Power hook-up pole to south
Parcel I and the eXlstmg home are served by eXlstmg overhead service from an eXlstmg
pole on Hayden Bndge Way
SectIon 4 3-125 of the SDC states "Whenever possible, all utIlity lines shall be placed
underground The sectIOn goes on to cite circumstances where overhead service IS
allowed Overhead and above ground service IS allowed when "Exlstmg non-backbone
dlstnbutlOn feeders located on eXlstmg streets on developed or undeveloped land" Tlus
exceptIon allows a very narrow WIndow of discretIOn for staff
In tlus case, If the eXlstmg pole on the south property Ime can provide servIce to Parcel 2
WIthOut safety concerns and or vIsual Impact from any nearby nght-of-way, the power
may be taken from the pole
ThIelke/Hunley Zon2008-000 15
ApT/I 10, 2008
3
Water hookup Lara Lee
Date Received *( 3(
Planner MM 1. ~ ~ 7
Water service to the site shall be provIded by Rambow Water District A conversatiOn
With TIm Handley at the Rambow Water District confirms that water IS available and
may be easily provided to the new parcel
How soon can we submit preliminary partition
The Land DIvIsiOn TentatIve ApplIcatIon Process IS descnbed m the apphcatiOn matenals
available on-lme or at the counter Two copies of the applIcatiOn are enclosed With thIs
staff report Upon recelvmg a Land DIvIsiOn Tentative ApplIcatiOn, a pre-submIttal
meetmg IS scheduled to review the completeness of the apphcatiOn
Staff strives to conduct pre-subrruttal meetmgs wIthIn five to seven days of the receipt of
an applIcatiOn A check With counter staff on 4/9 mdlcates that we are able to keep such
a schedule at thIs tIme The submiSSiOn of a thorough applIcatiOn and drawmg Will speed
the overall processmg of the partitiOn
ThIelke/Hunley Zon2008-000 15
ApT/l 10, 2008
4
Oate Received
Planner MM
Thielke/Hunley Zon2008-00015 (Vicinity and Structures)
'1/;0/6 (
r~ 7
=~-BRIJ6E-W~~,I- I _I~_ -~A"f8~~E-~Aii . ~ ~ ~
}l I,' C/l
.11; JJ J ~ -sip , .. II.'.. -\ 7"111
"' ! .. .I'~
II "'1Ii It .I..J 'I .. II. Iii ~ '
.~, l,\, - 1-. I
" mot ~ , J. I
I't~ I & .~!w___ _II ~E?fiID
11- " ~ 1-
..,~ 'I ....~ III ..,. ~ ,-..;
-~ . - ' ::: r -- ~~GJ_QQb MJ~~_~?_ ~ J ~
II~ ' p......,.I..-,-...I..,t l ·
_. .. .." I .',? : \It:
. - - - --l!! - ill Iw
~ , 1.1. ~ ';~..,.J"'l rl ~
ThIelke/Hunley Zon2008-000 15
ApnllO, 2008
5
Date Received
Planner MM
Thielke/Hunley Zon2008-00015 (Aerial Photo)
1 Itd()(
it
Thielke/Hunley Zon2008-000l5
ApnllO, 2008
6
Date Received ~ (to! 6 (
Planner MM 7 ~ '7
Thielke/Hunley Zon2008-00015 (Stormwater and Sanitary Sewer)
~~ -. I II"_~ l- ~ _'-: ..-. 7o-1=- 1~llfl (~l~
!OJ ,"rei _ ~ f ~t.
~ :--.,;,. J .. 1 ..-': -,.. I~~~ ..:
.......; {;'.I~ .' -~ ':1
..r, I I,. A'. Jm. r-
, D _ _ ," 1-..
Iii.' .~~r ... ..... ~
11,II1II1 ""~""I-.-..I~~.~-
II '. . . {il' ,@-
II .." I RJi I ,"; -.. ' ,,"I Ib,-:-11l
- \;--"---~I" . III.. III "'8~------!r01_ _ ..
__ ~~ - - - -- I 1-----::;;-'<1"-1 ~Oli),,). III
II "--------::::::-'i-' ts,)~ =2'
811 . II. W, \ __ 1_ 'L---;- I I S, ------,B1IIf&l.. III .. PIS\'-
Thielke/Hunley Zon2008-000 15
ApTlllO, 2008
7