HomeMy WebLinkAboutPermit Building 1995-11-15
e, REQUIRED INSPECTIONS e
It is the responsibility of the permit holder to see that all Inspections are made at the proper time, To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection, Requests received before 7:00 a,m, will be made the same working day, requests made after 7:00 a,m, will be made
the following work day,
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms,
x
.'
UNDERSLAB PLUMBING,
, ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete,
x
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
,piping, accessories anq other
ancil,lary equipment items are
in place but before any
concrete is placed,
)<
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines, To be made
prior to covering or filling
trenches,
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor insulation, decking or
floor sheathing.
y
POST & BEAM: To be made
prior to Installation of floor
insulation, decking or floor
sheathing,
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing,
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415,
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
ROUGH PLUMBING.
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete,
ATTIC DRAFT STOPS &
CURTAIN WALLS
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special Inspector shall be employed
by the Owner' Contractor during
construction of the following work, A
copy of the special testing reports shall
be furnished to the Building Division,
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
STRUCTURAL CONCRETE: In
excess of 2500 P,S,I. (306 a,1)
FRAMING: To be made after
the roof, all ,framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved,
STRUCTURAL WELDS: ,
Performed on the job, (2722 f)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations, (306
a,6)
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board Interior wall covering is
applied.
FIRE& SEPARATION WALL:
Located and constructed
according to plans.
,
SPRAYED ON
FIREPROOFING: U,B,C,
Standards 43.8,
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a,11 &
Chapter 29)
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, Is In
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU-LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed, (2501 U,B,C,
STDS. 25-10,11),
STRUCTURAL MASONRY: (306
a,7)
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way. to be made after all
excavating complete and form
work and sub-base material In
place,
.In addition to the inspec-
tions specified, the Building
Official may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code,
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
FINAL PLUMBING
-------------------------------------------------------
y
/
FINAL ELECTRICAL
A
X
FINAL ,MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
, SITE PLAN REVIEW BOARD: Must be requested 2'days in advance
ofthe date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc, must be completed before
requesting this Inspection,
Y FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the 'Building Division
and posted on the premises,
.
. -
PLANS REVIEWED BY // ~~~~DATEL/Y..5"'~ ~
ruv. ~ /'..-t"~ - ._
l.-
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
'who are in compliance with ORS 701,055 will be used on this project. ' . ' ",
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set'of plans will remain on the site at all
ti~es during ~uctlon, \\ ,,~\:) tV A ( .-
Signature ", ~ u. ~ "<\ ') .2. Date l/f 15
'. ""\
~.r
/I/!.r/f/
/ '/y;~
I.. '--
VALIDATION:
AMOUNT RECEIVED: S~ '7 '
/ F~CJ '8
DATE PAID:
RECEIVED BY:
.'r ..
RECEIPT ":
COMMERCIAL/INDUSTRIAL e
PERMIT APPLICATION
SPRINGFIELD
e
225 Fifth Street, Springfield, Oregon 97477
JOB NUMBER
95" / (p 2-7'
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK:
() ~ _~ cr::o
ASSESSORS MAP:
OWNER:
PHON F'
CITY:
STATE: () K
ZIP: 9 74L7
DESCRIPTION OF WORK:
+tfru Y.J~ &~~~
NEW
REMODEL
ADDITION
DEMOLISH
OTHER
VALUE:
1.50. Dao
,
NAME
ADDRESS
PHONE
71~ ~~~ ~.~ ..
Wh"Ct7l'W'~~?
EXPIRES PHONE
7CJ6 -nl?
, 9,f4 - 994~
344- ,J46t
343'" 7 ..29 7
ARCHITECT:
CONTRACTOR'S NAME
GENERAL: Stlt(,"+.~ s,,~ 5
PLUMBING: Jt..~ ~
MECHANICAL: ~MU h4 jiPAhiv
ELECTRICAL: ~rh.ld'i fbr/t!;{'
CONST,
ADDRESS CONTRACTOR #
$'B7 5 fh:-7 ./ to" 5l O.Pc2.
PLUMBING MECHANICAL
NO, FEE CHARGE NO 1=1=1= r. tI AB.r: F
Single Fixture Furnace/burner & vent
< 100,000 BTUs
Relocated Bldg. Furnace/burner & vent j
(new lix. addtl) >100,000 BTUs
Water Service Floor lurnace and vent I,
It,
Sanitary Sewer I Suspended wall or Iloor I
It. mounted unit heater
Storm Sewer I I Appliance Vent I
It. separate
I I Stationary evap, I
Backllow Device cooler
I I Vent Fan/Single
duct
I I I Vent System apart
Irom AC or htg,
I I I Mechanical exhaust
hood and duct
I I I
I ~ I I Permit Issuance $10,00
TOTAL PERMIT I I TOTAL PERMIT
- OFFICE USE -
HANDICAP ACCESS:
FLOOD PLAIN:
OUAD AREA:
LAND USF'
# OF BLDGS:
# OF UNITS:
ZONING:
LN/
# OF STORIES:
1?-~
:2..-
CONSTR. TYPE:
HEAT SOURCF'
9#
OCCY GROUP:
r
LIGHTING POWER BUDGET:
,WATER HEATER:
SO, FT,
$/SQ, FT.
VALUE
J
SO, FTG MAIN
SO, FTG ACCESS
SO, FTG OTHER
X
X
X.
=
=
=
I
TOTAL VALUE OF PROJECT
,~ >~
PLAN CHECK FEE '1 ~4 .
- - I
RCPT# 19~
DATE j/'/Y"~7
BY a~--;~ ..
'/.Y-
b"
DEMOLITION
J
J
I
,I ?69./S-1
.1 /V~L I
15% State
Surcharge
I MECHANICAL
15% State
SurCharge
I PAVING
I BUILDING PERMIT I
~
/?~;?50
~~.~
PLUMBING
5% State
Surcharge
FENCE,
VALUE $
SIDEWALK
I CURBCUT
FT,
I SUBTOTAL
PERMITS
I SYSTEMS
DEVELOPMENT
FT.
...
?$~./>
"
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL