HomeMy WebLinkAboutPermit Miscellaneous 2004-7-28 (2)
. 225 Fifth Street
, Springfield, Oregon 97477
541-726-3759 Phone
.
Job/Journal Number
COM2003-01196
COM2003-01196
COM2003-0 1196
COM2003-0 1196
COM2003-01196 .
COM2003-01196
COM2003-01196
COM2003-0 1196
COM2003-0 1196
COM2003-0 1196
COM2003-01196
.
fig'!!!1I~~!~i.
~
RECEIPT #:
2200400000000000981
Description
Planning Final Occy Inspection
SDC Sanitary/Storm Admin
Storm Drainage Impervious Area
Plan Review CommJInd/Public
Paving
Fixture
Storm Sewer - 1st 50 Feet
Water Line - 1st 50 Feet
Backflow Device
+ 7% State Surcharge
+ 10% Administrative Fee
1IitY of Springfield Official Receipt
.elopment Services Department
Public Works Department
Date: 07/28/2004
10:46:45AM
Amount Due
118.00
, 525,02
10,500.32
133.93
666.40
14.00
45.00
45,00
14.00
8,26
78.44
$12,148.37
Payments:
Type of Payment Paid By
Check FERGUSON ENTERPRISES
Item Total:
Check Number Authorization
Received By Batch Number Number How Received
Jmp 09962941 In Person
Payment Total:
.
7/28/2004
Page I of I
Amount Paid
$12,148,37
$12,148.37
.
. ATTACHMENT A .
CITY OLGFIELD SYSTEMS DEVELOPMENT CHARGE SHEET
JOURNAL OR JOB NUMBER C0M2003-01196
NAME OR COMPANY: FAMILIANNW
LOCATION: 3322 COMERCIAL
MAP & TAX LOT NUMBER: 17 02 31 21 02500
DEVELOPMENT TYPE: PAVED STORAGE AREA
NEW DEVELOPED AREA (S.F.):
EXISTING DEVELOPED AREA (S.F.):
TOTAL IMPERVIOUS SURFACE (S,F.):
,
810.00
37,018
ITE:
ITE:
LOT SIZE (S.F,):
,812
.
o
, 1. STORM DRAINAGE
IMPERVIOUS SQ. FT.
36,208
x
$ 0,290 PER SF
TOTAL STORM DRAINAGE SDq $ 10,500,32110;7.0
2, SANITARY SEWER-CITY
A. REIMBURSEMENT COST:
NUMBER OF DFU's
B, IMPROVEMENT COST:
NUMBER OF DFU's
(SEE REVERSE SIDE)
o
x $ 22.64 PER DFU
1$
, $
I
o
x $ 17.21 PER DFU
TOTAL LOCAL WASTEWATER SDC:' $
3. TRANSPORTATION: .
BLDG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENT COST:
0.00 x 39.71 x $ 17,23 PER TRIP x
B. IMPROVEMENT COST:
0.00 x 39,71 x $ 76.01 PER TRIP x
EXISTING
A. REIMBURSEMENT COST:
-0.81 x 0 x $ 17,23 PER TRIP x
B. IMPROVEMENT COST: ~
-0,81 x 0 x $ 76,01 PER TRIP x
0.75
NTF 1$
NTF 1 $
0.75
o
NTF '$
NTF 1$
o
(I
TOTAL TRANSPORTATION REIMBURSEMENT SDC: $
, I
TOTAL TRANSPORTATION IMPROVEMENT SDC: $
TOTAL TRANSPORTATION SDC:' $ I
4, SANITARY SEWER - MWMC
NEW:
A. REIMBURSEMENT COST:
. NUMBER OF FEU's 0.00
B. IMPROVEMENT COST:
NUMBER OF FEU's 0.00
x
$89.89 PER FEU
1$
1$
x
$61.21 PER FEU
EXISTING:
A. REIMBURSEMENT COST:
NUMBER OF FEU's
B, IMPROVEMENT COST:
NUMBER OF FEU's
-0.81
x
$0.00
PER FEU
1$
1$
I
I
$
$
$
$
I
10,500.32 ,
I.
-0,81
x
$0,00
PER FEU
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
TOTAL MWMC REIMBURSEMENT FEE:
TOTAL MWMC IMPROVEMENT FEE:
MWMC ADMINISTRATIVE FEE:
TOTAL MWMC SDC:' $
SUBTOTAL (ADD ITEMS 1,2,3, & 4)
, $
5, ADMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE)
$
10,500.32 x 5% = $ 525.02
TOTAL TRANSPORTATION ADMINISTRATION FEE: .$
TOTAL SEWER ADMINISTRATION FEE: $ 525.02
steveV\. w, lSeClucirl::)lSClt'V\.eS 12/8/2003
c~9~ob9-6VW~Uit~AN NW, 3322 COMMERCIAL.xPsATE
TOTAL SDC CHARGES
1$
11,025.34 ,
JULY 2001
'';
.
. CITY OF SPRINGFIELD'
Building/Combination Permit
Status Issued PERMIT NO: cOM2003-01196
225 Fifth Street, Springfield, OR ISSUED: 07/28/2004
APPLIED: 12/02/2003
541-726-3753 Phone
EXPIRES: 01/28/2005
541-726-3676 Fax
541-726-3769 Inspection Line VALUE: $ 131,000.00
Structural Review 12/03/2003 12/03/2003 WE JMP 12/3/2003 JMP called Brenda at
Branch. She said that the
contractor information requested
will probably be provided next
week. 12/22/2003 JMP followed up
with Rene Fabricant. Rene says the
client is still dealing with sticker
shock but that he will let me know
when contractors are selected.
Structural Review 03/26/2004 03/26/2004 APP JMP Received updated value and
contractor information
SUB Review 12/03/2003 12/29/2003 APP DH No code issues.
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a,m.
will be made the same working day, inspections requested after 7:00 a,m, will be made the following work
day,
I . Re~uire~ InsoectionsJ
Site Inspection: To be made after excavation but prior to setting forms.
Erosion/Grading Inspection: After all erosion measures are in place.
Final Fire Department. After all requirements of the Fire Department have been met.
Final Building: After all required inspections have been requested and approved and the building is complete.
Rough Grading: After gravel is in place but prior to placing concrete.
Final Paving: After paving is complete.
Storm Sewer Line: Prior to filling trench.
Backflow Device: Prior to covering and provide a copy of the test report on site at the time of inspection.
Water Line: Prior to filling trench and including required testing.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
//
.. / ~~ r!Z-(J!f94
Owner or Contractors Signature
Date
Pae:e 3 of 3
-~"'~m!!il~~:.~ _, _ , .
,
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: cOM2003-01196
ISSUED: 07/28/2004
APPLIED: 12/02/2003
EXPIRES: 01/28/2005
VALUE: $ 131,000.00
'0'
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
.
I Valuation Description I
Description Tvpe of Construction
Bid Amount Use Bid Amount
$ Per Sq Ft
or multiplier
$1.00 .
Square Footage
or Bid Amount
131,000.00
Value
Date Calculated
Total Value of Project
$131,000.00
$131,000.00
03/26/2004
~
Fee Description Amount Paid Date Paid Receipt Number
Plan Review Comm/Ind/Public $299.23 12/2/03 2200200000000001823
+ 10% Administrative Fee $78.44 7/28/04 2200400000000000981
+ 7% State Surcharge $8.26 7/28/04 2200400000000000981
Backflow Device $14.00 7/28/04 2200400000000000981
Fixture $14.00 7/28/04 2200400000000000981
Paving $666.40 7/28/04 2200400000000000981
Plan Review Comm/Ind/Public $133.93 7/28/04 2200400000000000981
Planning Final Occy Inspection $118.00 7/28/04 2200400000000000981
SDC Sanitary/Storm Admin $525.02 7/28/04 2200400000000000981
Storm Drainage Impervious Area $10,500.32 7/28/04 2200400000000000981
Storm Sewer - 1st 50 Feet $45.00 7/28/04 2200400000000000981
Water Line -1st 50 Feet $45.00 7/28/04 2200400000000000981
Total Amount Paid $12,447.60
I Plan Reviews I
Fire Department Review
Initial Review
12/03/2003
12/03/2003
12/22/2003
12/03/2003
OK GRG
APP LLH
Plan nine Review
12/03/2003
12/04/2003
APP EMM
See Attached Documents.
. See attached document for memo
from Planner Jim Donovan
regarding project and DRC
information.
Jim Donovan Planner
DRC2003-00042. No combustible
storage until the hydrant is in and
keyed acces is provided in the gate.
Applicant can delay paving the 18 X
20 driveay pad at Commerical until
after the 24' curb cut is provided in
the street project.
Impervious surface SDCs only
Public Works Review
12/03/2003
12/08/2003
APP SB