Loading...
HomeMy WebLinkAboutNotes Applicant 12/13/2024 (2)17-03-22-13-20801 78,750 SF 2.33 AC Building roof drainage piped directly into posposed soakage trenches. Road runoff graded to bedirected to stormwater planter for treatment, with an overflow into soakage trench for destination. Stormwater planters and soakage trenches Subdivision with private streets, sidewalk, parking area, and drainage controls. 12/12/24