Loading...
HomeMy WebLinkAboutMeeting Packet Planner 12/12/2024 Completeness Check Meeting Development and Public Works Department Conference Room 616 & Zoom COMPLETENESS CHECK MEETING DATE: Friday, December 20, 2024 10:00 a.m. - 11:00 a.m. DPW Conference Room 616 and Zoom Completeness Check Mtg (Partition Tentative Pre-Submittal) 811-24-000301-PRE 811-24-000201-PROJ Charles Harral Assessor’s Map: 18-03-01-00 TL: 00100 Address: 702, 750, 760, & 780 S. 28th Street Existing Use: Storage Applicant has proposed 3-parcel partition Planner: Tom Sievers Meeting: Friday December 20, 2024 10:00 – 11:00 via Zoom and Conference Rm 616 SITE VICINITY MAP 811-24-000301-PRE Partition Tentative Pre-Submittal 18-03-01-00 TL 00100 702, 750, 760 & 780 S. 28th Street Charles Harral Revised 1/7/14 kl 1 of 10 City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Land Division Tentative Plan Partition, Subdivision Application Type (Applicant: check one) Partition Tentative Pre-Submittal: Subdivision Tentative Pre-Submittal: Partition Tentative Submittal: Subdivision Tentative Submittal: Required Project Information (Applicant: complete this section) Applicant Name: Phone: Company: Fax: Address: Applicant’s Rep.: Phone: Company: Fax: Address: Property Owner: Phone: Company: Fax: Address: ASSESSOR'S MAP NO: TAX LOT NO(S): Property Address: Size of Property: Acres Square Feet Proposed Name of Subdivision: Description of Proposal: If you are filling in this form by hand, please attach your proposal description to this application. Existing Use: # of Lots/Parcels: Total acreage of parcels/ allowable density: Proposed # Dwell Units Signatures: Please sign and print your name and date in the appropriate box on the next page. Required Project Information (City Intake Staff: complete this section) Associated Applications: Signs: Pre-Sub Case No.: Date: Reviewed by: Case No.: Date: Reviewed by: Application Fee: $ Technical Fee: $ Postage Fee: $ TOTAL FEES: $ PROJECT NUMBER: EUGENE-SPRINGFIELD 310 5th Street, Springfield, OR 97477 | p: 541.746.0637 | www.branchengineering.com December 5, 2024 NARRATIVE 750 S. 28TH STREET TENTATIVE PARTITION PLAN Branch Engineering Inc. Project No. 24-212 This application proposes to partition a property located at 750 S. 28th Street (TM 18-03-01, TL 100). The site lies within the City of Springfield city limits and is zoned HI, which is consistent with the Eugene-Springfield Metropolitan Area General Plan designating the area as Heavy Industrial. The site has five structures with several access connections along S. 28th Street that were constructed this year. To the north, the site abuts S. F Street. Current improvements within S. F Street include pavement, sanitary sewer, water main, and gas main. To the east the site abuts and takes primary access off S. 28th Street. Current improvements within S. 28th Street include full street improvements with curb and gutter, 10’ wide curbside sidewalk, gas, sanitary sewer, water main, stormwater facilities, and overhead power and communication lines. The developer wishes to perform a 3-parcel partition with the northerly structure located in the central parcel, the remaining structures in the southerly parcel, and leaving the northerly parcel vacant except for vehicle storage. It should be noted that S. F Street does not appear to be a public right-of-way, but instead a street easement over the railroad right-of-way. Documentation supporting this is included in this submittal.