Loading...
HomeMy WebLinkAboutPlans Applicant 11/15/2024 (2)C C C C C C C C C C C C C C C C C C C C C C C CSCALE:0'1"=100'50'100'200'CHERRY SPRINGS APARTMENTS 2923-07 01/22/2021 JMM SNL 12/31/20 EXPIRES:DescriptionRev.Date Dwg Jan 08, 2021JamieW Z:\JOBS\2923-Timberview Construction\2923-07 Cherry Springs\CADD\CONSTRUCTION\2923-07_P SHEETS.dwg ISSUE: PROJECT NO. DRW: CHK:J6 91YLU,190 18566 PEOREGONIGNE REENREGIST E RDEPROFESSIONALL48TH ST. SPRINGFIELD, OREGON FOR REVIEW civilstructuralsurveyingarchitectureplanning809 SE Pine StRoseburg, ORieengineering.comi.e. Engineering, inc.EMERGENCY ACCESS ROUTES 1"=100'KCHERRY SPRINGSEMERGENCY ACCESS ROUTES8-PLEX18-PLEX28-PLEX38-PLEX48-PLEX58-PLEX68-PLEX78-PLEX98-PLEX108-PLEX11OFFICE +1 UNIT178-PLEX138-PLEX128-PLEX148-PLEX158-PLEX168-PLEX88-PLEX18-PLEX28-PLEX38-PLEX48-PLEX58-PLEX68-PLEX78-PLEX98-PLEX108-PLEX11OFFICE +1 UNIT178-PLEX138-PLEX128-PLEX148-PLEX158-PLEX168-PLEX8VEHICLE INFO:E-ONE HEAVYNON WALK IN RESCUE CUSTOMOverall Length: 36.083'Overall Width: 8.333'Overall Body Height:10.000'Min. Body Ground Clearance: 1.393'Track Width: 8.333'Lock-to-Lock Time: 6.00sMax. Wheel Angle: 45.00°Wheel to Wheel: 38.066'SOURCE INFO:Autodesk Vehicle Tracking forAutoCAD Civil 3DB ST. A ST. BEAVER ST. C ST. 48TH ST. ROUTE AROUTE BROUTE C ROUTE DROUTE EROUTE FFIGURE 1: VEHICLE INGRESS/EGRESS ROUTES A-DFIGURE 2: VEHICLE INGRESS/EGRESS ROUTES E-FB ST. A ST. BEAVER ST. C ST. 48TH ST.