Loading...
HomeMy WebLinkAboutNotes Applicant 11/15/2024 (2) Tentative Plan Submittal Application For CHERRY SPRINGS Prepared For: CHERRY SPRINGS LLC 3025 West 7th Place Eugene, OR 97402 Submittal Date: November 11, 2024 A & O Engineering LLC Cherry Springs Page 2 of 14 Tentative Partition Written Narrative August 16, 2024 INDEX WRITTEN NARRATIVE Project Summary 3 Tentative Plan Submittal Requirements 4 Tentative Plan General Approval Criteria and Findings 10 Tentative Plan Approval Criteria and Findings 12 Conclusion 14 EXHIBITS A. Zoning B. County Assessor’s Map C. Preliminary Title Report ITEMS SUBMITTED SEPARATELY Application Form Application Fee Tentative Partition Drawings Title Report Deed Traffic Study Stormwater Memo A & O Engineering LLC Cherry Springs Page 3 of 14 Tentative Partition Written Narrative August 16, 2024 Project Name: CHERRY SPRINGS Project Proposal: Tentative Partition to create 3 lots. One lot on each side of “B” Street as it extends to 48th Street through the city approved Cherry Springs Apartments and one lot fronting Main Street for future commercial development. Application Type: Type II – Tentative Partition Project Location: East side of 48th Street, north of Main Street Assessor’s Map: 17-02-32-41 Tax Lot: 0400 Size: 8.53 Acres. (Gross Area Prior to Public ROW Dedications) Zoning: Mixed Use Residential (MUR) Plan Designation: Mixed Use / Included in East Main Refinement Plan Existing Use: Vacant Pre-Submittal Mtg Date: 6/20/2019 City No. 811-19-000123 Associated Application: Final Site Plan Review Application (811-21-000015-Type II) Number of Proposed Lots: 3 Lots Owner Applicant Surveyor Cherry Springs LLC Colin Kelley Brent Corning, PLS Attn: Mike Kelley Timberview Construction EGR & Associates 3025 West 7th Place 3025 West 7th Place 2535B Prairie Road Eugene, OR 97402 Eugene, OR 97402 Eugene, OR 97402 colin@timberviewconst.com bcorning@egrassoc.com Engineer/Applicant Representative Scott Morris P.E A & O Engineering LLC 380 Q St Ste 200 Springfield, OR 97477 scottmorris@ao-engr.com PROJECT SUMMARY A & O Engineering LLC Cherry Springs Page 4 of 14 Tentative Partition Written Narrative August 16, 2024 Section 2 lists the application submittal requirements per the City of Springfield Development Code (SDC) and applicable City application forms. Code text is in bold italics followed by the Applicant’s response. SDC 5.12-120 Tentative Plan Submittal Requirements A Tentative Plan application shall contain the elements necessary to demonstrate that the provisions of this Code are being fulfilled. A. General Requirements. 1. The Tentative Plan, including any required Future Development Plan, shall be prepared by an Oregon Licensed Professional Land Surveyor on standard sheets of 18″ x 24″. The services of an Oregon Licensed Professional Engineer may also be required by the City in order to resolve utility issues (especially stormwater management, street design and transportation issues), and site constraint and/or water quality issues. Response: The Tentative Plan was prepared by Brent Corning, EGR & Associates., an Oregon licensed Professional Land Surveyor. 2. The scale of the Tentative Plan shall be appropriate to the area involved and the amount of detail and data, normally 1″ = 50′, 1″ = 100′, or 1″ = 200′. Response: The Tentative Plan includes a standard scale appropriate to the size of the development site and the amount of needed detail and data. 3. A north arrow and the date the Tentative Plan was prepared. Response: The Tentative Plan includes a north arrow and the date the plan was prepared. 4. The name and address of the owner, applicant, if different, and the Land Surveyor and/or Engineer who prepared the Partition Tentative Plan. Response: The Tentative Plan includes the name and address of the owner, applicant, and Land Surveyor who prepared the plan. 5. A drawing of the boundaries of the entire area owned by the partitioner or subdivider of which the proposed land division is a part. TENTATIVE PLAN – SUBMITTAL REQUIREMENTS A & O Engineering LLC Cherry Springs Page 5 of 14 Tentative Partition Written Narrative August 16, 2024 Response: The Tentative Plan includes the boundary of the subject property consisting of the current legal lot shown as Tax Lot 400 on Assessor’s Map 17-02-32-41. 6. City boundaries, the Urban Growth Boundary (UGB) and any special service district boundaries or railroad right-of-way, which cross or abut the proposed land division. Response: There are no City boundaries, UGB, special service district boundaries or railroad right-of-way which cross or abut the proposed land division. 7. Applicable zoning districts and the Metro Plan designation of the proposed land division and of properties within 100 feet of the boundary of the subject property. Response: The property is designated and zoned Mixed Use Residential. The zoning within 100 feet of the subject property are shown on Exhibit A - Zoning. The site is also located in the East Main Refinement plan area. Future development plan for parcel 3 will need to meet the policies in this refinement plan. 8. The dimensions (in feet) and size (either in square feet or acres) of each lot/parcel and the approximate dimensions of each building site, where applicable, and the top and toe of cut and fill slopes to scale. Response: Final Site Plan has been completed (Case #811-21-000015-TYP2). ROW to be dedicated by separate document outside of this partition. The Cherry Springs Apartments Site Plan Review contains dimensions for each building on the residential portion of the subject property. The dimensions for each parcel, including undeveloped Parcel 3 are included as part of this partition plat. 9. The location, outline to scale and present use of all existing structures to remain on the property after platting and their required setbacks from the proposed new property lines. Response: Apartment buildings are currently being constructed on proposed parcels one & two. Dimensions from the approved apartment buildings to the proposed property line is shown. 10. The location and size of existing and proposed utilities and necessary easements and dedications on and adjacent to the site, including, but not limited to, sanitary sewer mains, stormwater A & O Engineering LLC Cherry Springs Page 6 of 14 Tentative Partition Written Narrative August 16, 2024 management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points. Response: The Cherry Springs Apartments Final Site Plan Review contains a Site Plan and Utility Plan indicating proposed utilities and easements on the portion of the property currently under construction (Case #811-21-000015-TYP2). All existing utilities and easements are shown on Sheet C-1.0 – Existing Conditions Map. 11. The locations, widths and purpose of all existing or proposed easements on and abutting the proposed land division; the location of any existing or proposed reserve strips. Response: The locations, widths, and purpose of all existing easements are shown on Sheet C-1.0 – Existing Conditions Map. 12. The locations of all areas to be dedicated or reserved for public use, with the purpose, condition or limitations of the reservations clearly indicated. Response: The Partition application shows the location of the public right-of-way to be dedicated for the extension of “B” Street to 48th Street. There are no additional areas to be dedicated or reserved for public use as part of the Partition process. B. A Site Assessment of the Entire Development Area. The Site Assessment shall be prepared by an Oregon Licensed Landscape Architect or Engineer and drawn to scale with existing contours at 1-foot intervals and percent of slope that precisely maps and delineates the areas described below. Proposed modifications to physical features shall be clearly indicated. The Director may waive portions of this requirement if there is a finding that the proposed development will not have an adverse impact on physical features or water quality, either on the site or adjacent to the site. Information required for adjacent properties may be generalized to show the connections to physical features. A Site Assessment shall contain the following information. 1. The name, location, dimensions, direction of flow and top of bank of all watercourses that are shown on the Water Quality Limited Watercourses (WQLW) Map on file in the Development and Public Works Department; 2. The 100-year floodplain and floodway boundaries on the site, as specified in the latest adopted FEMA Flood Insurance Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision; A & O Engineering LLC Cherry Springs Page 7 of 14 Tentative Partition Written Narrative August 16, 2024 3. The Time of Travel Zones, as specified in Section 3.3-200 and delineated on the Wellhead Protection Areas Map on file in the Development and Public Works Department; 4. Physical features including, but not limited to significant clusters of trees and shrubs, watercourses shown on the (WQLW) Map and their riparian areas, wetlands, and rock outcroppings; 5. Soil types and water table information as mapped and specified in the Soils Survey of Lane County; and 6. Natural resource protection areas as specified in Section 4.3-117. Response: The Site Assessment includes the required information and is shown on Sheet C- 1.0 – Existing Conditions Map and was prepared by a licensed Engineer. C. A Stormwater Management Plan drawn to scale with existing contours at 1- foot intervals and percent of slope that precisely maps and addresses the information described below. In areas where the percent of slope is 10% or more, contours may be shown at 5-foot intervals. This plan shall show the stormwater management system for the entire development area. Unless exempt by the Director, the City shall require that an Oregon Licensed Civil Engineer prepare the plan. Where plants are proposed as part of the stormwater management system, an Oregon Licensed Landscape Architect may also be required. The plan shall include the following components: 1. Roof drainage patterns and discharge locations; 2. Pervious and impervious area drainage patterns; 3. The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater quality measures; and natural drainageways to be retained; 4. Existing and proposed site elevations, grades and contours; and 5. A stormwater management system plan with supporting calculations and documentation as required in Section 4.3-110 shall be submitted supporting the proposed system. The plan, calculations and documentation shall be consistent with the Engineering Designs Standards and Procedures Manual to allow staff to determine if the proposed stormwater management system will accomplish its purposes. A & O Engineering LLC Cherry Springs Page 8 of 14 Tentative Partition Written Narrative August 16, 2024 Response: There are no development plans for parcel 3 as part of this partition application. However, the proposed parcel is large enough to provide adequate space for storm management facilities. Storm management facilities incorporated with a future development plan will meet City of Springfield requirements. D. A response to transportation issues complying with the provisions of this Code. 1. The locations, condition, e.g., fully improved with curb, gutter and sidewalk, AC mat, or gravel, widths and names of all existing streets, alleys, or other rights-of-way within or adjacent to the proposed land division; 2. The locations, widths and names of all proposed streets and other rights-of-way to include the approximate radius of curves and grades. The relationship of all proposed streets to any projected streets as shown on the Metro Plan or Springfield Comprehensive Plan, including the Springfield Transportation System Plan (including the Conceptual Street Map) and, any approved Conceptual Development Plan; 3. The locations and widths of all existing and proposed sidewalks, multi-use paths, and accessways, including the location, size and type of plantings and street trees in any required planter strip; 4. The location of existing and proposed traffic control devices, fire hydrants, power poles, transformers, neighborhood mailbox units and similar public facilities, where applicable; 5. The location and dimensions of existing and proposed driveways demonstrating conformance with lot or parcel dimensions and frontage requirements for single-family and duplex lots/parcels established in Section 3.2-215, and driveway width and separation specifications established in Section 4.2-120, where applicable; 6. The location of existing and proposed street trees, associated utilities along street frontage(s), and street lighting: including the type, height and area of illumination; 7. The location of existing and proposed transit facilities; A & O Engineering LLC Cherry Springs Page 9 of 14 Tentative Partition Written Narrative August 16, 2024 8. A copy of a Right-of-way Approach Permit application where the property has frontage on an Oregon Department of Transportation (ODOT) facility; and 9. A Traffic Impact Study prepared by a Oregon Licensed Traffic Engineer, where necessary, as specified in Section 4.2-105A.4. Response: Information regarding the existing location and dimensions of adjacent public streets and existing transit facilities is shown on Sheet C-1.0 Site Assessment Map. The section of Main Street adjacent to the subject property is an ODOT facility. A Right-of-way approach permit application will be submitted prior to future building permit if required. E. A Future Development Plan. . . Response: Street connectivity was addressed during the city’s review of the Cherry Springs Final Site Plan Review and will result in the extension of “B” Street from the existing terminus to 48th Street. The Cherry Springs Site Plan Review approval required public improvements and physical features in the residential portion of the subject property. A PIP permit has already been issued for the required improvements. No future development plan is proposed for Parcel 3 as part of this submittal. A site review application will be required for any future development of this parcel. F. Additional information and/or applications required at the time of Tentative Plan application submittal shall include the following items, where applicable. . . Response: This Partition application provides the information needed to evaluate for compliance with the approval criteria. Section 3.0 provides the Tentative Plan – General approval criteria followed by findings demonstrating compliance. Springfield Development Code provisions are in bold italics. SDC 5.12-115 Tentative Plan – General Criteria Any residential land division shall conform to the following standards: TENTATIVE PLAN - GENERAL APPROVAL CRITERIA A & O Engineering LLC Cherry Springs Page 10 of 14 Tentative Partition Written Narrative August 16, 2024 A. The lot/parcel dimensions shall conform to the minimum standards of this Code. When lots/parcels are more than double the minimum area permitted by the zoning district, the Director shall require that these lots/parcels be arranged: 1. To allow redivision; and 2. To allow for the extension of streets to serve future lots/parcels. 3. Placement of structures on the larger lots/parcels shall be subject to approval by the Director upon a determination that the potential maximum density of the larger lot/parcel is not impaired. In order to make this determination, the Director may require a Future Development Plan as specified in Section 5.12-120E. Response: The subject property is zoned MUR with the minimum lot size per SDC 3.2-215. The requested Partition will create three lots within the City of Springfield parameters. The Cherry Springs Site Plan Review addressed street connectivity and how the proposed lots can be developed consistent with the Metro Plan designation and MUR zoning (Case #811-21-000015-TYP2). The proposed area and size of the new lot with frontage on Main Street is within the parameters of the City of Springfield code for development. Parcel 3 is located with the East Main Refinement plan area. Any future development plan shall adhere to policies within this plan or submit separate zone change and refinement plan amendment applications. B. Double frontage lots/parcels shall be avoided, unless necessary to prevent access to residential development from collector and arterial streets or to overcome specific topographic situations. Response: The subject property currently has frontage on 48th Street and Main Street. The Partition does not create a new double frontage lot. Parcels 1 & 2 have approved access from the future B Street right of way only. Access for parcel 3 will be established during a future site review application. C. Panhandle lots/parcels shall comply with the standards specified in Sections 3.2-215 and 4.2-120A. In the case of multiple panhandles in Subdivisions, construction of necessary utilities to serve all approved panhandle lots/parcels shall occur prior to recording the Plat. Response: The Partition does not request approval for a panhandle lot so this criterion is not applicable. A & O Engineering LLC Cherry Springs Page 11 of 14 Tentative Partition Written Narrative August 16, 2024 D. Block length for local streets. Response: In the mixed use zoning districts, the maximum block length for multi-unit is 1,400 feet. The maximum block perimeter for multi-unit development is 2,400 feet. Approval of the Cherry Springs Apartments Site Plan Review included review of historic patterns of development in the area and standards for block lengths for local streets. Cherry Springs Apartments includes the extension of “B” Street creating sufficient street connectivity between the existing low-density residential neighborhood and 48th Street. Due to the site’s proximity to the signalized intersection at 48th and Main Street and the desire to control access onto Main Street, no new north-south local street is proposed as part of this Partition. Section 4.0 provides the approval criteria for reviewing the proposed application followed by findings demonstrating compliance. Springfield Development Code provisions are shown below in bold italics. SDC 5.12-125 Tentative Plan Criteria The Director shall approve or approve with conditions a Tentative Plan application upon determining that all applicable criteria have been satisfied. If conditions cannot be attached to satisfy the approval criteria, the Director shall deny the application… A. The request conforms to the provisions of this Code pertaining to lot/parcel size and dimensions. Response: The proposed lot sizes and dimensions meet the minimum standards for the MUR zone as further described above related to SDC 5.12-115.A. B. The zoning is consistent with the Metro Plan diagram and/or applicable Refinement Plan diagram, Plan District map, and Conceptual Development Plan. Response: The site is zoned Mixed Use Residential (MUR) consistent with the Mixed Use designation on the Metro Plan diagram and in the East Main Street Refinement Plan. There are no proposed changes to the zoning for the site as part of this application. C. Capacity requirements of public and private facilities, including but not limited to, water and electricity; sanitary sewer and stormwater management facilities; and streets and traffic safety controls shall not be exceeded and the TENTATIVE PLAN APPROVAL CRITERIA A & O Engineering LLC Cherry Springs Page 12 of 14 Tentative Partition Written Narrative August 16, 2024 public improvements shall be available to serve the site at the time of development, unless otherwise provided for by this Code and other applicable regulations. The Public Works Director or a utility provider shall determine capacity issues. Response: Public and private facilities have the capacity to serve the development on parcels 1 & 2 which have already been permitted. Please refer to detailed utility plans for Cherry Springs Apartments Site Plan Review and the applicant’s traffic memo submitted under separate cover. There is adequate capacity in the existing public facilities in Main Street to provide service to the future development of parcel 3. D. The proposed land division shall comply with all applicable public and private design and construction standards contained in this Code and other applicable regulations. Response: There are no new public improvements proposed. Therefore this is not applicable. Private development will follow required adopted codes. E. Physical features, including, but not limited to: steep slopes with unstable soil or geologic conditions; areas with susceptibility of flooding; significant clusters of trees and shrubs; watercourses shown on the WQLW Map and their associated riparian areas; other riparian areas and wetlands specified in Section 4.3-117; rock outcroppings; open spaces; and areas of historic and/or archaeological significance, as may be specified in Section 3.3-900 or ORS 97.740- 760, 358.905-955 and 390.235-240, shall be protected as specified in this Code or in State or Federal law. Response: The subject property does not contain any steep slopes or known unstable soil or geological conditions. The Natural Resources Study, the National Wetlands Inventory, the Springfield Wetland Inventory Map, Wellhead Protection Overlay and the list of Historic Landmark Sites do not identify any known natural features or resources on the property that warrant protection. The City of Springfield Water Quality Limited Watercourse Map does not show any watercourses on the subject property.1 On the west side of 48th Street the map indicates that the 48th Street Channel is a “Tributary to Water Quality Limited Watercourse”. The map also indicates that the subject property does not contain any areas designated by FEMA as in the Floodplain or Floodway. 1 Water Quality Limited Watercourse map adopted by Council Ordinance 6021, 7/15/2002. A & O Engineering LLC Cherry Springs Page 13 of 14 Tentative Partition Written Narrative August 16, 2024 F. Parking areas and ingress-egress points have been designed to: facilitate vehicular traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity within the development area and to adjacent residential areas, transit stops, neighborhood activity centers, and commercial, industrial and public areas; minimize driveways on arterial and collector streets as specified in this Code or other applicable regulations and comply with the ODOT access management standards for State highways. Response: The city approved Cherry Springs Apartments provides street connectivity and safe circulation routes for motor vehicles, bicyclists and pedestrians. The applicant intends to comply with ODOT access management standards for the remaining vacant lot to have access on Main Street. This will be determined during a future site review process once the development plan for parcel 3 has been established. G. Development of any remainder of the property under the same ownership can be accomplished as specified in this Code. Response: The entire subject property is owned by Cherry Springs LLC. There is no additional adjacent property under the same ownership. Following approval of the requested Partition, each new legal lot will be of a size and configuration to allow development in compliance with the Springfield Development Code. H. Adjacent land can be developed or is provided access that will allow its development as specified in this Code. Response: All adjacent land is developed except tax lot 17-02-32-41-01900. This undeveloped adjacent parcel is not owned by the applicant. The tax lot fronts Main Street and can gain access from that right of way. I. Where the Partition of property that is outside of the city limits but within the City’s urbanizable area and no concurrent annexation application is submitted, the standards specified below shall also apply… Response: The subject property is located within the city limits; thus this approval criterion is not applicable. J. Where the Subdivision of a manufactured dwelling park or mobile home park is proposed, the following approval criteria apply A & O Engineering LLC Cherry Springs Page 14 of 14 Tentative Partition Written Narrative August 16, 2024 Response: The application does not include a request for a Subdivision of a manufactured dwelling park or mobile home park; this approval criterion is not applicable. The proposed Cherry Springs Tentative Partition complies with applicable approval criteria and SDC standards. If there are questions, please contact Scott Morris at 541-302-9790 or via email at: scottmorris@ao-engr.com. Sincerely, Scott Morris END OF WRITTEN STATEMENT 4.0 CONCLUSION