Loading...
HomeMy WebLinkAboutMeeting Packet Planner 10/23/2024 1 AGENDA DEVELOPMENT REVIEW COMMITTEE DEVELOPMENT SERVICES DEPARTMENT 225 FIFTH STREET Conference Room 616 / MS Teams Staff Review: Tuesday, November 12, 2024 9:00 – 9:30 a.m. 1. Tree Felling Permit 811-24-000267-TYP2 811-24-000009-PROJ Rosboro Assessor’s Map: 17-03-36-00 TL: 00100, 00300, 00401 Address: 2509 Main Street Existing Use: Mill Applicant has submitted proposal to clear 25 trees that are in direct conflict with current site improvement project Meeting: Tuesday, November 12, 2024 9:00 - 9:30 virtual meeting via Microsoft Teams The Complete DRC Packet for this meeting is available online for you to review or print out from the laserfiche website: https://www.springfield-or.gov/weblink8/browse.aspx SITE VICINITY MAP 811-24-000267-TYP2 Tree Felling Permit 17-03-36-00 TL 00100, 00300, 00401 2509 Main Street Rosboro Revised 1/1/08 Molly Markarian 1 of 5 City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 Tree Felling Permit Required Project Information (Applicant: complete this section) Applicant Name: Phone: Company: Fax: Address: Applicant’s Rep.: Phone: Company: Fax: Address: Property Owner: Phone: Company: Fax: Address: ASSESSOR'S MAP NO: TAX LOT NO(S): Property Address: Size of Property: Acres Square Feet Description of Proposal: If you are filling in this form by hand, please attach your proposal description to this application. Signatures: Please sign and print your name and date in the appropriate box on the next page. Required Property Information (City Intake Staff: complete this section) Associated Cases: Signs: Case No.: Date: Reviewed by: Application Fee: $ Technical Fee: $ Postage Fee: $ TOTAL FEES: $ PROJECT NUMBER: 2509 Main St, Springfield, OR 97477 Dean Locke, Director of Projects Rosboro Curt Wilson, AIA Wilson Architecture 86530 Sanford Rd, Eugene, OR 97402 541-912-0878 541-799-6585 2509 Main St, Springfield, OR 97477 Dean Locke, Director of Projects Rosboro 541-799-6585 17-03-36-00 00100, 00300, 00401 2509 Main St, Springfield, OR 97477 See attached 11,250 sf www.wilson-architecture.com | 541-912-0878 Memo Project: Rosboro Plant Improvements Subject: Tree Felling Permit – Scope of Work Description Date: October 23, 2024 From: Curt Wilson, AIA Rosboro is planning on improvements to their plant at 28th and Main. The improvements include two new buildings, the Planer Mill and the Glulam Building. The Planer Mill is located at the portion of the original Rosboro mill site and will be constructed in an area of a recently demolished building. The Glulam Building will be constructed on an area of the Rosboro mill site that was formerly Dow Corning site. This area was inactive for many years and volunteer trees grew in unpaved area. The site survey prepared November 2023 identified 25 existing trees in this area of the site with a breast-height diameter of 5 inches or more. During the winter storms in early 2024, most of the trees were damaged and removed. The remaining trees are either in direct conflict with site improvement areas, or as the case of the trees in the SW corner of the site, impacted by site construction activities. All trees are scheduled to be removed. The total disturbance area is 11,250 sf. This is an active manufacturing site and nearly all the site area without buildings is either traffic lanes or temporary storage for finished products, therefore trees within the site area is problematic for operations and harmful to the tree’s root system. An area south of the new fire lane Glulam Building and the perimeter fence should be safe for trees, therefore Rosboro intends to plant trees every 45 feet along this edge. The species to be determined by our landscape contractor, Rexius and from the City of Springfield Adopted Street Tree List (2012. See below for the location.