SITE PLAN REVIEW
PRE -SUBMITTAL CHECKLIST
Project Name: Cascade Health Center
Project Proposal: Change of use to professional offices in the R1 zone.
Case Number: 811-24-000238-PRE
Project Address: 344 8t" Street
Assessors Map and Tax Lot Number(s): 17-03-35-13-11500
Zoning: R1
Overlay District(s): Historical
Applicable Refinement Plan: N/A
Refinement Plan Designation: N/A
Comp Plan Designation: MDR
Pre -Submittal Meeting Date: 10/4/24
Application Submittal Deadline: 4/2/25
Associated Applications:
i
RINGFIELD
POSITION
REVIEW OF
NAME
Project Planner
Land Use Planning
Tom Sievers 726-2333
Transportation Planning
Transportation
Michael Liebler 736-1034
Public Works
Utilities: Sanitary & Storm Sewer
Clayton Mceachern 736-1036
Deputy Fire Marshal
Fire and Life Safety
Gilbert Gordon 682-5261
Building Official
Building Cod
I Chris Carpenter 744-4153
APPLICANT'S DEVEL
Applicant
Garreth MacDonald
Cascade Health Center
115 W. 8t" Ave
Eugene, OR 97401
Applicant's Representative
Don Sherman
Don Sherman Associates
1346 Echo Valley Dr.
Junction City, OR 97448
Revised 10/25/07
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE -SUBMITTAL CHECKLIST
PLANNING
o Application fee (confirm prior to submittal):
Impervious Area: 0 sf (new impervious cover)
Tentative Review Fee: $1616.00 + 80.80 + 203.00
Final Site Plan Fee: $161.60 + 5% tech fee
SrFE PLAN REVIEW: (Srx 517.100)
Application Completeness Check Meeting
City: $449
WA
WA
Required prior to suhmittal of Site Plan
UGB: $676
WA
WA
Review and Site Plan Review
Modification — Major applications.
Site Plan Review
Type 1
City Only: $1616
5%
WA
ApplicaW to Nukl-Unit residential
devetapnwnt (Soc 4.7.3W)
Type 2
City 8 UGB:
SW sq. ft or less impervious surface
$1,616
$80.80
s2o3
Type 2
>500 and c10,000 Sq. ft. impervious surface
$5,489
$274AS
s203
10.E Sq. It. or greater impervious surface
$5,489 + $6511000 sq. ft.
5%
$203
Final Site Plan Equivalent
City & UGB: s4,891
$244.55
WA
Type i
Type 1
Final Site Plan Review/Development
See Special Instructions
> > >:, >
»»
Type i — Final site plan and developmen
Agreement
agreement fee Is 10% of the paid site
plan fee (exclusive of postage) A 5%
Technology Fee will applied when
im ed or collected.
o Copy of the Site Plan reduced to 81/2"x 11"
Complete Incomplete
M El
See Planning
Note(s)
8 1/2" x 11" Copy of Site Plan
o Copy of the deed and a preliminary title report issued within the past 30 days
documenting ownership and listing all encumbrances. If the applicant is not the property
owner, written permission from the property owner is required.
Complete Incomplete See Planning
Note(s)
Deed and Preliminary Title Report
o Brief narrative explaining the purpose of the development, the existing use of the property,
and any additional information that may have a bearing in determining the action to be
taken. The narrative should also include the proposed number of employees and future
expansion plans, if known.
Complete Incomplete See Planning
Note(s)
o Site Assessment of Existing Conditions
Complete Incomplete See Planning
E El Note(s)
r;1 El
Revised 10/25/07
Brief Narrative
Prepared by an Oregon Licensed Architect,
Landscape Architect, Civil Engineer, or Surveyor
Vicinity Map
® ❑
The name, location and dimensions of all
existing site features including buildings, curb
cuts, trees and impervious surface areas, clearly
indicating what is remaining and what is being
removed. For existing structures to remain, also
indicate present use, size, setbacks from
property lines, and distance between buildings
The name, location, dimensions, direction of
flow and top of bank of all watercourses and
required riparian setback that are shown on the
Water Quality Limited Watercourse Map on file
in the Development & Public Works Department
;0
The 100-year floodplain and floodway
boundaries on the site, as specified in the latest
adopted FEMA Flood Insurance Rate Maps or
FEMA approved Letter of Map Amendment or
Letter of Map Revision
{ EJ
The Time of Travel Zones, as specified in SDC
3.3-200 and delineated on the Wellhead
Protection Areas Map on file in the Development
& Public Works Department
® _0
Physical features including, but not limited to
trees 5" in diameter or greater when measured
4 1/2 feet above the ground (stands of more than
five (5) trees may be shown as a cluster with
mix of trees species noted), riparian areas,
wetlands and rock outcroppings
o Proposed Site Plan
Complete Incomplete
See Planning
Note(s)
Prepared by an Oregon Licensed Architect,
Landscape Architect, Civil Engineer, or Surveyor
Proposed buildings: location, dimensions, size
(gross floor area applicable to the parking
requirement for the proposed use(s)), setbacks
from property lines, and distance between
buildings; measured setbacks shall be prepared
by an Oregon licensed Surveyor when minimum
setbacks are shown
(
1� Location and height of existing or proposed
�--''
fences, walls, outdoor equipment, storage, trash
` `�--�—
recepta-cles, and signs
[]
Location, dimensions, and number of typical,
compact and ADA parking spaces; including
aisles, wheel bumpers, directional signs, and
striping. ADA routes from public rights -of -way
shall be designated including at grade
connections
Revised 10/25/07
®]
Dimensions of the development area, as well as
area and percentage of the site proposed for
buildings, structures, parking and vehicular
areas, sidewalks, patios, and other impervious
surfaces
®
❑
Observance of solar access requirements as
specified in the applicable zoning district
❑�
On -site loading areas and vehicular and
pedestrian circulation
JZ
Access to streets, alleys, and properties to be
served, including the location and dimensions of
existing and proposed curb cuts and curb cuts
proposed to be closed
Location, type, and number of bicycle parking
spaces
j®
❑
Note location of existing and planned Lane
Transit District facilities (within 1/2 mile)
❑
❑
Area and dimensions of all property to be
conveyed, dedicated, or reserved for common
open spaces, recreational areas, and other
similar public and semi-public uses
o Phased Development Plan Where applicable, the Site Plan application must include a
phasing plan indicating any proposed phases for development, including the boundaries and
sequencing of each phase. Phasing must progress in a sequence promoting street
connectivity between the various phases of the development and accommodating other
required public improvements, including but not limited to, sanitary sewer, stormwater
management, water, and electricity. The applicant must indicate which phases apply to the
Site Plan application being submitted.
Complete Incomplete See Planning
Note(s)
2 Phased Development Planli�
o Existing Improvements and Public Utilities
Complete Incomplete See Planning
Note(s)
® ❑ Prepared by an Oregon Licensed Architect,
Landscape Architect, Civil Engineer, or Surveyor
Location and width of all existing easements
�❑
Location, widths (of paving and right-of-way), and
names of all existing streets, alleys, dedications,
or other rights -of -way within or adjacent to the
proposed development, including jurisdictional
status other than City. Indicate connection points
for roof drainage
El
Location and type of existing street lighting
Revised 10/25/07
® ❑ Location of existing and required traffic control
devices, fire hydrants, power poles, transformers,
neighborhood mailbox units, waterline backflow
preventers and similar public facilities
® ❑ Location, width, and construction material of all
existing and proposed sidewalks, sidewalk ramps,
pedestrian access ways, and trails
®
ElLocation
and size of existing utilities on and
adjacent to the site including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable TV.
Indicate the proposed connection points. Detail
must be proportionate to the complexity of the
proposed project
®
❑
Show existing and proposed spot elevations or
contours, and direction of drainage patterns
o Proposed Grading, Paving, & Utilities
Plan
Complete
Incomplete See Planning
Note(s)
❑
Prepared by an Oregon Licensed Civil Engineer,
except where noted
®
❑
The approximate size and location of storm water
management systems components
Location, widths (of paving and right-of-way), and
names of proposed streets, alleys, dedications or
other rights -of -ways within or adjacent to the
proposed development
Location and width of all proposed easements
El
Location and type of proposed street lighting
Location of existing and required traffic control
devices, fire hydrants, power poles, transformers,
neighborhood mailbox units, waterline backflow
preventers and similar public facilities
[�
Information on existing slopes over 5% shall be
prepared by an Oregon licensed surveyor and be
drawn with one foot contour interval lines; land
with a slope over 10 percent shall be shown with
5 foot contour interval lines
o Landscape Plan
Complete Incomplete
See Planning
Note(s)
Prepared by an Architect, Landscape Architect, or
other Landscape Professional approved by the
Director
Revised 10/25/07
I
!®
❑
Location and dimensions of landscaping and open
space areas to include calculation of landscape
coverage
Z
❑
Screening in accordance with SDC 4.4-110
®
❑
Written description, including specifications, of the
permanent irrigation system
®
❑
Location and type of street trees
®
❑
List in chart form the proposed types of landscape
materials (trees, shrubs, ground cover). Include
in the chart genus, species, common name,
quantity, size, spacing and method of planting
o Architectural Plan
Complete
Incomplete See Planning
Note(s)
❑
Exterior elevations of all buildings and structures
proposed for the development site, including
height
❑ Conceptual floor plans
o On -Site Lighting Plan
Complete Incomplete See Planning
Note(s)
Location, orientation, and maximum height of
exterior light fixtures, both free standing and
attached
❑ Type and extent of shielding, including cut-off
angles and type of illumination, wattage, and
luminous area
Photometric test report for each light source
Planning Notes:
1. I do not see an area designated for a trash enclosure, please expand on how trash is to be
contained. If a dumpster is used then an enclosure that is hydraulically isolated and piped
to the sanitary sewer is required.
2. No phasing has been proposed, section not applicable.
Additional comments not related to the completeness of the application:
Revised 10/25/07
ANY REQUIRED ADDITIONAL MATERIALS, APPLICATIONS OR
PERMITS
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE -
APPLICATION REPORT FOR MORE DETAILED INFORMATION:
Applicable Not
Applicable
Where a multi -family development is proposed, any additional
materials to demonstrate compliance with SDC 3.2-240
❑
Riparian Area Protection Report for properties located within 150
feet of the top of bank of any Water Quality Limited Watercourses
(WQLW) or within 100 feet of the top of bank of any direct
tributaries of WQLW
®
A Geotechnical Report prepared by an engineer must be submitted
concurrently if there are unstable soils and/or a high water table
present
!® []
Where the development area is within an overlay district, address
the additional standards of the overlay district
f
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified in SDC 5.19-100
A wetland delineation approved by the Oregon Division of State
Lands must be submitted concurrently where there is a wetland
on the property
I❑ ®
Any required federal or state permit must be submitted
concurrently or evidence the permit application has been
submitted for review
❑
Where any grading, filling or excavating is proposed with the
development, a Land and Drainage Alteration permit must be
submitted prior to development
❑
Where applicable, any Discretionary Use or Variance as specified
in SDC 5.9-100 and 5.21-100
❑
An Annexation application, as specified in SDC 5.7-100, where a
development is proposed outside of the city limits but within the
City's urban service area and can be serviced by sanitary sewer
Revised 10/25/07
W
THIS APPLICATION IS:
COMPLETE FOR PROCESSING
INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
TO", 5ZZV944
10/4/24
City Planner Date
This is not a decision on your application. Springfield Development Code Section 5.4-
105 and Oregon Revised Statutes 227.178 require the City take final action on a limited land
use decision within 120 days after the application is deemed complete. The 120-day
processing period for this application begins when all the missing information is submitted or
when you request that the City proceed without the information. You must indicate by either
signing this form or by submitting a written response to the City within seven days of the
date of this form asserting your intentions regarding the provision of the missing
information. If you indicate herein or in your written response that the missing information
will be submitted, then you have 180 days from the date the application was submitted for
Pre -Submittal Review to provide the City with the missing information. If you refuse to
submit the missing information, then upon receipt of the full application packet and
processing fee, the City will deem the application complete for purposes of starting the 120-
day clock and begin processing the application. No new information may be submitted after
the start of the 120-day period unless accompanied by a request for an extension of the
120-day processing time. Upon receipt of a request for extension, the City may extend the
120-day period for a reasonable period of time. The City may also require additional fees if
the new information is submitted after the Notification to Surrounding Property Owners is
sent out and a second notification is required or if the new information substantially affects
the application proposal and additional review is required.
I, the owner/applicant, intend to submit all missing items indicated herein to the
City within the 180-day timeline.
Owner/Applicant's Signature
C
to
EWE
Revised 10/25/07
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE -SUBMITTAL CHECKLIST
Engineer: Clayton McEachern Case#: 811-24-238-PRE
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete Incomplete See PW
Note(s)
Prepared by an Oregon licensed Landscape Architect
or Engineer
;❑ Vicinity Map
❑ The name, location, and dimensions of all existing
site features including buildings, curb cuts, trees
and impervious surface areas, clearly indicating
what is remaining and what is being removed. For
existing structures to remain, also indicate present
use, size, setbacks from property lines, and distance
between buildings
❑ ❑ n/a The name, location, dimensions, direction of flow
and top of bank of all watercourses and required
riparian setback that are shown on the Water
Quality Limited Watercourse Map on file in the
Development Services Department
❑ n/a The 100-year floodplain and floodway boundaries on
the site, as specified in the latest adopted FEMA
Flood Insurance Rate Maps or FEMA approved Letter
of Map Amendment or Letter of Map Revision
Q 1 The Time of Travel Zones, as specified in SDC 3.3-
200 and delineated on the Wellhead Protection
Areas Map on file in the Development Services
Department
!❑ Physical features including, but not limited to trees
5" in diameter or greater when measured 4 1/2 feet
above the ground, significant clusters of trees and
shrubs, riparian areas, wetlands, and rock
outcroppings
❑ 2 Soil types and water table information as mapped
and specified in the Soils Survey of Lane County. A
Geotechnical Report prepared by an Engineer must
be submitted concurrently if the Soils Survey
indicates the proposed development area has
unstable soils and/or a high water table
Revised 10/25/07
PW Notes:
1. development is in the 99 year totz.
soil type not specified but i don't think it is relevant to this developemnt as no
excavation or sitework is proposed.
3. The existing overhead power service is required to be placed underground for this
development.
4. the frontage along 8t" st will be required to have the pavement in the sidewalk
setback area removed, full height curb restored and suitable (for under power
lines) street trees planted and maintained. the frontage along A st will be
required to plant and maintain street trees also.
5. this development will not cross the threshold of 5000 sf of new or replaced
impervious area to require stormwater treatment or report.
6.
Additional comments not related to the completeness of the application:
• Per city policy for alley access the first 18' of the alley between A and Main will be
required to be paved for the parking lot use of this property.
•" A trash enclosure will be required for this development (this is standard for all
commercial property developments). The shed at the southwestern corner of
the building could possibly be repurposed for this.
Revised 10/25/07
I
FORK " S-WAAWOM Do=
: ,I2d
.*., ?i
. i -
KNOW Au AfzN or rmEss rRzsz.VTs. That .. ......... ...........
. ... . .......
In comaidek" ion chf..- .... .......... ..... Men-- Dollars,
to-.Aae=_ -pald by ;-.Vr.Izic;Ijej4j.
. . .. . ... .... .. .. .. .. ........
do, ... Iterchy grant, barodr4 sell and oonvay unto said ;%rixtefiald, Fast ..#40.. Tile Aineir-ican.
......... ..
"It. *jds,
all the following regii property, with the formn
nale'"Is andAppurforwrices, Afruared In the County of &".ft
of Oregon, boundvO and deKribed-.as lolows, to -wit:
Zeeimit,d At a point. b4 feet West of the
Wortaienst corner of Aoc'k 75 of Spz;imaield
14veotan"'t wA Power OampaWle hdAltjan, as
platted' ajid recorded at PmGe 3Ijb of Volume iljj
Lane County Oreh;ou Deed Tiecorda, ruzinine, tsionce
Sout-t 119 feet more or less to an Fkllsy running
East and best tarou, ;i said Blaek; titence, Nest 64
Feet; trance I-ort'. 119 feet more or lose to tree
fforti4 'line of said -Mlocx: tnence East b4 feet to
tite place cC bs%f.pnlzitj in Lw,e County, Oregon.
To Have end to Hold the above described and granted promises unto the ...... . ...........
... . ........ .. -.- ............... i ... .................. I ................. . .. .....
mprilitt .............
............... . . ... ............. . ._......................and. itli _ .. . ...... . . i
............... .............
............ .... . . ..... . ....... — ..... ....... . .... .. ....... . . ........ .. . ... ....... ...
AM: ....... . ..........
. ......... . ............................. . . ..... ... ..... .. the grantor it,
above named do...,.. covenant to and with the abov4narnOd ifftntOd- 6AA-116 ....... WOMM aseld"s
thai., _-...........-trey., arw ... . ...... - lawfully BWNcd in Im simple of the above granted promises, tU$ rho above
granted prowimsers life from all encumbrances, .... .. . ........ T•---- ---- ---------- . .... .. -. - . ... '.
. . .... . ...... 1-- .. . . .. ............ -- . ...... . ...... .. I ... .................. . ................ . ............. — ........ ..
.............. . . . . --- .......... ...... .... I ... ........ .1 ... .... .. ........... I .... ..... -.- ---. .1- ..... ......
.... ....... . .. . .......... ......... . ......... . - ".- . ..... I ........ ........... ........
. . ...... . .................... . . . ........... .. � ...... ............... . ............ I ....... . .. . ........... .....
............ I . ..... ....... ........... ...................... ... . ......... I .............. .... . ....... --- ....... ... 1.1 1 ::.
. . ............ . ........ . ................. L . ............ .. M ...... --- ........
................... . ......... . 1. ...... ... I ... ......... ........... .... . .................... ......... .....
......... .... . ........ ........ . ......... .... .. M ............. .1. .... —.1 ..... ..... ...... ...... .
;�4 L . ............ .. *--"- '*'*-'"** .... ..... ..... ... .... * ......... .... ....... .. th.t.-AhRy i0ill and IARAX . ..... heirs, executors and adovirtWirefors, shell warrant and, lonv&w
defend the &Wye gArdatect preadooff, and every part and Pared then al, 4m4tW the lawful Claims and demands
ofall Persons whomsoever, ...... ......... L --------- .... ................... ........ .. ..... ; .... ... .....
... ....... .......... ................ . . .................I....---:._.........
A day, of ........ .. lle,X
Eseeutad in the j'"Mma of
............. . ................ ..
.. .. ....... ........... I ......... .. .. .. ... .. ............ .. .. .... ............... (SEAL)
...................... . (SAAL)
!At•-65 s i z e s -- A RFe
1.50
Y i1
t7
yy
�M
V•
4 -.
{�k
4C