Loading...
HomeMy WebLinkAboutApplication Applicant 9/25/2024City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 SITE PLAN REVIEW — TYPE 2 o Site Plan Review Completeness Check ❑ Site Plan Review Submittal ❑ Final Site Pian Submittal Applicant Name:Garreth MacDonald Company: Cascade Health Center Address: 115 W 8th Ave Eugene OR Applicant's Rep: Don Sherman Company:DON SHERMAN ASSOC. Address: 1346 Echo Valley Dr Junction City OR 97448 Property Owner: Nick Gillaspie Company: Address:344 8th st. Springfield OR SPRINGFIELD 1k Phone: 541-517-8085 Email:docmacdonald@hotmaii.com Phone: 949-290-8042 Email: desherm@aol.com Phone: 541-232-5755 Email: nickgillaspie@gmail.com ASSESSOR'S MAP NO: 17-03-35-13 TAX LOT NO(S):11500 Property Address (if applicable):344 8th street, Springfield OR Size of Property:.22 n Sq.Ft. Units Per Acre:1 Proposed Project Name: CASCADE HEALTH CENTER Proposal: change of building/site use and zoning to professional office Existing Use: American Legion building and church New Impervious Area (Sq. Ft.): none - removing/replacing paving at median with new landscaping Associated Applications: Placard: Case No.s Date: �5 �� Reviewed By: N10 Application Fee: $ Tech Fee: $ Notice Fee: $ TOTAL FEE: $ 4 60 PROJECT NO: 1 AutheDigiSign Verified - 8313058e-b2e3-48d9-9978-988e5db223ea Owner Signature(s) • I represent this application to be complete for submittal to the City. I affirm the information identified by the City as necessary for processing the application is provided herein or the information will not be provided if not otherwise contained within the submittal, and the City may begin processing the application with the information as submitted. This statement serves as written notice pursuant to the requirements of ORS 227.178 pertaining to a complete application. Owner: Nick GLYa� Date: 09/06/2024 Owner: 2 Signature Nick Gillas ie Print Signature Print Date: Type 2 — Site Plan Review Application Process A. A Type 2 application involves the Director's interpretation and exercise of discretion when evaluating approval standards. Uses or development evaluated through this process are uses that are conditionally permitted or allowed after Director review that may require the imposition of conditions of approval to ensure compliance with development and approval standards. (SDC 5.1.415(A)). B. A Type 2 decision is made by the Director after public notice, but without a public hearing, unless appealed. A Type 2 application is reviewed according to the procedures below, unless the Director determines that the application should be reviewed as a Type 3 decision. A Type 2 decision may be appealed according to SDC 5.1.800. (SDC 5.1.415(B)). C. When application materials are over 20 pages in length, an applicant must provide an identical electronic version and hard copy of the submitted materials. (SDC 5.1.215(B)(2)). 1. Site Plan Review Completeness Check Meeting • The purpose of the completeness check meeting is to determine whether the proposed development application is complete prior to acceptance of the application for processing by the City. A complete application is required for the review process. • The completeness check meeting will examine if the submittal standards of SDC 5.1.220 and 5.17.115 are met. • A completeness check meeting is required for all Type 2 and 3 land use applications. • Completeness Check Meetings are typically held within five to seven working days of application submittal. • The application must conform with Application Submittal Standards in SDC 5.1.220, the Site Plan Review Submittal Requirements found in the SDC 5.17.155, and the Checklist provided in this form below. 2. Applicant and the City Conduct the Completeness Check Meeting • The applicant, owner, and associated design team are strongly encouraged to attend the Completeness Check meeting, however it is not required. • The meeting is held with representatives from Public Works Engineering and Transportation, Community Services (Building), Fire Marshall's office, and the Planning Division and is scheduled for 30 to 60 minutes. • The Case Planner provides the applicant with a Completeness Check Meeting Checklist specifying items required to make the application complete. • The applicant has 180 days to submit a complete Site Plan Review application to the city; a second Completeness Check meeting is required after the 180 days. 3. Applicant Submits a Complete Application i3 The application must conform with the Application Submittal Standards in SDC 5.1.220, the Site Plan Review Submittal Requirements found in the Springfield Development Code (SDC) 5.17.155, and the Checklist provided below. An application will be reviewed for completeness in accordance with SDC 5.1.405. • A Type 2 decision, made after public notice, but without a public hearing, unless appealed, is issued within 120 days of submittal of a complete application. • Mailed notice is provided to property owners and occupants within 300 feet of the property being reviewed and to any applicable neighborhood association. In addition, the applicant must post one sign, provided by the City, on the subject property. • There is a 14 -day public comment period, starting on the date notice is mailed. • Applications are distributed to the Development Review Committee, and their comments are incorporated into a decision that addresses all applicable approval criteria and/or development standards, as well as any written comments from those given notice. Applications may be approved, approved with conditions, or denied. • At the applicant's request, the Planner can provide a copy of the draft land use decision prior to issuing the final land use decision. • The City mails the applicant and any party of standing a copy of the decision, which is effective on the day it is mailed. • The decision issued is the final decision of the City but may be appealed within 12 calendar days to the Planning Commission or Hearings Official, as applicable. 4 Type 2 - Site Plan Review Submittal Requirements Checklist Please Note: • All the following items MUST be submitted. • If you feel an item on the list below does not apply to your specific application, please state the reason why in the attached narrative. • When application or appeal materials are over 20 pages in length, an applicant must provide an identical electronic version and hard copy of the submitted materials. O Site Plan Review Application Form ❑ Application Fee - Refer to the Development Code Fee Schedule for the appropriate fee calculation formula. ❑ An electronic copy of all application materials (USB drive or other) submitted at the time of application (if total submittal package is over 20 pages). D Proof of ownership, e.g., deed or other recorded document ❑ Concurrent applications where a proposal involves more than one (1) application ❑ State or Federal Permit Required - The applicant must demonstrate that an application has been submitted for any required federal or state permit and provide a copy of the application upon request. Rl Completed Attached Stormwater Scoping Sheet One (1) Hard Copy of the Following Plan Sets for Submittal: Application materials must be submitted as required below in addition to the requirements in SDC 5.1.220, Application Submittal Standards. Applications that do not include all the necessary information may be deemed incomplete in accordance with SDC 5.1.225, Acceptance of Application. Please Note: • These plans must provide enough information to enable the City to determine that the proposed development is feasible, but are not necessarily required to be detailed construction level documents • The City's Engineering Design Standards Manual, while not land use criteria, may be used in whole or in part, by the City Engineer to determine the feasibility of a proposed plan. • Nothing herein should be interpreted as implying any requirement in contradiction of Oregon Statute or Oregon Administrative Regulation. ❑ General Requirements. See SDC 5.17.115(A). 5 R] Be prepared by a design professional, licensed in the state of Oregon, when required by state law, such as an engineer, architect, landscape architect, land surveyor, or other qualified professional as determined by the Director; R] Be drawn to scale with the scale indicated on the plans, and the scale sized appropriately for the area involved and sufficient to show detail of the plan related to the approval standards; Z Include a north arrow and date of preparation and/or revision; F1 Provide the physical address of the subject property, if applicable, and the County assessor's tax map and lot number; F1 Provide the names and addresses of all persons listed as owners on the most recently recorded deed; R] Provide the name, address, email address, and telephone number of any person that assisted in preparing the application materials or plans; and F1 Show the size of the property and development area in acres or square feet. 0 Existing Conditions Plan. (SDC 5.17.115(6)). The application must include an existing site conditions plan that shows, for the entire property and the surrounding property to a distance of 150 feet from the subject property boundaries: R1 The property boundaries, dimensions, and gross area; -o Topographic contour lines at one -foot intervals for slopes equal to or less than ten percent and at two -foot intervals for slopes greater than ten percent; o The location and width of all public and private streets, drives, sidewalks, pathways, rights-of-way, and easements; N/Ac -.Ei Potential natural hazard areas, including areas mapped by the City, County, or State as having a potential for geologic hazards; tj/X .-wi Soil types and water table information as mapped and specified in the Soils Survey of Lane County; WA -wi Resource areas, including wetlands on the City's Local Wetlands Inventory, streams, surface mines, and wildlife habitat identified by the City or any natural resource regulatory agencies as requiring protection; V4 A The name, location, dimensions, direction of flow, and top of bank of all watercourses that are shown on the Water Quality Limited Watercourse Map and their riparian areas; NlA —U The 100 -year floodplain and floodway boundaries on the site, as specified in the latest adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision; o The Time of Travel Zones, as specified in SDC 3.3.200 and delineated on the Wellhead Protection Areas Map on file in the Development Services Department; r. R] Features, including existing structures, pavement, large rock outcroppings, drainage ways, canals and ditches; 04 IL -o The location, size and species of trees and other vegetation having a caliper (diameter) of six inches or greater at four feet above grade; and Z Locally or federally designated historic and cultural resources ❑ Proposed Site Plan. (SDC 5.17.115(C)). jo The proposed development site, including boundaries, dimensions, and gross area; 0 Existing site features, including trees, identified on the site analysis map, if any, which are proposed to be retained, removed, or modified by the proposed development; .0 The location and dimensions of all existing and proposed structures, utilities, pavement, and other improvements on the site and adjacent to the site for a distance of 150 feet; Setback dimensions for all existing and proposed buildings; Loading and service areas for waste disposal, loading, and delivery; and iJ/A .E Outdoor recreation spaces, common areas, plazas, outdoor seating, street furniture, and similar improvements Utility and Improvement Plan. (SDC 5.17.115(D)). The application must include a utility and improvement plant that shows: .z The name and location of all existing and proposed public and private streets within or on the boundary of the proposed development site including the right-of-way and paving dimensions, and the ownership and maintenance status; Location of existing and required traffic control devices, fire hydrants, streetlights, power poles, transformers, neighborhood mailbox units, and similar public facilities; The location, width, and construction material of all existing and proposed sidewalks, sidewalk ramps, pedestrian access ways, and trails; fd The location and size of existing and proposed utilities on and adjacent to the site including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and communications connections including cable, internet, and television cable, etc.; �l The proposed connection points of the proposed utilities; and } The location and size of existing and proposed easement and public dedications 3. Landscape Plan. (SDC 5.17.115(E)). y1 Existing and proposed building and pavement outlines; 1e' The location and dimensions of existing and proposed terraces, retaining walls, decks, patios, shelters, and play areas; Existing and proposed abutting street right-of-way landscaping; 7 hl/k ,e Screening as specified in SDC 4.4.110; g/p, ..o Plantings, either existing or proposed, used in erosion control and stormwater treatment facilities; NSC, _-B Details of a permanent irrigation system, unless specifically exempted as specified in SDC 4.4.100; j4otLro -e Street trees as specified in SDC 4.2.140; t4cA4r,- -o A specifications list for all landscaping materials to be used; t4lpc --e A planting schedule containing the location, size, and species of the existing and proposed plant materials (at time of planting); Njar wB The anticipated size of all proposed plants at two years, or at maturity, whichever is first; and ..o A description of planting methods as specified in SDC 4.4.100 A Access, Circulation, Parking, and Lighting Plan. (SDC 5.17.115(F)). The location, dimensions and number of typical, compact, and disabled parking spaces; including aisles, landscaped areas, wheel bumpers, directional signs and striping; fWra(-, -o The location and dimensions of all site circulation for vehicles, pedestrians, and bicycles including entrances and exits to the site, and loading and service areas; Access to streets, alleys, and properties to be served, including the location and dimensions of existing and proposed driveways and driveways proposed to be closed; On-site lighting including the location, orientation, and maximum height of all proposed exterior light fixtures, both free standing and attached. zr For lighting, the type and extent of shielding, including cut-off angles and the type of illumination, the wattage, luminous area, and a photometric test report for each light Grading, Paving, and Stormwater Management Plan. (SDC 5.17.115(G)). 6 K*k* '. -o Stormwater management system for the entire development area; 8 source; 9c*SE -o The location, type, number, and dimensions of all bicycle parking spaces; E The amount of gross floor area applicable to the parking requirement for the proposed use; kr The location of off-street loading areas; N%. -o Existing and proposed transit facilities; O/A -ti A copy of a Right-of-way Approach Permit application, where the property has frontage on an Oregon Department of Transportation (ODOT) facility; and HX A Traffic Impact Study prepared by an Oregon Licensed Traffic Engineer when required by and as specified in SDC 4.2.105(A)(4). Grading, Paving, and Stormwater Management Plan. (SDC 5.17.115(G)). 6 K*k* '. -o Stormwater management system for the entire development area; 8 Z The roof drainage patterns and discharge locations; 'E1cl tt .E1 The pervious and impervious area drainage patterns; The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater quality measures; and natural drainage ways to be retained; and Cxt�T The existing and proposed elevations, site grades, and contours -e Phased Development Plan. The application must include a Phased Development Plan if phasing is proposed. The plan must indicate any proposed phases for development, including the boundaries and sequencing of each phase as specified in SDC 5.17.115. Phasing must progress in a sequence that promotes street connectivity between the various phases and accommodates other required public improvements, including but not limited to, sanitary sewer, stormwater management, water, and electricity. The Approval Authority may require the applicant to enter into an agreement for phased developments, and may require bonding or other assurances for improvements, in accordance with SDC 5.15.135, Bonding and Assurances for Development. ,{Narrative. The application must include a written letter, narrative, or report documenting how the proposal is in compliance with the applicable approval criteria contained in SDC 5.17.125, Site Plan Review Approval Standards. Deed Restrictions. The application must submit copies of all existing and proposed restrictions or covenants. ❑ Additional Information. The Director may require an applicant to submit additional information at the time of Site Plan Review application submittal. At the applicant's expense, additional studies, reports, or exhibits prepared by qualified professionals may be required to address specific site features or concerns to demonstrate compliance with approval standards. Additional information may include, but is not limited to the following items: ❑ Evidence that any required Federal or State permit has been applied for or approved; ❑ A Geotechnical Report prepared by an Oregon -licensed engineer, if the required Site Assessment specified in SDC 5.17.120 indicates the proposed development area has unstable soils and/or a high water table as specified in the Soils Survey of Lane County. 1�t1� Septic Systems. If the properties are not served by the City sewer system in accordance with SDC 4.3.105, the application must include documentation from the Department of Environmental Quality or its agent that indicates that the proposed development will be in compliance with all applicable requirements for sanitary septic systems when such systems exist on the properties affected by the development. D IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS/APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD CONSIDER UTILIZING PRE -DEVELOPMENT MEETINGS AS DISCUSSED IN SDC 5.1.210: The following information may be submitted or may be required to be submitted for the applicant to demonstrate compliance with the applicable approval standards. Preliminary Title Report. A Copy of a Preliminary Title Report issued within the past 90 days documenting ownership and listing all encumbrances. ❑ Traffic Impact Stud. A developer may be required to prepare a Traffic Impact Study (TIS) to identify potential traffic impacts from proposed development and needed mitigation measures. ❑ Multiple Unit Housing Standards. Materials to demonstrate compliance with SDC 4.7.380, Multiple Unit Housing Standards (if applicable). ❑ Riparian Area Protection Report. Riparian Area Protection Report for properties located within 150 feet of the top of bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the top of bank of any direct tributaries of WQLW. ❑ Geotechnical Rept. A Geotechnical Report prepared by an engineer must be submitted concurrently if the Soils Survey indicates the proposed development area has unstable soils and/or a high-water table, or if required by the City Engineer. ❑ Overlay District. Where the development area is within an overlay district, address the additional standards of the overlay district on plans and narratives. ❑ Additional; Information. Where physical aspects of a proposed development, including but not limited to scale, odor noise, glare or vibration, will impact less intensive surrounding uses, the Director may request submittal of conceptual floor plans or other information necessary to determine compliance with applicable standards. ❑ Tree Felling_ Permit. If five or more qualifying trees are proposed to be removed, a Tree Felling Permit as specified in SDC 5.19.100. ❑ Wetland Delineation. A wetland delineation approved by the Oregon Department of State Lands must be submitted concurrently where there is a wetland on the property. ❑ Federal or State Permits. The applicant must demonstrate that an application has been submitted for any required federal or state permit and provide a copy of the application upon request. ❑ Land and Drainage Alteration Permit (LDAP). Where any grading, filling or excavating is proposed with the development, a Land and Drainage Alteration permit must be submitted prior to development in accordance with Springfield Municipal Code 8.418. 10 Discretionary Use or Variance. Where applicable, any Discretionary Use or Variance as specified in SDC 5.9-100 and 5.21-100 must be provided. ❑ Annexation. An Annexation application must be submitted prior to submission of application, as specified In SDC 5.7.100, where a development is proposed outside of the City limits but within the City's urban service area and can be served by sanitary sewer. 11 DEVELOPMENT AND PUBLIC WORKS SPRINGFIELD 225 FIFTH! STREET OREGON SPRINGFIELD, OR 97477 PHONE: 541.726.3753 FAX.- 541.726.1021 www. springfield-or. gov STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK (Area below this line filled out by Applicant) -----------------_________________— (Please return to Clayton McEachern @ City of Springfield Development and Public Works,- Fax # 736-1021, Phone # 736-1036), email.-cmceachern@springfield-or.gov Project Name: Assessors Parcel #: Land Use(s): Project Size (Acres): Cascade Health Center Applicant: Date: change —of use Phone #: .2 2 F # Approx. Impervious Area: ax . 600 sf at median strip Email: Garreth Macdonald ocma ona o mai .com Pro a ect Description co of Assessor's map): ChInge of use commercial �rir Chiropractic Mice. No site work is proposed beyond landscaping existing median strip along 8th street. All existing hard surface areas to remain. All existing drainage systems to remain. Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary: All existing site drainage systems to remain. See sheet SPR -6 attached for existing connections and discharge information. Proposed Stormwater Best Management Practices: Existing city provided stormwater systems to remain in tact. ------ ------ {Area below this line filled out 4 the Citi, and Returned to the Applicant) (At a minimum, all boxes checked by the City on the front and back of this sheet shall be submitted or an application to be com lete or submittal, although other requirements mg be necess Draimt,_,e Study Type (EDSPM Section 4.03.2): (Note, UH mai be substituted for Rational Method) ❑ Small Site Study — (use Rational Method for calculations) ❑ Mid -Level Development Study — (use Unit Hydrograph Method for calculations) ❑ Full Drainage Development Study — (use Unit Hydrograph Method for calculations) Environmental Considerations: ❑ Wellhead Zone: ❑ Wetland/Riparian: ❑ Soil Type: Downstream Analysis: ❑✓ N/A ❑ Flow line for starting water surface elevation: ❑ Design HGL to use for starting water surface elevation: ❑ Manhole/Junction to take analysis to: ❑ Hillside Development: ❑ Floodway/Floodplain: ❑ Other Jurisdictions Return to Clayton McEachern @ City of Springfield, email: cmceachern@springfield-or,gov, FAX: (541) 736-1021 COMPLETE STUDY ITEMS For Official Use Only: *Based upon the information provided on the front of this sheet, the following represents a minimum of what is needed for an application to be complete for submittal with respect to drainage; however, this list should not be used in lieu of the Springfield Development Code (SDC) or the City's Engineering Design Manual. Compliance with these requirements does not constitute site approval, Additional site specific information may be required Note: Upon scoping sheet submittal, ensure completed form has been signed in the space provided below: Interim Design Standards/Water Quality (EDSPM Chapter 3) f Req'd N/A drains. r ; All non -building rooftop (NBR) impervious surfaces shall be pre-treated (e.g. multi-chambered catchbasin w/oil filtration Private stormwater easements shall be clearly depicted on plans when private stormwater flows from one property to media) for stormwater quality. Additionally, a minimum of 50% of the NBR impervious surface shall be treated by another. vegetated methods. j' ✓ : Where required, vegetative stormwater design shall be consistent with design standards (EDSPM Section 3.02), set forth —' -- in Chapter 2 of the Eugene Stormwater Management Manual. the website: http://www.desstate.or.us/wg/uic/uic.htm for more information. 0 For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified a by the Eugene Stormwater Management Manual (Sec2.4.1). Mr If a stormwater treatment Swale is proposed, submit calculations/specifications for sizing, velocity, flow, side slopes, bottom slope, and seed mix consistent with City of Springfield or Eugene's Stormwater Management Manual. E] ✓) Water Quality calculations as required in Section 3.03.1 of the EDSPM. F1 F7 'I All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall be provided with secondary containment or weather resistant enclosure. General Study Requirements EDSPM Section 4.03 Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon. A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map. ✓ Calculations showing system capacity for a 2 -year storm event and overflow effects of a 25 -year storm event. Q Ej The time of concentration (Tc) shall be determined using a 10 minute start time for developed basins. Review of Downstream System EDSPM Section 4.03.4.0 E] C] A downstream drainage analysis as described in EDSPM Section 4.03A.C. On-site drainage shall be governed by the Oregon Plumbing Specialty Code (OPSC). 0 F] Elevations of the HGL and flow lines for both city and private systems where applicable. ® [E Design of Storm Systems (EDSPM Section 4.04). 0 r✓1 Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set. Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,000 lb load without failure of the pipe structure. r Manning's `W' values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to achieve a minimum velocity of three 3 feet per second at 0.5 pipe full based on Table 4-1 as well. OtheriMiscellaneous *This form shall be included as an attachment, inside the front cover, of the stormwater study. *IMPORTANT. ENGINEER PLEASE READ BELOWAND SIGNI As the engineer of record, I hereby certify the above required items are complete and included with the submitted stormwater study and plan set. Signature Date Form Version 5: June 2015 ✓ Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site drains. ✓' Private stormwater easements shall be clearly depicted on plans when private stormwater flows from one property to another. ✓ j Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs, with the exception of residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to the website: http://www.desstate.or.us/wg/uic/uic.htm for more information. 0 F1' Detention ponds shall be designed to limit runoff to pre -development rates for the 2 through 25 -year storm events. *This form shall be included as an attachment, inside the front cover, of the stormwater study. *IMPORTANT. ENGINEER PLEASE READ BELOWAND SIGNI As the engineer of record, I hereby certify the above required items are complete and included with the submitted stormwater study and plan set. Signature Date Form Version 5: June 2015 PROJECT:: CASCADE HEALTH CENTER 3448 TH STREET:: SPRINGFIELD OR SUBJECT ::SITE PLAN REVIEW:: TYPE 2 FOR CHANGE OF USE PROJECT DESCRIPTION EXISTING FOREIGN LEGION BUILDING/CHURCH CHANGE OF USE TO COMMERCIAL FOR CHIROPRACTIC OFFICES SUBMITTAL NARRATIVE EXISTING PROPERTY/BUILDING CURRENTLY HOUSES THE AMERICAN LEGION AND BAPTIST CHURCH. THE BUILDING/PROPERTY 1S BEING PURCHASED AND WILL BE REMODELED TO HOUSE A NEW CHIROPRACTIC MEDICAL PRACTICE OFFICE. THIS REQUEST IS SUBMITTED FOR CONSIDERATION FOR A CHANGE OF USE VIA SITE PLAN REVIEW TYPE 2. ASSOCIATED APPLICATION: 8 1 1-24-000220-TYP2 THE FOLLOWING ADDRESS CHECKLIST ITEMS THAT DO NOT APPLY TO THIS APPLICATION: PAGE 5 STATE OR FEDERAL PERMIT REQUIRED CHANGE OF USE ONLY N/A STORM WATER SCOPING SHEET CHANGE OF USE ONLY N/A PAGE 6 TOPOGRAPHIC CONTOURS - EXISTING - NO ALTERATIONS PROPOSED N/A POTENTIAL NATURAL HAZARD AREAS - NO ALTERATIONS PROPOSED N/A SOIL TYPES AND WATER TABLE - NO ALTERATIONS PROPOSED N/A RESOURCE AREAS - WETLANDS AND HABITATS - NO ALTERATIONS N/A WATERCOURSES - EXISTING TO REMAIN - NO ALTERATIONS N/A 100 YEAR FLOODPLAI N N/A TIME OF TRAVEL ZONES - WITHIN THE 99 YR OF TRAVEL ZONE PAGE 7 LOCATION OF TREES/VEGETATION OVER 6" NONE EXIST LOCALLY/FED HISTORIC RESOURCE - PROPERTY IN HISTORIC DISTRICT APPLICATION FOR TYPE 1.480 CHANGE OF USE LOADING AND SERVICE TO REMAIN IN EXISTING ALLEY CHANGE OF USE ONLY - NO PROPOSED OUTDOOR CHANGES N/A PAGE 8 LANDSCAPE SCREENING N/A EXISTING LANDSCAPING ELEMENTS TO REMAIN N/A NO EXISTING IRRIGATION SYSTEM - NONE PLANNED N/A STREET TREES - NONE EXISTING OR PROPOSED LANDSCAPE SPECIFICATIONS - NONE PROPOSED N/A BICYCLE PARKING - NONE PROPOSED BUILDING SF TO PARKING REQUIREMENTS N/A LOADING AREA TO REMAIN IN EXISTING ALLEY N/A TRANSIT FACILITIES N/A RIGHT OF WAY APPROACH PERMIT N/A TRAFFIC IMPACT STUDY N/A GRADING/PAVING/STORM WATER - EXISTING TO REMAIN N/A PAGE 9 SITE DRAINAGE PATTERNS AND SYSTEMS TO REMAIN N/A EXISTING GRADES AND CONTOURS TO REMAIN N/A PHASED DEVELOPMENT PLAN N/A I KNOW ALL MEN BY THESE PRESENTS. That ....... ......... ....... in conaideration of- ....... . ....... ....... ........... . Dollars, ....... . ......... .... .. to--taem-, .-paid by.- Awa can ... ... .... do. hereby grant, bargain, sell and convey unto said ppriAgfield. Pas t.#40.. Tim AMOriCan_., Uplaimaasigns, all the following real property, with the tenements, harediramezift and appurtenances, situated in the County of . ..... -LAnO and State of Oregon, bounded and deacribedas follows, to -wit: Beginnitir, at a point b4 feet West of tne Vortneast corner of clock 75 of Springfield InNertment and Power G,>mpauyls Addition, no platted And recorded at PAtse 3-A) ol Volume 25, Lane Zounty Oregon Doe(! Records, riu4iiint; t:,ence ZiDUt.L 115 feet =Ire or less to an alley running East aftd best tnrou_a said Block; tzience Nest by feet, tueute bort:, 119 feet more or leas to tne !tort,; line of said Blocs; t.-4ence East b4 feet to ts,e place of bagin,.Ind in Lane County. Oret;on. To Have and to Hold the Above described And granted promises unto the said,. .......... .......... ... . ...... - ...... ...... ................................. .... ­ ........ .. .............. ..... . ...... . ............. . 'AIMIURM ase(ans forever. .. ... ..... ............. ............. .......... ........... ..... . .......... ­­­' . --1 .. . . .......... ...... .... .. . ........... . . ....... ... ...... ......... ... .. . And ............ rift ........ . .......... . ....... . ........ ....... ... . . ....... ... ..... .. . . ........... the grantors, Above named do__ - covenant to and with the above named grantee...AUdAtfl Marie" assigns that ____ t Lay.. are ............. lawfully seised in let simple 01 the above granted promises, that the Above granted promisca'are free from all encumbrances, .. ............... ..... .................... .................. .. .. .............. ...... .................. ... .. ... ... ............ ..... ..... ............ ...... . ...... ..... . ......... ... ........ ... ........... .... ......... .... ......... ....................... .................. ...... ................... I ­ .................. . . . .......... .............. . . ......... ............. . .. . ........... ... .......................... ......... ........... .... . ................ .......................... I -- -------- ..... ...... I ............... ...... .... ............ .. .................. . ........... .. . ...... ......... ..... ­­ ................... ............ ...... . ................. .......... ......... ............ ............. .. ­­.....­ . ......... ... . ... ........... .. .... . .. hare, Asacutors and administrators, shall warrant and forever ;tw that... ...�­'l§'U'V­* - .vP, , M- .. .............. ..... ......... detand the above granted promises, and every Part and PWOO iher*a. Against the lawful claims and demands ofall persons whomwever . ... .... ­ . .. ... ............ .......... ... . ........ .... .... .............. .... ... .. .... ........ ... __ ... ........ ...... .... ....................... I ................ . . . ... ...... ­­­­ ...................... ........... Witrwa.-Ausir ............ --hand.N. - end! seal_.... this grA .......day of ........ .. JW ............... .. ..... SRewtad in the Presence of wt� ......... (SRAL) ....... ... . .......... ............ ... ..... (Sant.) .. ............................. .. ................. .. ..... .............. .............. ...... ................. ... .. (SEAL) . .......... ..................___.__..a._. ................... .... ... ... ur--4-55 5 7 2 3 5 " A 1RFe 7..50 Ii Y t�, Ii Akk 911 Country Club Rd, Ste 320 • Eugene, OR 97401 260 Country Club Rd, Ste 120 • Eugene, OR 97401 Phone: 541.741.1981 P.O. Box 10211 • Eugene, OR 97440 Fax: 541.741.0619 Phone: 541.687.9794 Fax: 541.687.0924 September 06, 2024 Order No. 24-28079 Ef Cpm Lieell ne Tolle TITLE INSURANCE SERVICES • ESCROW CLOSINGS 3rd SUPPLEMENTAL TITLE REPORT Evergreen Land Title Company Estimated Premium for: 260 Country Club Road, Ste. 120 $525,000.00 Owners Policy $1,041.00 Eugene, OR 97401 Full Premium: $1,388.00 Re -Issue Credit: Attn: Jolene Stephenson $347.00 e-mail: jolene@evergreenlandtitle.com $419,000.00 Lenders Policy, (Extended) $590.00 Dear Jolene Stephenson: Full Premium: $1,544.00 Discount: $954.00 Endorsements (209.10-06, 222-06, 208.2-06, $1,057.00 218-06, 203.1, 218, 206, 228, 237, 66, 70) $144,000.00 2nd Lender Policy, (Extended): $325.00 Full Premium: $728.00 Discount: $403.00 Endorsements: 209.10-06, 222-06, 208.2-06 $156.00 Gov't Service Fee $35.00 Breakout Fee: Evergreen Land Title - 89% Underwriter - 11 % TOTAL $3,204.00 UNDERWRITER: Doma Title Insurance, Inc. - 2021 ALTA POLICIES PROPOSED INSURED (1ST): UMPQUA BANK PROPOSED INSURED (2ND): LCOG We are prepared to issue on request and on recording of the appropriate documents, a policy or policies as applied for, with coverage's as indicated, based on this preliminary report. LEGAL DESCRIPTION: SEE EXHIBIT "A" ATTACHED HERETO Showing fee simple title as of August 30, 2024, at 8:00 a.m., vested in: SPRINGFIELD POST #40, THE AMERICAN LEGION, a Corporation Subject only to the exceptions shown herein and to the terms, conditions and exceptions contained in the policy form. No liability is assumed until a full premium has been paid. Order No.: 24-28079 Page 1 of 5 SCHEDULE B GENERAL EXCEPTIONS 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records; proceedings by a public agency which may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the public records. 2. Facts, rights, interests or claims which are not shown by the public records but which could be ascertained by an inspection of the land or by making inquiry of persons in possession thereof. 3. Easements, or claims of easement, not shown by the public records; reservations or exceptions in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. 4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments or other facts which a correct survey would disclose. 5. Any lien, or right to a lien, for services, labor, material, equipment rental or workers compensation heretofore or hereafter furnished, imposed by law and not shown by the public records. CURRENT EXCEPTIONS: 6. Minerals of whatsoever kind, subsurface and surface substances, including but not limited to coal, lignite, oil, gas, uranium, clay, rock, sand and gravel in, on, under and that may be produced from the Land, together with all rights, privileges, and immunities relating thereto, whether or not appearing in the Public Records or listed in Schedule B. The Company makes no representation as to the present ownership of any such interests. There may be leases, grants, exceptions or reservations of interests that are not listed. 7. 2024-2025 Taxes, a lien not yet due or payable. 8. City Liens, if any, City of Springfield. A search has been requested and we will advise. 9. Declaration of Easements, including the terms and provisions thereof, by instrument Recorded December 26, 2019, Reception No. 2019-059363, Lane County Oregon Records. 10. Deed of Trust, including the terms and provisions thereof, executed by Springfield Post #40, the American Legion, as Grantor(s), to Arnold Gallagher PC, as Trustee, for the benefit of Jason R. Kennedy and Kimberly M. Kennedy, Trustees of the Kennedy Family Trust, dated October 1, 2023, as Beneficiary, Dated June 20, 2024, Recorded June 28, 2024, Reception No. 2024-018422, Official Records of Lane County Oregon, given to secure payment of a Note for $315,000.00. 11. A certified copy of the resolution authorizing the execution of the documents herein, and designating the parties authorized to execute said document to be insured should be furnished for examination, which resolution must be passed by the Board of Directors of Canusa Health Chiropractic, P.C. Order No.: 24-28079 Page 2 of 5 12. Any encroachments, unrecorded easements, violations of conditions, covenants and restrictions, and any other matters which would be disclosed by a correct survey. 13. Proof that there are no parties in possession, or claiming to be in other than above vestees. 14. Any statutory liens for labor or material, which have now gained or hereafter may gain over the lien of the insured mortgage, which liens do not now appear of record. The real property taxes for the fiscal year 2023-2024 are exempted by virtue of Fraternal ownership. The company assumes no liability should the exempt status be lifted and taxes levied. (Map No. 17-03-35-13-11500, Code 19-00, Account No. 0305217) NOTE: The address of the property to be insured herein is: 344 8th Street, Springfield, OR 97477. NOTE: A Judgment/Lien/Bankruptcy Search was done for the name(s) SPRINGFIELD POST #40, THE AMERICAN LEGION, A CORPORATION AND CANUSA HEALTH CHIROPRACTIC, P.C., and as of August 30, 2024, none were found. INFORMATIONAL NOTE: EVERGREEN LAND TITLE COMPANY FINDS NO NOTICE OF RESCISSION RECORDED IN THE LAST 24 MONTHS. NOTE: The following applicable recording fees will be charged by Lane County: First Page: $87.00 Each Additional Page $ 5.00 Non -Standard Document Fee $20.00 E -Recording Fee $ 5.00 INFORMATIONAL NOTE: The current vesting deed and all changes back to the deed which vests ownership 24 months ago are as follows: DECLARATION OF PROPERTY LINE ADJUSTMENT DEED RECORDED DECEMBER 26, 2019, RECEPTION NO. 2019-059362. WARRANTY DEED RECORDED MAY 6, 1955, FROM EDGAR R. FARNSWORTH AND MYRTLE FARNSWORTH, HUSBAND AND WIFE, TO SPRINGFIELD POST #40, THE AMERICAN LEGION, A CORPORATION, RECEPTION NO. 56126. WARRANTY DEED RECORDED JANUARY 25, 1945, FROM JOHN M. LARSEN AND VIOLET R. LARSEN, TO SPRINGFIELD POST NO. 40, THE AMERICAN LEGION, RECEPTION NO. 146210. Order No.: 24-28079 Page 3 of 5 NOTE: Due to current conflicts or potential conflicts between state and federal law, which conflicts may extend to local law, regarding marijuana, if the transaction to be insured involves property which is currently used or is to be used in connection with a marijuana enterprise, including but not limited to the cultivation, storage, distribution, transport, manufacture, or sale of marijuana and/or products containing marijuana, the Company declines to close or insure the transaction, and this Preliminary Title Report shall automatically be considered null and void and of no force and effect. NOTE: SUPPLEMENTED TO ADD ADDITIONAL ENDORSEMENT. Very truly yours, EVERGREEN LAND TITLE COMPANY HOME OFFICE Andrew Rollins Title Officer cc: Hybrid Real Estate Re/Max Integrity Umpqua Bank NO LIABILITY IS ASSUMED HEREUNDER UNTIL POLICY IS ISSUED AND PREMIUM PAID. IF FOR ANY REASON THE REPORT IS CANCELLED, A MINIMUM CANCELLATION FEE OF $200.00 WILL BE CHARGED. Order No.: 24-28079 Page 4 of 5 EXHIBIT "A" LEGAL DESCRIPTION All of the lands described in that certain Warranty Deed recorded on January 25, 1945, at Book 282 Page 66-7 in the Lane County Oregon Official Records. ALSO, the South 34.26 feet, by perpendicular measurement, of the lands described in that certain Warranty Deed recorded on May 6, 1955, as Instrument 56126 on Reel 5855D in the Lane County Oregon Official Records. Order No.: 24-28479 Page 5 of 5 911 Country Club Rd, Ste 320 • Eugene, OR 97401 260 Country Club Rd, Ste 120 • Eugene, OR 97401 Phone: 541.741.1981 P.O. Box 10211 • Eugene, OR 97440 Fax: 541.741.0619 4& y Phone: 541.687.9794 Fax: 541.687.0924 September 05, 2024 Order No. 24-28079 ,�rf}rQ�reen TITLE INSURANCE SERVICES • ESCROW CLOSINGS 2nd SUPPLEMENTAL TITLE REPORT Evergreen Land Title Company Estimated Premium for: 260 Country Club Road, Ste. 120 $525,000.00 Owners Policy $1,041.00 Eugene, OR 97401 Full Premium: $1,388.00 Re -Issue Credit: Attn: Jolene Stephenson $347.00 e-mail: jolene@evergreenlandtitle.com $419,000.00 Lenders Policy, (Extended) $590.00 Dear Jolene Stephenson: Full Premium: $1,544.00 Discount: $954.00 Endorsements (209.10-06, 222-06, 208.2-06, $817.00 218-06, 203.1, 218, 206, 228, 237, 66) $144,000.00 2nd Lender Policy, (Extended): $325.00 Full Premium: $728.00 Discount: $403.00 Endorsements: 209.10-06, 222-06, 208.2-06 $156.00 Gov't Service Fee $35.00 Breakout Fee: Evergreen Land Title - 89% Underwriter - 11 % TOTAL $2,964.00 UNDERWRITER: Doma Title Insurance, Inc. - 2021 ALTA POLICIES PROPOSED INSURED (1ST): UMPQUA BANK PROPOSED INSURED (2ND): LCOG We are prepared to issue on request and on recording of the appropriate documents, a policy or policies as applied for, with coverage's as indicated, based on this preliminary report. LEGAL DESCRIPTION: SEE EXHIBIT "A" ATTACHED HERETO Showing fee simple title as of August 30, 2024, at 8:00 a.m., vested in: SPRINGFIELD POST #40, THE AMERICAN LEGION, a Corporation Subject only to the exceptions shown herein and to the terms, conditions and exceptions contained in the policy form. No liability is assumed until a full premium has been paid. Order No.: 24-28079 Pagel of 5 SCHEDULE B GENERAL EXCEPTIONS 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records; proceedings by a public agency which may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the public records. 2. Facts, rights, interests or claims which are not shown by the public records but which could be ascertained by an inspection of the land or by making inquiry of persons in possession thereof. 3. Easements, or claims of easement, not shown by the public records; reservations or exceptions in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. 4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments or other facts which a correct surrey would disclose. 5. Any lien, or right to a lien, for services, labor, material, equipment rental or workers compensation heretofore or hereafter furnished, imposed by law and not shown by the public records. CURRENT EXCEPTIONS: 6. Minerals of whatsoever kind, subsurface and surface substances, including but not limited to coal, lignite, oil, gas, uranium, clay, rock, sand and gravel in, on, under and that may be produced from the Land, together with all rights, privileges, and immunities relating thereto, whether or not appearing in the Public Records or listed in Schedule B. The Company makes no representation as to the present ownership of any such interests. There may be leases, grants, exceptions or reservations of interests that are not listed. 7. 2024-2025 Taxes, a lien not yet due or payable. 8. City Liens, if any, City of Springfield. A search has been requested and we will advise. 9. Declaration of Easements, including the terms and provisions thereof, by instrument Recorded December 26, 2019, Reception No. 2019-059363, Lane County Oregon Records. 10. Deed of Trust, including the terms and provisions thereof, executed by Springfield Post #40, the American Legion, as Grantor(s), to Arnold Gallagher PC, as Trustee, for the benefit of Jason R. Kennedy and Kimberly M. Kennedy, Trustees of the Kennedy Family Trust, dated October 1, 2023, as Beneficiary, Dated June 20, 2024, Recorded June 28, 2024, Reception No. 2024-018422, Official Records of Lane County Oregon, given to secure payment of a Note for $315,000.00. 11. A certified copy of the resolution authorizing the execution of the documents herein, and designating the parties authorized to execute said document to be insured should be furnished for examination, which resolution must be passed by the Board of Directors of Canusa Health Chiropractic, P.C. Order No.: 24-28079 Page 2 of 5 12. Any encroachments, unrecorded easements, violations of conditions, covenants and restrictions, and any other matters which would be disclosed by a correct survey. 13. Proof that there are no parties in possession, or claiming to be in other than above vestees. 14. Any statutory liens for labor or material, which have now gained or hereafter may gain over the lien of the insured mortgage, which liens do not now appear of record. The real property taxes for the fiscal year 2023-2024 are exempted by virtue of Fraternal ownership. The company assumes no liability should the exempt status be lifted and taxes levied. (Map No. 17-03-35-13-11500, Code 19-00, Account No. 0305217) NOTE: The address of the property to be insured herein is: 344 8th Street, Springfield, OR 97477. NOTE: A Judgment/Lien/Bankruptcy Search was done for the name(s) SPRINGFIELD POST #40, THE AMERICAN LEGION, A CORPORATION AND CANUSA HEALTH CHIROPRACTIC, P.C., and as of August 30, 2024, none were found. INFORMATIONAL NOTE: EVERGREEN LAND TITLE COMPANY FINDS NO NOTICE OF RESCISSION RECORDED IN THE LAST 24 MONTHS. NOTE: The following applicable recording fees will be charged by Lane County - First Page: $87.00 Each Additional Page $ 5.00 Non -Standard Document Fee $20.00 E -Recording Fee $ 5.00 INFORMATIONAL NOTE: The current vesting deed and all changes back to the deed which vests ownership 24 months ago are as follows: DECLARATION OF PROPERTY LINE ADJUSTMENT DEED RECORDED DECEMBER 26, 2019, RECEPTION NO. 2019-059362. WARRANTY DEED RECORDED MAY 6, 1955, FROM EDGAR R. FARNSWORTH AND MYRTLE FARNSWORTH, HUSBAND AND WIFE, TO SPRINGFIELD POST #40, THE AMERICAN LEGION, A CORPORATION, RECEPTION NO. 56126. WARRANTY DEED RECORDED JANUARY 25, 1945, FROM JOHN M. LARSEN AND VIOLET R. LARSEN, TO SPRINGFIELD POST NO. 40, THE AMERICAN LEGION, RECEPTION NO. 146210. Order No.: 24-28079 Page 3 of 5 NOTE: Due to current conflicts or potential conflicts between state and federal law, which conflicts may extend to local law, regarding marijuana, if the transaction to be insured involves property which is currently used or is to be used in connection with a marijuana enterprise, including but not limited to the cultivation, storage, distribution, transport, manufacture, or sale of marijuana and/or products containing marijuana, the Company declines to close or insure the transaction, and this Preliminary Title Report shall automatically be considered null and void and of no force and effect. NOTE: SUPPLEMENTED TO BRING CURRENT AND ADD ADDITIONAL ENDORSEMENTS. Very truly yours, EVERGREEN LAND TITLE COMPANY HOME OFFICE By: Andrew Rollins Title Officer cc: Hybrid Real Estate Re/Max Integrity Umpqua Bank NO LIABILITY IS ASSUMED HEREUNDER UNTIL POLICY IS ISSUED AND PREMIUM PAID. IF FOR ANY REASON THE REPORT IS CANCELLED, A MINIMUM CANCELLATION FEE OF $200.00 WILL BE CHARGED. Order No.: 24-28079 Page 4 of 5 EXHIBIT "A" LEGAL DESCRIPTION All of the lands described in that certain Warranty Deed recorded on January 25, 1945, at Book 282 Page 66-7 in the Lane County Oregon Official Records. ALSO, the South 34.26 feet, by perpendicular measurement, of the lands described in that certain Warranty Deed recorded on May 6, 1955, as Instrument 56126 on Reel 5855D in the Lane County Oregon Official Records. Order No.: 24-28079 Page 5 of 5