Loading...
HomeMy WebLinkAboutPlans Applicant 9/16/20241.6% 0.7% ??? ???4.7%1.6%1.6%1.6%1.6%1.6%1.6%1.6%1.5%15.4%1.0%1.8%1.8%1.8%1.6%??? ???16.0%16.0%16.0%56.9%7.8%25.3%24.9%23.6%1.6%1.6%1.6%0.6%1.8%1.8% 0.6%1.8%1.8%1.8% 16.9% 22.5% 26.4% 22.8% 22.8% 8.8%HIGH BANKS ROAD3 MA 6 SD 6 COS 5 BP 5 COS POND GRASSY SWALE SEE NOTE 'C' GRASSY SWALE SEE NOTE 'C' GRAVEL SURFACE - SEE CIVIL WATER QUALITY OVERFLOW - SEE CIVIL PLANS WATER QUALITY OVERFLOW - SEE CIVIL PLANS GRAVEL SURFACE - SEE CIVIL GRAVEL SURFACE - SEE CIVIL 6 SD EXISTING FENCE TO REMAIN 3 PC 1 MA 7 BP EXISTING VEGETATION TO REMAIN SHRUBS PLANTING LEGEND DECIDUOUS TREES GRASSY SWALE (SEE LANDSCAPE NOTES FOR SEED MIX) GRAVEL SURFACE (SEE CIVIL PLANS AND NOTES) SEEDING AT STORMWATER FACILITIES (GRASSY SWALES)C. 1.HYDROSEED OR TERRASEED WITH STREAMBANK SEED MIXTURE BY SUNMARK SEEDS INTERNATIONAL. HYDROSEED MIXTURE SHALL BE COMPOSED OF TACKIFIER AND HYDROMULCH MIX TO BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO APPLICATION. APPLY SEED MIX AT RATE ACCORDING TO MANUFACTURERS SPECIFICATIONS. 1.PROVIDE ONLY HEALTHY, FULL PLANT MATERIAL AT SIZES INDICATED. 2.PLANT SUBSTITUTIONS TO BE APPROVED BY LANDSCAPE ARCHITECT. 3.PLANT LAYOUT TO BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 1.FINISHED ELEVATION OF SUB-BASE TO BE 18" MINIMUM BELOW FINISHED GRADE AT PLANT BEDS AND 24" MIN. AT PARKING ISLANDS. 2.TILL SUBGRADE THOROUGHLY TO A DEPTH OF 8" MINIMUM PRIOR TO PLACEMENT OF TOPSOIL. 3.PLACE 18" MINIMUM OF SANDY LOAM TOPSOIL OVER TILLED SUBGRADE (24" AT PARKING ISLANDS). CROWN PER DETAILS. ADD 4" OF ORGANIC MATERIAL AND 15-5-10-10 FERTILIZER TO TOPSOIL AT THE RATE OF 20 LBS. PER 1000 SQ. FT. ROTO-TILL AMENDMENTS AND TOPSOIL TO A DEPTH OF 8" MINIMUM. 4.PROVIDE 3" OF SHREDDED FIR BARK MULCH OVER ALL PLANT BEDS. NOTE:NATIVE SOIL MAY BE USED AS SANDY LOAM AT PLANT BEDS ONLY PROVIDED THAT IT HAS A LOOSE, CRUMBLY COMPOSITION AND IS NOT COMPACTED. SUB-BASE AND TOPSOIL SHOULD BE DRY DURING INSTALLATION AND GRADING TO PREVENT COMPACTION AND FUTURE POOR DRAINAGE CONDITIONS. IF NATIVE SOIL DOES NOT MEET THESE REQUIREMENTS, AN APPROVED SANDY LOAM SHOULD BE IMPORTED TO THE SITE. SOIL PREPARATIONA. LANDSCAPE NOTES PLANT BEDS B.PLANT MATERIAL PLACE 12" MINIMUM OF SANDY LOAM TOPSOIL OVER SUB-BASE. ADD 2" OF ORGANIC MATERIAL AND 15-5-10-10 FERTILIZER TO TOPSOIL AT THE RATE OF 20 LBS. PER 1000 SQ. FT. ROTO-TILL AMENDMENTS AND TOPSOIL TO A DEPTH OF 8" MINIMUM. STORMWATER FACILITIES (GRASSY SWALES) 1. GENERAL NOTES THE INFORMATION PROVIDED IS PRELIMINARY AND FOR REFERENCE ONLY TO DEMONSTRATE COMPLIANCE WITH THE APPLICABLE LAND USE APPLICATION APPROVAL CRITERIA. DESIGN INFORMATION AND DETAILS WILL BE REFINED TO MEET ALL APPLICABLE REQUIREMENTS AT THE TIME OF BUILDING PERMIT SUBMITTAL. 2.COMPLETE PLANTING PLANS TO BE INCLUDED AT TIME OF BUILDING PERMIT SUBMITTAL. TYPICAL SHRUB PLANTING LA-1 1 SECTION SCALE: 1/2" = 1'-0" 2 x ROOTBALL DIAMETER - MIN.6"SCARIFIED SUB-GRADE REMOVE ALL BINDINGS AND BURLAP FROM ENTIRE ROOT BALL COMPACTED TOPSOIL (BELOW ROOT BALLS ONLY)3"18" - 24"MULCH AS SPECIFIED (2" CLEAR AT TRUNK)SEE PLANT LIST ORNURSERY STANDARDSFOR HEIGHTPLANTING SOIL WITH SPECIFIED FERTILIZER AND AMENDMENTS TO FACE NORTH AT THE SITE WHEN EVER POSSIBLE. MARK THE NORTH SIDE OF THE TREE IN THE NURSERY, AND ROTATE TREE SLOPE TO GRADE TYPICAL TREE PLANTING5' MIN. - ORNAMENTAL/CONIFER6' MIN. - SHADENOTESTABILITYNEEDED LA-1 2 MIN.4"24"ASFORSECTION 4' (3) EACH SHADE TREE MULCH AS SPECIFIED (2" CLEAR AT TRUNK) (BELOW ROOT BALLS ONLY) OF ROOT BALL REMOVE BURLAP FROM TOP 1/3 SUB GRADE PLANTING SOIL COMPACTED TOPSOIL MIN. 2'MIN6"SCALE: 1/2" = 1'-0" STAKES AS SPECIFIED - EVENLY SPACED (2) EACH ORNAMENTAL/CONIFER TREE GUY WIRE PLANT SCHEDULE CODE QTY BOTANICAL NAME COMMON NAME SIZE REMARKS TREES MA 4 Maackia amurensis Amur Maackia 2" cal.Matching, full PC 3 Prunus virginiana 'Canada Red'Canada Red Chokecherry 2" cal.Matching, full SHRUBS BP 12 Baccharis pilularis Coyote Brush 5 gal.Matching, full COS 12 Cornus sericea Red Twig Dogwood 5 gal.Matching, full SD 11 Spiraea douglasii Western Spirea 5 gal.Matching, full Revisions Date: Checked By: Drawn By: LA-1HIGH BANKS RV STORAGE0 10 20 40 80 160 LANDSCAPE PLAN SCALE: 1"=40'-0"NORTH DLA INC. COPYRIGHT 2024 Client / Consultant Shaun Hyland 1941 Laura St Springfield, OR 97477 541-726-8081 Submission: EKS DJD 9-12-2024 www.DLAdesign.com P 541.683.5803 F 541.683.8183 474 Willamette Street Suite 305 Eugene, Oregon 97401 PRELIMINARYNOT FORCONSTRUCTION