HomeMy WebLinkAboutMeeting Packet Planner 8/15/2024
Completeness Check
Meeting
Development and Public Works Department
Conference Room 616 & Zoom
COMPLETENESS CHECK MEETING DATE:
Friday, August 23, 2024
11:00 a.m. - 12:00 p.m.
DPW Conference Room 616 and Zoom
Completeness Check Mtg (Partition Plat) 811-24-000196-PRE 811-21-000245-PROJ Neal & Sheri Moore
Assessor’s Map: 17-03-25-24 TL: 2300
Address: 1975 16th Street
Existing Use: residential
Applicant has submitted plans for a 3 lot partition
Planner: Tom Sievers
Meeting: Friday, August 23, 2024 11:00 – 12:00 via Zoom and Conference Rm 616
SITE
VICINITY MAP
811-24-000196-PRE Completeness Check Meeting
17-03-25-24 TL 2300
1975 16th Street
Neal and Sheri Moore
Completeness Check
Meeting
Development and Public Works Department
Conference Room 616 & Zoom
COMPLETENESS CHECK MEETING DATE:
Friday, August 23, 2024
11:00 a.m. - 12:00 p.m.
DPW Conference Room 616 and Zoom
Completeness Check Mtg (Partition Plat) 811-24-000196-PRE 811-21-000245-PROJ Neal & Sheri Moore
Assessor’s Map: 17-03-25-24 TL: 2300
Address: 1975 16th Street
Existing Use: residential
Applicant has submitted plans for a 3 lot partition
Planner: Tom Sievers
Meeting: Friday, August 23, 2024 11:00 – 12:00 via Zoom and Conference Rm 616
SITE
VICINITY MAP
811-24-000196-PRE Completeness Check Meeting
17-03-25-24 TL 2300
1975 16th Street
Neal and Sheri Moore
Revised 10.14.13 kl 1 of 6
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Land Division Plat
Partition, Subdivision
Application Type (Applicant: check one)
Partition Plat Pre-Submittal: Subdivision Plat Pre-Submittal:
Partition Plat Submittal: Subdivision Plat Submittal:
Required Project Information (Applicant: complete this section)
Applicant Name: Phone:
Company: Fax:
Address:
Applicant’s Rep.: Phone:
Company: Fax:
Address:
Property Owner: Phone:
Company: Fax:
Address:
ASSESSOR'S MAP NO: TAX LOT NO(S):
Property Address:
Size of Property: Acres Square Feet
Proposed Name of Subdivision:
Description of
Proposal:
If you are filling in this form by hand, please attach your proposal description to this application.
Existing Use: Tentative Case #:
# of Lots/Parcels: Avg. Lot/Parcel Size: sf Density: du/acre
Signatures: Please sign and print your name and date in the appropriate box on the next page.
Required Project Information (City Intake Staff: complete this section)
Associated Applications:
Pre-Sub Case No.: Date: Reviewed by:
Case No.: Date: Reviewed by:
Application Fee: $ Technical Fee: $ Postage Fee: $0
TOTAL FEES: $ PROJECT NUMBER:
310 5th Street, Springfield, OR 97477 | p: 541.746.0637 | www.branchengineering.com
August 6, 2024
FINAL PLAT REVIEW COMPLIANCE
PARTITION PLAT FOR MOORE RESIDENTIAL TRUST (811-23-000074-TYP2)
TM 17-03-25-24; TL 2300
Branch Engineering Inc. Project No. 21-466
This application is a submittal of the Final Partition Plat for Moore Residential
Trust at Map 17-03-25-24; Tax Lot 2300. The Tentative Partition Plan was granted
approval on May 2, 2023 under File Number 811-23-000074-TYP2. The following
explains how the Conditions of Approval are satisfied.
1. Future development of the parcels must conform to the density standards of the
R-2 district by requiring two (2) dwelling units per parcel, which may consist of
2-attached or detached units.
A restriction document is enclosed in this submittal, which will be recorded
concurrently with the plat. This document includes language confirming that the
future development of the parcels will conform to the R-2 district density standards by
requiring a minimum of two dwelling units per parcel, which may consist of either
attached or detached units.
2. Prior to Final Plat approval, the applicant must contact SUB Electric to gain
sufficient capacity for future dwellings.
Dave Kandle (davidka@subutil.com) from SUB Electric has been contacted and
confirmed that they will be able to provide power to the parcels. All necessary utilities
for power provision will be constructed concurrently with the home construction on
the parcels.
3. Prior to Final Plat approval, the applicant must construct the lateral from the
existing main on the north side of S Street to Parcel 1 as shown on the tentative
partition plan. This will require an encroachment permit.
A lateral is currently under permit to be constructed from the main within 16th Street.
This will ensure that the lateral connection to Parcel 1 is completed in accordance with
the tentative partition plan.
Final Plat Review Compliance – Partition Plat for Moore Residential Trust
August 6, 2024
Branch Engineering, Inc. Page 2 of 2
4. The applicant must install the sidewalk and driveway into S Street per City
Standard Dwg 3-27 for the driveway and culvert, and 3-12 for the setback
sidewalk using an encroachment permit (this will be separate for the permit for
the sewer connection to Parcel 1).
The sidewalk and driveway installation in S Street are currently under permit. This
permit covers the construction in accordance with City Standard Drawings 3-27 for
the driveway and culvert, and 3-12 for the setback sidewalk.
5. Prior to approval of the Final Plat, the applicant must execute and record an
Improvement Agreement for S Street, for all remaining improvements required to
bring the street to current city standards, which are limited to the paving, curb
and gutter, and storm drain.
The developer is prepared to execute and record an Improvement Agreement for S
Street. Please provide a draft copy of the agreement for the developer's review.
Closure Sheets – Partition Plat for
Moore Residential Trust
Client: Prepared by:
Moore Residential Trust Branch Engineering, Inc.
1955 16th Street 310 5th Street
Springfield, OR 97477 Springfield, OR 97477
Parcel Name: Plat Boundary
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North:114,606.2485' East:207,643.9240'
Segment# 1: Line
Course: N89° 49' 25"W Length: 100.32'
North: 114,606.5573' East: 207,543.6045'
Segment# 2: Line
Course: N0° 07' 08"E Length: 182.48'
North: 114,789.0369' East: 207,543.9831'
Segment# 3: Line
Course: S89° 49' 25"E Length: 100.27'
North: 114,788.7282' East: 207,644.2526'
Segment# 4: Line
Course: S0° 06' 14"W Length: 182.48'
North: 114,606.2485' East: 207,643.9217'
Perimeter: 565.55' Area: 18,302Sq.Ft.
Error Closure: 0.0022 Course: N88° 25' 46"W
Error North : 0.00006 East: -0.00223
Precision 1: 257,068.18
SOUTHEAST CORNER
OF PLAT; INITIAL POINT
Parcel Name: Parcel 1
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North:114,732.2480' East:207,644.1526'
Segment# 1: Line
Course: N89° 49' 25"W Length: 44.30'
North: 114,732.3844' East: 207,599.8529'
Segment# 2: Line
Course: N0° 10' 35"E Length: 10.00'
North: 114,742.3843' East: 207,599.8836'
Segment# 3: Line
Course: N89° 49' 25"W Length: 56.00'
North: 114,742.5567' East: 207,543.8839'
Segment# 4: Line
Course: N0° 07' 08"E Length: 30.59'
North: 114,773.1467' East: 207,543.9474'
Segment# 5: Line
Course: N45° 03' 27"E Length: 15.37'
North: 114,784.0040' East: 207,554.8265'
Segment# 6: Line
Course: S89° 49' 25"E Length: 89.42'
North: 114,783.7287' East: 207,644.2461'
Segment# 7: Line
Course: S0° 06' 14"W Length: 51.48'
North: 114,732.2488' East: 207,644.1527'
Perimeter: 297.15' Area: 4,543Sq.Ft.
Error Closure: 0.0008 Course: N7° 17' 56"E
Error North : 0.00078 East: 0.00010
Precision 1: 371,450.00
SOUTHEAST CORNER
OF PARCEL 1
L2
L1
Parcel Name: Parcel 2
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North:114,671.5484' East:207,644.0425'
Segment# 1: Line
Course: N89° 49' 25"W Length: 100.30'
North: 114,671.8572' East: 207,543.7430'
Segment# 2: Line
Course: N0° 07' 08"E Length: 70.70'
North: 114,742.5570' East: 207,543.8897'
Segment# 3: Line
Course: S89° 49' 25"E Length: 56.00'
North: 114,742.3846' East: 207,599.8894'
Segment# 4: Line
Course: S0° 10' 35"W Length: 10.00'
North: 114,732.3847' East: 207,599.8586'
Segment# 5: Line
Course: S89° 49' 25"E Length: 44.30'
North: 114,732.2483' East: 207,644.1584'
Segment# 6: Line
Course: S0° 06' 14"W Length: 60.70'
North: 114,671.5484' East: 207,644.0483'
Perimeter: 342.00' Area: 6,648Sq.Ft.
Error Closure: 0.0059 Course: S89° 57' 03"E
Error North : -0.00001 East: 0.00586
Precision 1: 57,966.10
SOUTHEAST CORNER
OF PARCEL 2
L2
Parcel Name: Parcel 3
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North:114,606.2485' East:207,643.9240'
Segment# 1: Line
Course: N89° 49' 25"W Length: 100.32'
North: 114,606.5573' East: 207,543.6045'
Segment# 2: Line
Course: N0° 07' 08"E Length: 65.30'
North: 114,671.8572' East: 207,543.7399'
Segment# 3: Line
Course: S89° 49' 25"E Length: 100.30'
North: 114,671.5484' East: 207,644.0395'
Segment# 4: Line
Course: S0° 06' 14"W Length: 65.30'
North: 114,606.2485' East: 207,643.9211'
Perimeter: 331.22' Area: 6,550Sq.Ft.
Error Closure: 0.0029 Course: N89° 26' 28"W
Error North : 0.00003 East: -0.00290
Precision 1: 114,213.79
SOUTHEAST CORNER OF
PARCEL 3; INITIAL POINT
Parcel Name: S Street Road Dedication
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North:114,788.7270' East:207,644.2552'
Segment# 1: Line
Course: S0° 06' 14"W Length: 5.00'
North: 114,783.7270' East: 207,644.2461'
Segment# 2: Line
Course: N89° 49' 25"W Length: 89.42'
North: 114,784.0023' East: 207,554.8265'
Segment# 3: Line
Course: S45° 03' 27"W Length: 15.37'
North: 114,773.1450' East: 207,543.9474'
Segment# 4: Line
Course: N0° 07' 08"E Length: 15.89'
North: 114,789.0349' East: 207,543.9803'
Segment# 5: Line
Course: S89° 49' 25"E Length: 100.27'
North: 114,788.7262' East: 207,644.2499'
Perimeter: 225.95' Area: 561Sq.Ft.
Error Closure: 0.0053 Course: S81° 56' 35"W
Error North: -0.00075 East: -0.00528
Precision 1: 42,632.08
NORTHEAST CORNER
OF PLAT
4,543SF + 6,648SF + 6,550SF + 561SF = 18,302SF
(Parcel 1) (Parcel 2) (Parcel 3) (Road
Dedication)
L1
DIGITALLY SIGNED