Loading...
HomeMy WebLinkAboutMeeting Packet Planner 6/5/2024 Completeness Check Meeting Development and Public Works Department Conference Room 616 & Zoom COMPLETENESS CHECK MEETING DATE: Tuesday, June 18, 2024 10:00 a.m. - 11:00 a.m. DPW Conference Room 616 and Zoom Completeness Check Mtg (Partition Tentative) PRE 811-24-000145-PRE 811-23-000266-PROJ Robert Kemp Assessor’s Map: 18-02-06-14 TL: 6200 Address: 904 Filbert Lane Existing Use: residential Applicant has submitted plans for 2-lot partition Planner: Tom Sievers Meeting: Tuesday, June 18, 2024 10:00 – 11:00 via Zoom and Conference Rm 616 SITE VICINITY MAP 811-24-000145-PRE Completeness Check Mtg 18-02-06-14 TL 6200 904 Filbert Lane Robert Kemp Revised 1/7/14 kl 1 of 10 City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Land Division Tentative Plan Partition, Subdivision Application Type (Applicant: check one) Partition Tentative Pre-Submittal: Subdivision Tentative Pre-Submittal: Partition Tentative Submittal: Subdivision Tentative Submittal: Required Project Information (Applicant: complete this section) Applicant Name: Phone: Company: Fax: Address: Applicant’s Rep.: Phone: Company: Fax: Address: Property Owner: Phone: Company: Fax: Address: ASSESSOR'S MAP NO: TAX LOT NO(S): Property Address: Size of Property: Acres Square Feet Proposed Name of Subdivision: Description of Proposal: If you are filling in this form by hand, please attach your proposal description to this application. Existing Use: # of Lots/Parcels: Total acreage of parcels/ allowable density: Proposed # Dwell Units Signatures: Please sign and print your name and date in the appropriate box on the next page. Required Project Information (City Intake Staff: complete this section) Associated Applications: Signs: Pre-Sub Case No.: Date: Reviewed by: Case No.: Date: Reviewed by: Application Fee: $ Technical Fee: $ Postage Fee: $ TOTAL FEES: $ PROJECT NUMBER: EUGENE-SPRINGFIELD 310 5th Street, Springfield, OR 97477 | p: 541.746.0637 | www.branchengineering.com June 5, 2024 PROJECT NARRATIVE TENTATIVE PARTITION – ROBERT KEMP Branch Engineering Inc. Project No. 23-553 This partition is proposed for an under-developed property within the Low Density Residential (R1) Zone at 904 Filbert Lane. Located at the southwest corner of the intersection of Filbert Lane and North Street in Springfield, Oregon, the site spans approximately 15,949 square feet. This application seeks to divide the property into two parcels. The northerly parcel, Parcel 1, will retain all existing improvements in the northerly half of the property, including a home and a driveway, covering an area of 7,288 square feet. The southerly parcel, Parcel 2, which also has a driveway and is designated for future residential development, will be vacant and spans 8,661 square feet. A 20-foot-wide joint use access easement along Parcel 2’s southerly boundary will be established to provide the neighbors to the south and west joint-use ingress and egress to Filbert Lane. In accordance with the Annexation Agreement associated with the site, planned public improvements along North Street will include the construction of a new sidewalk and a roadside ditch. Existing utility services such as sanitary, stormwater, gas, water, and electric are readily accessible from Filbert Lane and/or North Street. Any future residence(s) on Parcel 2 will connect to these services.