HomeMy WebLinkAboutMeeting Packet Planner 6/5/2024
Completeness Check
Meeting
Development and Public Works Department
Conference Room 616 & Zoom
COMPLETENESS CHECK MEETING DATE:
Tuesday, June 18, 2024
10:00 a.m. - 11:00 a.m.
DPW Conference Room 616 and Zoom
Completeness Check Mtg (Partition Tentative) PRE 811-24-000145-PRE 811-23-000266-PROJ
Robert Kemp
Assessor’s Map: 18-02-06-14 TL: 6200
Address: 904 Filbert Lane
Existing Use: residential
Applicant has submitted plans for 2-lot partition
Planner: Tom Sievers
Meeting: Tuesday, June 18, 2024 10:00 – 11:00 via Zoom and Conference Rm 616
SITE
VICINITY MAP
811-24-000145-PRE Completeness Check Mtg
18-02-06-14 TL 6200
904 Filbert Lane
Robert Kemp
Revised 1/7/14 kl 1 of 10
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Land Division Tentative Plan
Partition, Subdivision
Application Type (Applicant: check one)
Partition Tentative Pre-Submittal: Subdivision Tentative Pre-Submittal:
Partition Tentative Submittal: Subdivision Tentative Submittal:
Required Project Information (Applicant: complete this section)
Applicant Name: Phone:
Company: Fax:
Address:
Applicant’s Rep.: Phone:
Company: Fax:
Address:
Property Owner: Phone:
Company: Fax:
Address:
ASSESSOR'S MAP NO: TAX LOT NO(S):
Property Address:
Size of Property: Acres Square Feet
Proposed Name of Subdivision:
Description of
Proposal:
If you are filling in this form by hand, please attach your proposal description to this application.
Existing Use:
# of Lots/Parcels: Total acreage of parcels/
allowable density: Proposed #
Dwell Units
Signatures: Please sign and print your name and date in the appropriate box on the next page.
Required Project Information (City Intake Staff: complete this section)
Associated Applications: Signs:
Pre-Sub Case No.: Date: Reviewed by:
Case No.: Date: Reviewed by:
Application Fee: $ Technical Fee: $ Postage Fee: $
TOTAL FEES: $ PROJECT NUMBER:
EUGENE-SPRINGFIELD
310 5th Street, Springfield, OR 97477 | p: 541.746.0637 | www.branchengineering.com
June 5, 2024
PROJECT NARRATIVE
TENTATIVE PARTITION – ROBERT KEMP
Branch Engineering Inc. Project No. 23-553
This partition is proposed for an under-developed property within the Low
Density Residential (R1) Zone at 904 Filbert Lane. Located at the southwest corner of the
intersection of Filbert Lane and North Street in Springfield, Oregon, the site spans
approximately 15,949 square feet. This application seeks to divide the property into two
parcels.
The northerly parcel, Parcel 1, will retain all existing improvements in the
northerly half of the property, including a home and a driveway, covering an area of
7,288 square feet. The southerly parcel, Parcel 2, which also has a driveway and is
designated for future residential development, will be vacant and spans 8,661 square
feet. A 20-foot-wide joint use access easement along Parcel 2’s southerly boundary will
be established to provide the neighbors to the south and west joint-use ingress and
egress to Filbert Lane.
In accordance with the Annexation Agreement associated with the site, planned
public improvements along North Street will include the construction of a new sidewalk
and a roadside ditch.
Existing utility services such as sanitary, stormwater, gas, water, and electric are
readily accessible from Filbert Lane and/or North Street. Any future residence(s) on
Parcel 2 will connect to these services.