HomeMy WebLinkAboutMeeting Packet Planner 5/14/2024
1
AGENDA
DEVELOPMENT REVIEW
COMMITTEE
DEVELOPMENT SERVICES DEPARTMENT
225 FIFTH STREET
Conference Room 616 / MS Teams
Staff Review: Tuesday, May 28, 2024 9:30 – 10:00 a.m.
1. Subdivision Tentative 811-24-000126-TYP2 811-24-000102-PROJ Hayden Homes
2. Minor Variance 811-24-000127-TYP2 811-24-000102-PROJ Hayden Homes
Assessor’s Map: 18-02-04-00 TL: 3800, 3500
Address: 5410 Mt. Vernon Rd.
Existing Use: Vacant
Applicant has submitted plans for 225-lot residential subdivision
Planner: Andy Limbird
Meeting: Tuesday, May 28, 2024 9:30 – 10:00 virtual meeting via Microsoft Teams
The Complete DRC Packet for this meeting is available online for you to review or print out
from the laserfiche website: https://www.springfield-or.gov/weblink8/browse.aspx
SITE
VICINITY MAP
811-24-000126-TYP2 Subdivision Tentative
18-02-04-00 TL 3800 & 3500
5410 Mt. Vernon Rd.
Hayden Homes
Revised 1/7/14 kl 1 of 10
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Land Division Tentative Plan
Partition, Subdivision
Application Type (Applicant: check one)
Partition Tentative Pre-Submittal: Subdivision Tentative Pre-Submittal:
Partition Tentative Submittal: Subdivision Tentative Submittal:
Required Project Information (Applicant: complete this section)
Applicant Name: Phone:
Company: Fax:
Address:
Applicant’s Rep.: Phone:
Company: Fax:
Address:
Property Owner: Phone:
Company: Fax:
Address:
ASSESSOR'S MAP NO: TAX LOT NO(S):
Property Address:
Size of Property: Acres Square Feet
Proposed Name of Subdivision:
Description of
Proposal:
If you are filling in this form by hand, please attach your proposal description to this application.
Existing Use:
# of Lots/Parcels: Total acreage of parcels/
allowable density:
Proposed #
Dwell Units
Signatures: Please sign and print your name and date in the appropriate box on the next page.
Required Project Information (City Intake Staff: complete this section)
Associated Applications: Signs:
Pre-Sub Case No.: Date: Reviewed by:
Case No.: Date: Reviewed by:
Application Fee: $ Technical Fee: $ Postage Fee: $
TOTAL FEES: $ PROJECT NUMBER:
Brian Thoreson 541-912-6607
Hayden Homes
2464 SW Glacier Pl #100 Redmond, OR 97756
Scott Morris 541-302-9790
A & O Engineering LLC
380 Q Street Suite 200 Springfield, OR 97477
Will Goodwin
PO Box 2617 Eugene, OR 97402
18-02-04-00 3800,3500,307
5410 Mt Vernon Rd Springfield, OR 97478; near Mt Vernon
38.26 x
Woodland Ridge Phase 5 - 8
single family lots - addition to Woodland Ridge Subdivision
vacant
207
SSR Investments LLC
(503) 936-3852
x
Document Date May 10, 2024
Applicant’s Request Woodland 5-8 Subdivision
Property Owner/Applicant Brian Thoreson
Hayden Homes LLC
2464 SW Glacier Pl Ste 100
Redmond, OR 97756
Property Owner SSR Investments
PO Box 2617
Eugene, OR 97402
Applicant’s Representative Scott Morris, PE
A & O Engineering, LLC
380 Q St, Ste 200
Springfield, OR 97477
Subject Property Assessors Map 18-02-04-00
Tax Lot 3800,3500,307
Location 5410 Mt Vernon Rd
Springfield, OR 97478
Property Size 38.26 Acres
Zoning LDR (Low Density Residential
Background
This is an application for the tentative plat of Woodland Ridge Phases 5 through 8 to create
219 residential lots and supporting infrastructure. This is the next addition of the existing
Woodland Ridge Subdivision (case #811-18-000007-TYP2).
The subject property is located in Springfield and is zoned Low Density Residential (LDR)
Annexation of the subject property was completed on March 4th, 2024 as part of ordinance
No. 6474.
There is one existing house on the northeast corner of the property that will be removed prior
to construction of phase 8.
In this written statement, Springfield Development Code (SDC) 5.12-145 Land Divisions –
Partitions and Subdivisions Plat Criteria are addressed to demonstrate that this application
clearly meets all of the SDC requirements and criteria. Within this document, the SDC text
excerpts are in italics and the applicant’s responses are in plain text.
SDC 5.12-115 Plat Criteria
The Director, in consultation with the City Surveyor and City Engineer, shall approve or deny
the Plat. Approval shall be based on compliance with the following criteria:
A. The lot/parcel dimensions shall conform to the minimum standards of this code. When
lots/parcels are more than double the minimum are permitted by the zoning district, the
Director shall require that these lots/parcels be arranged:
The proposed lots are in conformance with the minimum standards of Springfield
development code. There are 12 lots in Phase 7 that range from 2,695 square feet to
2,700 square feet. A minor variance application will be submitted concurrent with
the tentative subdivision to request these lots to remain below the 3,000 sf
minimum requirement.
B. Double frontage lots/parcels shall be avoided, unless necessary to prevent access to
residential development from collector and arterial streets or to overcome specific
topographic situations.
No double frontage lots are proposed as part of this subdivision
C. Panhandle lots/parcels shall comply with the standards specified in SDC 3.2.215 and
4.2.120(A). In the case of multiple panhandles in Subdivisions, construction of necessary
utilities to serve all approved panhandle lots/parcels shall occur prior to recording the Plat.
No panhandle lots are proposed as part of this subdivision.
D. Public street standards as specified in SDC 4.2.105 (block length)
All block lengths are less than 600 feet except the sections between S. 53rd Street and S.
54th Street. These are closer to 700 feet due to topography on the site making it difficult
to meet the 600 foot requirement in these (3) sections. The applicant requests this
additional length due to site constraints. Traffic circulation is adequate with the blocks
as shown on the tentative site plan.
SDC 5.12-120 Tentative Plan Submittal Requirements
A. General Requirements
1) The Tentative Plan, including any required Future Development Plan, shall be
prepared by an Oregon Licensed Professional Land Surveyor on standard sheets of 18
inches x 24 inches. The services of an Oregon Licensed Professional Engineer may also be
required by the City in order to resolve utility issues (especially stormwater management,
street design and transportation issues), and site constraint and/or water quality issues.
The tentative plan has been prepared by Scott Morris, PE of A & O Engineering, and
Brent Corning, PLS of EGR and Associates in order to adequately and comprehensively
address all standards and requirements of this code, including stormwater
management, street design, transportation issues and site constraints. A landscape
architect has completed the stormwater planting sheets.
(2) The scale of the Tentative Plan shall be appropriate to the area involved and the
amount of detail and data, normally 1 inch = 50 feet, 1 inch = 100 feet, or 1 inch = 200 feet.
A scale of 1 inch = 80 feet has been used to be able to show the entire development
area on one plan sheet.
(3) A north arrow and the date the Tentative Plan was prepared.
A north arrow and date are included on the tentative subdivision plan drawing set that
is being submitted with this application.
(4) The name and address of the owner, applicant, if different, and the Land Surveyor
and/or Engineer who prepared the Partition Tentative Plan.
All of the above information has been included on the cover sheet of this narrative and
is also located on the plan set included with this submittal.
(5) A drawing of the boundaries of the entire area owned by the partitioner or subdivider of
which the proposed land division is a part.
The boundaries of subject property are shown on the site plan.
(6) City boundaries, the Urban Growth Boundary (UGB) and any special service district
boundaries or railroad right-of-way, which cross or abut the proposed land division.
The remainder of the Woodland Ridge development is within the Springfield city limits.
The annexation was completed on March 4th, 2024. The panhandle portion of the
property adjacent to the Woodland Ridge land is in the process of being annexed and
will be annexed prior to construction. The portion of the adjacent property where the
existing house is located was annexed to city of Springfield by the previous owner.
(7) Applicable zoning districts and the Metro Plan designation of the proposed land
division and of properties within 100 feet of the boundary of the subject property.
The subject property is zoned LDR (Low Density Residential) and designated Low
Density in the Metro Plan. All adjacent properties to the East and South are designated
for low-density residential zoning.
(8) The dimensions (in feet) and size (either in square feet or acres) of each lot/parcel and
the approximate dimensions of each building site, where applicable, and the top and toe of cut
and fill slopes to scale.
The proposed lot sizes (square feet) are clearly labeled on the attached tentative
subdivision plan drawing set.
(9) The location, outline to scale and present use of all existing structures to remain on the
property after platting and their required setbacks from the proposed new property lines.
There is one existing house on the North East corner of the property that will be
removed prior to construction of phase 8.
(10) The location and size of existing and proposed utilities and necessary easements and
dedications on and adjacent to the site, including, but not limited to, sanitary sewer mains,
stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate
the proposed connection points.
The City of Springfield has an existing wastewater trunk line that runs through the
property on the South side in a public utility easement. This existing system will provide
service stubs to the project at various locations with new mainlines installed in rights of
way to serve the individual house development.
The development will include the construction of three stormwater management facilities
to serve the project. The facilities will include a collection system (curb inlets and
mainlines) which will be routed to one of three detention and treatment ponds within the
project area. The stormwater run-off will be treated per requirements in the updated 2024
Springfield stormwater code. Treated stormwater will then be detained within the ponds
and metered out through underdrains under the soil media and weir outlet structures
similar to Woodland Ridge Phase 3 to keep post-construction peak flow rates at or below
the existing condition. The run-off will then be routed to historic drainage path offsite.
Springfield Utility Board has provided a master water service plan for the development of
all phases of Woodland Ridge. The routing plan is prescriptive and will provide
connection points at :
• Holly Street (West End) - This has been constructed as part of Woodland Ridge
phase 3.
• South 51st Place (North) - This has been constructed as part of Woodland Ridge
phase 3
• Holly Street (East End) - Future connection to the existing facilities in Pinehurst
Subdivision.
• Pinehurst Street (East End) – Future connection to existing facilities in Pinehurst
Subdivision
Sub Electric - There are existing electric utility connections at Holly Street (West & East),
South 51st Place (North) and Pinehurst Street (East) to serve the proposed development.
SUB electric has indicated there is adequate capacity to serve this development.
Comcast Cable - There are existing cable utility connections at Holly Street (West &
East), South 51st Place (North) and Pinehurst Street (East) to serve the proposed
development. Comcast has indicated there is adequate capacity to serve this
development.
NW Natural Gas - There are existing natural gas connections at Holly Street (West &
East), South 51st Place (North) and Pinehurst Street (East) to serve the proposed
development. NW Natural Gas has indicated there is adequate capacity to serve this
development.
See the plan set dated 5-10-2024 for more information on the existing and proposed
utilities within the development.
(11) The locations, widths and purpose of all existing or proposed easements on and
abutting the proposed land division; the location of any existing or proposed reserve strips.
All proposed public and private easements are shown on the attached Civil Engineering
Plan drawing set
(12) The locations of all areas to be dedicated or reserved for public use, with the purpose,
condition or limitations of the reservations clearly indicated.
The attached Civil Engineering Utility Plan sheets show the areas to be dedicated to the
public for streets, sidewalks and public utilities. Tracts are also shown around the
stormwater detention facilities that are proposed to be dedicated to the City of
Springfield for long term ownership/maintenance.
B. A Site Assessment of the Entire Development Area
Existing wetlands on site as well as proposed impacts are shown on included Civil
engineering plans. A joint fill permit will be obtained (if necessary) prior to any work
within the boundaries of the delineated and concurred wetland area. There are no
delineated wetlands in the phase 5 development area.
The proposed site is located outside of the 100-year floodplain and floodway
boundaries of the site. The proposed site is outside of the 100 year flood zone,
therefore it is not applicable.
There are no physical features that preclude development on the proposed property.
A tree felling permit will be submitted prior to start of construction for each phase
where trees will be required to be removed.
The soil types on the proposed property include (per web soil survey):
Salkum Silty Clay Loam, 2 to 8 percent slopes
Salkum Silty Clay Loam, 8 to 16 percent slopes
Linslaw Loam
C. A Stormwater Management Plan
A stormwater management plan for the development showing compliance with the
applicable provisions of SDC 4.3.110 and the Engineering Design Standards and
Procedures Manual has been included with this submittal.
D. A response to Transportation issues
A Traffic Impact study has been completed and is included as part of this submittal. All
proposed streets and parking have been designed in compliance with City of
Springfield development code.
E. A Future Development Plan
Street connectivity throughout Woodland Ridge and adjacent streets have been shown
on the included plan set. A TIA has also been completed and included with this
submittal.
The existing lot East of phase 8 (including the panhandle portion to Mt. Vernon) has
recently been purchased by the applicant. Therefore, right of way for extension of
roadways and utilities to the Pinehurst Subdivision can be dedicated when appropriate.
Development of the lot will be included in Phase 8 Construction.
Properties to the West, North and East have been fully developed and there is a railroad
mainline along the entire South property line. Therefore, no other future extensions are
available or proposed.
(1) Discusses the timing and financial provisions relating to phasing.
There are 8 phases proposed in total for Woodland Ridge. This submittal is
covering phases 5-8. See table for building timeline.
Phase 5 53 Lots Fall 2024
Phase 6 51 Lots Spring 2025
Phase 7 69 Lots Fall 2025
Phase 8 46 Lots Spring 2026
The above proposed construction/plat schedule is contingent on market
conditions. Each phase will have bonding of public improvements as
required by City of Springfield prior to plat recording of each phase.
5.12.125 Tentative Plan Criteria
(A) The request conforms to the provisions of this code pertaining to lot/parcel size and
dimensions.
The average lot size is 4,415 square feet which conforms with Springfield
Development Code standards. There are 12 lots below the 3,000 square foot
minimum which is being addressed with a minor variance application
concurrent with this submittal. The average lot frontage is 45 feet, meeting
the needs of the development as well as the City of Springfield housing
goals.
(B) Capacity requirements of public and private facilities, including but not limited to,
water and electricity; sanitary sewer and stormwater management facilities; and
streets and traffic safety controls shall not be exceeded and the public
improvements shall be available to serve the site at the time of development,
unless otherwise provided for by this code and other applicable regulations. The
Director or a utility provider shall determine capacity issues.
There is an existing wastewater trunk line running on the South end of the
property that accounted for flow from this basin, so there is adequate
capacity to serve the proposed development.
SUB water has also provided a schematic water design and confirmed there
is adequate water supply to serve the development including the area above
the 550 foot elevation which is considered “high level service area”.
All other utilities are available to the site and have adequate capacity.
(C) The proposed land division shall comply with all applicable public and private
design and construction standards contained in this code and other applicable
regulations.
The proposed land division is in compliance with all applicable public and
private design and constructions standards within this code and other
applicable regulations.
(D) Physical features, including, but not limited to: steep slopes with unstable soil or
geologic conditions; areas with susceptibility of flooding; significant clusters of trees
and shrubs; watercourses shown on the WQLW Map and their associated riparian
areas; other riparian areas and wetlands specified in SDC 4.3.117; rock
outcroppings; open spaces; and areas of historic and/or archaeological
significance, as may be specified in SDC 3.3.900 or ORS 97.740.760, 358.905.955
and 390.235.240, shall be protected as specified in this code or in State or Federal
law.
A wetland delineation was completed and concurred by Division of State
Lands and Army Corp of Engineers and is shown on the site plan. In
addition, a geotechnical investigation was completed by GeoPacific
Engineering Inc. and their report is included with the tentative submittal.
There are no physical features that would prevent developing the property as
designed and shown on the proposed site plan.
(E) Parking areas and ingress-egress points have been designed to: facilitate vehicular
traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity
within the development area and to adjacent residential areas, transit stops,
neighborhood activity centers, and commercial, industrial and public areas;
minimize driveways on arterial and collector streets as specified in this code or
other applicable regulations and comply with the ODOT access management
standards for State highways.
The site plan shows proposed parking, vehicle traffic, bicycle, and pedestrian
safety measures that comply with City of Springfield development code. A
TIA has been included with this submittal for reference.
(F) Development of any remainder of the property under the same ownership can be
accomplished as specified in this code.
Due to wetlands and geotechnical issues on the ridge, no additional site
development is proposed.
(G) Adjacent land can be developed or is provided access that will allow its
development as specified in this code.
The proposed development is designed in such a way that adjacent land has
been provided access to and is able to be developed in the future.
The site abuts the railroad tracks and Jasper Road on the south site. On the
west, east and north is existing residential development. On the east is
existing residential development.
5.12.130 Tentative Plan Conditions
(A) Dedication of Right-of-Way and/or Utility Easements.
(1) Right-of-way, when shown in the Springfield Transportation System Plan (including
the Conceptual Street Map), the transportation elements of refinement plans, or as
specified in Table 4.2.1.
(2) Easements as specified in SDC 4.3.140, when necessary to provide services,
including, but not limited to: sanitary sewers, stormwater management, water and
electricity, to the site and neighboring properties. The dedication of easements shall also
include any easements required to access and maintain watercourses or wetlands that are
part of the City’s Stormwater Management System.
All proposed tracts, rights of way and easements are shown on the proposed site plan.
The rights of way and tracts within each phase will be dedicated and conveyed as each
phase plat is recorded.
TRACTS S.F. PROPOSED USE
R 10,226 SF Conveyed to HOA for open space buffer
S 75,540 SF Conveyed to HOA for open space buffer
T 14,357 SF Conveyed to HOA for open space buffer
U 32,950 SF Conveyed to City for Maintenance - storm management facility
V 42,746 SF Conveyed to City for Maintenance - storm management facility
W 34,657 SF Conveyed to City for Maintenance - storm management facility
J 347,090 SF Conveyed to HOA for open space buffer / wetland preservation
All tracts will be created as part of the phase 5 plat. However, only tracts within each
development phase will be conveyed after the corresponding phase has been
constructed.
Tracts R, S and U will be maintained by the HOA to insure they do not become an
eyesore and control potential problems with transient population.
Tract J was created as part of the Woodland phase 3 plat, but will be re-platted to a new
configuration as part of the phase 5 plat. This will be conveyed to the HOA after phase
7 construction is completed and all wetland permit conditions have been satisfied.
(C) Installation of traffic signals and signs; restricting access to and from arterial or
collector streets; requiring a frontage road; restricting and strategically locating driveways;
and/or requiring the joint use of driveways to serve 2 or more lots/parcels through a Joint
Use/Access Agreement when transportation safety issues are identified by the Transportation
Planning Engineer and/or a Traffic Impact Study.
No new traffic signals are proposed as part of this subdivision. No joint use driveways
are proposed as part of this subdivision. The developer has agreed to pay a
proportionate share for a future traffic signal at Daisy Street and Bob Straub Parkway as
part of the existing annexation agreement.
(D) Modification of the layout of parcel lines caused by the location of streets, required
stormwater management systems, including, but not limited to: swales and detention basins or
when required by the Geotechnical report specified in SDC 5.12.120.
A geotechnical report has been prepared and is included in this submittal. The only
geotechnical item that required moving a road is at the North end of the site. The
proposed extension of Cedar View drive through phase 8 is required to angle further
South away from the ridge due to an old potential landslide hazard. This is shown on
the site plan sheet and addresses the geotechnical concern in the area.
(G) Submittal of a Land and Drainage Alteration Permit.
A Land and Drainage Alteration Permit is planned to submitted for all phases to be
released upon tentative land use approval and issuance of the 1200c permit. The 1200c
permit will be obtained from the Department of Environmental Quality prior to the start
of any grading on the project site.
Revised 2/25/11 1 of 4
City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
Minor Variance
Required Project Information (Applicant: complete this section)
Applicant Name: Phone:
Company: Fax:
Address:
Applicant’s Rep.: Phone:
Company: Fax:
Address:
Property Owner: Phone:
Company: Fax:
Address:
ASSESSOR'S MAP NO: TAX LOT NO(S):
Property Address:
Size of Property: Acres Square Feet
Description of
Proposal:
If you are filling in this form by hand, please attach your proposal description to this application.
Existing Use:
Numeric Standard to be Adjusted (See SDC 5.21-125 A. for standards that may be adjusted):
Percentage of Standard to be Adjusted:
Signatures: Please sign and print your name and date in the appropriate box on the next page.
Required Project Information (City Intake Staff: complete this section)
Associated Applications: Signs:
Case No.: Date: Reviewed by:
Application Fee: $ Technical Fee: $ Postage Fee: $
TOTAL FEES: $ PROJECT NUMBER:
Brian Thoreson 541-912-6607
Hayden Homes LLC
2464 SW Glacier Pl #110 Redmond, OR 97756
Scott Morris 541-302-9790
A & O Engineering LLC
380 Q Street Suite 200 Springfied, OR 97477
Will Goodwin 503-936-3852
SSR Investments LLC
PO Box 2617 Eugene, OR 97402
18-02-04-00 3800, 3500
5410 Mt Vernon Rd Springfield, OR 97478, near Mt Vernon
36.1 x
12 of the proposed lots are under 3000 SF
vacant
lot square footage minimum, see narrative for detail10% decrease, see narrative for detail
Minor Variance Narrative
Woodland 5 -8
Map 18-02-04-00, Tax Lots 3800,3500
This narrative is for a minor variance application for the Woodland 5-8 proposed subdivision. Woodland
Ridge 5-8 is an expansion of the existing Woodland Ridge Subdivision (case #811-18-000007-TYP2, case
#811-22-000040-TYP2). This minor variance application is concurrent with the Tentative Plan application
for Woodland Ridge Phase 5-8. See submittal for additional details on the proposal.
There are 12 lots in phase 7 of the proposed Woodland Ridge Subdivision that we are requesting a
minor variance to be below the 3,000 square foot minimum lot requirement (see table below).
In discussion with the Planning Director at the City of Springfield, he indicated that this request would be
allowed with a minor variance. The proposed variance is approximately 10% from the City standard.
Lots #
Square
Ft
356 2700
357 2700
358 2700
359 2700
360 2700
361 2700
388 2700
387 2700
370 2700
371 2700
372 2700
373 2695
The applicant has demonstrated that all of the City of Springfield’s goals as well as the owners needs can
be met with the proposed lot size.
Given the constraints on the proposed site, the lot reduction is the minimum necessary to fit the needs of
both the builder and the surrounding conditions. The layout was designed this way to minimize wetland
impact while also meeting the road requirements and not impede emergency access to the site.
There are some trees within the phase 7 development boundary. A tree felling permit application will be
submitted to City of Springfield during the phase 7 PIP Process.
No public or private easements are being impacted with this proposal.
Please contact Scott Morris at A & O Engineering LLC for any additional questions by phone (541) 302-
9790 or email (scottmorris@ao-engr.com).