Loading...
HomeMy WebLinkAboutPlans Applicant 5/10/2024Revised 1/7/14 kl 1 of 10 City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Land Division Tentative Plan Partition, Subdivision Application Type (Applicant: check one) Partition Tentative Pre-Submittal: Subdivision Tentative Pre-Submittal: Partition Tentative Submittal: Subdivision Tentative Submittal: Required Project Information (Applicant: complete this section) Applicant Name: Phone: Company: Fax: Address: Applicant’s Rep.: Phone: Company: Fax: Address: Property Owner: Phone: Company: Fax: Address: ASSESSOR'S MAP NO: TAX LOT NO(S): Property Address: Size of Property: Acres Square Feet Proposed Name of Subdivision: Description of Proposal: If you are filling in this form by hand, please attach your proposal description to this application. Existing Use: # of Lots/Parcels: Total acreage of parcels/ allowable density: Proposed # Dwell Units Signatures: Please sign and print your name and date in the appropriate box on the next page. Required Project Information (City Intake Staff: complete this section) Associated Applications: Signs: Pre-Sub Case No.: Date: Reviewed by: Case No.: Date: Reviewed by: Application Fee: $ Technical Fee: $ Postage Fee: $ TOTAL FEES: $ PROJECT NUMBER: Brian Thoreson 541-912-6607 Hayden Homes 2464 SW Glacier Pl #100 Redmond, OR 97756 Scott Morris 541-302-9790 A & O Engineering LLC 380 Q Street Suite 200 Springfield, OR 97477 Will Goodwin PO Box 2617 Eugene, OR 97402 18-02-04-00 3800,3500,307 5410 Mt Vernon Rd Springfield, OR 97478; near Mt Vernon 38.26 x Woodland Ridge Phase 5 - 8 single family lots - addition to Woodland Ridge Subdivision vacant 207 SSR Investments LLC (503) 936-3852 x Revised 1/7/14 kl 5 of 10 Planning Division staff strives to conduct pre-submittal meetings within five to seven working days of receiving an application. 2.Applicant and the City Conduct the Pre-Submittal Meeting The applicant, owner, and design team are strongly encouraged to attend the pre- submittal meeting. The meeting is held with representatives from Public Works Engineering and Transportation, Community Services (Building), Fire Marshall’s office, and the Planning Division and is scheduled for 30 to 60 minutes. The Planner provides the applicant with a Pre-Submittal Checklist specifying the items required to make the application complete if it is not already complete, and the applicant has 180 days submit a complete application to the City. 3. Applicant Submits a Complete Application, City Staff Review the Application and Issue a Decision A complete application must conform to the Land Division Tentative Submittal Requirements Checklist on pages 4-6 of this application packet. A Type II decision, made after public notice, but without a public hearing, unless appealed, is issued within 120 days of submittal of a complete application. Mailed notice is provided to property owners and occupants within 300 feet of the property being reviewed and to any applicable neighborhood association. In addition, the applicant must post one sign, provided by the City, on the subject property. There is a 14-day public comment period, starting on the date notice is mailed. Applications are distributed to the Development Review Committee, and their comments are incorporated into a decision that addresses all applicable approval criteria and/or development standards, as well as any written comments from those given notice. Applications may be approved, approved with conditions, or denied. At the applicant’s request, the Planner can provide a copy of the draft land use decision prior to issuing the final land use decision. The City mails the applicant and any party of standing a copy of the decision, which is effective on the day it is mailed. The decision issued is the final decision of the City but may be appealed within 15 calendar days to the Planning Commission or Hearings Official. Land Division Tentative Submittal Requirements Checklist NOTE: Revised 1/7/14 kl 6 of 10   ALL of the following items MUST be submitted for BOTH Pre-Submittal and Submittal. If you feel an item on the list below does not apply to your specific application, please state the reason why and attach the explanation to this form. Application Fee – refer to the Development Code Fee Schedule for the appropriate fee calculation formula. A copy of the fee schedule is available at the Development & Public Works Department. Any applicable application, technology, and postage fees are collected at the pre-submittal and submittal stages. Land Division Tentative Application Form Narrative explaining the purpose of the proposed development, the existing use of the property, and any additional information that may have a bearing in determining the action to be taken. Density - list the size of property (acres), maximum allowable density and the density proposed. Copy of the Deed Copy of a Preliminary Title Report issued within the past 30 days documenting ownership and listing all encumbrances. Copy of the Land Division Plan Reduced to 8½”x 11”, which will be mailed as part of the required neighboring property notification packet. Right-of-Way Approach Permit Application provided where the property has frontage on an Oregon Department of Transportation (ODOT) facility. Three (3) Copies of the Stormwater Management System Study with Completed Stormwater Scoping Sheet Attached - The plan, supporting calculations, and documentation must be consistent with the Engineering Design Standards and Procedures Manual. Three (3) Copies of the Traffic Impact Study prepared by a Traffic Engineer in accordance with SDC 4.2-105 A.4. Traffic Impact Studies (TIS) allow the City to analyze and evaluate the traffic impacts and mitigation of a development on the City’s transportation system. In general, a TIS must explain how the traffic from a given development affects the transportation system in terms of safety, traffic operations, access and mobility, and immediate and adjoining street systems. A TIS must also address, if needed, City, metro plan and state land use and transportation policies and objectives. Four (4) Copies of the Following Plan Sets for Pre-Submittal OR Three (3) Copies of the Following Plan Sets: All of the following plans must include the scale appropriate to the area involved and sufficient to show detail of the plan and related data, north arrow, and date of preparation. All plan sets must be folded to 8½” by 11” and bound by rubber bands. a.Site Assessment of Existing Conditions Prepared by an Oregon licensed Landscape Architect or Engineer Revised 1/7/14 kl 7 of 10 Vicinity Map The name, location, and dimensions of all existing site features including buildings, curb cuts, trees, and impervious surface areas, clearly indicating what is remaining and what is being removed. For existing structures to remain, also indicate present use and required setbacks from proposed property lines. The name, location, dimensions, direction of flow and top of bank of all watercourses and required riparian setback that are shown on the Water Quality Limited Watercourse Map on file in the Development & Public Works Department The 100-year floodplain and floodway boundaries on the site, as specified in the latest adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead Protection Areas Map on file in the Development & Public Works Department Physical features including, but not limited to trees 5” in diameter or greater when measured 4 ½ feet above the ground, significant clusters of trees and shrubs, riparian areas, wetlands and rock outcroppings Soil types and water table information as mapped and specified in the Soils Survey of Lane County. A Geotechnical Report prepared by an Engineer must be submitted concurrently if the Soils Survey indicates the proposed development area has unstable soils and/or a high water table b.Land Division Tentative Plan Prepared by an Oregon licensed Land Surveyor City boundaries, the Urban Growth Boundary, and any special service district boundaries or railroad right-of-way which cross or abut the proposed land division Location and width of all existing and proposed easements on and abutting the proposed land division Boundaries of entire area owned by the property owner, of which the proposed land division is a part, as well as dimensions and size of each parcel and the approximate dimensions of each building site indicating the top and toe of cut and fill slopes to scale Location and type of existing and proposed street lighting, including type, height, and area of illumination Location, widths, conditions, and names of all existing and proposed streets, alleys, dedications or other right-of-ways within or adjacent to the proposed land division. Proposed streets should also include approximate radius of curves and grades and relationship to any projected streets as shown on the Metro Plan, TransPlan, Conceptual Development Plan, or Conceptual Local Street Map. Location of existing and required traffic control devices, fire hydrants, power poles, transformers, neighborhood mailbox units and similar public facilities Location and dimensions of existing and proposed driveways Location of existing and proposed transit facilities Location and width of all existing and proposed sidewalks, sidewalk ramps, pedestrian access ways and bike trails Location, size and type of plantings and street trees in any required planter strip Location and size of existing and proposed utilities on and adjacent to the site including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points The locations of all areas to be dedicated or reserved for public use, with the purpose, condition or limitations of the reservations clearly indicated Future Development Plan where phasing or large lots/parcels are proposed as specified in SDC 5.12-120 E. c.Stormwater Management Plan Prepared by an Oregon licensed Civil Engineer Planting plan prepared by an Oregon licensed Landscape Architect where plants are proposed as part of the stormwater management system Roof drainage patterns and discharge locations Pervious and impervious area drainage patterns The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater quality measures; and natural drainageways to be retained Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for land with a slope over 10 percent, the contour lines may be at 5 foot intervals) Amount of proposed cut and fill Additional Materials That May be Required IT IS THE APPLICANT’S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS/APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD CONSIDER UTILIZING PRE-DEVELOPMENT MEETINGS AS DISCUSSED IN SDC 5.1-120: Proposed deed restrictions and a draft of any Homeowner’s Association Agreement Additional plans and documentation for submittal of a Cluster Subdivision proposal as specified in SDC 3.2-230 Riparian Area Protection Report for properties located within 150 feet of the top of bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the top of bank of any direct tributaries of WQLW A Geotechnical Report prepared by an engineer must be submitted concurrently if there are unstable soils and/or a high water table present Where the development area is within an overlay district, address the additional standards of the overlay district If five or more trees are proposed to be removed, a Tree Felling Permit as specified in SDC 5.19-100 A wetland delineation approved by the Oregon Division of State Lands must be submitted concurrently where there is a wetland on the property Any required federal or state permit must be submitted concurrently or evidence the permit application has been submitted for review Where any grading, filling or excavating is proposed with the development, a Land and Drainage Alteration permit must be submitted prior to development CITY OF SPRINGFIELD, OREGON 225 FIFTH STREET Where applicable, any Discretionary Use or Variance as specified in SDC 5.9-100 and 5.21-100 An Annexation application, as specified in SDC 5.7-100, where a development is be served by sanitary sewer proposed outside of the city limits but within the City’s urban service area and can All public improvements proposed to be installed and to include the approximate time of installation and method of financing DEVELOPMENT AND PUBLIC WORKS SPRINGFIELD, OR 97477 PHONE: 541.726.3753 FAX: 541.736.1021 www.springfield-or.gov December 6, 2013 REQUIRED STORMWATER SCOPING SHEET USE POLICY: In October 2003, Springfield Public Works released a trial “stormwater scoping sheet,” provided to help engineers and developers meet stormwater requirements in the Springfield Development Code (SDC) and Engineering Design Standards and Procedures Manual (EDSPM). After a five month trial period, it became apparent that users of the scoping sheet submitted much more complete applications than non-users. An added bonus was a decrease in the overall review time spent on the applications, resulting in quicker notice of decisions. As a result of the benefits of the scoping sheets, the City has decided to make their use a mandatory process. Current city policy is that the use of stormwater scoping sheets is required for all applications which require development review. All applications submitted to the City shall provide a copy of a completed stormwater scoping sheet with the application packet. Attached with this letter is the latest version of the scoping sheet, which reflects changes requested by the development community. PLEASE NOTE: SUBMITTED APPLICATIONS WILL NOW BE REQUIRED TO SUBMIT A COMPLETED STORMWATER SCOPING SHEET, STORMWATER STUDY AND PLANS IN CONFORMANCE WITH THE SCOPE REQUIREMENTS DIRECTIONS FOR USING STORMWATER SCOPING SHEETS ARE AS FOLLOWS: 1.) Obtain scoping sheet from application packet, city website, or other location. 2.) Fill out project information (top half of front sheet) prior to commencement of work on stormwater study. (Note: Do not sign scoping sheet until it is received from the City with requirements checked.) 3.) Mail, fax, or email all pages to: City of Springfield, Development and Public Works Dept., Attn: Clayton McEachern. 4.) Receive completed scoping sheet (filled out by the City) indicating minimum requirements for a complete stormwater study. 5.) Include four (4) copies of complete scoping sheet (signed by engineer at the bottom of page 2), stormwater study and plans that comply with the minimum required scope with submittal of application packet. The scoping sheet shall be included as an attachment, inside the front cover of the stormwater study. Stormwater scoping sheets can be found with all application packets (City website and the DPW front counter) as well as on the Engineering and Construction Resources webpage located at: http://www.springfield- or.gov/DPW/EngineeringandConstructionResources.htm under the Public Improvement Permit Projects Forms section. Thank you in advance for working with the City of Springfield with this new process. Sincerely, Clayton McEachern, PE City of Springfield, Development and Public Works Email: cmceachern@springfield-or.gov Phone: (541) 736 – 1036 Fax: (541) 736 – 1021 CITY OF SPRINGFIELD, OREGON DEVELOPMENT AND PUBLIC WORKS 225 FIFTH STREET SPRINGFIELD, OR 97477 PHONE: 541.726.3753 FAX: 541.726.1021 www.springfield-or.gov STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK ------------------------------------------------- (Area below this line filled out by Applicant) -------------------------------------------------- (Please return to Clayton McEachern @ City of Springfield Development and Public Works; Fax # 736-1021, Phone # 736-1036), email:cmceachern@springfield-or.gov Project Description (Include a copy of Assessor’s map): Applicant: Approx. Impervious Area: Project Name: Date: Phone #: Land Use(s): Email: Assessors Parcel #: Project Size (Acres): Fax #: Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary: Proposed Stormwater Best Management Practices: --------------------------------- (Area below this line filled out by the City and Returned to the Applicant) ---------------------------- (At a minimum, all boxes checked by the City on the front and back of this sheet shall be submitted for an application to be complete for submittal, although other requirements may be necessary.) Drainage Study Type (EDSPM Section 4.03.2): (Note, UH may be substituted for Rational Method) Small Site Study – (use Rational Method for calculations) Mid-Level Development Study – (use Unit Hydrograph Method for calculations) Full Drainage Development Study – (use Unit Hydrograph Method for calculations) Environmental Considerations: Soil Type: Floodway/Floodplain: Other Jurisdictions Hillside Development: Wellhead Zone: Wetland/Riparian: Downstream Analysis: N/A Flow line for starting water surface elevation: Design HGL to use for starting water surface elevation: Manhole/Junction to take analysis to: Return to Clayton McEachern @ City of Springfield, email: cmceachern@springfield-or,gov, FAX: (541) 736-1021 For Official Use Only: COMPLETE STUDY ITEMS *Based upon the information provided on the front of this sheet, the following represents a minimum of what is needed for an application to be complete for submittal with respect to drainage; however, this list should not be used in lieu of the Springfield Development Code (SDC) or the City’s Engineering Design Manual. Compliance with these requirements does not constitute site approval; Additional site specific information may be required. Note: Upon scoping sheet submittal, ensure completed form has been signed in the space provided below: Req’d N/A Calculations showing system capacity for a 2-year storm event and overflow effects of a 25-year storm event. Other/Miscellaneous A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map. Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set. A downstream drainage analysis as described in EDSPM Section 4.03.4.C. On-site drainage shall be governed by the Oregon Plumbing Specialty Code (OPSC). Private stormwater easements shall be clearly depicted on plans when private stormwater flows from one property to another. The time of concentration (Tc) shall be determined using a 10 minute start time for developed basins. Interim Design Standards/Water Quality (EDSPM Chapter 3) Where required, vegetative stormwater design shall be consistent with design standards (EDSPM Section 3.02), set forth in Chapter 2 of the Eugene Stormwater Management Manual. For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified by the Eugene Stormwater Management Manual (Sec2.4.1). Water Quality calculations as required in Section 3.03.1 of the EDSPM. General Study Requirements (EDSPM Section 4.03) Detention ponds shall be designed to limit runoff to pre-development rates for the 2 through 25-year storm events. Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon. Manning’s “n” values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to achieve a minimum velocity of three (3) feet per second at 0.5 pipe full based on Table 4-1 as well. Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site drains. Elevations of the HGL and flow lines for both city and private systems where applicable. All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall All non-building rooftop (NBR) impervious surfaces shall be pre-treated (e.g. multi-chambered catchbasin w/oil filtration media) for stormwater quality. Additionally, a minimum of 50% of the NBR impervious surface shall be treated by vegetated methods. Review of Downstream System (EDSPM Section 4.03.4.C) If a stormwater treatment swale is proposed, submit calculations/specifications for sizing, velocity, flow, side slopes, bottom slope, and seed mix consistent with City of Springfield or Eugene’s Stormwater Management Manual. be provided with secondary containment or weather resistant enclosure. Design of Storm Systems (EDSPM Section 4.04). Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs, with the exception of residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to the website: http://www.deq.state.or.us/wq/uic/uic.htm for more information. Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,000 lb load without failure of the pipe structure. *This form shall be included as an attachment, inside the front cover, of the stormwater study. * IMPORTANT: ENGINEER PLEASE READ BELOW AND SIGN! As the engineer of record, I hereby certify the above required items are complete and included with the submitted stormwater study and plan set. Sginature Date . Form Version 5: June 2015 Document Date May 10, 2024 Applicant’s Request Woodland 5-8 Subdivision Property Owner/Applicant Brian Thoreson Hayden Homes LLC 2464 SW Glacier Pl Ste 100 Redmond, OR 97756 Property Owner SSR Investments PO Box 2617 Eugene, OR 97402 Applicant’s Representative Scott Morris, PE A & O Engineering, LLC 380 Q St, Ste 200 Springfield, OR 97477 Subject Property Assessors Map 18-02-04-00 Tax Lot 3800,3500,307 Location 5410 Mt Vernon Rd Springfield, OR 97478 Property Size 38.26 Acres Zoning LDR (Low Density Residential Background This is an application for the tentative plat of Woodland Ridge Phases 5 through 8 to create 219 residential lots and supporting infrastructure. This is the next addition of the existing Woodland Ridge Subdivision (case #811-18-000007-TYP2). The subject property is located in Springfield and is zoned Low Density Residential (LDR) Annexation of the subject property was completed on March 4th, 2024 as part of ordinance No. 6474. There is one existing house on the northeast corner of the property that will be removed prior to construction of phase 8. In this written statement, Springfield Development Code (SDC) 5.12-145 Land Divisions – Partitions and Subdivisions Plat Criteria are addressed to demonstrate that this application clearly meets all of the SDC requirements and criteria. Within this document, the SDC text excerpts are in italics and the applicant’s responses are in plain text. SDC 5.12-115 Plat Criteria The Director, in consultation with the City Surveyor and City Engineer, shall approve or deny the Plat. Approval shall be based on compliance with the following criteria: A. The lot/parcel dimensions shall conform to the minimum standards of this code. When lots/parcels are more than double the minimum are permitted by the zoning district, the Director shall require that these lots/parcels be arranged: The proposed lots are in conformance with the minimum standards of Springfield development code. There are 12 lots in Phase 7 that range from 2,695 square feet to 2,700 square feet. A minor variance application will be submitted concurrent with the tentative subdivision to request these lots to remain below the 3,000 sf minimum requirement. B. Double frontage lots/parcels shall be avoided, unless necessary to prevent access to residential development from collector and arterial streets or to overcome specific topographic situations. No double frontage lots are proposed as part of this subdivision C. Panhandle lots/parcels shall comply with the standards specified in SDC 3.2.215 and 4.2.120(A). In the case of multiple panhandles in Subdivisions, construction of necessary utilities to serve all approved panhandle lots/parcels shall occur prior to recording the Plat. No panhandle lots are proposed as part of this subdivision. D. Public street standards as specified in SDC 4.2.105 (block length) All block lengths are less than 600 feet except the sections between S. 53rd Street and S. 54th Street. These are closer to 700 feet due to topography on the site making it difficult to meet the 600 foot requirement in these (3) sections. The applicant requests this additional length due to site constraints. Traffic circulation is adequate with the blocks as shown on the tentative site plan. SDC 5.12-120 Tentative Plan Submittal Requirements A. General Requirements 1) The Tentative Plan, including any required Future Development Plan, shall be prepared by an Oregon Licensed Professional Land Surveyor on standard sheets of 18 inches x 24 inches. The services of an Oregon Licensed Professional Engineer may also be required by the City in order to resolve utility issues (especially stormwater management, street design and transportation issues), and site constraint and/or water quality issues. The tentative plan has been prepared by Scott Morris, PE of A & O Engineering, and Brent Corning, PLS of EGR and Associates in order to adequately and comprehensively address all standards and requirements of this code, including stormwater management, street design, transportation issues and site constraints. A landscape architect has completed the stormwater planting sheets. (2) The scale of the Tentative Plan shall be appropriate to the area involved and the amount of detail and data, normally 1 inch = 50 feet, 1 inch = 100 feet, or 1 inch = 200 feet. A scale of 1 inch = 80 feet has been used to be able to show the entire development area on one plan sheet. (3) A north arrow and the date the Tentative Plan was prepared. A north arrow and date are included on the tentative subdivision plan drawing set that is being submitted with this application. (4) The name and address of the owner, applicant, if different, and the Land Surveyor and/or Engineer who prepared the Partition Tentative Plan. All of the above information has been included on the cover sheet of this narrative and is also located on the plan set included with this submittal. (5) A drawing of the boundaries of the entire area owned by the partitioner or subdivider of which the proposed land division is a part. The boundaries of subject property are shown on the site plan. (6) City boundaries, the Urban Growth Boundary (UGB) and any special service district boundaries or railroad right-of-way, which cross or abut the proposed land division. The remainder of the Woodland Ridge development is within the Springfield city limits. The annexation was completed on March 4th, 2024. The panhandle portion of the property adjacent to the Woodland Ridge land is in the process of being annexed and will be annexed prior to construction. The portion of the adjacent property where the existing house is located was annexed to city of Springfield by the previous owner. (7) Applicable zoning districts and the Metro Plan designation of the proposed land division and of properties within 100 feet of the boundary of the subject property. The subject property is zoned LDR (Low Density Residential) and designated Low Density in the Metro Plan. All adjacent properties to the East and South are designated for low-density residential zoning. (8) The dimensions (in feet) and size (either in square feet or acres) of each lot/parcel and the approximate dimensions of each building site, where applicable, and the top and toe of cut and fill slopes to scale. The proposed lot sizes (square feet) are clearly labeled on the attached tentative subdivision plan drawing set. (9) The location, outline to scale and present use of all existing structures to remain on the property after platting and their required setbacks from the proposed new property lines. There is one existing house on the North East corner of the property that will be removed prior to construction of phase 8. (10) The location and size of existing and proposed utilities and necessary easements and dedications on and adjacent to the site, including, but not limited to, sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points. The City of Springfield has an existing wastewater trunk line that runs through the property on the South side in a public utility easement. This existing system will provide service stubs to the project at various locations with new mainlines installed in rights of way to serve the individual house development. The development will include the construction of three stormwater management facilities to serve the project. The facilities will include a collection system (curb inlets and mainlines) which will be routed to one of three detention and treatment ponds within the project area. The stormwater run-off will be treated per requirements in the updated 2024 Springfield stormwater code. Treated stormwater will then be detained within the ponds and metered out through underdrains under the soil media and weir outlet structures similar to Woodland Ridge Phase 3 to keep post-construction peak flow rates at or below the existing condition. The run-off will then be routed to historic drainage path offsite. Springfield Utility Board has provided a master water service plan for the development of all phases of Woodland Ridge. The routing plan is prescriptive and will provide connection points at : • Holly Street (West End) - This has been constructed as part of Woodland Ridge phase 3. • South 51st Place (North) - This has been constructed as part of Woodland Ridge phase 3 • Holly Street (East End) - Future connection to the existing facilities in Pinehurst Subdivision. • Pinehurst Street (East End) – Future connection to existing facilities in Pinehurst Subdivision Sub Electric - There are existing electric utility connections at Holly Street (West & East), South 51st Place (North) and Pinehurst Street (East) to serve the proposed development. SUB electric has indicated there is adequate capacity to serve this development. Comcast Cable - There are existing cable utility connections at Holly Street (West & East), South 51st Place (North) and Pinehurst Street (East) to serve the proposed development. Comcast has indicated there is adequate capacity to serve this development. NW Natural Gas - There are existing natural gas connections at Holly Street (West & East), South 51st Place (North) and Pinehurst Street (East) to serve the proposed development. NW Natural Gas has indicated there is adequate capacity to serve this development. See the plan set dated 5-10-2024 for more information on the existing and proposed utilities within the development. (11) The locations, widths and purpose of all existing or proposed easements on and abutting the proposed land division; the location of any existing or proposed reserve strips. All proposed public and private easements are shown on the attached Civil Engineering Plan drawing set (12) The locations of all areas to be dedicated or reserved for public use, with the purpose, condition or limitations of the reservations clearly indicated. The attached Civil Engineering Utility Plan sheets show the areas to be dedicated to the public for streets, sidewalks and public utilities. Tracts are also shown around the stormwater detention facilities that are proposed to be dedicated to the City of Springfield for long term ownership/maintenance. B. A Site Assessment of the Entire Development Area Existing wetlands on site as well as proposed impacts are shown on included Civil engineering plans. A joint fill permit will be obtained (if necessary) prior to any work within the boundaries of the delineated and concurred wetland area. There are no delineated wetlands in the phase 5 development area. The proposed site is located outside of the 100-year floodplain and floodway boundaries of the site. The proposed site is outside of the 100 year flood zone, therefore it is not applicable. There are no physical features that preclude development on the proposed property. A tree felling permit will be submitted prior to start of construction for each phase where trees will be required to be removed. The soil types on the proposed property include (per web soil survey): Salkum Silty Clay Loam, 2 to 8 percent slopes Salkum Silty Clay Loam, 8 to 16 percent slopes Linslaw Loam C. A Stormwater Management Plan A stormwater management plan for the development showing compliance with the applicable provisions of SDC 4.3.110 and the Engineering Design Standards and Procedures Manual has been included with this submittal. D. A response to Transportation issues A Traffic Impact study has been completed and is included as part of this submittal. All proposed streets and parking have been designed in compliance with City of Springfield development code. E. A Future Development Plan Street connectivity throughout Woodland Ridge and adjacent streets have been shown on the included plan set. A TIA has also been completed and included with this submittal. The existing lot East of phase 8 (including the panhandle portion to Mt. Vernon) has recently been purchased by the applicant. Therefore, right of way for extension of roadways and utilities to the Pinehurst Subdivision can be dedicated when appropriate. Development of the lot will be included in Phase 8 Construction. Properties to the West, North and East have been fully developed and there is a railroad mainline along the entire South property line. Therefore, no other future extensions are available or proposed. (1) Discusses the timing and financial provisions relating to phasing. There are 8 phases proposed in total for Woodland Ridge. This submittal is covering phases 5-8. See table for building timeline. Phase 5 53 Lots Fall 2024 Phase 6 51 Lots Spring 2025 Phase 7 69 Lots Fall 2025 Phase 8 46 Lots Spring 2026 The above proposed construction/plat schedule is contingent on market conditions. Each phase will have bonding of public improvements as required by City of Springfield prior to plat recording of each phase. 5.12.125 Tentative Plan Criteria (A) The request conforms to the provisions of this code pertaining to lot/parcel size and dimensions. The average lot size is 4,415 square feet which conforms with Springfield Development Code standards. There are 12 lots below the 3,000 square foot minimum which is being addressed with a minor variance application concurrent with this submittal. The average lot frontage is 45 feet, meeting the needs of the development as well as the City of Springfield housing goals. (B) Capacity requirements of public and private facilities, including but not limited to, water and electricity; sanitary sewer and stormwater management facilities; and streets and traffic safety controls shall not be exceeded and the public improvements shall be available to serve the site at the time of development, unless otherwise provided for by this code and other applicable regulations. The Director or a utility provider shall determine capacity issues. There is an existing wastewater trunk line running on the South end of the property that accounted for flow from this basin, so there is adequate capacity to serve the proposed development. SUB water has also provided a schematic water design and confirmed there is adequate water supply to serve the development including the area above the 550 foot elevation which is considered “high level service area”. All other utilities are available to the site and have adequate capacity. (C) The proposed land division shall comply with all applicable public and private design and construction standards contained in this code and other applicable regulations. The proposed land division is in compliance with all applicable public and private design and constructions standards within this code and other applicable regulations. (D) Physical features, including, but not limited to: steep slopes with unstable soil or geologic conditions; areas with susceptibility of flooding; significant clusters of trees and shrubs; watercourses shown on the WQLW Map and their associated riparian areas; other riparian areas and wetlands specified in SDC 4.3.117; rock outcroppings; open spaces; and areas of historic and/or archaeological significance, as may be specified in SDC 3.3.900 or ORS 97.740.760, 358.905.955 and 390.235.240, shall be protected as specified in this code or in State or Federal law. A wetland delineation was completed and concurred by Division of State Lands and Army Corp of Engineers and is shown on the site plan. In addition, a geotechnical investigation was completed by GeoPacific Engineering Inc. and their report is included with the tentative submittal. There are no physical features that would prevent developing the property as designed and shown on the proposed site plan. (E) Parking areas and ingress-egress points have been designed to: facilitate vehicular traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity within the development area and to adjacent residential areas, transit stops, neighborhood activity centers, and commercial, industrial and public areas; minimize driveways on arterial and collector streets as specified in this code or other applicable regulations and comply with the ODOT access management standards for State highways. The site plan shows proposed parking, vehicle traffic, bicycle, and pedestrian safety measures that comply with City of Springfield development code. A TIA has been included with this submittal for reference. (F) Development of any remainder of the property under the same ownership can be accomplished as specified in this code. Due to wetlands and geotechnical issues on the ridge, no additional site development is proposed. (G) Adjacent land can be developed or is provided access that will allow its development as specified in this code. The proposed development is designed in such a way that adjacent land has been provided access to and is able to be developed in the future. The site abuts the railroad tracks and Jasper Road on the south site. On the west, east and north is existing residential development. On the east is existing residential development. 5.12.130 Tentative Plan Conditions (A) Dedication of Right-of-Way and/or Utility Easements. (1) Right-of-way, when shown in the Springfield Transportation System Plan (including the Conceptual Street Map), the transportation elements of refinement plans, or as specified in Table 4.2.1. (2) Easements as specified in SDC 4.3.140, when necessary to provide services, including, but not limited to: sanitary sewers, stormwater management, water and electricity, to the site and neighboring properties. The dedication of easements shall also include any easements required to access and maintain watercourses or wetlands that are part of the City’s Stormwater Management System. All proposed tracts, rights of way and easements are shown on the proposed site plan. The rights of way and tracts within each phase will be dedicated and conveyed as each phase plat is recorded. TRACTS S.F. PROPOSED USE R 10,226 SF Conveyed to HOA for open space buffer S 75,540 SF Conveyed to HOA for open space buffer T 14,357 SF Conveyed to HOA for open space buffer U 32,950 SF Conveyed to City for Maintenance - storm management facility V 42,746 SF Conveyed to City for Maintenance - storm management facility W 34,657 SF Conveyed to City for Maintenance - storm management facility J 347,090 SF Conveyed to HOA for open space buffer / wetland preservation All tracts will be created as part of the phase 5 plat. However, only tracts within each development phase will be conveyed after the corresponding phase has been constructed. Tracts R, S and U will be maintained by the HOA to insure they do not become an eyesore and control potential problems with transient population. Tract J was created as part of the Woodland phase 3 plat, but will be re-platted to a new configuration as part of the phase 5 plat. This will be conveyed to the HOA after phase 7 construction is completed and all wetland permit conditions have been satisfied. (C) Installation of traffic signals and signs; restricting access to and from arterial or collector streets; requiring a frontage road; restricting and strategically locating driveways; and/or requiring the joint use of driveways to serve 2 or more lots/parcels through a Joint Use/Access Agreement when transportation safety issues are identified by the Transportation Planning Engineer and/or a Traffic Impact Study. No new traffic signals are proposed as part of this subdivision. No joint use driveways are proposed as part of this subdivision. The developer has agreed to pay a proportionate share for a future traffic signal at Daisy Street and Bob Straub Parkway as part of the existing annexation agreement. (D) Modification of the layout of parcel lines caused by the location of streets, required stormwater management systems, including, but not limited to: swales and detention basins or when required by the Geotechnical report specified in SDC 5.12.120. A geotechnical report has been prepared and is included in this submittal. The only geotechnical item that required moving a road is at the North end of the site. The proposed extension of Cedar View drive through phase 8 is required to angle further South away from the ridge due to an old potential landslide hazard. This is shown on the site plan sheet and addresses the geotechnical concern in the area. (G) Submittal of a Land and Drainage Alteration Permit. A Land and Drainage Alteration Permit is planned to submitted for all phases to be released upon tentative land use approval and issuance of the 1200c permit. The 1200c permit will be obtained from the Department of Environmental Quality prior to the start of any grading on the project site. MAIN OFFICE 811 WILLAMETTE ST. EUGENE, OREGON 97401 PH: (541) 687-2233 * FAX: (541)485-0307 FLORENCE OFFICE 715 HWY 101 * FLORENCE, OREGON 97439 MAILING: PO BOX 508 * FLORENCE, OREGON 97439 PH: (541) 997-8417 * FAX: (541)997-8246 VILLAGE PLAZA OFFICE 4750 VILLAGE PLAZA LOOP SUITE 100 EUGENE, OREGON 97401 PH: (541) 653-8622 * FAX: (541) 844-1626 STATUS OF RECORD TITLE REPORT SUPPLEMENTAL HAYDEN HOMES Date: MAY 07, 2024 ATTN: DAMON KLUCK Our No: CT-0340619 2646 SW GLACIER PLACE, SUITE 110 Your No: -- REDMOND, OR 97756 Charge: N/C As requested, Cascade Title Co. has searched our tract indices as to the following described real property: ( A T T A C H E D ) and as of: APRIL 25, 2024 at 8:00 A.M., we find the following: Vestee: HAYDEN HOMES, LLC, an Oregon limited liability company Said property is subject to the following on record matters: 1. City liens, if any, as levied by the City of Springfield, for which no search was made. (The City of Springfield charges $32.00 for a lien search on each tax lot number. Please inform us if one is to be ordered.) 2. Rights of the public in and to any portion lying within streets, roads and highways. 3. Easement, including the terms and provisions thereof, granted to the City of Eugene, Oregon, a municipal corporation, of Lane County, Oregon, by and through the Eugene Water & Electric Board, by instrument recorded October 28, 1971, Reception No. 1971- 070389, Lane County Official Records. 4. Subject to terms and provisions as forth in Street Deed, between James D. Parmenter and Barbara K. Parmenter to the City of Springfield, recorded January 5, 1979, Reception No. 1979-000757, Lane County Official Records. 5. Easements for utilities, if any, over and across the premises formerly included within the boundaries of Mt. Vernon Cemetery Road, vacated by Order No. 81-9-30-9, recorded February 17, 1987, Reception No. 1987-007542, Lane County Official Records. *0340619* Order No. 0340619 Page 2 NOTE: The property address as shown on the Assessor's Roll is: 5309 And 5353 Ivy Street Springfield, OR 97478 NOTE: Taxes, Account No. 1238128, Assessor's Map No. 18 02 04 0 0, #307, Code 19-37, 2023-2024, in the amount of $5.77, PAID IN FULL. Taxes, Account No. 1248648, Assessor's Map No. 18 02 04 0 0, #307, Code 19-00, 2023-2024, in the amount of $8,248.89, PAID IN FULL. NOTE: This report is being supplemented to update the vesting, exception no. 2, and tax note, remove prior exception nos. 1, 5 and 6, and add new exception no. 1. This report is to be utilized for information only. This report is not to be used as a basis for transferring, encumbering or foreclosing the real property described. The liability of Cascade Title Co. is limited to the addressee and shall not exceed the premium paid hereunder. CASCADE TITLE CO., by: ec: Title Officer: DEBBIE FORSTROM Order No. 0340619 Page 3 PROPERTY DESCRIPTION Beginning at the East Southeast corner of the R. Hixon Donation Land Claim No. 47, Section 4, Township 18 South, Range 2 West of the Willamette Meridian; thence North 1523.05 feet; thence West 1222.39 feet to the true point of beginning of this described parcel; run thence West 266.61 feet; thence South 1520 feet, more or less; thence East 22 feet, more or less; thence North 1250.33 feet, more or less; thence East 244.61 feet; thence North 269.67 feet to the true point of beginning, all in Lane County, Oregon. TOGETHER WITH that portion of vacated Mt. Vernon Cemetery Road inuring to said tract of land on the South, by operation of law, under Order No. 81-9-30-9, recorded February 17, 1987, Reception No. 1987-007542, Lane County Official Records, in Lane County, Oregon. EXCEPT that portion deeded to the City of Springfield by Street Deed recorded January 5, 1979, in Reception No. 79-00757, Lane County Official Records, herein described as follows: Beginning at a point being North 1253.38 feet and West 1489 feet from the East Southeast corner of the R. Hixon Donation Land Claim No. 47, in Township 18 South, Range 2 West of the Willamette Meridian; thence East 266.61 feet; thence South 60.0 feet; thence West 266.61 feet; thence North 60.0 feet to the point of beginning, in Lane County, Oregon. 911 Country Club Rd, Ste 320 • Eugene, OR 97401 Phone: 541.741.1981 Fax: 541.741.0619 260 Country Club Rd, Ste 120 • Eugene, OR 97401 P.O. Box 10211 • Eugene, OR 97440 Phone: 541.687.9794 Fax: 541.687.0924 TITLE INSURANCE SERVICES • ESCROW CLOSINGS May 07, 2024 Order No. 24-27634 PRELIMINARY TITLE REPORT Hayden Homes 2464 SW Glacier Pl, Ste 110 Redmond, OR 97756 Attn: Brian Thoreson e-mail: bthoreson@hayden-homes.com Dear Brian Thoreson: Partial Billing Additional Chain TOTAL $400.00 $400.00 We are prepared to issue on request and on recording of the appropriate documents, a policy or policies as applied for, with coverage's as indicated, based on this preliminary report. LEGAL DESCRIPTION: SEE EXHIBIT "A" ATTACHED HERETO Showing fee simple title as of May 03, 2024, at 8:00 a.m., vested in: SSR INVESTMENTS LLC, an Oregon Limited Liability Company Subject only to the exceptions shown herein and to the terms, conditions and exceptions contained in the policy form. No liability is assumed until a full premium has been paid. Order No.: 24-27634 Page 1 of 5 SCHEDULE B GENERAL EXCEPTIONS 1. 2. 3. 4. 5. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records; proceedings by a public agency which may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the public records. Facts, rights, interests or claims which are not shown by the public records but which could be ascertained by an inspection of the land or by making inquiry of persons in possession thereof. Easements, or claims of easement, not shown by the public records; reservations or exceptions in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. Discrepancies, conflicts in boundary lines, shortage in area, encroachments or other facts which a correct survey would disclose. Any lien, or right to a lien, for services, labor, material, equipment rental or workers compensation heretofore or hereafter furnished, imposed by law and not shown by the public records. CURRENT EXCEPTIONS: 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. City Liens, if any, City of Springfield. Easement, granted to Mountain States Power Company, including the terms and provisions thereof, by instrument Recorded March 28, 1951, Reception No. 42246, Lane County Oregon Records. Utility Easement, granted to City of Springfield, including the terms and provisions thereof, by instrument Recorded June 15, 1983, Reception No. 8320250, Lane County Oregon Records. Pipeline Easement, granted to City of Springfield, including the terms and provisions thereof, by instrument Recorded December 26, 2012, Reception No. 2012-066090, Lane County Oregon Records. Access and Maintenance Easement, granted to City of Springfield, including the terms and provisions thereof, by instrument Recorded December 26, 2012, Reception No. 2012-066091, Lane County Oregon Records. Temporary Construction Easement, granted to City of Springfield, including the terms and provisions thereof, by instrument Recorded December 26, 2012, Reception No. 2012-066092, Lane County Oregon Records. Easement, granted to Qwest Communication Company, LLC, Level 3 Communications, LLC and/ or WilTel Communications, LLC, including the terms and provisions thereof, by instrument Recorded September 12, 2013, Reception No. 2013-049553, and by instrument Recorded January 9, 2014, Reception No. 2014-000678, Lane County Oregon Records. Public Utility Easement and Slope Easement, granted to City of Springfield, including the terms and provisions thereof, by instrument Recorded August 17, 2020, Reception No. 2020-045188, Lane County Oregon Records. Declaration of a Temporary Public Turnaround Easement, including the terms and provisions thereof, by instrument Recorded August 17, 2020, Reception No. 2020-045189, Lane County Oregon Records. Public Utility Easement as shown on the recorded plat. Order No.: 24-27634 Page 2 of 5 16. 17. 18. 19. 20. 21. 22. 23. Covenants, Conditions, and Restrictions, but omitting restrictions, if any, based on race, color, religion, sex, sexual orientation, familial status, marital status, disability, handicap, national origin, ancestry, source of income, gender, gender identity, gender expression, medical condition or genetic information, imposed by instrument, including the terms and provisions thereof, Recorded September 22, 2020, Reception No. 2020-053370; amended by instrument Recorded November 23, 2020, Reception No. 2020-068781; further amended by instrument Recorded April 3, 2023, Reception No. 2023-008678: annexation for Woodland Ridge Phase II by instrument Recorded January 13, 2022, Reception No. 2022-002005; annexation for Woodland Ridge Phase 3 by instrument Recorded April 4, 2023, Reception No. 2023-008730, Lane County Oregon Records. The By-Laws, including the terms and provisions thereof, of Woodland Ridge Homeowners Association, Recorded September 22, 2020, Reception No. 2020-053370, Lane County Oregon Records. Levies and Assessments, if any, by virtue of the fact that the Covenants, Conditions and Restrictions contain among other things provisions for said levies and assessments of the Woodland Ridge, Homeowners' Association. Covenants, restrictions, and other notes as shown on Plat of Woodland Ridge Phase 3. Easement, granted to City of Springfield, a municipal corporation of the State of Oregon, acting by and through its Springfield Utility Board, including the terms and provisions thereof, by instrument Recorded February 22, 2021, Reception No. 2021-011932, Lane County Oregon Records. Easement, granted to City of Springfield, a municipal corporation of the State of Oregon, acting by and through its Springfield Utility Board, including the terms and provisions thereof, by instrument Recorded October 27, 2021, Reception No. 2021-068215, Lane County Oregon Records. Easement, granted to City of Springfield, including the terms and provisions thereof, by instrument Recorded October 27, 2021, Reception No. 2021-068267, Lane County Oregon Records. Annexation Agreement, including the terms and provisions thereof, Recorded June 13, 2022, Reception No. 2022-025907, Lane County Oregon Records. NOTE: Taxes, Map No. 18-02-04-00-03800, Code 19-37, Account No. 1915334, 2023-2024, $1,438.29, paid in full. Taxes, Map No. 18-02-04-00-03800, Code 19-37, Account No. 1915333, 2023-2024, $7,343.00, paid in full. Taxes, Map No. 18-02-04-00-03500, Code 19-37, Account No. 1915329, 2023-2024, $0.00, paid in full. NOTE: The address of the property to be insured herein is: 5410 Mt Vernon Rd., Springfield, OR 97478. NOTE: A Judgment/Lien/Bankruptcy Search was done for the name(s) SSR INVESTMENTS LLC , and as of May 03, 2024, none were found. INFORMATIONAL NOTE: EVERGREEN LAND TITLE COMPANY FINDS NO NOTICE OF RESCISSION RECORDED IN THE LAST 24 MONTHS. NOTE: The following applicable recording fees will be charged by Lane County: First Page:$87.00 Each Additional Page $ 5.00 Non-Standard Document Fee $20.00 E-Recording Fee $ 5.00 Order No.: 24-27634 Page 3 of 5 NOTE: Due to current conflicts or potential conflicts between state and federal law, which conflicts may extend to local law, regarding marijuana, if the transaction to be insured involves property which is currently used or is to be used in connection with a marijuana enterprise, including but not limited to the cultivation, storage, distribution, transport, manufacture, or sale of marijuana and/or products containing marijuana, the Company declines to close or insure the transaction, and this Preliminary Title Report shall automatically be considered null and void and of no force and effect. NOTE: SUPPLEMENTED TO BRING CURRENT. Very truly yours, EVERGREEN LAND TITLE COMPANY HOME OFFICE By: Don Greep Title Officer cc: NO LIABILITY IS ASSUMED HEREUNDER UNTIL POLICY IS ISSUED AND PREMIUM PAID. IF FOR ANY REASON THE REPORT IS CANCELLED, A MINIMUM CANCELLATION FEE OF $200.00 WILL BE CHARGED. Order No.: 24-27634 Page 4 of 5 EXHIBIT "A" LEGAL DESCRIPTION Tracts M and J, WOODLAND RIDGE PHASE 3, platted and recorded April 4, 2023, Reception No. 2023-008729, Lane County Deeds and Records, Lane County, Oregon. Order No.: 24-27634 Page 5 of 5 Produced using RLID (www.rlid.org) on 04/03/2024 at 3:27 PM Produced using RLID (www.rlid.org) on 04/03/2024 at 3:27 PM Produced using RLID (www.rlid.org) on 05/09/2024 at 2:41 PM Produced using RLID (www.rlid.org) on 05/09/2024 at 2:41 PM SANDOWENGINEERING 160 MADISON STREET SUITE A EUGENE, OREGON 97402 541.513.3376 Date: February 12, 2024 TO: Michael Liebler PE City of Springfield FROM: Kelly Sandow PE Sandow Engineering RE: Woodland Ridge Phase 5-8 Fiscal “Fair Share” Evaluation The following provides an update to the Woodland Ridge Subdivision Fiscal “Fair Share” calculation for the intersection of Bob Straub Parkway at Daisy Street. The update to the “Fair Share” calculation follows the specific methodology utilized by the City of Springfield in Section 1.1.5 of the Annexation Agreement dated June 13, 2022. The current development proposal for Phases 5-8 includes 206 single family lots. Using the trip rates for Land Use Code 210-Single Family Residential from the 11 th ed of the ITE Trip Generation Manuals, the PM peak hour trips are estimated at 196 1. As provided in the Woodland Ridge Subdivision Phase 3-8 Traffic Impact Analysis by Access Engineering dated February 21, 2002, during the PM peak hour 25% of the total site trips will use the intersection of Bob Straub Parkway at Daisy Street. Therefore, the PM peak hour trips estimated to use the Bob Straub Parkway at Daisy Street intersection is 49 (25% of 196 total trips) with the current site plan. The “Fair Share” contribution is calculated as “49 site trips/525 minimum traffic volumes needed for meeting a signal warrant”, which results in 9% of the total trips to the signal. The traffic signal is estimated at a cost of $1,500,000. Therefore, 9% of the total cost attributed to the phases 5-8 construction is $135,000. 1 PM peak hour fitted curve equation for trip calculation: LN(T)=0.94LN(Units)+0.27 ...DesignerDate03/29/2024ScaleNot to ScaleDrawing No.Summary1 of 1Current ViewStatisticsDescription Symbol Avg Max Min Max/Min Avg/MinHolly Street 0.3 fc 0.7 fc 0.1 fc 7.0:1 3.0:1North Local 0.3 fc 0.8 fc 0.1 fc 8.0:1 3.0:1North Stub 0.3 fc 0.6 fc 0.1 fc 6.0:1 3.0:1South Local 0.3 fc 0.7 fc 0.1 fc 7.0:1 3.0:1ScheduleSymbol Label Image Quantity Manufacturer Catalog Number DescriptionNumberLampsLumensPer LampLight LossFactorWattage PlotA41AmericanElectricLightingATB010BLEDE70XXXXX R24K/5KATB0 SERIES LED 700MATYPE 2 4000K/5000KCCT129941 25 ...DesignerDate03/29/2024ScaleNot to ScaleDrawing No.Summary1 of 1Current ViewStatisticsDescription Symbol Avg Max Min Max/Min Avg/MinHolly Street 0.3 fc 0.7 fc 0.1 fc 7.0:1 3.0:1North Local 0.3 fc 0.8 fc 0.1 fc 8.0:1 3.0:1North Stub 0.3 fc 0.6 fc 0.1 fc 6.0:1 3.0:1South Local 0.3 fc 0.7 fc 0.1 fc 7.0:1 3.0:1ScheduleSymbol Label Image Quantity Manufacturer Catalog Number DescriptionNumberLampsLumensPer LampLight LossFactorWattage PlotA41AmericanElectricLightingATB010BLEDE70XXXXX R24K/5KATB0 SERIES LED 700MATYPE 2 4000K/5000KCCT129941 25 ...DesignerDate03/29/2024ScaleNot to ScaleDrawing No.Summary1 of 1Current ViewStatisticsDescription Symbol Avg Max Min Max/Min Avg/MinHolly Street 0.3 fc 0.7 fc 0.1 fc 7.0:1 3.0:1North Local 0.3 fc 0.8 fc 0.1 fc 8.0:1 3.0:1North Stub 0.3 fc 0.6 fc 0.1 fc 6.0:1 3.0:1South Local 0.3 fc 0.7 fc 0.1 fc 7.0:1 3.0:1ScheduleSymbol Label Image Quantity Manufacturer Catalog Number DescriptionNumberLampsLumensPer LampLight LossFactorWattage PlotA41AmericanElectricLightingATB010BLEDE70XXXXX R24K/5KATB0 SERIES LED 700MATYPE 2 4000K/5000KCCT129941 25