HomeMy WebLinkAboutPlans Applicant 4/26/2024Zero Degree Room
Room
Lab
Storage Freezer
36" DOOR
EVAPORATOR MODEL 120LSHTST
Balance
Tank
Infeed
Height
17'-6"
Discharge
Height
36"
RMF Spiral Freezer
Enclosure Height
20'-6"
Smoking
Area
Gas
2-lbH2O
1 12BF S-7741-HES-7725-HES-7725-HEDN250PS 40148B053
4G20Mn5 QT0045DANFOSSCHARGE
N
O
.
DUnderground powerUnderground powerUnderground powerUnderground power
MF800
MF800
N2 Contro
l
Above Ground Drain Above Ground Drain
Above Ground Drain120/208
Xformer
Air
Dryer
BoilerSwitch GearTo City SewerClean
Out
Clean
Out
Clean Out
Drain
Grease Trap
SDDF DanoneWave
1100 Shelly Street
Springfield, OR 97477
Scale in Feet
0' 5' 10'A/C EquipmentXformer
CIP
Equipment
SD
SD
SD
Mix Room Area
Nitrogen
Storage
NitrogenTunnel
CV601 Pusher PH601ProductPlatformFlavor Tanks
MF600
MF600
MF600
Hot Room
Cartoner CN501
Main Processing Room Area
Production Rm 6217ftsq
Mix Rm 1340ftsq
Polypack Area 760ftsq
Property Line
?
?
PT #3
2500 Gal.
PT #2
2500 Gal.
PT #1
2500 Gal.
Stairs
Shrink Bundler
MD601
FLOW
Discharge 41" H
Cartoner CN602
ISHIDA
Panel
WH
V2
V1
Pump
Lids
HWSink
Doboy HP
Bars (LINE 3)
LINE 1
SticksX
ISHIDA
Panel
IJ601
IJ501
wheeledcaged dolly
634"x438"634"x438"
7x678"TP60x3M case TaperCart
TP60x 3M case TaperCartwheeledcaged dolly123Homog
Flow
P
a
n
e
l
Flow Panel
DrumPump
PT FP
PT #4
PT #5
PT #6
5000 Gal.
3500 Gal.
3500 Gal.
Recirc FP
Air
Comp.
AC802
AIRTANK
AIRTANK Switch GearAir
Comp.AC801
Fan
ACVFD
pipepipe
Brine
CA Exhaust
Controls
Steamcondreturn
Containment berm, no
drain
El 45"
Load lidshere
Access platform
LIDSTUBS
29.35" S.O.----TRAVEL---->----TRAVEL---->Sandwich WrapperWR601BACK
FLOWPRODUCT
WEIGHTREJECTS
BACK
FLOW
PROD
UC
T
WEIGH
T
REJEC
TS
COP Tank
-20 Degree Shop
Maintenance
Room
Engine
Lunch Room
Ladie's Locker Room Men's Locker Room
LINE 2
Warehouse
War Room
480/277 CONTROLPANELCONTROLPANEL CONTRO
LPANEL
ABBR. DESCRIPTION
EQUIPMENT ABBREVIATIONS
ABBR. DESCRIPTIONABBR.
PIPING ABBREVIATIONS
ABBR.
ABBREVIATIONS
REFRIGERATION
DESCRIPTION
DRAWING INDEX
SHEET
GENERAL NOTES
MEDIUM TEMPERATURE-
R-5077A (OMSC CLASS: A1) REFRIGERANT:
LOW SIDE TEST PRESSURE:
HIGH SIDE TEST PRESSURE:
OPERATING PRESSURES:
REFRIGERANT CHARGE:
REFRIGERATION SYSTEM
REFRIGERANT CLASSIFICATION:HIGH PROBABILITY
LOW TEMPERATURE -
EXISTING
HORSEPOWERHP
(E)
B.O.P.BOTTOM OF PIPE
TOP OF RACK
TR
N.O.
N.C.
T.O.R.
W.P.
NORMALLY OPEN
NORMALLY CLOSED
TONS OF REFRIGERATION
WATER PRESSURE
LBS POUNDS
MISC. ABBREVIATIONS
BLEED
BY-PASS
BOOSTER DISCHARGE
BP
BD
B
AIR HANDLERAH
BC BOOSTER COMPRESSOR
AMMONIA PUMPAP
AMMONIA DIFFUSION TANKADT
CP CHILLED WATER PUMP
EC EVAPORATIVE CONDENSER
EV EVAPORATOR/FAN COIL/AIR HANDLER
GC GLYCOL CHILLER
GP GLYCOL PUMP
HC HIGH STAGE COMPRESSOR
HPR HIGH PRESSURE RECEIVER
HX HEAT EXCHANGER
IB ICE BUILDER
IC INTERCOOLER
IM ICE MAKER
LLA LOW LEVEL ALARM
LLS LOW LEVEL SHUTDOWN
LPC LOW PRESSURE CUTOUT
LT LIQUID TRANSFER
OP OIL POT
OS OIL SEPERATOR
PR PILOT RECEIVER
RC REFRIGERATION COMPRESSOR
RP RECIRCULATOR PACKAGE
SA SUCTION ACCUMULATOR
SC SWING COMPRESSOR
SD SURGE DRUM
TV THERMOSIPHON VESSEL
WC WATER CHILLER
CONDENSER DRAINCD
CHILLED WATER SUPPLYCWS
DEFROST CONDENSATEDC
EQUALIZINGEQL
ECONOMIZER SUCTIONES
FIRE DIFFUSIONFD
HOT GAS DEFROSTHGD
HIGH PRESSURE LIQUIDHPL
HIGH STAGE DISCHARGEHSD
HIGH STAGE SUCTIONHSS
HIGH TEMPERATURE RECIRCULATED LIQUIDHTRL
HIGH TEMPERATURE RECIRCULATED SUCTIONHTRS
HIGH TEMPERATURE SUCTIONHTS
CONTROL PRESSURE LIQUIDCPL
CHILLED WATER RETURNCWR
FOUL GASFG
GLYCOL RETURNGR
GLYCOL SUPPLYGS
LIQUID INJECTION COOLINGLIC
LOW TEMPERATURE RECIRCULATED LIQUIDLTRL
LOW TEMPERATURE RECIRCULATED SUCTIONLTRS
LOW TEMPERATURE SUCTIONLTS
MEDIUM TEMPERATURE RECIRCULATED LIQUIDMTRL
MEDIUM TEMPERATURE RECIRCULATED SUCTIONMTRS
MEDIUM TEMPERATURE SUCTIONMTS
OIL DRAINOD
OIL RETURNOR
OIL SUPPLYOS
PUMP-OUTPO
RETURNRTN
RELIEF VENTRV
SUB-COOLED LIQUIDSCL
SUPPLYSUP
THERMOSIPHON RETURNTSR
THERMOSIPHON SUPPLYTSS
THERMOSIPHON VENTTSV
WATER JACKET RETURNWJR
WATER JACKET SUPPLYWJS
WATER RETURNWR
TRANSFERXFR
CROSS-OVERXOVR
VFD VARIABLE FREQUENCY DRIVE
PNL PANEL
CPR CONTROL PRESSURE RECEIVER
EP EVAPORATOR - PRECOOLER
ES EVAPORATOR - STORAGE
WP WATER PUMP
ET EXPANSION TANK
ST STORAGE TANK/SILO
EF EXHAUST FAN
DEFROST RELIEFDR
LOW STAGE SUCTIONLSS
LOW TEMPERATURE LIQUIDLTL
LIQUID LINELIQ
PUMPED LIQUID SUPPLYPLS
PUMPED LIQUID RETURNPLR
SUCTION LINESUC
VENT LINEVENT
WATER SUPPLYWS
WATERWTR
BR BRINE CHILLER
CT COOLING TOWER
IF ICE CREAM FREEZER
AUTO-PURGERAU
RS REMOTE SUMP
SF SPIRAL FREEZER
INSTRUMENTATION ABBREVIATIONS
AS AMMONIA SENSOR
DPS DIFFERENTIAL PRESSURE SWITCH
HLA HIGH LEVEL ALARM
HLS HIGH LEVEL SHUTDOWN
HPC HIGH PRESSURE CUTOUT
OL OPERATING LEVEL
SS SOLID STATE STARTER
ACL ACROSS THE LINE STARTER
VFD VARIABLE FREQUENCY DRIVE
YD WYE DELTA STARTER
330 PSIG
330 PSIG
11.26 PSIG (-30°F)
1.25 PSIG (-50°F)
13,800 LBS.
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD, ORNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLY STREETPDP
KT
2370078
-
COVER
SHEET
-
R0.0
2
01100 SHELLY STREET
SPRINGFIELD, OR.
97477
SCOPE OF WORK
R0.0 TITLE SHEET
R1.0 EQUIPMENT SCHEDULE
R2.0 SITE PLAN
R2.1 MACHINE ROOM EQUIPMENT PLAN
R2.2 MACHINE ROOM PIPING PLAN
R2.3 VESSELS EQUIPMENT PLAN
R2.4 VESSELS PIPING PLAN
R2.5 DEMO PLAN
R2.6 FOUNDATION PLAN
R2.7 EXISTING WAREHOUSE PLAN
R3.0 SECTIONS AND ELEVATIONS
R5.0 STANDARD DETAILS
R5.1 STANDARD DETAILS
R5.2 STANDARD DETAILS
SITE PLAN
INSTALL NEW REFRIGERATION MACHINE ROOM, PIPE BRIDGE TO VESSEL AREA.
NEW CONDENSER AND HIGH PRESSURE RECEIVER.
NEW LIQUID RECIRCULATOR FOR EXISTING FREEZE TUNNEL.
NEW ECONOMIZER, AND HEAT EXCHANGER
RELOCATE EXISTING SUCTION ACCUMULATOR
AND CONNECT TO ALL EXISTING SYSTEMS IN PLANT.
AREA OF
WORK
PERMIT SET
HIGH TEMPERATURE - 58.11 PSIG (+20°F)
CONDENSING - 192.6 PSIG (+85°F)
2
2
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLEY STREETPDP
KT
PROPOSAL
EQUIPMENT
SCHEDULE
-
-
R1.0
2
GLYCOL CHILLER SCHEDULE
25% PROPELYNE GLYCOL
ITEM MAKE/ MODEL NO.
REFR.
TEMP
(°F)
REFRIG.
FEED
ENTER
TEMP.
(°F)
LEAVE
TEMP
(°F)
WATER
FLOW
(#/HR)
CAPACITY
(MBH)
PLATE
PAIRS
CHANGE
(LBS)
RECIP.
RATE
REFRIG.
FLOW
(#/HR)
SHIPPING
WEIGHT
OPER.
WEIGHT
AUTOMATIC PURGER SCHEDULE
ITEM MAKE/ MODEL NO.CONTL
POINTS
CONTL
PANLL
SYSTEM
(L/H)VOLTS CAPACITY
(TONS)
WTR
CON
WTR
DRAIN
OPER.
CHARGE
(LBS)
SHIPPING
WEIGHT
OPER.
WEIGHT
GLYCOL PUMP SCHEDULE
ITEM MAKE/ MODEL NO.
WTR
TEMP
(°F)
SUCT
(IN)
DISCH
(IN)
FLOW
(GPM)
HEAD
(FT)
IMPEL
(IN)RPM MOTOR
(HP)
MOTOR
VOLTS
STARTER
TYPE
STARTER
SUPPLIED
SHIPPING
WEIGHT
OPER.
WEIGHT
EXHAUST FAN SCHEDULE
ITEM MAKE/ MODEL NO.MOUNTING
METHOD
AIR FLOW
(CFM)
ESP
(IN.WG)RPM MOTOR
(HP)
MOTOR
TYPE
MOTOR
VOLTS
STARTER
TYPE
STARTER
SUPPLIED
SHIPPING
WEIGHT
OPER.
WEIGHT
R507 RECIRCULATOR SCHEDULE
ITEM MAKE/ MODEL NO.VESSEL
DIRECTION
DWP
(PSIG)
OPER.
TEMP.
(°F)
DIA.
(IN)
OVERALL
LENGTH
(FT)
CAPACITY
(TONS)
REL CAP
(#/AIR/MIN)
LEVEL
OPT (IN)
SURGE
VOLUME
(FT3)
OPER.
CHARGE
(LBS)
R507
PUMP
HP
MOTOR
VOLTS
STARTER
TYPE
STARTER
SUPPLIED
PUMP
(GPM)
PUMP
(PSID)
SHIPPING
WEIGHT
OPER.
WEIGHT
VESSEL SCHEDULE
ITEM MAKE/ MODEL NO.VESSEL
DIRECTION
DWP
(PSIG)
OPER
TEMP
(°F)
DIA.
(IN.)
OVERALL
LENGTH
(FT)
CAPACITY
(TONS)
REL CAP
(#/AIR/MIN)
LEVEL
OPT (IN)
INTERNAL
VOLUME
(FT3)
OPER.
CHARGE
(LBS)
PUMP
OUT
(LBS)
SHIPPING
WEIGHT
OPER.
WEIGHT
EVAPORATIVE CONDENSER SCHEDULE
CONDITIONS TO BE 85°F CONDENSING AND +69°F WET BULB
ITEM MAKE/ MODEL NO.RATE
(MBH)
CORR.
FACTOR
CORR.
(MBH)
FAN
MOTOR
HP
WTR
PUMP
HP
MOTOR
VOLTS
FAN
STARTER
TYPE
PUMP
STARTER
TYPE
FAN
STARTER
SUPPLIED
PUMP
STARTER
SUPPLIED
R507
CHARGE
(LBS)
WATER
MAKE-UP
(GPM)
HEAVIEST
SECTION
SHIPPING
WEIGHT
OPER.
WEIGHT
SCREW COMPRESSOR SCHEDULE
BASED ON -50°F SST/+85°F SDT. 0.5 PSI SUCTION, 2.0 PSI DISCHARGE LINE LOSSES. +10°F SUPERHEAT & +15°F LIQUID
ITEM MAKE/ MODEL NO.
SWEPT
VOLUME
(CFM)
OIL
COOLING
TONNAGE @
RATED
CONDITIONS
BHP @
RATED
CONDITIONS
MOTOR
HP
MOTOR
VOLTS
STARTER
TYPE
STARTER
SUPPLIED
OIL
PUMP
HP
OC
CHRG
(LBS)
OCHR
(MBH)
HOR
(MBH)
SHIPPING
WEIGHT
OPER.
WEIGHT
PERMIT SET
POLYISOCYANURATE INSULATION THICKNESS [IN]
NOTES:
INSULATION SCHEDULE
INTAKE LOUVER
ITEM MAKE/ MODEL NO.MOUNTING
METHOD
AIR FLOW
(CFM)
ESP
(IN.WG)WIDTH HEIGHT ACTUATOR VOLTS SHIPPING
WEIGHT
OPER.
WEIGHT
Zero Degree Room
Room
Lab
Storage Freezer
36" DOOR
EVAPORATOR MODEL 120LSHTST
Balance
Tank
Infeed
Height
17'-6"
Discharge
Height
36"
RMF Spiral Freezer
Enclosure Height
20'-6"
Smoking
Area
Gas
2-lb
H2O
1 1
2BF S-7741-HES-7725-HES-7725-HEDN250PS 40148B0534G20M
n
5
Q
T
0045 DANFOSSCHA
R
G
E
N
O
.DUnderground powerUnderground powerUnderground powerUnderground powerMF800
MF800
N2 ControlAbove Ground Drain Above Ground Drain
Above Ground Drain120/208
Xformer
Air
Dryer
BoilerSwitch GearTo City SewerClean
Out
Clean
Out
Clean
Out
Drain
Grease
Trap
SDDF DanoneWave
1100 Shelly Street
Springfield, OR 97477
Scale in Feet
0' 5' 10'A/C EquipmentXformer
CIP
Equipment
SD
SD
SD
Mix Room Area
Nitrogen
Storage
Nitrogen
Tunnel
CV601 Pusher PH601
ProductPlatformFlavor TanksMF600
MF600
MF600
Hot Room
Cartoner CN501
Main Processing Room Area
Production Rm 6217ftsq
Mix Rm 1340ftsq
Polypack Area 760ftsq
Property Line
?
?
PT #3
2500 Gal.
PT #2
2500 Gal.
PT #1
2500 Gal.
Stairs
Shrink Bundler
MD601
FLOW
Discharge 41" H
Cartoner CN602
ISHIDA
Panel
WH
V2
V1
Pump
LidsHW
Sink
Doboy HP
Bars (LINE 3)
LINE 1
Sticks
X
ISHIDA
Panel
IJ601
IJ501
wheeled
caged dolly
634"x438"
634"x438"
7x
678"TP60x3M case TaperCart
TP60x3M case TaperCartwheeled
caged dolly123Homog
Fl
o
w
P
a
n
e
l
Flow Panel
Drum
Pump
PT FP
PT #4
PT #5
PT #6
5000 Gal.
3500 Gal.
3500 Gal.
Recirc FP
Air
Comp.
AC802
AIR
TANK
AIR
TANK Switch GearAir
Comp.
AC801
Fan
AC
VFD
pipepipe
Brine
CA Exhaust
Controls
Steam
cond
return
Containment berm, no
drain
El 45"
Load lids
here
Access platform
LIDSTUBS
29.35" S.O.----TRAVEL---->----TRAVEL---->Sandwich WrapperWR601BACK
FLOWPRODUCT
WEIGHTREJECTS
BACKFLOWPRODUCTWEIGHTREJECTS COP Tank
-20 Degree Shop
Maintenance
Room
Engine
Lunch Room
Ladie's Locker Room Men's Locker Room
LINE 2
Warehouse
War Room
480/277 CONTROLPANELCONTROLPANELCONTROLPANELProject No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLEY STREETPDP
KT
2370078
SHOWN
SITE PLAN
.
-
-
R2.0
2
PERMIT SETOVERALL SITE PLAN1
R2.0
C
R3.0
B
R3.0
A
R3.0
CONTROLPANELCONTROLPANELCONTROLPANELProject No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONE1100 SHELLEY STREET.PDP
KT
2370078
SHOWN
MACHINE ROOM
EQUIPMENT
PLAN
-
R2.1
2
PERMIT SETMACHINE ROOM EQUIPMENT PLAN1
R2.0
PIPE BRIDGE
ELECTRICAL
HPR
42"Ø X 219 OAL
BELOW
CONDENDSER
EC01
SPX DTC1212TKJ1
RC01
MYCOM F220JL
450 HP 103.4TR
-50
RC04
RELOCATED
MYCOM F220JM
WITH MOTOR UPGRADE
350 HP TR
SWING
RC02
MYCOM F220JS
300 HP 126.3TR
-30
RC03
MYCOM F170JL
200 HP 98.3 TR
+20
PR-1
PILOT RECEIVER
16" Ø 10'-0"
PU01
AUTO PURGER
EF-01
MACHINE ROOM
VENTILATION FAN
(ROOF MTD)
IL01
MACHINE ROOM
AIR INTAKE LOUVER
OR-1
OIL RECTIFIER
6" Ø 3'-0"
BELOW
ABB
SWITCH GEAR
RC01
STARTER
RC04
STARTER
RC02
STARTER
RC03
STARTER
MISC
PANEL
EF-02
MACHINE ROOM
VENTILATION FAN
(ROOF MTD)LOGIXPANEL
CONTROLPANELCONTROLPANELCONTROLPANELProject No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS.1100 SHELLEY STREETPDP
KT
PROPOSAL
SHOWN
MACHINE ROOM
PIPING
PLAN
-
R2.2
2
PERMIT SETMACHINE ROOM PIPING PLAN1
R2.0
MACHINE ROOM
PIPE BRIDGE
ELECTRICAL
EC01
FRICK IDSC2 1218-12-40-7.5 EC
HPR
42"Ø X 192 OAL
BELOW
CONDENDSER
RC01
MYCOM F220JL
450 HP 103.4TR
-50
RC04
RELOCATED
MYCOM F220JM
WITH MOTOR UPGRADE
350 HP TR
SWING
RC02
MYCOM F220JS
300 HP 126.3TR
-30
RC03
MYCOM F170JL
200 HP 98.3 TR
+20
ABB
SWITCH GEAR
RC01
STARTER
RC04
STARTER
RC02
STARTER
RC03
STARTER
MISC
PANEL
PR-1
PILOT RECEIVER
16" Ø 10'-0"
OR-1
OIL RECTIFIER
6" Ø 3'-0"
BELOW
FILTER DRIERS
BELOW
PU01
AUTO PURGER
12
R5.1
S-7741-HES-7725-HES-7725-HEDN250PS 40148B0534G20Mn5 QT0045DANFOSSCHARGE NO.DShop
Maintenance
Room
Engine
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIOSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLEY STREETPDP
KY
PROPOSAL
SHOWN
VESSEL
EQUIPMENT
PLAN
-
R2.3
2
PERMIT SETVESSEL EQUIPMENT PLAN1
R2.0
PIPE BRIDGE
HX01
FRICK PLW-68D-24
100 TR
RP01 -50
42"Ø X 120 OAL
94 TR
ECONOMIZER
42"Ø X 119 OAL
RELOCATED
SA01
42"Ø X 119 OAL
GLYCOL TANK
S-7741-HES-7725-HES-7725-HEDN250PS 40148B0534G20Mn5 QT0045DANFOSSCHARGE NO.DShop
Maintenance
Room
Engine
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLY STREETPDP
KT
PROPOSAL
SHOWN
VESSEL
PIPING
PLAN
-
R2.4
2
PERMIT SETVESSEL EQUIPMENT PLAN1
R2.0
PIPE BRIDGE
RP01 -50
42"Ø X 120 OAL
94 TR
ECONOMIZER
42"Ø X 119 OAL
RELOCATED
SA01
42"Ø X 119 OAL
HX01
FRICK PLW-68D-24
100 TR
GLYCOL TANK
INDICATES POINT OF TIE-IN.
Zero Degree Room
Storage Freezer
36" DOOR
EVAPORATOR MODEL 120LSBalance
Tank
Infeed
Height
17'-6"
Discharge
Height
36"
RMF Spiral Freezer
Enclosure Height
20'-6"S-7741-HES-7725-HES-7725-HEDN250PS 40148B0534G20Mn5 QT0045DANFOSSCHARGE NO.DAbove Ground Drain
Mix Room Area
Cartoner CN501
Stairs
Shrink Bundler
ISHIDA
Panel
HW
Sink
ISHIDA
Panel
IJ501
wheeled
caged dolly
634"
x
438"
634"
x
438"
7
x
678"TP60x3M case TaperTP60x3M case TaperCartwheeled
caged dolly12COP Tank
-20 Degree Shop
Maintenance
Room
Engine
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD, OR.NEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1130 SHELLEY STREETPDP
KT
2370078
SHOWN
DEMO
PLAN
-
-
R2.5
2
PERMIT SETDEMO PLAN1
R2.0
DEMO LINES & EQUIPMENT
EVAPORATOR MODEL 120LSRMF Spiral Freezer
Enclosure Height
S-7741-HES-7725-HES-7725-HEDN250PS 40148B0534G20Mn5 QT0045DANFOSSCHARGE NO.DRoom
Engine
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLEY STREETPDP
KT
2370078
SHOWN
FOUNDATION
PLAN
-
-
R2.6
2
PERMIT SETFOUNDATION PLAN1
R2.6
HX01
RP01
EC01
SA01
HPR
EC01
RC01 RC04RC02RC03
CONTROLPANELCONTROLPANELCONTROLPANELProject No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLEY STREETPDP
KT
2370078
SHOWN
EXISTING
WAREHOUSE
PLAN
-
R2.7
2
PERMIT SETEXISTING WAREHOUSE1
R2.6
RC01 RC04RC02RC03
EXISTING 120°F
TEMPERED
INGREDIENTS
EXISTING R&I
COOLER/FREEZER)
EXISTING
MAINTENANCE
OFFICE AND
SPARE PARTS
2
EXISTING
DRY
INGREDIENTS
AND STAGING
IVECOIVECO
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLEY STREETPDP
KT
2370078
SHOWN
SECTION
ELEVATION
VIEWS
-
R3.0
2
PERMIT SET
VESSEL ELEVATION SECTIONC
R2.0
RP01 -50ECONOMIZERRELOCATED
SA01 HX01
BRIDGE ELEVATION SECTIONA
R2.0
CONDENSER ELEVATION SECTIONB
R2.0
EC01
HPR
PR-1
PU01
RELOCATED
SA01
EC01
HPR
RC01 RC04
RELOCATED
RC02 RC03
INDICATES POINT OF TIE-IN.
MACHINE ROOM
VESSEL
AREA
VESSEL
AREA
EXISTING
SPIRAL FREEZER
GLYCOL
TANK
EF-01
MACHINE ROOM
VENTILATION FAN
R5.1
12
01 SIGN COMPLIANCE
INSTALLED & SERVICED BY:
REFRIGERANT TYPE: R-507
REFRIGERANT CHARGE: 13,800 LBS
TEST PRESSURE HIGH: 330 PSIG
TEST PRESSURE LOW: 330 PSIG
LOCATIONS TO SERVE - (WWW.APCCO.NET):
MODESTO CA. (209) 578-1000, SANGER CA. (559) 875-7720
FRESNO CA. (559) 875-7720. & SALEM OR. (503) 689-1200
TYPICAL SOCKET WELD CONNECTIONSALIGNMENT DETAIL
TYPICAL WELDED CONNECTIONS05
·
·
·
·
REFRIGERANT SUCTION
VISIBILITY:
·
04 PIPE LABELING
BRANCH 16 14 12 10 8 6 5 4 3 2-1/2 2 1-1/2 1-1/4 1 3/4 1/2 1/4
03 GAUGE PANEL DETAIL
CA LIC.#419612 - OR LIC.#204317
REFRIGERANT SUCTION REFRIGERANT SUCTION
REFRIGERANT SUCTIONINSTALLED & SERVICED BY:
REFRIGERANT TYPE: R-507
REFRIGERANT CHARGE: 13,800 LBS
TEST PRESSURE HIGH: 330 PSIG
TEST PRESSURE LOW: 330 PSIG
MED. TEMPERATURE
SUCTION (MTS)
(-30F) ( 11.26 PSIG)
LOCATIONS TO SERVE - (WWW.APCCO.NET):
MODESTO CA. (209) 578-1000, SANGER CA. (559) 875-7720
FRESNO CA. (559) 875-7720 & SALEM OR. (503) 689-1200
HIGH STAGE
DISCHARGE (HSD)
(+85F) (192.6 PSIG)
ECONOMISER
SUCTION (ES)
(+18F) ( 58 PSIG)
LOW TEMPERATURE
SUCTION (LTS)
(-50F) ( 1.25 PSIG)
CA LIC.#419612 - OR LIC.#204317
02
H
RELIEF PIPING DETAIL
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERTAIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLEY STREETPDP
KT
2370078
STANDARD
DETAILS
-
-
R5.0
2
2
2
TYPICAL WALL MTD SUPPORT 12
07 WALL PENETRATION INSULATED
09 ROOF PENETRATION W/ INSULATION
08 WALL PENETRATION06PIPE SUPPORTS
16 TYPICAL PIPE BRIDGE PIPE SUPPORT15TYPICAL U-BOLT DETAIL
10 ROOF PENETRATION
14
11 TYPICAL BEAM SUPPORT 13
MAXIMUM ALLOWABLE
HANGER ROD LOADING
ROD DIAMETER
(IN)
MAXIMUM LOAD
(LBS)
SUPPORT SCHEDULE NO.2
PIPE SIZE SHIELD GAURD SHIELD
LENGTH
MAXIMUM
HANGER SPACING
PIPING, HANGERS & SUPPORT SCHEDULE
NORMAL PIPE
SIZE SCHEDULE EMPTY Wt. (lb/ft)FILLED Wt. (lb/ft) *MAXIMUM
SPAN (FT)
MINIMUM ROD
DIAMETER (IN)
RELIEF WEATHER CAP DETAIL
PIPING MAINS 2 1/2" AND LARGER
·
·
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLEY STREETPDP
KT
2370078
STANDARD
DETAILS
-
-
R5.1
2
27
19 21
26
2017COMPRESSOR ANCHOR DETAIL 18
22 2423 25
27
VESSEL ANCHOR DETAIL
Project No:
Stamp:
Sheet No:
Sheet Title:
Designed By:
Checked By:
Drawing Scale:
ALL DRAWINGS PRODUCED BY APCCO SHALL REMAIN PROPERTY OF APCCO AND MAY NOT BE USED BY CLIENT FOR ANY OTHER ENDEAVOR WITHOUT THE WRITTEN CONSENT OF APCCO.
REVISIONNO.DATE
BY
1 ISSUE FOR PERMIT 2-9-24
PDP
2
--
--
PLAN REVIEW COMMENT PDP
4-5-24
----
--
----
--
Rev.SPRINGFIELD OREGONNEW REFRIGERATIONSYSTEM UPGRADESDANONESO DELICIOUS1100 SHELLY STREETPDP
KT
2370078
STANDARD
DETAILS
-
-
R5.2
2