AGENDA
DEVELOPMENT REVIEW
COMMITTEE
DEVELOPMENT SERVICES DEPARTMENT
225 FIFTH STREET
Conference Room 616 / MS Teams
Staff Review: Tuesday, May 14, 2024 9:00 – 9:30 a.m.
1. Site Plan Review 811-24-000115-TYP2 811-24-000094-PROJ Clarissa Martinez
Assessor’s Map: 17-03-27-00 TL: 902
Address: 1100 Shelley St.
Existing Use: frozen treat manufacturing
Applicant has submitted plans to extend pipe bridge and replace compressors
Planner: Tom Sievers
Meeting: Tuesday, May 14, 2024 9:00 - 9:30 virtual meeting via Microsoft Teams
The Complete DRC Packet for this meeting is available online for you to review or print out
from the laserfiche website: https://www.springfield-or.gov/weblink8/browse.aspx
SITE
VICINITY MAP
811-24-000115-TYP2 Site Plan Review
17-03-27-00 TL 902
1100 Shelley St.
Clarissa Martinez
4/17/2024 Attention: Springfield Site Plan Committee Record: 811-24-000619-STR Job Address: 1100 Shelley Street, Springfield OR 97477 Brief Narrative for our permit application A new machine room will be built inside the existing dry storage warehouse to minimize both noise to the neighbors and the costs of building a standalone structure. A ventilation system will be installed for emergency exhaust and temperature control. Our plan is to install upgraded, new refrigeration equipment to be placed in the existing warehouse building; a pipe bridge will run from the existing processing plant to connect to the new equipment in the warehouse. A painted pipe bridge will be engineered and installed from the existing piping in the production area to the new vessels. Installation of the new refrigeration system, engine room, and pipe bridge to replace the obsolete refrigerant currently in use. Once the new system is online and tied in, the old system will be demolished and taken away. We anticipate the noise that is currently an issue for the neighborhood to decrease once the equipment is installed in the warehouse. Also, new equipment is rated at lower decibels than what is there currently. Given the noise concerns we will leave the Sound Wall panels that are currently on-site in place as an extra protection against any noise. This project and plan will be done in one phase (no additional phases are required as we are only replacing equipment). There is no change to the footprint of the site. No grading or paving is required, and there is no landscaping that will be affected in this vicinity. There is no new lighting plan and no modification to the existing lighting. Attached is a revised set of drawings for Permit as requested by the Site Plan Committee, I have added an existing site plan without any of the proposed additions shown, as requested. Please feel free to contact me with any questions. Thank you! Clarissa Martinez Project Manager, Northwest Division APCCO - Applied Process Cooling Corp Salem | 3501 Brooklake Rd., Salem, OR 97303
Office: (503) 689-1200 ext. 203 | Cell: (503) 801-8844 | apcco.net