HomeMy WebLinkAboutApplication Applicant 4/16/2024Revised 3/9/22 Sandy Belson 1 of 4
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Floodplain Overlay District Development
Required Project Information (Applicant: complete this section)
Applicant Name: Phone:
Company: Email:
Address:
Applicant’s Rep.: Phone:
Company: Email:
Address:
Property Owner: Phone:
Company: Email:
Address:
ASSESSOR'S MAP NO: TAX LOT NO(S):
Property Address:
Size of Property: Acres Square Feet
Zoning:
Existing Use:
Description of
Proposal:
If you are filling in this form by hand, please attach your proposal description to this application.
Signatures: Please sign and print your name and date in the appropriate box on the next page.
Required Property Information (City Intake Staff: complete this section)
Associated Cases:
Case No.: Date: Reviewed by:
Application Fee: $ Technical Fee: $ Postage Fee: $0
TOTAL FEES: $ PROJECT NUMBER:
Eliyah Cassidy 541-505-0761
United Property Improvement Eli@UnitedPropertyImprovement.com
29540B Airport Road, Eugene OR 97402
Chris 541-505-0761
United Property Improvement Chris@UnitedPropertyImprovement.com
29540B Airport Road, Eugene OR 97402
Greg Daily 541-780-5808
N/A gregdaily2395@gmail.com
2005 Harbor Drive, Springfield OR 97477
18-03-02-33 08300
2002 Harbor Drive, Springfield OR 97477
LDR - PLOS
N/A
0.46 (0.15 Tax Account)
DocuSign Envelope ID: 0FA7CFAD-F182-42A5-BE10-9FFF5BA1A590
Revised 3/9/22 Sandy Belson 2 of 4
Signatures
The undersigned acknowledges that the information in this application is correct and accurate.
Applicant:
Date:
Signature
Print
If the applicant is not the owner, the owner hereby grants permission for the applicant to act in his/her behalf.
Owner:
Date:
Signature
Print
DocuSign Envelope ID: 0FA7CFAD-F182-42A5-BE10-9FFF5BA1A590
Eliyah Cassidy
4/8/2024
4/8/2024
Gregory Daily
Revised 3/9/22 Sandy Belson 3 of 4
Floodplain Overlay District Development Application Process
1. Applicant Submits a Floodplain Overlay District Development Application to the
Development & Public Works Department
• The application must conform to the Floodplain Overlay District Development
Submittal Requirements Checklist on page 4 of this application packet.
• Planning Division staff screen the submittal at the front counter to determine
whether all required items listed in the Floodplain Overlay District Development
Submittal Requirements Checklist have been submitted.
• Applications missing required items will not be accepted for submittal.
2. City Staff Conduct Detailed Completeness Check
• Planning staff conduct a detailed completeness check within 30 days of submittal.
• The assigned Planner notifies the applicant in writing regarding the completeness of
the application.
• An application is not deemed complete until all information as required by SDC
3.3.435(B), including all information necessary to evaluate the proposed
development, its impacts, and its compliance with the provisions of the Springfield
Development Code and other applicable codes and statutes have been provided.
• Incomplete applications, as well as insufficient or unclear data, will delay the
application review process and may result in denial.
3. City Staff Review the Application and Issue a Decision
• Floodplain development approval is a Type I decision and thus is made without
public notice and without a public hearing since there are clear and objective
approval criteria and/or development standards that do not require the use of
discretion.
• Decisions address all the applicable approval criteria and/or development
standards.
• Applications may be approved, approved with conditions, or denied based on the
findings of fact showing compliance/non-compliance with the floodplain
development standards in SDC 3.3.430.
• The City mails the applicant and any party of standing a copy of the decision, which
is effective on the day it is mailed.
• The decision issued is the final decision of the City and may not be appealed.
4. Next Steps
• Approval of a floodplain development permit is required before construction or
development begins within any area of special flood hazard established in SDC
3.3.420(B).
• Upon placement of the lowest floor of a structure (including basement) but prior to
further vertical construction, applicant must obtain documentation, prepared and
sealed by a professional licensed surveyor or engineer, certifying the elevation (in
relation to mean sea level) of the lowest floor (including basement).
• Where base flood elevation data are utilized, the applicant must obtain As-built
certification of the elevation (in relation to mean sea level) of the lowest floor
(including basement) prepared and sealed by a professional licensed surveyor or
engineer, prior to the final inspection.
DocuSign Envelope ID: 0FA7CFAD-F182-42A5-BE10-9FFF5BA1A590
Revised 3/9/22 Sandy Belson 4 of 4
Floodplain Overlay District Development Submittal Requirements Checklist
NOTE: If you feel an item does not apply, please state the reason why and attach the
explanation to this form.
Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department and on the city’s website. The applicable application, technology, and
postage fees are collected at the time of complete application submittal.
Floodplain Development Application Form
Property Ownership or Control – a copy of the deed to the property, present lease
agreement, or other evidence showing the applicant is exclusive ownership or control of
the property, or has consent of all owners to act on their behalf.
Narrative explaining the proposal and any additional information that may have a
bearing on the action to be taken, including findings demonstrating compliance with the
Floodplain Overlay District Development Standards described in SDC 3.3.430.
Three (3) Copies of a Plot Plan drawn to scale to include:
The nature, location, dimensions, and elevations of the development area
Name, location, and dimensions of all existing and proposed structures
Name, location, and dimensions and amount of fill and/or excavations
Name, location, and dimensions of all storage of materials
Name, location, and dimensions of all drainage facilities
Base flood elevation area
Elevation in relation to mean sea level
Of the natural grade(s) of the proposed development area (for structures, show
elevations at the corners of the proposed structures) prior to excavation or the
placement of fill
Of the lowest floor (including basement) of all structures and all attendant
utilities of all new and substantially improved structures (in accordance with
SDC 3.3.425(C)(2)
To which any structure has been flood-proofed
Other Permits – Copies of required local, state, and federal permits
Floodproofing Certification – Provide certification by a registered professional engineer
or architect licensed in the State of Oregon that flood-proofing methods for any non-
residential structure meet the flood-proofing criteria for non-residential structures in SDC
3.3.430(B)(3)(c).
Floodway – Certification by a registered professional engineer demonstrating through
hydrologic and hydraulic analyses performed in accordance with standard engineering
practice that proposed encroachment(s) will not result in any increase in flood levels
within the community during the occurrence of the base flood discharge (unless a CLOMR
is approved by FEMA).
Watercourse – Description of the extent to which any watercourse will be altered or
relocated. Base Flood Elevation data for subdivision proposals or other development when
required per SDC 3.3.425(C)(1) and SDC 3.3.430(A)(7)
Substantial Improvement Calculation for any improvement, addition, reconstruction,
renovation, or rehabilitation of an existing structure
DocuSign Envelope ID: 0FA7CFAD-F182-42A5-BE10-9FFF5BA1A590
Daily Manufactured Home Installation Narrative
Once permits are approved, the plan is to lay form boards, get them inspected, pour
concrete, let it cure, place the manufactured home on it, get it married, get a set up inspection, get
it strapped down, lay block around it, get it belly banded, hook it up to water, power and sewer,
install gutters, downspouts and drains, then backfill and sculpt.
There will also be stormwater treatment installed.
450
445
440
449
449
448
438
PROJECT NO.:
DATE :
CHECKED:
LEI ENGINEERING
& SURVEYING
2564 19TH St SE
Salem, Oregon 97302
(503) 399-3828
www.leiengineering.comOF OREGON
SCALE:
1" = 40'
17-64
04-02-2024
C. FOGERSON, P.L.S.
2002 HARBOR DR
SCALE IN FEET
0 40'80'
TBM 1
1/2" IRON ROD
ELEV: 449.84'
TBM 2
PK NAIL
ELEV: 448.66'
FORM BOARD
HARBOR DR CENTERLINE
BASE FLOOD ELEVATION EXHIBIT
LOT 35, BLOCK 3 OF "FILBERT GROVE 5TH ADDITION"
REAL PROPERTY IN SW 1/4 OF SECTION 2
TOWNSHIP 18 SOUTH, RANGE 3 WEST, WILLAMETTE MERIDIAN
CITY OF SPRINGFIELD, LANE COUNTY, OREGON
FOR: GREG DAILY
NOTES:
THIS MAP IS PRODUCED TO ILLUSTRATE THE
LOCATION AND ELEVATION OF LOCAL CONTROL,
BEING TWO TBM'S WITH ELEVATIONS ON THE
NGVD29 DATUM, THE SAME DATUM AS THE
FIRM LISTED HEREON.
FIRM ZONE: AE
BASE FLOOD ELEVATION:449.0 FEET
TBM 1 ELEVATION: 449.84 FEET
TBM 2 ELEVATION: 448.66 FEET
THE BASE FLOOD ELEVATION OF 449' BASED
ON FIRM 41039C1144 F, THE SAID FIRM
VERTICAL DATUM IS NGVD29.
THE CONTRACTOR SHALL CONSULT WITH
LOCAL MUNICIPALITIES ON THE REQUIRED
HEIGHT ABOVE THE BASE FLOOD ELEVATION
THAT THE FINISHED FLOOR AND MECHANICAL
EQUIPMENT MUST BE CONSTRUCTED.
THE PROPERTY BOUNDARY ON THIS MAP IS
FOR GRAPHICAL PURPOSES ONLY. NO
PROPERTY CORNERS SHALL BE SET, AND THIS
MAP SHALL NOT BE RECORDED AT THE
COUNTY AS RECORD.
WILLAMETTE RIVER
LOT 35
LOT 36
LOT 34
LOT 37
CALCULATED POINT
(TYPICAL)
RIGHT OF WAY LINE
CURB AND GUTTER