ITEM TITLE: 2025-2029 CAPITAL IMPROVEMENT PROGRAM, A COMMUNITY REINVESTMENT
PLAN
ACTION
REQUESTED:
Review and provide direction for the recommended five-year Capital Improvement Program (CIP).
ISSUE
STATEMENT:
Draft Project lists have been prepared for the City of Springfield’s 2025-2029 CIP – A Community
Reinvestment Plan. The lists were presented to the Planning Commission during the November 7th
work session for discussion and comment. It is now being brought to the Planning Commission to
hold a public hearing, provide final comments, and provide a recommendation to the City Council
to approve the CIP. The City Council has reviewed the CIP at their November 27th work session
with consideration for final adoption January 16th, 2024.
ATTACHMENTS: 1. Communication Memorandum
2. Draft 2025-2029 Capital Improvement Program – A Community Reinvestment Plan Project
Lists
3. Citizen Request Summary
4. Planning Commission Order
DISCUSSION:
Draft project lists have been compiled for the City of Springfield 2025-2029 CIP. Since the
Planning Commission reviewed the draft list at the November 7th work session, no changes have
been suggested. The proposal is ready for Planning Commission final review and approval of the
CIP.
The City of Springfield’s Capital Improvement Program (CIP) is a five-year Community
Reinvestment Plan that describes the near-term program for funding, evaluation, and construction
of City owned and operated public facilities. A fundamental purpose of the CIP is to facilitate the
efficient use of capital resources to maintain, improve, and expand City assets. The underlying
concept is to strategically prioritize and program these resources to extend the useful life of
existing assets, replace assets before failure, and to support growth with timely expansion.
As a reference, the Planning Commission Memorandum from the November 7th, 2023 work
session is included as Attachment 1.
After hearing public comments, Staff recommends that the Planning Commission support the draft
2025-2029 CIP and recommend it for Council review and adoption.
01/03/2023
Regular Meeting
Stan Petroff, DPW
Jeff Paschall, DPW
541-726-1673
541-726-1674
10 Minutes
COMMUNICATION MEMORANDUM Meeting Date: 11/7/2023
Meeting Type: Work Session
Staff Contact/Dept.: Stan Petroff/DPW
Jeff Paschall/DPW
Staff Phone No: 541-726-1673
541-726-1674
Estimated Time: 30 Minutes
S P R I N G F I E L D
PLANNING COMMISSION
Council Goals: Maintain and Improve
Infrastructure and
Facilities
ITEM TITLE: 2025-2029 CAPITAL IMPROVEMENT PROGRAM, A COMMUNITY
REINVESTMENT PLAN
ACTION
REQUESTED:
Review and provide direction for the recommended five-year Capital Improvement
Program (CIP).
ISSUE
STATEMENT:
Draft Project lists have been prepared for the City of Springfield’s 2025-2029 CIP – A
Community Reinvestment Plan. The lists are being brought to the Planning
Commission for review and discussion with the Planning Commission. Staff will bring
the CIP back to the Planning Commission December 5th during the regular session for a
recommendation to forward to the City Council.
ATTACHMENTS: 1. Draft 2025-2029 Capital Improvement Program – A Community Reinvestment Plan
Project Lists
DISCUSSION:
BACKGROUND
The City of Springfield’s Capital Improvement Program (CIP) is a five-year
Community Reinvestment Plan that describes the near-term program for funding,
evaluation, and construction of City owned and operated public facilities. A
fundamental purpose of the CIP is to facilitate the efficient use of capital resources to
maintain, improve, and expand City assets. The underlying concept is to strategically
prioritize and program these resources to extend the useful life of existing assets,
replace assets before failure, and to support growth with timely expansion.
The CIP is typically updated on a biennial basis and was last updated in the fall of 2021.
The CIP update schedule is set to ensure that adoption of the plan occurs prior to
preparation of the draft capital budget which typically begins the end of January each
year.
The CIP is an intermediate step in a process that originates with long term planning
activities that anticipate the need for public facilities at least 20 years into the future and
concludes with the adoption of the annual Capital Budget to appropriate funds to
construction projects. Operation and maintenance cost of City owned assets is
appropriated separately in the City’s budget.
As the interim step in the process, the CIP identifies the facilities concepts that may
reasonably be expected to be required in the next five years, refines those concepts, and
provides a priority list of projects. Priority projects are selected from the long list of
needed capital improvements identified in the various master plans and refinement plans.
The draft project lists are then presented to both the Planning Commission and the City
Council for public review and comment prior to adoption by the City Council.
Over the last decade, the City has seen the wastewater and stormwater funds stabilize,
which has supported completion of several projects and funding to be programmed for
the next suite of projects identified within the City’s adopted master plans. The City is
currently in the midst of a Wastewater Master Plan update that assesses capital needs for
Attachment 1, Page 1 of 4
the next 20 years. The draft project list from this effort has been used to inform
wastewater section for this CIP update and will be utilized for future updates. Street and
Transportation funds have not seen growth to keep pace with operating costs and provide
for robust capital spending. The City relies on federal and state funding sources to
support a majority of street and transportation projects and relies on street fund revenues
and systems development charges to provide required match to outside funding sources.
The City Council has directed staff to prepare a proposed project list and other materials
to consider seeking voter approval of another street preservation bond next year.
The project section of the 2025-2029 CIP is organized by asset system with three
sections for each system. The first section is a table that has details for the projects that
are either in the current capital budget or have been completed since the last CIP
update. The next section is the project detail sheets for those projects proposed to be
programmed over the next five-year cycle. The last section is another table detailing
the list of currently unfunded or partially funded projects. As appropriate resources
become available or potential grant opportunities are identified these lists will be used
to match projects with those priorities.
Stormwater – In review of the current capital budget and the previous CIP, a majority
of the projects have been placed into a hold status. This is due to anticipation of
focusing limited capital delivery staffing resources to delivery of the 2024 GO Bond
street preservation projects, as well as Phase 2 of the federal aid funded Franklin Blvd.
Roundabout Project. However, water quality initiatives are being advanced as many of
the street projects incorporate improvements to treat runoff from street surfaces.
Street and Transportation – Currently all of the street segments scheduled for
preservation through the citizen approved five-year general obligation bond are
completed. Several safety and pedestrian projects were also completed over the past
two years such as the Aster St. ADA Ramp Project, Jasper Dondea RRFB, Meadow
Park ADA Ramp Project, Virginia-Daisy Bikeway – Phase 1A, S. 32nd and Virginia
RRFB, and Jasper Rd/Filbert Ln SRTS Project. Many others such as the Sidewalk
Filling the Gaps, Franklin Blvd./OR22 Environmental Study, Franklin Blvd.
Roundabouts Phase 2, 42nd St. Levee Study, S28th St. Paving, Virginia-Daisy Bikeway
Phase 2, Mill St. Reconstruction, Laura St. Reconstruction, Signal Enhancements
Project, S 42nd/Daisy Roundabout and 42nd St. Overlay are in the design phase with
construction anticipated in 2024 or 2025. If the passage of a 2024 GO Bond project
package is successful it is anticipated planning and design for preservation of several
additional street segments will start in late 2024.
Wastewater – Several sewer projects have been completed over the last couple of years
including 42nd-48th Sanitary Sewer Rehab, S. 28th St. Sanitary Sewer Extension, and S.
37th/S. 38th/Osage Sewer Replacement. The Jasper Trunk Sewer – Phase 3 and 70th St
and 72nd St. Wastewater Basin Rehab Projects are currently in the design phase with
anticipated construction in either 2024 or 2025. Wastewater improvements are also
planned for the Mill Street and 16th Street Emergency Repair projects which are
currently in the design phase with construction planned in 2024. There are several areas
within the City and urban growth boundary that are fully developed but lack wastewater
service. It is anticipated sewer extensions to these areas will be completed in 2024 and
2025 and these projects are proposed in the 2025-2029 CIP. Additionally, the
Wastewater Master Plan is being updated and certain portions of the Capacity,
Management, Operations, and Maintenance (CMOM) program are proposed to be
included as policy. Adoption of the updated document is expected in 2024. In
anticipation of this update, some of the identified rehabilitation needs are considered
with this CIP update.
Attachment 1, Page 2 of 4
Buildings and Facilities – Available funding for building and facilities projects is very
limited so there is a long list of identified unfunded projects or programs. However,
upgrades to City Hall including security and Council Hall improvements and the
Building G roof at Booth-Kelly were completed. Additional upgrades to at City Hall are
planned for 2024 and 2025. Many of these projects have been funded through American
Rescue Plan Act (ARPA) funds.
FUTURE CONSIDERATIONS
As stated earlier, many of the stormwater and wastewater projects have been on hold
due to staffing resources. The majority of capital staff workload has been focused on
delivering street and transportation projects. A change to this focus for current staff is
not for the near or intermediate term as the City is seeking to pass another street
preservation bond and several federal grant funded transportation projects are currently
programmed.
Given that the wastewater and stormwater funds are very stable with healthy reserves
and a steady annual revenue stream, Community Development will be recommending
an increase in capital staffing levels for FY25. If approved, new staff would be
dedicated to delivery of wastewater and stormwater projects.
FINANCIAL IMPACT:
The CIP does not carry budget authority. It is, however, a valuable planning tool used
to guide staff, the Budget Committee, and the City Council in creating the annual
budget to fund priority projects.
Attachment 1, Page 3 of 4
S. 67th Street
Stormwater
Improvements
Jasper-Natron
Lower
Mill Race
Mill Race
FIRM Update
Over-Under
Channel
Phase 2
Gateway Area
Traffic
Improvements
Aspen Street
Improvements
Harbor Drive
Pump Station
Oregon State Parks, State of Oregon GEO, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS,
USDA, Esri, NASA, NGA, USGS, FEMAPublished: 12/4/2023
There are no warranties that accompany this product. Users assume allresponsibility for any loss or damage arising from any error, omission, orpositional inaccuracy of this product.
0 0.5 1
Miles o
!"#$5
Drainage Repair
Channel Improvement
MS4 Permit Requirements
Riparian Land Management
HOA Water Quality Facilities
Wastewater Repair
CMOM Planning & Implementation
Local Sewer Extension
ADA Transition Projects
Transportation Demand Management
Traffic Control Projects
Intelligent Transportation Systems (ITS)
Local/Residential Street Preservation
& Maintenance
Building Preservation
CITY-WIDE CIP PROJECTS NOT SHOWN ON MAP
STORMWATER
BUILDINGS & FACILITIES
STREETS & TRANSPORTATION
WASTEWATER
Stormwater Streets &
Transportation
Wastewater
FUNDED CAPITAL
IMPROVEMENT PROJECTS (CIP)
2025-2029
City Limits
Urban Growth Boundary
Attachment 1, Page 4 of 4
COMMUNICATION MEMORANDUM Meeting Date: 11/7/2023
Meeting Type: Work Session
Staff Contact/Dept.: Stan Petroff/DPW
Jeff Paschall/DPW
Staff Phone No: 541-726-1673
541-726-1674
Estimated Time: 50 Minutes
S P R I N G F I E L D
PLANNING COMMISSION
Council Goals: Maintain and Improve
Infrastructure and
Facilities
ITEM TITLE: 2025-2029 CAPITAL IMPROVEMENT PROGRAM, A COMMUNITY
REINVESTMENT PLAN
ACTION
REQUESTED:
Review and provide direction for the recommended five-year Capital Improvement
Program (CIP).
ISSUE
STATEMENT:
Draft Project lists have been prepared for the City of Springfield’s 2025-2029 CIP – A
Community Reinvestment Plan. The lists are being brought to the Planning
Commission for review and discussion with the Planning Commission. Staff will bring
the CIP back to the Planning Commission December 5th during the regular session for a
recommendation to forward to the City Council.
ATTACHMENTS: 1. Draft 2025-2029 Capital Improvement Program – A Community Reinvestment Plan
Project Lists
DISCUSSION:
BACKGROUND
The City of Springfield’s Capital Improvement Program (CIP) is a five-year
Community Reinvestment Plan that describes the near-term program for funding,
evaluation, and construction of City-owned and operated public facilities. A
fundamental purpose of the CIP is to facilitate the efficient use of capital resources to
maintain, improve, and expand City assets. The underlying concept is to strategically
prioritize and program these resources to extend the useful life of existing assets,
replace assets before failure, and to support growth with timely expansion.
The CIP is typically updated on a biennial basis and was last updated in the fall of 2021.
The CIP update schedule is set to ensure that adoption of the plan occurs prior to
preparation of the draft capital budget which typically begins the end of January each
year.
The CIP is an intermediate step in a process that originates with long term planning
activities that anticipate the need for public facilities at least 20 years into the future and
concludes with the adoption of the annual Capital Budget to appropriate funds to
construction projects. Operation and maintenance cost of City-owned assets is
appropriated separately in the City’s budget.
As the interim step in the process, the CIP identifies the facilities concepts that may
reasonably be expected to be required in the next five years, refines those concepts, and
provides a priority list of projects. Priority projects are selected from the long list of
needed capital improvements identified in the various master plans and refinement plans.
The draft project lists are then presented to both the Planning Commission and the City
Council for public review and comment prior to adoption by the City Council.
Over the last decade, the City has seen the wastewater and stormwater funds stabilize,
which has supported completion of several projects and funding to be programmed for
the next suite of projects identified within the City’s adopted master plans. The City is
currently in the midst of a Wastewater Master Plan update that assesses capital needs for
Attachment 1, Page 1 of 3
the next 20 years. The draft project list from this effort has been used to inform
wastewater section for this CIP update and will be utilized for future updates. Street and
Transportation funds have not seen growth to keep pace with operating costs and provide
for robust capital spending. The City relies on federal and state funding sources to
support a majority of street and transportation projects and relies on street fund revenues
and systems development charges to provide required match to outside funding sources.
The City Council has directed staff to prepare a proposed project list and other materials
to consider seeking voter approval of another street preservation bond next year.
The project section of the 2025-2029 CIP is organized by asset system with three
sections for each system. The first section is a table that has details for the projects that
are either in the current capital budget or have been completed since the last CIP
update. The next section is the project detail sheets for those projects proposed to be
programmed over the next five-year cycle. The last section is another table detailing
the list of currently unfunded or partially funded projects. As appropriate resources
become available or potential grant opportunities are identified these lists will be used
to match projects with those priorities.
Stormwater – In review of the current capital budget and the previous CIP, a majority
of the projects have been placed into a hold status. This is due to anticipation of
focusing limited capital delivery staffing resources to delivery of the 2024 General
Obligation (GO) Bond street preservation projects, as well as Phase 2 of the federal aid
funded Franklin Blvd. Roundabout Project. However, water quality initiatives are
being advanced as many of the street projects incorporate improvements to treat runoff
from street surfaces.
Street and Transportation – The City completed all of the street segments scheduled for
preservation through the citizen approved five-year general obligation bond are
completed. Several safety and pedestrian projects were also completed over the past
two years such as the Aster St. ADA Ramp Project, Jasper Dondea Rectangular Rapid
Flashing Beacon (RRFB), Meadow Park ADA Ramp Project, Virginia-Daisy Bikeway
– Phase 1A, S. 32nd and Virginia RRFB, and Jasper Rd/Filbert Ln Safe Routes to
School Project. Many others such as the Sidewalk Filling the Gaps, Franklin
Blvd./OR22 Environmental Study, Franklin Blvd. Roundabouts Phase 2, 42nd St. Levee
Study, S28th St. Paving, Virginia-Daisy Bikeway Phase 2, Mill St. Reconstruction,
Laura St. Reconstruction, Signal Enhancements Project, S 42nd/Daisy Roundabout and
42nd St. Overlay are in the design phase with construction anticipated in 2024 or 2025.
If the passage of a 2024 GO Bond project package is successful, it is anticipated
planning and design for preservation of several additional street segments will start in
late 2024.
Wastewater – Several sewer projects have been completed over the last couple of years
including 42nd-48th Sanitary Sewer Rehab, S. 28th St. Sanitary Sewer Extension, and S.
37th/S. 38th/Osage Sewer Replacement. The Jasper Trunk Sewer – Phase 3 and 70th St
and 72nd St. Wastewater Basin Rehab Projects are currently in the design phase with
anticipated construction in either 2024 or 2025. Wastewater improvements are also
planned for the Mill Street and 16th Street Emergency Repair projects which are
currently in the design phase with construction planned in 2024. There are several areas
within the City and urban growth boundary that are fully developed but lack wastewater
service. It is anticipated sewer extensions to these areas will be completed in 2024 and
2025 and these projects are proposed in the 2025-2029 CIP. Additionally, the
Wastewater Master Plan is being updated and certain portions of the Capacity,
Management, Operations, and Maintenance (CMOM) program are proposed to be
included as policy. Adoption of the updated document is expected in 2024. In
anticipation of this update, some of the identified rehabilitation needs are considered
with this CIP update.
Attachment 1, Page 2 of 3
Buildings and Facilities – Available funding for building and facilities projects is very
limited so there is a long list of identified unfunded projects or programs. However,
upgrades to City Hall including security and Council Chamber improvements and the
Building G roof at Booth-Kelly were completed. Additional upgrades to at City Hall are
planned for 2024 and 2025. Many of these projects have been funded through American
Rescue Plan Act (ARPA) funds.
FUTURE CONSIDERATIONS
As stated earlier, many of the stormwater and wastewater projects have been on hold
due to limited staffing resources. The majority of capital staff workload has been
focused on delivering street and transportation projects. A change to this focus for
current staff is not for the near or intermediate term as the City is seeking to pass
another street preservation bond and several federal grant funded transportation projects
are currently programmed.
Given that the wastewater and stormwater funds are very stable with healthy reserves
and a steady annual revenue stream, Community Development will be recommending
an increase in capital staffing levels for FY25. If approved, new staff would be
dedicated to delivery of wastewater and stormwater projects.
FINANCIAL IMPACT:
The CIP does not carry budget authority. It is, however, a valuable planning tool used
to guide staff, the Budget Committee, and the City Council in creating the annual
budget to fund priority projects.
Attachment 1, Page 3 of 3
UNDERSTANDING THE PROJECT PAGES
Once projects are identified and selected for inclusion in the Capital Improvement Program, a project
page is created for the project. The project page includes important information about a project such
as: project description, relation to plans and policies, and status. This information is important for
conveying and tracking details as each project moves from concept to construction. The following is a
list and description of these elements:
Project Description – This is a description or early scope for a project. Many times this description will
be very broad as it may be taken from a master plan or refinement plan and most likely in conceptual
form. The actual scope of a project is generally refined through the various phases of project planning,
design and delivery.
Project Status – Status describes the current stage of the Project, e.g. Planning, design, or construction.
Specific Plans/Policies related to this Project – This is a list of the various Council Goals, master plans,
refinement plans, adopted policies, and/or reports that relate to a project.
Expenditure Schedule – Lists various project activities and estimates the timing and cost to accomplish
the project activity.
Funding Source – Describes how and when a project will/needs to be funded and the source of that
funding (e.g., bonds, capital funds, SDCs, grants).
Attachment 2, Page 1 of 37
STORMWATER
Overview
Stormwater projects fall into several categories:
Stormwater Studies – These projects typically fund the study of an area or basin to review current
conditions and model future conditions to determine capital investment needs such as water quality
facilities, repairs and upgrades, or system expansion.
Stormwater Rehab/Improvements – These projects typically provide upgrades to the City’s existing
stormwater system or the removal of inactive or potentially unsafe storm lines. Projects may include the
repair and upsizing of storm lines, or the addition of storm lines to reduce localized flooding and
enhance system performance.
Capacity Enhancement – These projects typically provide additional capacity to an existing stormwater
system that is currently undersized or address capacity needs that have been identified to support
future growth. These types of improvements may include an additional detention pond, detention
facilities, offline water quality treatment facilities, or increased pipe capacity.
Restoration and enhancement – These projects typically involve restoring or enhancing streams and
waterways. Projects may include repairing channel deterioration, providing access for fish passage,
removal of invasive plant species and enhancing native species, or improving flow capacity.
New Facilities - These projects typically add new capacity to the system by constructing new stormwater
facilities because of or in anticipation of new development, or permit requirements to expand treatment
capacity. Projects may include storm lines or water quality facilities built as part of a new subdivision or
identified in the Stormwater Master Plan. Projects may also include the extension of stormwater
pipelines to support growth.
Attachment 2, Page 2 of 37
Project Title
Project
Number
In
Previous
CIP Project Category
Project
Status
FY24 Budget
($ in Thousands)
Total Cost to
Complete Notes
5th St./EWEB Path Pipe Upgrade P21124 X Upgrades On-Hold $112
Booth Kelly Stormwater Drainage Plan
Implementation P50234 X Upgrades Not Started $150
Irving Slough Improvements P21138 X Water Quality On-Hold $1,225
Pending needs analysis following
International Paper's process water
discharge changes and 42nd St Levee
analysis
2021 Maintenance Hole Rehab P21168 Repair and
Preservation Completed $0 Constructed in FY22
Channel 6 Master Plan Implementation P41020 X Upgrades On-Hold $799
Some work will complete as part of the
Laura Street Upgrades, remainder of
projects on hold
Stormwater Master Plan Update P41021 X Studies Not Started $0
Glenwood Stormwater Master Plan P41042 X Studies Planning $325
42nd Street Levee Study P41044 X Flood Control Planning $600 Receiving a State grant ($40,000) in FY22
Glenwood Park Blocks P41045 X Studies Not Started $50
Stormwater Repair P61002 X Repair and
Preservation
Ongoing
Program $700
Channel Improvement P61004 X Water Quality Ongoing
Program $1,192
MS4 Permit Implementation P61005 X Water Quality Ongoing
Program $80 Updating code in FY24, ongoing annual
reporting and program management
Riparian Land Management P61006 X Water Quality Ongoing
Program $303 Purchased Linda Lane property.
HOA Water Quality Facilities P61012 X Water Quality Ongoing
Program $85
South 70th St Storm Pipe Replacement P21191 Flood Control On-Hold
2023 Main. Hole Rehabilitation P21192 Repair and
Preservation On-Hold
FY23-FY24 Capital Project Status Update - Stormwater
Attachment 2, Page 3 of 37
Drainage Repair
Department
Specific Plans/Policies Related to this Project:
Springfield Stormwater Management Plan
Stormwater Master Plan
DEQ Stormwater Discharge Permit
Asset Management Program
Natural Hazard Mitigation Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $150 $150 $150 $150 $150 $750
Stormwater Reimbursement SDC $50 $50 $50 $50 $50 $250
Total $200 $200 $200 $200 $200 $1,000
Project Status:
Ongoing Program
Stormwater Repair and Preservation
Development and Public Works
Project Description:
This program involves the rehabilitation of Springfield drainage systems; to repair or replace older pipe in the system
and solve flooding problems and reduce street surface failures due to poor drainage. This program also includes
rehabilitation of catch basins and culverts to prevent flooding, and the contractual cleaning of large storm sewer pipe.
Potential projects include:
Attachment 2, Page 4 of 37
Department
Specific Plans/Policies Related to this Project:
Springfield Stormwater Management Plan
Stormwater Master Plan
DEQ Stormwater Discharge Permit
Asset Management Program
Natural Hazard Mitigation Plan
Total Maximum Daily Load (TMDL) Implementation Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $80 $80 $80 $80 $80 $400
Stormwater Reimbursement SDC $20 $20 $20 $20 $20 $100
Total $100 $100 $100 $100 $100 $500
Project Status:
Ongoing Program
Channel Improvement
Stormwater Water Quality
Development and Public Works
Project Description:
This project is intended to provide improvements to key drainage ways to address barriers to fish passage, and to
correct previous channel modifications that have caused deterioration of flow capacity, water quality, and fish habitat
functions. These improvements include culvert replacements or retrofits, road crossing and outfall modifications, and
channel restoration. The adoption of the Springfield Total Maximum Daily Load Implementation Plan identifies an
additional temperature benefit from channel restoration and shading.
Attachment 2, Page 5 of 37
Department
Specific Plans/Policies Related to this Project:
Springfield Stormwater Management Plan
Stormwater Master Plan
DEQ Stormwater Discharge Permit
Total Maximum Daily Load (TMDL) Implementation Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $20 $20 $20 $20 $20 $100
Stormwater Reimbursement SDC $20 $20 $20 $20 $20 $100
Total $40 $40 $40 $40 $40 $200
Project Status:
Ongoing Program
Stormwater Water Quality
MS4 Permit Requirements
Development and Public Works
Project Description:
Develop and implement programs and projects to comply with the National Pollutant Discharge Elimination System
(NPDES) Municipal Separate Storm Sewer System (MS4) Discharge requirements. In 2003, the City applied for an
MS4 permit from the Oregon Department of Environmental Quality (DEQ), which authorizes the City to lawfully
discharge stormwater to the McKenzie and Willamette Rivers and their tributaries. The Permit was renewed in 2021
and requires the City to implement programs and capital projects that improve stormwater quality. Data show that
stormwater in Springfield waterways routinely violates water quality standards established to protect human health and
aquatic life. This project provides for minor capital improvements and/or capital equipment purchases necessary and
appropriate to address high priority water quality problem areas.
Attachment 2, Page 6 of 37
Department
Specific Plans/Policies Related to this Project:
Springfield Stormwater Management Plan
Stormwater Master Plan
DEQ Stormwater Discharge Permit
Total Maximum Daily Load (TMDL) Implementation Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $15 $15 $15 $15 $15 $75
Stormwater Reimbursement SDC $13 $13 $13 $13 $13 $65
Total $28 $28 $28 $28 $28 $140
Project Status:
Ongoing Program
Stormwater Water Quality
Riparian Land Management
Development and Public Works
Project Description:
This project provides funding to purchase riparian area lands from private property owners where needed to meet City
and regulatory objectives for water quality, stormwater management, flood control and habitat protection. It also
provides funding for consultant services to evaluate riparian buffer areas, City and other activities affecting them.
Property acquisitions will typically result in increased operational spending to maintain city owned property. Projects
developed on property acquired may, however, produce savings through reduced spending for flood control, water
quality improvement, and wetland mitigation activities. Project funding levels have been reduced to conform to
eligibility levels for improvement SDCs. Council adoption and implementation of a reimbursement SDC may permit
restoration of prior funding levels.
Attachment 2, Page 7 of 37
Department
Specific Plans/Policies Related to this Project:
Springfield Stormwater Management Plan
Stormwater Master Plan
DEQ Stormwater Discharge Permit
Total Maximum Daily Load (TMDL) Implementation Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $85 $85 $85 $85 $85 $425
Stormwater Reimbursement SDC
Total $85 $85 $85 $85 $85 $425
Project Status:
Ongoing Program
Stormwater Water Quality
HOA Water Quality Facilities (WQF)
Development and Public Works
Project Description:
There are approximately 40 WQFs in subdivisions that were built between 1993 and 2010 that are privately owned by
HOAs or another private entity (individual residents, the original developer, etc.). The City has taken a progressively
more active role in maintaining these facilities over the past five years. With the approval of Council in 2013, the City’s
Operations Division hires a temporary work crew each summer to manage vegetation in the facilities and ensure they
are functioning properly. This capital program will begin setting aside funds to take over and bring into compliance
selected privately owned water quality facilities.
Attachment 2, Page 8 of 37
Department
Specific Plans/Policies Related to this Project:
Stormwater Master Plan
DEQ Stormwater Discharge Permit
Natural Hazard Mitigation Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $408 $408
Sormwater Improvement SDC $42 $42
Total $0 $450 $0 $0 $0 $450
Project Status:
Not Started
Stormwater Flood Control
S. 67th Street Stormwater Improvements
Development and Public Works
Project Description:
Pipe improvements for flood control. Currently, during heavy rainfall the storm system surcharges at 67th and Main
Street flooding private property.
Attachment 2, Page 9 of 37
Department
Specific Plans/Policies Related to this Project:
Stormwater Master Plan
DEQ Stormwater Discharge Permit
Natural Hazard Mitigation Plan
Total Maximum Daily Load (TMDL) Implementation Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $350 $350
Sormwater Improvement SDC $350 $350
Total $0 $0 $700 $0 $0 $700
Project Status:
Not Started
Stormwater Expansion
Jasper-Natron
Development and Public Works
Project Description:
The Jasper-Natron area requires comprehensive evaluation for future stormwater infrastructure needs to support
future growth and meet the City's DEQ Stormwater Discharge Permit requirements. The first phase of the project will
completing the analysis to develop a master plan for the basin, followed by implementation either by private
developments, or City sponsored initiatives. The funding identified is for study and plan development.
Attachment 2, Page 10 of 37
Department
Specific Plans/Policies Related to this Project:
Stormwater Master Plan Booth Kelly Stormwater Plan
DEQ Stormwater Discharge Permit Stormwater Management Plan
Natural Hazard Mitigation Plan Mill Race Ecosystem Plan
Total Maximum Daily Load (TMDL) Implementation Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $500 $500
Sormwater Improvement SDC $73 $73
Total $0 $0 $573 $0 $0 $573
Project Status:
Not Started
Stormwater Water Quality
Lower Mill Race
Development and Public Works
Project Description:
Design and construct a daylight or diversion pretreatment structure, an offline water quality treatment facility, and a
green pipe open channel improvement. Additional detail for this multi-faceted project are in WQ-12 project of the
Stormwater Facilities Master Plan.
Attachment 2, Page 11 of 37
Department
Specific Plans/Policies Related to this Project:
Natural Hazard Mitigation Plan
Continued Participation in the National Flood Insurance Program
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $200 $200
Total $0 $0 $200 $0 $0 $200
Project Status:
Not Started
Stormwater Studies
Mill Race Firm Update
Development and Public Works
Project Description:
Using consulting services, prepare a scope document for a new flood plain study to update the Flood Insurance Rate
Map (FIRM) for the Springfield Mill Race from the inlet at Clearwater Park to the outlet at Island Park to incorporate
construction changes.
Attachment 2, Page 12 of 37
Department
Specific Plans/Policies Related to this Project:
Stormwater Master Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Stormwater Capital $500 $500
Sormwater Improvement SDC $10 $10
Total $0 $0 $510 $0 $0 $510
Project Status:
Not Started
Stormwater Studies
Over-Under Channel Phase 2
Development and Public Works
Project Description:
The Over-Under Channel system has approximately 2,200 linear feet of woodstave pipe, and 1,000 linear feet of
corrugated metal pipe (CMP) remaining under the existing channel. Phase 2 is intended to replace the existing
woodstave and remaining CMP with a new pipe, as well as provide a parallel pipe for additional capacity as
recommended in the 2008 Stormwater Facility Master Plan and the Over-Under Channel investigative report. The
remaining pipe to be replaced runs from 10th Street east to 14th Street across Springfield School District property and
Willamalane Park property.
Attachment 2, Page 13 of 37
Project Title Project Category
Project
Status
Estimated Funding
Need Notes
Gray Creek/72nd Street Expansion Not Programmed-Pending Funding $6,000,000 Construction of new channels and other improvements to accommodate
runoff from future development
Corporate Way Pond Studies Not Programmed-Pending Funding $250,000 Develop a vegatation management plan SWMP Project 43-WQ
Cedar Creek Intake Reconstruction Water Quality Not Programmed-Pending Funding $1,000,000 Restoration work to improve and manage year round flow volumes
North Willamette Heights Studies Not Programmed-Pending Funding $100,000 Develop a basin specific master plan to guied development and
redevelopment
Jasper Slough Restoration Not Programmed-Pending Funding $100,000 Culvert and open channel improvements along with riparian vegetation
restoration
Woodstave Removal Upgrades Not Programmed-Pending Funding $750,000
This pipeline is located south of S. A Street and is complicated by the fact
portions of the line are under existing buildings and lack public access
easements
S and T Streets Drainage Upgrades Not Programmed-Pending Funding $750,000 Upgrade project to improve inadequate storm system and alleviate
localized flooding. Reference Channel 6 Study and Master Plan
I-5 N. Gateway/Sports Way Channel Water Quality Not Programmed-Pending Funding $750,000 Construct a combination flood control/water quality facility adjacent to
the Gateway Natural Resource area.
Q Street Channel Water Quality Not Programmed-Pending Funding $750,000 Channel Repair, riparian enhancement and shading to address
temperature issues in the TMDL.
Maple Island Slough Studies Not Programmed-Pending Funding $650,000 Evaluate capacity needs to support developments and develop a
vegetation management plan.
Unfunded Projects List - Stormwater
Attachment 2, Page 14 of 37
TRANSPORTATION
Overview
Transportation projects fall into the categories noted below:
Planning and Project Development – These projects range from larger facility planning, to concept
project planning, to specific project development. Funding for these projects relies heavily on Federal
and State funds, with City funds used to supplement project budgets and, in some cases, provide
required match funding to external resources. Current examples of this in the CIP are Mill Street
Reconstruction and Franklin Boulevard Phase 2 Improvements.
Maintenance and Operations – These projects are typically programmatic and can provide funding for a
range of activities within each project. Street Light Infill and Pole Replacement, Traffic Control Projects,
and Intelligent Transportation System investments fall into this category.
Pavement Preservation – These projects are identified by the Operations Division through the
Infrastructure Management System. Funding for these projects relies heavily on local and State fuel tax
revenues and are supplemented with Transportation Reimbursements SDCs, and federal dollars
programmed at the discretion of the Central Lane Metropolitan Planning organization (MPO). Examples
of pavement preservation projects is the Street Seal and Overlay program identified in this CIP and the
Street Bond preservation projects identified in the previous CIP and current Capital Budget.
System Improvement, Existing – These projects typically either bring existing infrastructure up to the
adopted urban standards, or make capacity and safety improvements to existing facilities. Funding for
these projects rely on all available resources. A current example of these types of projects in the CIP is
the Filling the Gaps – Safe Routes to Schools project.
System Improvement, New Facilities – These projects typically add new infrastructure to the City’s
transportation system and are identified within the various planning documents. The trigger for these
projects is driven mostly by growth and an identified future need to relieve stress on the system. Project
funding relies on all available sources.
Attachment 2, Page 15 of 37
Project Title
Project
Number
In
Previous
CIP Project Category
Project
Status
FY24 Budget
($ in Thousands)
Total Cost to
Complete
($ in Thousands)Notes
Filling the Gaps - Sidewalk Infill
Project P21147 X Safety Design $151 Project list approved through Council
Centennial Blvd Overlay P21151 X Repair and
Preservation Completed $935 Constructed in FY23
High Banks Rd./58th St./
Thurston Rd. Overlay P21152 X Repair and
Preservation Completed $2,301 Constructed in FY23
S. 28th Street Paving P21155 X Upgrades Construction $1,171 Design complete, construction anticipated FY24
Mill Street Reconstruction P21156 x Repair and
Preservation Design $557 Construction anticipated FY24
Mohawk blvd./Olympic St. Overlay P21157 x Repair and
Preservation Completed $2,465 Constructed in FY23
Virginia/Daisy Bicycle Blvd.
Phase 2 - S. 42nd and Daisy
Roundabout
P21159 X Safety Design $594 Design underway, construction anticipated FY24
Gateway/Kruse Improvements P21165 x Safety Completed $0
Jasper Rd./Dondea RRFB P21167 Safety Construction $0 Construction to be completed end of FY23
Aster Street at S 58th and Meadow
Park ADA Ramps P21172 Upgrades Completed $35 Constructed in FY23
City of Springfield Signal
Enhancements P21173 Upgrades Construction $0 Design nearing completion, constsuction anticipated
FY24
Jasper/Filbert RRFB Crossing P21174 Safety Design $0 Design underway, construction anticipated FY24
Franklin OR 225 (Env. Analysis and
Prelim Design)P21176 Upgrades Design $60 $56 Design underway through Preliminary Plans.
S 32nd and Virginia RRFB P21177 Safety Design $20
Citywide Streetlight LED Upgrades P21183 Upgrades Construction $0
Laura St. Reconstruction P21188 Repair and
Preservation Design $182 Design underway, construction anticipated FY24
42nd Street Overlay - International
Paper to Marcola Rd.P21195 Repair and
Preservation Design $1,650 Design underway, construciton anticipated FY24
West D Street Improvements P41049 x Safety Construction $34 Project identified and funded though the Walking-
Biking Safety grant application
Franklin Phase 2 Design P41058 x Upgrades Planning $0
ADA Transition Projects P61003 X Upgrades Ongoing
Program $225
FY23-FY24 Capital Project Status Update - Streets and Transportation
Attachment 2, Page 16 of 37
Project Title
Project
Number
In
Previous
CIP Project Category
Project
Status
FY24 Budget
($ in Thousands)
Total Cost to
Complete
($ in Thousands)Notes
FY23-FY24 Capital Project Status Update - Streets and Transportation
Transportation Demand Management P61007 X Ongoing
Program $140 Funds set aside to advance projects to enhance non-
auto travel links thoughout the City.
Traffic Control Projects P61008 X Ongoing
Program $520 Funds set aside to advance intersection improvement
projects. Example: S. 42nd St.\Daisy Intersection.
42nd Street Operational, Safety, and
Mobility Improvements x Upgrades On-Hold $10,000 Planning to commence in coordination with 42nd
Street Levee project
Gateway Area Traffic Improvements P61009 X Ongoing
Program $1,070 Funds set aside to advance project in the Gateway
area to increase capacity.
Attachment 2, Page 17 of 37
Department
Specific Plans/Policies Related to this Project:
Springfield TSP
Regulatory Requirements
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Street Capital $50 $50 $50 $50 $50 $250
Transportation Reimbursement SDC $50 $50 $50 $50 $50 $250
Total $100 $100 $100 $100 $100 $500
Project Status:
Ongoing Program
Streets and Transportation Upgrades
ADA Transition Projects
Development and Public Works
Project Description:
The Americans with Disabilities Act of 1990 requires the City to maintain a "Transition Plan" that details how it will
bring facilities that were not in compliance at the adoption of the act, up to the newly adopted standards. Currently, the
City policy is to correct defects as projects occur and to make improvements as requests are received from citizens
who make their need known. This project will set aside funds to be used for high priority locations that are identified,
and will allow the City to respond in a timely manner to those requests.
Attachment 2, Page 18 of 37
Department
Specific Plans/Policies Related to this Project:
Springfield TSP TDM Goals
State Legislation Regional Transportation Plan
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Transportation Improvement SDC $10 $10 $10 $10 $10 $50
Total $10 $10 $10 $10 $10 $50
Project Status:
Ongoing Program
Streets and Transportation Upgrades
Transportation Demand Management
Development and Public Works
Project Description:
The project includes match funding for other transportation options projects to enhance non-auto travel links in the
community such as Street multi-use paths, bike lane striping, enhancements to pedestrian facilities, and other activities
that promote non-single auto travel choices.
Attachment 2, Page 19 of 37
Department
Specific Plans/Policies Related to this Project:
Springfield TSP Regional Transportation Plan
Council Policy
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Transportation Improvement SDC $35 $35 $35 $35 $35 $175
Total $35 $35 $35 $35 $35 $175
Project Status:
Ongoing Program
Streets and Transportation Upgrades
Traffic Control Projects
Development and Public Works
Project Description:
This project is for installation of new traffic signals and modification of existing signals or installation of roundabouts at
various City intersections. Example intersections include: Thurston Rd. & 66th St., 42nd St. & Marcola Road, South
42nd & Daisy St., South 40th & Daisy St., 19th St. and Marcola Rd., and 28th St. & Centennial Blvd. Signal
modifications may include changing phase order, adding overlaps, and other enhancements to safety or efficiency like
improved pedestrian crossings. Various striping and signing improvements may also be implemented under the Traffic
Control Projects. Funding is set aside in this program and as projects are identified that fit into this category they are
given an individual account and at that time another source of funding will be identified to match the allowable SDC
funds.
Attachment 2, Page 20 of 37
Department
Specific Plans/Policies Related to this Project:
Springfield TSP Gateway Traffic Capacity Analysis
Council Goals I-5/Beltline Environmental Assessment
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Transportation Improvement SDC $225 $225 $225 $225 $225 $1,125
Total $225 $225 $225 $225 $225 $1,125
Project Status:
Ongoing Program
Streets and Transportation Upgrades
Gateway Area Traffic Improvements
Development and Public Works
Project Description:
Transportation improvements at various locations in the Gateway area to increase capacity, relieve congestion, and
improve safety. Funding is set aside in this program and as projects are identified that fit into this category they are
given an individual account and at that time another source of funding is identified to match the allowable SDC funds.
Attachment 2, Page 21 of 37
Department
Specific Plans/Policies Related to this Project:
Regional ITS Operations & Implementation Plan for Eugene-Springfield Metropolitan Area
Springfield TSP
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Transportation Improvement SDC $25 $25 $25 $25 $25 $125
Total $25 $25 $25 $25 $25 $125
Project Status:
Ongoing Program
Streets and Transportation Upgrades
Intelligent Transportation Systems (ITS)
Development and Public Works
Project Description:
ITS projects in various locations to increase communications, capacity, safety and traveler information. Funding is set
aside in this program and as projects are identified that fit into this category they are given an individual account and at
that time another source of funding will be identified to match the allowable SDC funds.
Attachment 2, Page 22 of 37
Department
Specific Plans/Policies Related to this Project:
Infrastructure Management System
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Street Capital $150 $150 $150 $150 $150 $750
Total $150 $150 $150 $150 $150 $750
Project Status:
Ongoing Program
Streets and Transportation Repair and Preservation
Local/Residential Street Preservation and Maintenenace
Development and Public Works
Project Description:
A continuing street maintenance preservation effort by slurry and crack sealing of Local/Residential Street System
performed by contract. In order to maintain the City's local street system approximately 5 to 8 miles should be crack
sealed and slurry sealed annually. Funds prgrammed fund an annual slurry seal project.
Attachment 2, Page 23 of 37
Department
Specific Plans/Policies Related to this Project:
Infrastructure Management System
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Street Capital $415 $415
$0
Total $415 $0 $0 $0 $0 $415
Project Status:
Not Started
Streets and Transportation Repair and Preservation
Aspen Street Improvements
Development and Public Works
Project Description:
The City has negotiated jurisdictional os Aspen St. and Menlo Lp. Between Centennial Blvd. and Tamarack St. As part
of the transfer agreement, the County is giving the City $415,000 to facilitate pavement improvments as well as
facilities upgrades (e.g., sidewalks).
Attachment 2, Page 24 of 37
Project Title Project Category
Project
Status
Estimated Funding
Need Notes
Virginia-Daisy Bikeway Phase 3 Upgrades Not Programmed-Pending Funding $1,400,000
Construction of Bicycle, pedestrian, and ADA improvements between S.
32nd Street and S. 42nd Street. Currently scoping for potential ARTS grant
funding.
Gateway-Beltline Intersection
Improvements Upgrades Not Programmed-Pending Funding $20,000,000 Phase 2 improvements currently outlined in the Revised Environmental
Assessment (REA) include construction of a couplet.
Signal System Mondernization Upgrades Not Programmed-Pending Funding $55,000 on an
annual basis Upgrade program to keep City traffic signals up to date on technology
S. 48th Street connection - Main to Daisy Expansion Not Programmed-Pending Funding $927,000 Construction of this new road segment is delopment driven.
Bridge Preservation Repair and
Preservation Not Programmed-Pending Funding $50,000 on an annual
basis This City owns 14 bridges that are inspected on a biennial schedule by
ODOT. This program would facilitate completion of identified repair needs
Downtown District Pedestrian Scale
Lighting Upgrades Not Programmed-Pending Funding $7,600,000 Complete all downtown lighting upgrade phases.
Arterial/Collector Street Preservation
Program
Repair and
Preservation Not Programmed-Pending Funding $1,000,000 on an
annual Basis
A continuing street maintenance effort of pavement sealing and/or overlay
of the Arterial/Collector Street System
Arterial/Collector Street Reconstruction
Program Restoration Not Programmed-Pending Funding $1,000,000 on an
annual Basis
Within the City's Street inventory, the condition of approximately 24 miles
of streets classified as a collector or arterial have deteriorated to the point
that reconstruction of the structure is the only option
Local/Residential Street Reconstruction Restoration Not Programmed-Pending Funding $300,000 on an
annual basis
Within the City's Street inventory, the condition of approximately 68 miles
of local/residential streets has deteriorated to the point that
reconstruction of the structure is the only option
Maple Island Improvements Upgrades Not Programmed-Pending Funding $2,000,000
This project will upgrade the roundabout at Maple Island Road and
International Way. It will also extend the Maple Island Loop Road to the
north along the Maple Island Slough.
Main Street Lighting Upgrades Not Programmed-Pending Funding $1,000,000
The project will add lighting to Main Street from 20th to 72nd by placing
lights on existing poles where available and installing new poles where
necessary
Pedestrian Crossing Enhancements Safety Not Programmed-Pending Funding $750,000
Several crossings have been identified that would receive a safety benefit
from the installation of a RRFB (Rectangular Rapid Flashing Beacon) or a
PHB (Pedestrian Hybrid Beacon).
Signal Communications Upgrades Not Programmed-Pending Funding $500,000 The project will evaluate central system software, fiber optic lines, wireless
radio communication, and existing copper connections
Glenwood Riverfront Path Expansion Not Programmed-Pending Funding $1,000,000
The project will complete required Federal National Environmental Policy
Act (NEPA) documentation and approval for the new Glenwood Multi-Use
Riverfront Path, including locating the path alignment along the Willamette
River and completing pathway design
Unfunded/Partial Funded Projects List - Streets and Transportation
Attachment 2, Page 25 of 37
Project Title Project Category
Project
Status
Estimated Funding
Need Notes
Unfunded/Partial Funded Projects List - Streets and Transportation
28th St Bike Lanes Not Programmed-Pending Funding TBD Currently scoping for potential ARTS grant funding
14th St Bikeway Not Programmed-Pending Funding TBD Currently scoping for potential ARTS grant funding
E St Bikeway Not Programmed-Pending Funding TBD
48th Street / G Street / 52nd Street Path Not Programmed-Pending Funding TBD
McKenzie River Path Not Programmed-Pending Funding TBD
Attachment 2, Page 26 of 37
WASTEWATER
Overview
Wastewater projects included in this CIP fall into two categories:
Preservation and Rehabilitation – These projects typically involve upgrading the current wastewater
system. Projects may include the rehabilitation of existing sanitary sewer lines, laterals and connections
to reduce infiltration and inflow of groundwater into the system.
New Facilities – These projects typically involve the construction of new wastewater facilities as a result,
or in anticipation of new development. Projects may include sanitary sewer lines built as part of a new
subdivision and extension of sanitary sewer trunk lines.
Attachment 2, Page 27 of 37
Project Title
Project
Number
In
Previous
CIP Project Category
Project
Status
FY24 Budget
($ in Thousands)
Total Cost to
Complete
($ in Thousands)Notes
Jasper Trunk - Phase 3 P21065 X Expansion Design $2,343 Design is nearing completion, construction
anticipated FY24
S. 28th Sewer Extension P21166 X Expansion Completed $594 Constucted in FY22
42nd -48th Sewer Rehabilitation P21170 x Repair and Preservation Completed $764 Constructed in FY22
S 37th St., S 38th St., Osage St., and
Janus St. Sewer Extension P21181 Expansion Completed $1,422 Constucted in FY23
70th St. Wastewater Basin Rehab P21185 Repair and Preservation $2,000
72nd St. Wastewater Basin Rehab P21186 Repair and Preservation $1,500
Flow Monitoring 2022 P41064 X Studies Design $176
Work on Phase 3 microbasin modeling
continues. Rehab projects have been
identinfied and will be programmed in the
CIP
Wastewater Master Plan P41062 X Studies Planning $500 Request for proposals to be advertised in
2nd qtr of FY22
CMOM Planning & Implementation P61000 X Repair and Preservation Ongoing
Program $1,700
Funds to be programmed to repair and
preservation projects identified through
modeling
Wastewater Repair P61001 X Repair and Preservation Ongoing
Program $500 Funds programmed each year for
unforeseen emergency repair work.
Local Sewer Extension P61013 X Expansion On-Hold $1,000
Funds set aside to extend wastewater
service to annexed area within the City that
are not currently served.
FY23-FY24 Capital Project Status Update - Wastewater
Attachment 2, Page 28 of 37
Department
Specific Plans/Policies Related to this Project:
Wastwater Master Plan
CMOM Program
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Wastewater Capital $250 $250 $250 $250 $250 $1,250
Wastewater Reimbursement SDC $250 $250 $250 $250 $250 $1,250
Total $500 $500 $500 $500 $500 $2,500
Project Status:
Ongoing Program
Wastewater Repair and Preservation
Wastewater Repair
Development and Public Works
Project Description:
This project involves the contracted repair or replacement of sanitary sewers that require either emergency
rehabilitation as a result of Sanitary Sewer Overflows or the prospect of impending system failures. The DPW
Operations Division addresses an average of four (4) emergency repairs of this nature annually.
Attachment 2, Page 29 of 37
Department
Specific Plans/Policies Related to this Project:
Wastwater Master Plan
Regulatory Requirements
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Wastewater Capital $2,000 $2,000 $2,000 $2,000 $2,000 $10,000
Total $2,000 $2,000 $2,000 $2,000 $2,000 $10,000
Project Status:
Ongoing Program
Wastewater Repair and Preservation
CMOM Planning & Implementation
Development and Public Works
Project Description:
The City of Springfield's obligations in the 2001 Wet Weather Flow Management Plan (WWFMP) were completed by
January 2010; however it is necessary for the City to continue to fund wastewater system rehabilitation and Inflow and
Infiltration (I/I) reduction projects. These additional projects will be identified through the Wastewater Master Plan
Update project and the Capacity, Management, Operations and Maintenance (CMOM) program that will likely be
included in the next NPDES permit for the wastewater system.
Attachment 2, Page 30 of 37
Department
Specific Plans/Policies Related to this Project:
Wastwater Master Plan
Council Goal to provide for development
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Wastewater Capital $500 $500 $500 $500 $500 $2,500
Total $500 $500 $500 $500 $500 $2,500
Project Status:
Ongoing Program
Wastewater Expansion
Local Sewer Extensions
Development and Public Works
Project Description:
Within the City of Springfield's city limits and Urban Growth Boundary (UGB) are several areas that are fully
developed, but lack wastewater service. The project would fund extending wastewater pipes to these areas upon
request of affected property owners or annexation, with some or all of the cost possibly reimbursable through
assessments. Increased infrastructure will increase the need for more maintenance personnel which impacts the
wastewater operations budget. The estimated increase in the wastewater operations cost is $1,600 per 1,000 feet of
new pipe.
Attachment 2, Page 31 of 37
Department
Specific Plans/Policies Related to this Project:
Wastwater Master Plan
Council Goal to provide for development
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Wastewater Capital
Wastewater Improvement SDC $1,000 $1,000
Total $1,000 $0 $0 $0 $0 $1,000
Project Status:
Not Started
Wastewater Expansion
Harbor Drive Pump Station
Development and Public Works
Project Description:
The S. 2nd St./Harbor Drive area is currently not have sanitary sewer service. The Council has directed staff to
analyze areas within the UGB where investment in infrastructure may spur residential development, and investment in
the Harbor Drive Pump Station provides a key service to 58 buildable acres. This project will construct a sanitary
pump station and associated pipline to connect to the dry lines previously constructed.
Attachment 2, Page 32 of 37
Project Title Project Category
Project
Status
Estimated Funding
Need
($ in thousands)Notes
19th Street Sewer Upgrade Upgrades Not Programmed-Pending Funding $1,500 Replace a 12" pipe with a new 18" pipe. With model analysis this upgrade
may not be necessary. Will be evaluated with Master Plan Update
Marcola Rd Sewer Expansion Not Programmed-Pending Funding $500 Provide sewer service to area within the UGB currently not annexed.
Main Street Improvements - Unit 1 Expansion Not Programmed-Pending Funding $2,100 Upgrade pipeline capacity to support future growth in East Springfield
Peacehealth-Riverbend PS Expansion Not Programmed-Pending Funding $3,189 New pump station to support development within the Riverbend campus.
Main Street Improvements - Unit 2 Expansion Not Programmed-Pending Funding $1,145 Upgrade pipeline capacity to support future growth in East Springfield
Hayden Lo PS Upgrades Not Programmed-Pending Funding $1,050
Upgrade existing pumps to maintain capacity and avoid potential SSOs.
Project will be reevaluated as some work has been completed through
routine maintenance.
River Glen PS Upgrades Not Programmed-Pending Funding $950
Upgrade existing pumps to maintain capacity and avoid potential SSOs.
Project will be reevaluated as some work has been completed through
routine maintenance.
Unfunded Projects List - Watewater
Attachment 2, Page 33 of 37
BUILDINGS AND PROPERTY
Overview
The Buildings and Property section identifies and programs available funds for a variety of projects that
may include construction of new facilities; maintenance, repair, or renovation of existing facilities; and
the demolition of unnecessary or un-maintainable facilities. As the City of Springfield grows, so does the
need for municipal public services. These services come with an associated infrastructure that requires
continual monitoring, maintenance, replacement and/or additions.
Currently funding is only identified for one ongoing program which is the general ongoing Building
Preservation program. Several other projects are identified in the Unfunded Priority Project List. On the
overall buildings and Facilities needs list, there are projects at all City-owned buildings, including City
Hall, Fire Stations, Museum, Justice Center, Depot, and Development and Public Works Operations
Division Facilities.
Attachment 2, Page 34 of 37
Project Title
Project
Number
In
Previous
CIP Project Category
Project
Status
FY24 Budget
($ in Thousands)
Total Cost to
Complete
($ in Thousands)Notes
Building Preservation P61011 X Repair and
Preservation
Ongoing
Program $306
Program funds preservation and repairs of
City owned buildings. (e.g., City Hall Seismic
upgrades)
Booth Kelly Roof Replacement P21084 X Repair and
Preservation Not Started $100
Booth Kelly Building Repair P21170 x Repair and
Preservation Not Started $40
Firing Range Decommissioning P21075 X Water Quality On-Hold $25 Initial study has been completed in
coordination with DEQ
FY23-FY24 Capital Project Status Update - Building and Facilities
Attachment 2, Page 35 of 37
Department
Specific Plans/Policies Related to this Project:
Council Goals
Capital Costs ($ in thousands)
Fund 2025 2026 2027 2028 2029 Total
Building Preservation Fund $270 $270 $270 $270 $270 $1,350
Total $270 $270 $270 $270 $270 $1,350
Project Status:
Ongoing Program
Buildings and Facilities Repair and Preservation
Building Preservation
Development and Public Works
Project Description:
Perform preservation, capital maintenance and repair projects on City-owned buildings, including but not limited to City
Hall, 5 Fire Stations, Museum, Justice Center, Jail, Depot, Carter Building and Maintenance Facilities. Projects can
include the repair, renovation or replacement of structural, mechanical, electrical, and plumbing systems. Other
projects can include systems preservation such as, painting, roofing, lighting, alarm and elevator projects as well as
repair and/or upgrades to aesthetic and architectural elements.
Attachment 2, Page 36 of 37
Project Title Project Category
Project
Status
Estimated Funding
Need Notes
City Storage Facility Expansion Not Programmed-Pending Funding $300,000
Library Expansion Not Programmed-Pending Funding $28,000,000
City Hall Renovation Upgrades Not Programmed-Pending Funding $4,000,000
Fire Station 4 Upgrades Not Programmed-Pending Funding $6,100,000
City Hall HVAC Upgrades Not Programmed-Pending Funding $1,800,000
Energy Efficiency Projects Upgrades Not Programmed-Pending Funding $200,000
Downtown Mill Plaza Design &
Construction Expansion Not Programmed-Pending Funding $3,700,000
City Hall Storage Expansion Not Programmed-Pending Funding $100,000
Unfunded Projects List - Buildings and Facilities
Attachment 2, Page 37 of 37
Project TitleLocationProject CategoryRequest SummaryNotes17th Street E St to Main Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.18th & MohawkSafety Add street light28th StreetRepair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.28th Street Main to Olympic Repair and PreservationPavement surface repair and preservation. Street widening. Project would also need to include ADA upgrades.2nd Street S Street to T Street Safety Add sidewalks.2nd Street Q St to T St SafetyAdd sidewalks, speed cushions, re-pave, widen.2nd Street At Q StSafetyAdd traffic circle, difficult to turn left from 2nd onto Q St.2nd Street S St to T St SafetyAdd sidewalks, speed cushions, re-pave, widen.33rd Street Main north to 32nd street SafetyPavement surface repair and preservation. Add sidewalks.36th Street Main to Commercial Repair and PreservationPavement surface repair and preservation. Street widening. Project would also need to include ADA upgrades.Project programed37th Street Jasper Rd to Redwood Dr Upgrades Add sidewalks along the school side.37th Street Redwood Drive and 37th Safety Speeding near school, near misses.42ndIP to Marcola Repair and PreservationPavement repair, add turn lane, add signal at 126 entrance ramp.Project programed51st Place Main to Daisy Repair and PreservationPavement surface repair and preservation. Street widening. Project would also need to include ADA upgrades.51st Street Entire street SafetyPavement surface repair and preservation. Widen street, add sidewalks and add illumination.54th Street Entire street Safety Sidewalks and speed bumps.54th Street Entire street Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.54th Street Main to F Street Safety Pave and add sidewalks.Citizen Project Request SummaryAttachment 3, Page 1 of 6
Project TitleLocationProject CategoryRequest SummaryNotesCitizen Project Request Summary64th Street Thurston Park Subdivision Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades. Replace missing street signs, upgrade or replace sewer and water lines before they fail.66th and Thurston Rd.Safety Add stop signs both directions.6th Street B to C Streets Repair and PreservationPavement surface repair and preservation, paint curbs yellow near intersections, no parking for residents due to City employees taking all the parking.6th Street E to GSafety Add sidewalks.9th Street (29 Requests) C to FRepair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.Anderson Ln At Centennial Safety Pedestrian activated crossing with lights.Arrowhead Park/Marcola MeadowsUpgradesAdd "spray and play" area for kids to play in the summer.Forwarding to WillamalaneAspen Street (7 Requests)SafetyReduce speed from 35 to 25 and add speed bumps.May be addressed with upcoming project.Aster Street ??Repair and Preservation Pavement surface repair and preservation. Project programedBob Straub 57th to Mt. Vernon SafetyAdd path on west side to create loop and prevent crossing of highway.Bob Straub Main Street to Mount Vernon Upgrades Clean up landscaping in the center median.To be included as part of ongoing maintenance program.By-gully path At Don St SafetyAdd a bridge over 126 from By-Gully path to Don St.Centennial Blvd 21st to 28th SafetyImprove ped saftey, improve sidewalks, add speed bumps, better signage, blinking stop lights, roundabouts, ADA improvements.City View & Crest Ln. Kelly Butte SafetyPrevent water from running across the street in the winter creating ice sheets on roadway which are unsafe. Bioswales?CitywideUpgradesImpiment grey water system rather than sending all wastewater to treatment plant.Not feasibleCitywideSafetyCreate car free zones with more trees, larger sidewalks, and art. Places for vendors.CitywideSafety Upgrade to LED luminaires.In constructionAttachment 3, Page 2 of 6
Project TitleLocationProject CategoryRequest SummaryNotesCitizen Project Request SummaryCitywide Planter strips Repair and PreservationRemove dead trees and stumps in planter strips and replace with new trees.To be included as part of ongoing maintenance program.CitywideRemodelsStreet lighting is too bright in some areas such as A street.In constructionCitywide, 1353 C StreetRepair and PreservationRemove tree stump at 1353 C street and at other locations within the City.To be included as part of ongoing maintenance program.Commercial 35th to 42nd SafetySidewalks and planter strips with trees and plants.Coryell Pass I-5 entrance ramp from Hwy 225 SafetyAdd flashing yellow turn signal for I-5 NB entrance ramp.ODOT jurisdictionDaisy and 42nd StreetSafety Add roundabout.Project programedDarlene Dornoch to Hartman SafetyAdd sidewalks, there are none and it is dangerous for kids.Darlene Beverly to Hartman Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.Darlene Repair and PreservationPavement surface repair and preservation. Street widening. Add sidewalk. Project would also need to include ADA upgrades.Depue Street 3rd to 5th Repair and Preservation Pave over gravel.Dorncoh Corner of Dornoch and Darlene Upgrades Add ADA ramps on the corners.Add to ongoing ADA programDornoch to Clear Vue PathSafetyAdd a path along the slough for kids to get to Guy Lee school.F Street Near 835 F Street Safety Add sidewalks.Fairview (10 Requests) Tamarack to Mill Street Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.G StreetSafetyAdd pavement legends to improve safety for bicyclists who have to share the road.G Street 19th to 21st Safety Finish sidewalk connection on south side.Guy Lee ShoolRemodelsUpgrade sidewalks around Guy Lee school to meet ADA. H Street Kelly Blvd to Water Street Repair and Preservation Pave the dirt section.I Street Mohawk to 21st Street Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.I-10542nd path to 52nd Safety Add bike path along the north side of I-105.ODOT jurisdictionAttachment 3, Page 3 of 6
Project TitleLocationProject CategoryRequest SummaryNotesCitizen Project Request SummaryJasper Road 42nd to Mt. Vernon Road SafetyAdd crossing at 44th street and add sidewalks and bike lanes between Mt. Vernon Road and 42nd.Kathryn Street Entire street Repair and PreservationPavement surface repair and preservation, widen street.M Street 12th to Market Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.Marcola Meadows W and 30th SafetyAdd no parkign yellow paint on curbs. Turning left from 30th onto W is dangerous. Parked cars in front of stop sign. Parked cars not obeying no parking sign. Cars parked on both sides of the road.Marcola Rd Marcola at Mohawk Loop Safety Add deer sign. This is outside of the CityMarcola Rd Near 42nd Repair and Preservation Pavement surface repair and preservation.Marcola Rd Hayden Br to 42nd Repair and Preservation Pavement surface repair and preservation.This is under County jurisdictionMill StreetRepair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.Project programedMohawk I-105 exit to Marcola Rd Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.Project programedMohawk I-105 exit to Marcola Rd Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.Project programedMohawk I streetSafetyNeed pedestrian crossing between hospital and park.Project programedMohawk Blvd McKenzie Willamette Hospital SafetyAdd pedestrian crossing on Mohawk to get people from hospital to Willamalane park.Programed through Filling the Gaps ProjectN 13th Paths I, Modoc, Parker SafetyAdd yellow curb paint near pedestrian crossings to keep cars from parking too close to crossing blocking sight distance for peds trying to cross the street.N 65th Place Cul-de-sac Repair and Preservation Pavement surface repair and preservation.N 72ndRepair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.Attachment 3, Page 4 of 6
Project TitleLocationProject CategoryRequest SummaryNotesCitizen Project Request SummaryPathPath between Obsidian Ave. and Pumice Pl. SafetyReplace two lights which are no longer working.In constructionPathI, Modoc, Parker Safety Pave path connections between streets.Pioneer Pkwy EWEB bike path to Don St SafetyConnect bike path along EWEB bike path to Don street to allow safe crossign of Pioneer Pkwy.Pioneer Pkwy Path ConnectionsSafetyAdd crossings of Pioneer Parkway connecting Don Street to EWEB path. Add crossing at roundabout, bridge or lights.Q StAt Pioneer Pkwy & Pioneer to Laura SafetyIntersection is difficult to navigate and dangerous, needs safety improvements, reflectors or more paint.Railcrossings 32nd, 42nd, and Main St SafetyMake rail corssings safer for wheel chairs, large gaps are dangerous.RR JurisdictionRainbow Centennial to W N Street Safety Add sidewalks and pavement repair.Rainbow Centennial to N St Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.Rainbow D St. to Centennial Blvd. Repair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.Riverview to Prescott SafetyProvide a path conection between Riverview Blvd and Prescott Ln.S 51st Pl Entire street SafetyPavement surface repair and preservation, add sidewalks, add illumination.S B Street Booth Kelly Trail to S D Street SafetyAdd bike lane on S B Street between Booth Kelly Trail and S D St.S B StreetRepair and PreservationPavement surface repair and preservation. Project would also need to include ADA upgrades.S Street 10th to 17th Repair and Preservation Pavement surface repair and preservation. ShellyMain Street SafetyImprove lighting at intersection, brighter lightingT Street 2nd to 5th Safety Add sidewalks.Washburn DistrictRepair and PreservationTree thinning to improve tree health, reduce hazards to people and structures, and enhance beauty.To be included as part of ongoing maintenance program.Washburn DistrictSafetyRepair sidewalks and trim tree roots to prevent further damage to sidewalks. Trim trees to improve lighting.Attachment 3, Page 5 of 6
Project TitleLocationProject CategoryRequest SummaryNotesCitizen Project Request SummaryWater Street E to FRepair and Preservation Pave the dirt section and add storm system.Attachment 3, Page 6 of 6
BEFORE THE PLANNING COMMISSION
OF THE CITY OF SPRINGFIELD
REQUEST FOR APPROVAL
OF THE DRAFT FY25-FY29
CAPITAL IMPROVEMENT
PROGRAM
+ DRAFT CAPITAL
IMPROVEMENT
+ PROGRAM FY25-FY29
+
AYES: ____
NOES: ____
ABSENT: ____
ABSTAIN: ____
Attachment 4, Page 1 of 1
NATURE OF THE APPLICATION
The Development and Public Works Department has been going through the process of updating
the Capital Improvements Program project lists and has produced a draft copy for the five year
period of FY25-FY29. The Development and Public Works Department is now bringing the
prioritized project lists before the Planning Commission and seeks a recommendation to the City
Council for review and adoption.
ORDER
It is ORDERED by the Planning Commission of Springfield that the draft FY25-FY29 Capital
Improvement Program project lists be sent to the City Council with the Planning Commission’s
recommendation for review and adoption. This ORDER was presented to and approved by the
Planning Commission on January 3rd, 2023.