Loading...
HomeMy WebLinkAboutApplication Applicant 2/23/2024Revised 3/10/11 1 of 3 City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Pre-Application Report Required Project Information (Applicant: complete this section) Prospective Applicant Name: Phone: Company: Fax: Address: Prospective Applicant’s Rep.: Phone: Company: Fax: Address: Property Owner: Phone: Company: Fax: Address: ASSESSOR'S MAP NO: TAX LOT NO(S): Property Address: Size of Property: Acres Square Feet Description of Proposal: If you are filling in this form by hand, please attach your proposal description to this application. Existing Use: # of Lots/Parcels: Avg. Lot/Parcel Size: sf Density: du/acre Prospective Applicant: Date: Signature Print Required Project Information (City Intake Staff: complete this section) Case No.: Date: Reviewed by: Application Fee: $ Technical Fee: $0 Postage Fee: $0 TOTAL FEES: $ PROJECT NUMBER: Joe Schiewe Holt Holdings OR, LLC 1301 SE Tech Center Drive, Ste. 150, Vancouver, WA 98683 Please contact applicant's consultant. Marie Holladay (Consultant) AKS Engineering & Forestry, LLC 12965 SW Herman Road, Ste. 100, Tualatin, OR 97062 (503)-563-6151 Email:holladaym@aks-eng.com Robert Smejkal, David Smejkal, Douglas Wolf, Leona Person N/A PO Box 1758, Eugene, OR 97440 Various; see materials.Various; see materials. 36443 Jasper Road, Springfield, OR ±382 Potential annexation, zone change, land division, etc. Please see the attached narrative. Rural residential, farm pasture, forest. N/A Holt Holdings OR, LLC Please contact applicant's consultant. Please contact applicant's consultant. Please contact applicant's consultant. Please see materials herin Please see materials herin Holt Holdings OR, LLC 2/21/2024 Revised 3/10/11 2 of 3 Pre-Application Report Process The purpose of a Pre-Application Report is to provide an informal yet thorough review of a particular proposal by the Development Review Committee (DRC). A Pre-Application Report is recommended for large or complex proposals to avoid unanticipated costs or delay during the formal application process. A staff planner shepherds the application through the City’s land use application review process and prepares a written report identifying policies and regulations that create opportunities or pose constraints for the proposed development. The planner meets with the prospective applicant to discuss the proposal in detail and present the Pre-Application Report. A Pre-Application Report provides information to a prospective applicant related to the current development standards of the City. The Pre-Application Report is not a land use decision and does not confer any development rights, establish any conditions, or bind the applicant or the City to any course of action. The report conveys the status of known development opportunities and constraints. The status may, however, change over time as development conditions or standards change. 1. Applicant Submits a Pre-Application Report Application  The application must conform to the Pre-Application Report Submittal Requirements Checklist on page 3 of this application packet.  The applicant’s proposal is circulated to the relevant staff in preparation for a Pre- Application Report meeting.  To allow for adequate review by affected public agencies, the processing time for a Pre- Application Report is approximately four to six weeks. 2. Applicant and the City Conduct a Pre-Application Report Meeting  The applicant and any design team should attend the meeting.  The meeting is scheduled for one to two hours.  Staff attending the meeting will be prepared to discuss the issues raised in the submittal by the applicant. Other issues raised during the meeting may also be discussed.  The meeting is informal and the City will not issue a decision at this time. Revised 3/10/11 3 of 3 Pre-Application Report Submittal Requirements Checklist Application Fee – refer to the Development Code Fee Schedule for the appropriate fee calculation formula. A copy of the fee schedule is available at the Development & Public Works Department. The applicable application, technology, and postage fees are collected at the time of complete application submittal. Pre-Application Report Application Form Narrative explaining the proposal. Questions – list specific questions the applicant would like staff to answer during the meeting. There is no limit on the number of questions. Three (3) Copies of the Proposed Plan – the minimum requirements necessary for staff to thoroughly review the proposal are listed below. Applicants are encouraged to include additional information on the plan as listed in the Springfield Development Code (SDC) 5.12-120, Land Divisions – Partitions & Subdivisions – Tentative Plan Submittal Requirements or 5.17-120, Site Plan Review Submittal Requirements. Applicants should be aware that the level of information that City staff is able to provide is commensurate with the level of detail provided by the applicant. Drawn in ink on quality paper no smaller than 11” x 17” Scale appropriate to the area involved and sufficient to show detail of the plan and related data, such as 1” = 30’, 1” = 50’ or 1” = 100’ North arrow Date of preparation Dimensions (in feet) and size (either square feet or acres) of the development area Location and size of existing and proposed utilities, including connection points On-site drainage collection system and flow patterns, the size and location of drain lines and catch basins, dry wells, and natural drainageways to be retained Area and dimensions of all property to be conveyed, dedicated, or reserved for common open spaces Reports Related to Land Divisions Approximate location, number and dimensions of proposed lots How streets in the proposal area connect with existing streets Reports Related to Site Plan Review Proposed and existing buildings: location, dimensions, size (gross floor area), setbacks from property lines, distance between buildings, and height Area and percentage of the site proposed for buildings, structures, driveways, sidewalks, patios and other impervious surfaces Parking and circulation plan N/A N/A N/A February 2024 City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 RE: Pre-Application Conference Narrative for the Brand S Road Project This Pre-Application Conference involves multiple tax lots totaling ±382 acres located within the Springfield Urban Growth Boundary (UGB), east of Bob Straub Parkway and Jasper Road. The subject site is bisected by Brand S Road, an existing driveway. The northern portion of the site is relatively flat and mostly pasture, while the southern area of the site is characterized by steeper terrain with more trees and brush. The site is illustrated with wetland/natural resource areas according to the MapSpring ArcGIS Interactive Map. According to the Draft Springfield Comprehensive Plan Map, Light-Medium Industrial and Special Heavy Industrial plan designations are forecasted for the properties north of Brand S Road upon future annexation into the City. The portion of land south of Brand S Road is identified for Low- Density Residential, Medium-Density Residential, and Community Commercial plan designations upon annexation. The site currently contains multiple single-family dwellings, accessory structures, pastureland, and former industrial uses that are no longer operating. The Conceptual Master Plan includes a mix of single-family attached and detached housing. The preliminary layout also includes a cohesive circulation system with vehicle access onto Bob Straub Parkway (minor arterial) via Brand S Road (collector), open space areas, and on-site stormwater management facilities. The goal of this meeting is to determine all requirements, standards, applications, permits, processes, etc. which are necessary to complete the project, determine costs, and develop a schedule. We would like to discuss the following issues at the meeting in addition to the typical items that are covered: General/ Land-Use 1. Please confirm the different land use application(s) required and the applicable City review procedure type(s), sequencing, timelines, etc. 2. Please confirm whether land use applications can be submitted concurrently. If so, should application narratives/findings/materials be compiled in separate binders (per application type) or together as a single project? 3. Please confirm if additional studies, analysis, or reports are required. 4. Please discuss any current, pending, or future Municipal Code / Design Standard changes and what impact those Code / Standard changes may have on this project. 5. Please confirm that the conceptual master plan layout shown is acceptable with respect to the applicable development standards. a. Please confirm the applicable code requirements (e.g. setbacks, lot coverage, building height, off-street parking, etc.) for the R1 and R2 districts. Brand S Road Project Pre-Application Conference City of Springfield February 2024 Page 2 of 5 b. Please confirm that the net acreage density calculations for minimum density are acceptable to the City (assumes all open space, right-of-way, unbuildable areas, and stormwater facilities are excluded from net acreage). c. Please confirm that density can be shared across the master plan (i.e. density will be calculated by R1 and R2 districts respectively, and all unit types can be included in each phase to provide housing market variability). d. Will buffering be required between the residential and industrial properties north of Brand S Road? If so, please describe the buffering requirement. Hillside Development Overlay 6. Please discuss the Hillside Development Overlay (HDO) in relation to the proposed Conceptual Master Plan. a. Please confirm the acreage that should be included in the “development area” or “A=Area” input for the ‘average slope calculation’ of SDC 3.3.520. i. Is the entire acreage within the Master Plan considered the “development area”? Or are only residential areas of the Master Plan included? ii. Are areas not intended for development (parks, open spaces, stormwater facilities, rights-of-way, etc.) included in the “development area”? iii. Please clarify the applicability of the ‘average slope calculation’ when portions of the site reside both above and below 670 feet in elevation. iv. Please clarify how the ‘average slope calculation’ should be applied to a site with mixed topography. b. For discussion purposes, two average slope calculation exhibits have been provided with this submittal. One including the entirety of the master plan area and another including only the portions of the site intended for future residential zoning. Please confirm the applicability of the Average Slope Calculation with regards to the Hillside Development (HD) Overlay (land greater than 15 percent and/or above 670 feet in elevation) within the master plan area. c. Please discuss the process related to Modification of Standards per SDC 3.3.535 and how the modification(s) can be utilized to improve portions of the master plan area with topographic constraints. d. Please discuss the outcome of the recent Director’s Interpretation application regarding the HDO, and how that result may impact this project. Will subsequent code changes be required by the City? e. Please confirm OAR 660-046-0120, Duplex Siting Standards, applies to middle housing within the HDO. f. When are HDO fees collected? At time of tentative subdivision plan (Type II) submittal, at phased subdivision plat (Type I) submittal, or as part of the initial Master Plan (Type III) submittal? Parks and Open Space 7. Please discuss the City's park and/or open space requirements for the project based on the areas illustrated on the conceptual layout. Brand S Road Project Pre-Application Conference City of Springfield February 2024 Page 3 of 5 a. Please provide input on the neighborhood park size (size, dimensions, location, etc.) shown north of Brand S Road. b. According to SDC Table 3.2.420, linear parks and recreational facilities are permitted uses within LMI and SHI plan designations. Please confirm that placing a neighborhood park on land currently designated LMI or SHI would not require a comprehensive plan amendment (to Residential) or a zone change (to Public Land and Open Space District). c. The Willamalane Park and Recreation District (WPRD) Comprehensive Plan Maps (Figures 36 and 37, included herein) identify proposed park improvements and recommendations. Is there a mechanism for the City to require parkland beyond these identified projects? How are community parks between ±15-30 acres as described on the Willamalane Parks and Recreation District Comprehensive Plan implemented? d. As shown on the conceptual layout, a large portion of the project is identified as open space area and includes existing logging roads that could be repurposed for pedestrian connectivity/recreation. Please provide input on the feasibility of dedicating open space for public trails and recreation. e. What is the City’s relationship with WPRD? Would future park land and/or open space be dedicated to the City or to WPRD? f. Please confirm that a neighborhood park (e.g. approximately 5-15 acres in size pursuant to SDC 6.1.110) will be reviewed/approved through the master plan process. Please confirm that the Type III review procedure described in SDC 4.7.200 applies to regional parks (100 acres) or community parks (15-100 acres). Comprehensive Plan Map Clarification Project 8. Does the City use a specific term for an application that includes a Map Clarification (e.g. should the applicant be referring to this process as something other than a comprehensive plan amendment/zone change?) Is a ‘Map Clarification’ a separate application or should this be included in the Master Plan narrative/application? 9. Please confirm that the area north of Brand S Road on Tax Lot 1104 can be ‘clarified’ to R1 as part of a Comprehensive Plan Map Clarification, provided it is demonstrated that there are site constraints that prevent a 20-acre unencumbered industrial site on that portion of the property. 10. Will the large/regional public stormwater facility on Tax Lot 900 need to be rezoned from Industrial to Residential? 11. Please discuss the potential for the remaining portion of the 12-acre site shown as LMI in the proposed master plan to be redesignated through a comprehensive plan amendment to residential/commercial. 12. Please discuss the supportability for a future comprehensive plan amendment for portions of the site north of Brand S Road that are shown as SHI to be redesignated to commercial. Transportation/Access/Circulation 13. Please discuss the traffic analysis and preliminary scope necessary for approval of this master plan. 14. Please provide an overview of the City's TIA requirements and the preferred process for agency coordination and scoping. Brand S Road Project Pre-Application Conference City of Springfield February 2024 Page 4 of 5 15. Please confirm the collector intersection locations shown on the layout are sufficient to accommodate the City’s requirements. 16. Please discuss block length and intersection spacing requirements with respect to the preliminary layout. 17. Please discuss SDC Section 3.3.525.B.1, Street Grade Standards. If topographical constraints make it impractical to meet the 12 percent street grade standard, can concessions/adjustments be accommodated through the master plan to permit driveways and/or intersections that exceed grading standards? 18. Please discuss secondary emergency access and fire water supply and hydrant requirements. 19. Please discuss the potential required off-site transportation improvements along Jasper Road, including a potential traffic signal at Mt. Vernon Road and a potential roundabout at Brand S Road? 20. Please discuss the necessity (or lack thereof) of street stubs for residential streets where they abut industrially zoned property to the north of Brand S Road. 21. Please discuss the necessity (or lack thereof) of street stubs along the UGB boundary to the south and east, in light of topographic constraints in these areas. 22. Please discuss any transportation issues in the area that may affect this project of which we are not already aware. 23. Please discuss any required frontage improvements to the existing Bob Straub Parkway and Weyerhauser Road rights-of-way and at what stage of the process they may be triggered. Public Services/Utilities/Natural Resources 24. Please confirm the process for annexation into local utility districts. 25. Will existing overhead wires along Brand S Road need to be undergrounded? If so, can undergrounding occur by phase (in accordance with an approved phasing plan/schedule for the master plan)? 26. Please discuss the tree preservation and removal requirements, process(es), and how the provisions apply to this project. 27. Does the fire district foresee any issues with the preliminary layout, emergency vehicle access, or fire-fighting water supply? 28. Please confirm requirements for fire suppression sprinkler systems, street grades, and fire hydrants. 29. Are there any special requirements or considerations for connecting to public services? 30. Please let us know the requirements for all water improvements, possible funding sources, plans for capital projects, reimbursements, etc. 31. Are there any reimbursement districts applicable to this property/project? Please discuss any system collection charges or reimbursement fees associated with sanitary sewer, storm drainage, water, or transportation. Brand S Road Project Pre-Application Conference City of Springfield February 2024 Page 5 of 5 32. Please confirm if separate stormwater facilities are required for public and private stormwater and discuss public vs. private responsibilities for ownership and maintenance of stormwater facilities. 33. Please discuss application fees, permit fees, estimated SDCs, and other agency fees, including any known upcoming changes. 34. Are there any other required on or off-site improvements we should be aware of? 35. Please confirm availability of gravity public wastewater infrastructure for this project. 36. Please confirm availability of public storm drainage infrastructure for this project. 37. Please discuss any impacts to the Public Improvement Permit (PIP) process related to Hillside Development Overlay requirements. Please let us know if there are any other issues or site constraints of which you are aware. Sincerely, AKS ENGINEERING & FORESTRY, LLC Marie Holladay 12965 SW Herman Road, Suite 100 | Tualatin, OR 97062 503-563-6151 | holladaym@aks-eng.com Attachments: Conceptual Master Plan Exhibits Hillside Development Overlay - Average Slope Calculation Exhibit: Future Residential Areas - Average Slope Calculation Exhibit: Entire Master Plan Area Preliminary Residential Density Calculation Willamalane Park and Recreation District Comprehensive Plan Maps (Figures 36 and 37) Lane County Assessor’s Maps BOB STRAUBPARKWAYSOUTHERN PAC IF IC RR J A S P E R RO AD WI L L AM E T T E R I V E R W E Y E R H A U S E R R O A D SO U TH E R N P A C I F IC R R FORESTRYSURVEYINGENGINEERINGNATURAL RESOURCESLANDSCAPE ARCHITECTUREPLANNINGBRAND S ROAD FEASIBILITY LAYOUT #6SPRINGFIELD, OREGONDRAFT 1PRELIMINARY EXISTING CONDITIONS PLANWITH AERIAL PHOTO AND CONTOURS BOB STRAUBPARKWAYSOUTHERN PAC IF IC RR J A S P E R RO AD WI L L AM E T T E R I V E R W E Y E R H A U S E R R O A D SO U TH E R N P A C I F IC R R R-2 CC R-2 R-1 FORESTRYSURVEYINGENGINEERINGNATURAL RESOURCESLANDSCAPE ARCHITECTUREPLANNINGBRAND S ROAD FEASIBILITY LAYOUT #6SPRINGFIELD, OREGONDRAFT 2MASTER PLAN AREAEXISTING ZONING DESIGNATIONSEXISTING ZONING LEGEND COLOR ZONE DEFINITION CC R-1 R-2 LMI SHI BOB STRAUBPARKWAYSOUTHERN PAC IF IC RR J A S P ER RO A D WI L L AM E T T E R I V E R W E Y E R H A U S E R R O A D BRAND S ROAD BRA N D S R O A D SO U TH E R N P A C I F IC R R STREET 1 STREET 2 STREET 3 STREET 25STREET 21STREET 23STREET 24STREET 29STREET 30STREET 22 STRE E T 4 STRE E T 5 STREET 6STREET 20 S T R E E T 2 0 STREET 25STREET 7 S T R E E T 2 6 ST R E E T 2 7 STREET 8 STREET 28STREET 7STREET 14 STREET 15 STREET 16 STREET 17 STREET 31STREET 32STREET 32STREET 34STRE ET 14STREET 36STREET 36STREET 36STRE E T 15STREET 37S TR E E T 3 7 STREET 13 STREET 12 STREET 11STREET 10 STREET 19STREET 18STREET 19 STREET 19STREET 21STREET 9STREET 35STREET 33 LOT SUMMARY FORESTRYSURVEYINGENGINEERINGNATURAL RESOURCESLANDSCAPE ARCHITECTUREPLANNINGBRAND S ROAD FEASIBILITY LAYOUT #6SPRINGFIELD, OREGONDRAFT 3CONCEPTUAL MASTER PLANWITH LOT SUMMARYLEGEND BOB STRAUBPARKWAYSOUTHERN PAC IF IC RR J A S P E R RO AD WI L L AM E T T E R I V E R W E Y E R H A U S E R R O A D BRAND S ROAD BRA N D S R O A D SO U TH E R N P A C I F IC R R STREET 1 STREET 2 STREET 3 STREET 25STREET 21STREET 23STREET 24STREET 29STREET 30STREET 22 STRE E T 4 STRE E T 5 STREET 6STREET 20 S T R E E T 2 0 STREET 25STREET 7 S T R E E T 2 6 ST R E E T 2 7 STREET 8 STREET 28STREET 7STREET 14 STREET 15 STREET 16 STREET 17 STREET 31STREET 32STREET 32STREET 34STRE E T 14STREET 36STREET 36STREET 36STRE ET 15STREET 37S TR E E T 3 7 STREET 13 STREET 12 STREET 11STREET 10 STREET 19STREET 18STREET 19 STREET 19STREET 21STREET 9STREET 35STREET 33 FORESTRYSURVEYINGENGINEERINGNATURAL RESOURCESLANDSCAPE ARCHITECTUREPLANNINGBRAND S ROAD FEASIBILITY LAYOUT #6SPRINGFIELD, OREGONDRAFT 4CONCEPTUAL MASTER PLAN WITHPROPOSED ZONING DESIGNATIONSZONING LEGEND COLOR ZONE DEFINITION CC R-1 R-2 LMI SHI BOB STRAUBPARKWAYSOUTHERN PAC IF IC RR J A S P E R RO A D WI L L AM E T T E R I V ER W E Y E R H A U S E R R O A D BRAND S ROAD BRA N D S R O A D SO U T H ER N P A C I F I C R R STREET 1 STREET 2 STREET 3 STREET 25STREET 21STREET 23STREET 24STREET 29STREET 30STREET 22 STRE E T 4 STRE E T 5 STREET 6STREET 20 S T R E E T 2 0 STREET 25STREET 7 S T R E E T 2 6 ST R E E T 2 7 STREET 8 STREET 28STREET 7STREET 14 STREET 15 STREET 16 STREET 17 STREET 31STREET 32STREET 32STREET 34STRE ET 14STREET 36STREET 36STREET 36STRE E T 15STREET 37STR E E T 3 7 STREET 13 STREET 12 STREET 11STREET 10 STREET 19STREET 18STREET 19 STREET 19STREET 21STREET 9STREET 35STREET 33 SUB WATER PRESSURE ZONE ELEVATION TABLE FORESTRYSURVEYINGENGINEERINGNATURAL RESOURCESLANDSCAPE ARCHITECTUREPLANNINGBRAND S ROAD FEASIBILITY LAYOUT #6SPRINGFIELD, OREGONDRAFT LEGEND 5CONCEPTUAL MASTER PLAN WITH AERIALCONTOURS AND SUB WATER PRESSURE ZONES BOB STRAUBPARKWAYSOUTHERN PAC IF IC RR J A S P E R RO A D WI L L AM E T T E R I V E R W E Y E R H A U S E R R O A D BRAND S ROAD BRA N D S R O A D SO U T H E RN PA C I F I C R R STREET 1 STREET 2 STREET 3 STREET 25STREET 21STREET 23STREET 24STREET 29STREET 30STREET 22 STRE E T 4 STRE E T 5 STREET 6STREET 20 S T R E E T 2 0 STREET 25STREET 7 S T R E E T 2 6 ST R E E T 2 7 STREET 8 STREET 28STREET 7STREET 14 STREET 15 STREET 16 STREET 17 STREET 31STREET 32STREET 32STREET 34STRE E T 14STREET 36STREET 36STREET 36STRE ET 15STREET 37S TR E E T 3 7 STREET 13 STREET 12 STREET 11STREET 10 STREET 19STREET 18STREET 19 STREET 19STREET 21STREET 9STREET 35STREET 33 SLOPES TABLE LEGEND 6CONCEPTUAL MASTER PLAN WITHAERIAL CONTOURS AND SLOPESFORESTRYSURVEYINGENGINEERINGNATURAL RESOURCESLANDSCAPE ARCHITECTUREPLANNINGBRAND S ROAD FEASIBILITY LAYOUT #6SPRINGFIELD, OREGONDRAFT BOB STRAUBPARKWAYSOUTHERN PAC IF IC RR J A S P ER RO A D WI L L AM E T T E R I V E R W E Y E R H A U S E R R O A D BRAND S ROAD BRA N D S R O A D SO U T H E RN PA C I F I C R R SLOPES TABLE AVERAGE SLOPE CALCULATION EXHIBITFUTURE RESIDENTIAL AREASFORESTRYSURVEYINGENGINEERINGNATURAL RESOURCESLANDSCAPE ARCHITECTUREPLANNINGBRAND S ROAD FEASIBILITY LAYOUT #6SPRINGFIELD, OREGONDRAFT LEGEND BOB STRAUBPARKWAYSOUTHERN PAC IF IC RR J A S P ER RO A D WI L L AM E T T E R I V E R W E Y E R H A U S E R R O A D BRAND S ROAD BRA N D S R O A D SO U T H E RN PA C I F I C R R SLOPES TABLE LEGEND AVERAGE SLOPE CALCULATION EXHIBITENTIRE MASTER PLAN AREAFORESTRYSURVEYINGENGINEERINGNATURAL RESOURCESLANDSCAPE ARCHITECTUREPLANNINGBRAND S ROAD FEASIBILITY LAYOUT #6SPRINGFIELD, OREGONDRAFT BOB STRAUBPARKWAYSOUTHERN PAC IF IC RR J A S P E R RO AD WI L L AM E T T E R I V E R W E Y E R H A U S E R R O A D BRAND S ROAD BRA N D S R O A D SO U TH E R N P A C I F IC R R STREET 1 STREET 2 STREET 3 STREET 25STREET 21STREET 23STREET 24STREET 29STREET 30STREET 22 STRE E T 4 STRE E T 5 STREET 6STREET 20 S T R E E T 2 0 STREET 25STREET 7 S T R E E T 2 6 ST R E E T 2 7 STREET 8 STREET 28STREET 7STREET 14 STREET 15 STREET 16 STREET 17 STREET 31STREET 32STREET 32STREET 34STRE E T 14STREET 36STREET 36STREET 36STRE ET 15STREET 37S TR E E T 3 7 STREET 13 STREET 12 STREET 11STREET 10 STREET 19STREET 18STREET 19 STREET 19STREET 21STREET 9STREET 35STREET 33 FORESTRYSURVEYINGENGINEERINGNATURAL RESOURCESLANDSCAPE ARCHITECTUREPLANNINGBRAND S ROAD FEASIBILITY LAYOUT #6SPRINGFIELD, OREGONDRAFT 7PRELIMINARY RESIDENTIALDENSITY CALCULATION Map of 2023 Proposed Park Improvements Figure 36: Map of 2023 Proposed Park Improvements åå å åå ååå ååå å åå å åå å å Willamalane Park and Recreation District, OR Park Project List and Recommendations Map ²Miles Map Note: This map includes many of the Phase 1, Phase 2, and some Ongoing capital projects identified in the 2023 Comprehensive Plan. For a full list of projects, project descriptions, and order of magnitude costing, please review the Project List in Appendix 11. Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community, Lane County GIS Legend Indoor Facilities å School Willamalane Multi-Use Path Willamalane Foot Path Highway /Major Road Railroads River/Stream Willamalane Parks Study AreaBoundary Projects* "AS#Short-term Projects (Phase 1, 1-5 years)"AM#Mid-term Projects (Phase 2, 6-10 years)"AO#Ongoing Projects (Continuous) *Project descriptions are provided for each project number in the Project List (Appendix 11). Other Parkland (County/City of Eugene) 1"AO11 "AM5 "AM7 å"AM9 "AM10"AM11 "AM12 "AM13 "AM14 "AM6 "AM8 "AM22 "AM23 "AS8 "AS13 "AS10 "AS11 "AS12"AS16 "AS9 "AS34 "AS17 "S15A"AS33 "AS18 Thurston Hills Natural AreaDorris Ranch Clearwater Park Georgia Pacific Natural Area Weyerhaeuser McKenzie Natural Area Eastgate Woodlands of the Whilamut Natural Area Rob Adams Park Island Park Harvest Landing By-Gully Path West D St Greenway Lively (Jack B.) Park Guy Lee Park Willamalane Park Les Schwab Sports Park Meadow Park Fort (William S.) Memorial Park Arrow Park Ruff (Wallace M. Jr.) Memorial Park Bob Artz Memorial Park Page Park Moe Mountain Natural Area Thurston ParkTyson Park Volunteer Park Jasper Rd Trailhead Kelly Butte Overlook Jasper Meadows Park Douglas Gardens Park James Park Quartz Park Willamette Heights Park Bluebelle Park Royal Delle Park Menlo Park Jesse Maine Memorial Park Robin Park Gamebird Park Mill Race Park Booth Kelly Trailhead Marylhurst Park Pride Park Pacific Park Splash! Willamalane Park Swim Center Bob Keefer Willamalane Center for Sports and Recreation Willamalane Adult Activity Center SECTION 9 Moving the District  Forward Willamalane Park and Recreation District COMPREHENSIVE PLAN114 Map of 2023 Proposed Path and Trail Improvements Figure 37: Map of 2023 Proposed Path and Trail Improvements åå å åå ååå ååå å åå å åå å å Willamalane Park and Recreation District, OR Path and Trail Project List and Recommendations Map ²Miles Map Note: This map includes many of the Phase 1, Phase 2, and some Ongoing capital projects identified in the 2023 Comprehensive Plan. For a full list of projects, project descriptions, and order of magnitude costing, please review the Project List in Appendix 11. Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community, Lane County GIS Legend Indoor Facilities å School Willamalane Multi-Use Path Willamalane Foot Path Highway /Major Road Railroads River/Stream Willamalane Parks Study AreaBoundary Projects* "AS#Short-term Projects (Phase 1, 1-5 years)"AM#Mid-term Projects (Phase 2, 6-10 years)"AO#Ongoing Projects (Continuous) *Project descriptions are provided for each project number in the Project List (Appendix 11). Other Parkland (County/City of Eugene) Legend Indoor Facilities å School Willamalane Multi-Use Path Willamalane Foot Path Non-Willamalane Path Highway /Major Road Railroads River/Stream Willamalane Parks Study AreaBoundary Proposed or Planned Path Proposed On-Street Connection Other Parkland (County/City of Eugene) # "AS25 "AS26 "AS28 "AS27 "AS29 "AM27 "AM28 "AM29 "AM29 "AM30 "AM31 "AM34 "AM35 "AO1 "AO2 @AO3 6"AO6 #AO5 Thurston Hills Natural AreaDorris Ranch Clearwater Park Georgia Pacific Natural Area Weyerhaeuser McKenzie Natural Area Eastgate Woodlands of the Whilamut Natural Area Rob Adams Park Island Park Harvest Landing By-Gully Path West D St Greenway Lively (Jack B.) Park Guy Lee Park Willamalane Park Les Schwab Sports Park Meadow Park Fort (William S.) Memorial Park Arrow Park Ruff (Wallace M. Jr.) Memorial Park Bob Artz Memorial Park Page Park Moe Mountain Natural Area Thurston ParkTyson Park Volunteer Park Jasper Rd Trailhead Kelly Butte Overlook Jasper Meadows Park Douglas Gardens Park James Park Quartz Park Willamette Heights Park Bluebelle Park Royal Delle Park Menlo Park Jesse Maine Memorial Park Robin Park Gamebird Park Mill Race Park Booth Kelly Trailhead Marylhurst Park Pride Park Pacific Park Splash! Willamalane Park Swim Center Bob Keefer Willamalane Center for Sports and Recreation Willamalane Adult Activity Center SECTION 9 115 Moving the District  Forward COMPREHENSIVE PLAN Willamalane Park and Recreation District ** **** ********+* **+++********* * * ********** * **************++**** *** **** *********((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((( (((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ((((((( ( (((((((((( ( ( ( ( ( (((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((R R R R R R R R ( ( ( 2 0 3 .9 6 '2 6 5 'N2 2 ° 4 1 'ES 7 1 °5 6 ' W 3 0 4 .4 '2 8 6 .1 '272.69'149+78.59L 141+59.35 L 141+47.63 L 138+26.25 L 135+14.71L 128+90.68L 126+17.46L 117+7 0.73 L 114+77.64 L 111+69.22 L 1 0 8 +76 .1 3 768.5' (720')9.01CH S34°38'E 28 5.3' N 37° W 16.87 CHS6 0'24.19CHEC672+29.39.30CH 1.24CH (300')(320')S17°E3. 5 0 CHS3°E21.31CH13.50CHS51°30'E 2.0 CH S 3 0° E 4.0 0 C H S04°W3.50CHS23°30'W5.70CH1.78CHS32°W15.00CHS19°W5.60CHS5°W4.50CHS11°E2.40CHS2 1 ° 3 0 'E4. 9 0 CHS 2 7 ° E 3.2 C H1.44CH2.85CH5.70 CHS23°30'WN10°30'E3.90 CHN01°E 5.15 CHWEST S 0° 31' 33" E662.49'S 89° 51' 31" W320'21 5 3 . 0'M/ L L 1 2 2 +98 .3 9 N89°19'W 7 6 6 .9 '1101 PCL 2 DLC 39J LOONEYSE COR NE CORBJ PENGRADLC 38 M IDDLE FORK WILLAMETTE 1503BOBSTRAU BPARKWAY300 600 N W CORJ LOONEYDLC 39 NNW CORDLC 39 INT ELL CORDLC 39DLC 48J SMITHSE COR LOT 737.38 10 11 23 APPROX.1/4 COR. 4 3 9 10 PCL 3 NE CORJ LOONEYDLC 39 1100 DLC 38NW COR 1506 S O U T H E R N PACI FI CR R 10 11 15 9 10 16 15 NW CORJ WALLACEDLC 40220'N O COMMUNITY ROAD ROAD 2387.3' NORTH & 4472.6'W 2108' NORTH & 4355.5'W 1848.9' NORTH & 4192.1'W OF SE COR BV PENGRA OF SE COR BV PENGRA OF SE COR BV PENGRA DLC NO 39 DLC NO 38 DLC NO 38 CO-RD R/W SURVEY SEC COR BYGLO SEC COR BYWEYERHAEUSER COJOINT TRUCK RD LOCATIONSURVEY M AINE ST.901 LOT 635.20 LOT 3LOT 25.20 5.00LOT 12.46 C O U N T Y WE Y E RHA USE RB & K ROADWEYERHAEUSER S89°49'45"E 2632.19'1307.55'(SET 5/8 IRON ROD) N89°32'00"W 2631.68' (CS 22780)N89°19'W 40.175CHS=2651.55' (G.L.O.) 14SSE COR.D.L.C. 48 S 42-21-22 W620.77N 89-40-38 W309.28 N51°51'50"W 249.51'202.01'N54°06'E78.35'WEST 233.27'295.32'N37°56'E 35.37'S37°47'44"E 560.24' S34°51'50"E 147.89' N44°45'30"W15.06' S36°43'10"E 299.45'S83°W N89°55'W 80 CH 16.58 CH = 1094.28'115'10 0' N 2 6 -4 1-5 2 W3 6 1.2 7 44.75 CH2° C N 44-0-39 E647.81N 0-26-30 E323.87N 44-0-39 E183402'50'50' 10°C 1083.2' S89°51'31"W - 1028.51' (PLAT)10.70 CH = 706.2'EAST 543.39'443.39' 405'528.55'SOUTHN15°21'57"W62.92' N00°30'33"E74.51'N01°02'W 503.84'N02°50'W 489.1'LC= 8 0 7.3 7' N 2 8°27'57"W L = 8 39.07' R = 8 76.19' 8° C 6 85.9'27.73 CH = 1830.1NORTH 821.93'LC = 89.44'N56°45'WR = 3024.79'N56°48'W 311.70'60'60'12° C121.64'308.26'S87°W N28°15'W276.83'S47°E285.22'N50°26'E58.5'S56°04'30"W 369.8'20 5.2'S 6 4°09'30"W N15°36'30"W461.7' S 7 4 °1 8 '3 0 "W N06°50'30"W 1131.1'1325.42' 715.4'220'S 3 3°09'E 1 27 1.5' 1 2 69.9' 59.3'250'9.01 CH 80.08 CH (1220')S89°41'E 47.78 CH = 3153.48' 39.28 CH27.05 CH = 1785.3'29.00 CH10.70 CH = 706.2'S 6 8 °5 1 'W 7 8 4 .2 '509.03'34'23.49 CH = 15.50' 734.69' 30.95 CH 246.12'S8 2°1 6'30 "W303.54 '15.18 CH = 1001.88'N00°0021'30"E 101.94'30' 12°C 733.3'N23 ° 0 9 'W 6 7 0 .7' 382.3'18°C 10°C 345.3' N 2 6 ° 5 4 'W 6 5 3 . 5'S58°39'45"W 200'N 3 1°5 3'W - 3 5 2.8 3' 4.3 3 C H = 2 8 5.7 8' S 58°59'W 170.47'S 6 9 °2 1 '1 5 "W 7 3 4 .5 5 '3.5 1 C H = 2 3 1.66' N 32°3 5' W S58°46'52"W78.36'N07°15'W8.50 CHN24°30'W 7.8 CHN38°E2.65 CH2.5 CHN15°EN21°36'W 13.20 CH40 CHS18.87 CH = 1267.42'N18°55'W12.67 CH = 836.22' 9.31 CH = 614.46'714' 3 7 1. 2 5' 1 2 0. 8 1' 2 2 0.4 4' 7 0 '7 0 '7 0 'N 6 8 °2 3 '3 0 "E 4 9 1 .1 0 'S2 2°45'E30 3' 1 4 7.8 9' S 2 8 ° 3 0' E 188.9' 155' N 7 1 °5 6 'E 3 0 4 .4 'N39°36'W N58°36'W 9.29 CHS = 613.14'454.78'13.16 CH = 868.56'18.87 CH = 1267.42'30'30'7.09 CH = 467.94' (288')N2 6 ° 2 6'W 4 4 8 .8' 454.70'NORTH 34.05 CH = 2247.3'1100'1100'509.05' 80.00 CH = 5280' 23.49 CH = 1550.34'18.76 CH S00°31'33"E 2256.73' (PLAT)1856.73'S88°37'W180' 180'146'146'S01°23'E1147.34'400'SOUTH 528.55'N 7 1 °4 9 '1 0 "E 4 1 2 .0 6 'WEST 381.61'NORTH 297.45'EAST 526.21'420' NORTH66.05' N35°10'56"W36.55' 2273 (H W Y 222) 657.73' APPROX.1/4 COR.100'PCL 1 436.67' L 144+25.00 POC P P NOL 1 5 5 +5 4 P O C L 143+75.00 POC S 89°56'5" E J LOONEY L 152+61 PO C 561.0'SW COR 96-P0790L 1 5 6 +53 .6 3 P T S89°36'30"E 1310.74' 1102 100'800 L 152+29.08 PC100'DLC 39 0.6 AC 13.08 AC11.42 AC 12.23 AC67.17 AC 1.52 AC 0.05 AC 0.4 AC 1.07 AC 5 AC 0.98 AC 0.62 AC 1.48 AC 1 .23 AC1 1 .2 3 A C 4.67 AC 16.32 AC 1.81 AC 0.59 AC 31.94 AC 2.1 AC 215.82 AC 0.58 AC 5.74 AC 60.72 AC 29.03 AC 9.7 AC 8.33 AC 503 501 1200 1201 1001 1000 1105 1103 1002 1500 1507 1501 1504 1502 1600 150 81400 1301 1300 700 500 900 100 1104 1505 200 201 502 001-13 019-32 019-15 SEE MAP18020900 SEE MAP18021100 SEE MAP18021500 SEE MAP18020300 SEE MAP18020333 SEE MAP18020200 SEE MAP18020334 SEE MAP18020400 SEE MAP18021600 SEE MAP18021400 FOR ASSESSMENT ANDTAXATION ONLY SECTION 10 T.18S. R.2W. W.M.Lane County1" = 400' CANCELLED30040060080011011503150611009011102 18021000 18021000 LCATBHH - 2015-09-28 10:54 REVISIONS06/07/2006 - LCAT130 - CONVERT MAP TO GIS06/08/2006 - LCAT130 - PTN 1100 INTO 1605 & 160307/21/2006 - LCAT142 - CORRECT TL 1508 & 150804/24/2007 - LCAT142 - PTN OF 1400 OUT TO CO. RD. NO. 26610/26/2007 - LCAT155 - NTL 302; LLA BETWEEN 1100 & 30202/01/2008 - LCAT155 - REMAP 1100 TO 180211000200003/27/2008 - LCAT142 - PTN 500, 502, 900 TO BOB STRAUB PARKWAY03/27/2008 - LCAT142 - DIV 901 O.O. 90003/27/2008 - LCAT142 - CANC 901 TO BOB STRAUB PARKWAY03/27/2008 - LCAT142 - PTN 1301, 200 TO BOB STRAUB PARKWAY04/29/2008 - LCAT142 - LLA BETWEEN 100 & 18020900-10009/17/2010 - LCAT167 - ADDED "CO RD 2273" TO JASPER RD12/08/2010 - LCAT115 - PTN TL 502 INTO 18-02-09-40108/26/2013 - LCAT142 - DIV TL 201 O.O. 20008/26/2013 - LCAT142 - PTN TL 201 OUT TO BOB STRAUB PKWY09/05/2013 - LCAT115 - PTN TO JASPER RD EXTENSION09/28/2015 - LCAT142 - CANC TL 1102 TO 110509/28/2015 - LCAT142 - LLA BETWEEN 1104 & 1105 ((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((( ( (((((((((( ( ( ( ( ( ( (((((((((((((R R R R R R R R R R R R R R R R R R R R )) ( ( ( ( ( ( ( ( ( R ( ( ( ( WEST 10 CH SOUTHDLC NO 73 71.31N54°W 8.65 CH 547.49'360.44'S39°30'E NE COR N15°08'32"E 70'15 60'30' 48' 102'N 0-4-43 W679.15NO 680 S51°15'E181.73'SW COR 4.25 CH = 280.50'SOUTH 816.90'144' BJ PENGRA 215'NW COR NORTH 816.90'S37°50'06"EN 36°30'W 8.94 C H 6.06 CH = 399.96'R R 689.25' N51°W 21.10 CH 7.78 9.30 CH 208.6' W.M. VEACH DLC 38 217.3' 61'375.53' J LOONEY 177.4' 10 102' N 38°W283.57'79.12 S39°30'E 207.32' JASPER RDS.39455 157.3' S.6375 S 5-19-11 E441.7487.71' S O U T H E A S T E R L Y 6 5 0.0 0'S45°29'W150' 8.50 CH = 561' WEST D.L.C. NO 38 16.04 CH S T A T E H WY 15 N53°54'38"W N47°27'E12.308 CH = 812.328'50' 328' 357.2'417.692 2 0 'N04°25'WNORTH - 496.64'92.11N 2 7 ° 4 5'WN2 1 ° 5 6 'WN 34°2 1'1 6" W 14.39'312.04'S 60-1-33 W 17031'21.40 CH = 1412.40'S14°52'45"EDLC N0 38 EAST 758.27'164'N7°53'16"E - 736'N10°45'W164±'LOT 32.36 CH 122' 10 CH = 660'82'N60°30'E 12.43 CH DLC 38 D L C NO 41 21 N23°55'ES01°24'30"EMID D L E N 44-0-39 E647.81INT ELL COR S 42-21-22 W620.77(231)N 0-4-43 W337.5119.38 CH = 1279.08'NORTHN47°20'03"W 808.20' S38°30'30"E 31' 14.90 CH = 983.40'19.38 CH = 1279.03'36.30 76.60' G. CALLISSON SSE COR.D.L.C. 48 210.03' 80.45 CH 266.70' EAST LOT 2 23.552 RODS 23.40 CH61'N8°05'WN0°50'E19.00 4.18 CH = 275.88'14.52 CH = 958.37'S53°W(120')SOUTH 544.60'30.90 CH = 2039.40' 86.15'199.98'2 1 1.3 3'466.06'214.66' D.L.C NO 73 N47°37'34"W 400'RIVER408'16 109' 3800 LOT 9 S 89-32-44 E551.69 CO RD NO 70 S49°50'18"E N01°16'WLAIRD LANEN55°13'41"W NAT RON - J A S PE R RD CO RD 2 2 7 3 (HWY 2 2 2 ) 2.9 CHS53°W15.76 7.24 N 47-11-54 W 141.24 87.72'SOUTH 27.93 CH = 1843.38'37.40 78'96.86'10 0'310.39'11.20 CH LOT 7 JOINT TRUCK RD LOCATION N65°30'W 6.70 CH 2 C H 14.11 CH = 931.26'271'10.09 CH = 665.94'80 CH 180'DLC 54 312.04'594.90'222'1.80 S64°E 175.89' N45°35"W 195' 150' S89°58'15"W 296'NORTHLOT 11 143.83'9.23 CH N.N.E COR WEYERHAEUSER CO N50°25'06"W 3.90 CH = 257.4'(PRIVATE ROAD)354.53' N52°19'45"WS38°21'06"E126.47'LOT 8 N 89-40-38 W309.2816.87 CHS186.58' S 2 8-3 9 -0 E 1 1 8.3 1 N61°38'21"W = 155.76' 379.06'122.54'290.53'12 CH = 792'953.40' 194'15.67 CH 1034.22'S 24369 N50°W 97.23'N54°32'25"EN 75-1-50 W266.44 302.95' P A CIFIC N61°38'21"W N4°25'W16 2.39' 5.70 EAST 562.00' 96' 79.53' D.L.C NO 41 180'8.17 CH = 539.22'LOT 5193.54'272.30'419.54' 23131.45'416'177.18'S77°09'45"W154.41' 122' 30' WILLAMETTE 3.50 CH 19.00 S52°E S 2 3 - 4 2 - 2 5 E 2 5 6 . 4 576'32.08 CH = 2117.28'S29°57'75"W234.02' 9 EAST 10 CH 51.05 CH S 46-56-36 W192.04N53°58'57"W 15.67 CH = 1034.22'N61°29'09"W334' NW COR 496.51'S89°23'39"E LOT 10 84.1'15 236.51 NORTH - 2902.26'R=286.48'N56°00'19"W 115'92.54'20.25 CH = 1336.5' 118' 7.78 22 5 CH180'33± 19.70 N89°57'W85.00 CH10'60'157.5'215'242.44'316' 190.20'S00°24'W 904.77'292.37' 109'352.17'155.55' NE COR 397.83' 120'S 45-2-6 W815.82211.14' S72°E - 9.30 CH 8.70 C H 740.74'(3369.30')104.4710.27 CH = 677.82'150' S.40266N75°33'23"WS 40-34-45 W226.7660' 100' 100' DLC 39 496.51'N52°42'06"E 104.67' N52°47'30"W N63°21'23"E 10 265'S 3-47-44 W201.94.5 CH LOT 12 99.72' 14 S 89-32-44 E567.17 WEST 325.44'83'15.78 1 9 4' LAIRD LANE 23.60 C H 266.70' 1.88 CH 222'N65°W 6 CH 1 3 0 ±'321.72'78'327'15 177.47'26.61 CH = 1756.26' N89°55'W NW COR ROAD 8.09 CH = 533.98' 344.53' N 34°5 0'0 3" W N 2 6-4 1 - 5 2 W3 6 1.2 7 DLC NO 54 16 CH 124 ±' 22 14 L 1 56 +5 3.6 3 P T N44°ES48°15'E79.5'11 C O U N T R Y R D N O 4 2 1S 1-33-32 W129.3516.92 CH 327.61' 214.79' 265.4' 244.82' S 36°30'E 13 C HS 60-1-33 W 584.758.50 CH = 561' S53°E 70'8 C H 5 CHJ. PENGRA LOT 576.70'253.43'N01°16'W97.2'163.76'N2 7 °W770'250±' 15.30 CH 544.60'157.3' 38.64' 9.80 CH = 646.8' LOT 4 COUNTYNE COR 194' (PRIVATE ROAD)6.88 CH = 450'SOUTH16 CH = 1056'152.62'N2 6 ° 4 3'1 3 "W73'LOT 6 S.E. COR 3900 S O U T H E R NN30°25'E 144' S.23983 N59°19'W DLC 40 N4°50'E9.54 CH 3.03 CH292.40' 14.14 CH = 933.24'7.072 CH = 466.75'93.06' S45°E 9.50 CH S.5980 F O R K SURVEY EAST 344.32' 1799 16 N39°43'50"EN01°16'WS26°E 6 . 6 CH387.16' 2100 SHELLEY 160'112.84'4.34 CH = 286.44' 545' INITIAL R =2 0 3 9 .8 6 'PCL 2 47.92' 19.36 CH = 1277.76' 3.75 CH = 247.50'36.20 CH4.138 CHN 38°49'43" W160'S 2 5 °1 1 '4 7 "E 7.888 CH = 520.08' S. 45624 67.57' S38°46'59"E 6.05 CH = 399.30'N0°15'55"EPOINT DLC NO 54 P3050NW COR 480' 1 1 8.5 5' PCL 1 S38°46'59"E 513.19'2022-206.16'PCL 3 N89°44'05"W 4 7 4 .8 4 '273.108'572.96' S 3 3°2 4'3 4"E 0.3 AC 0.41 AC0.73 AC0.54 AC 0.95 AC 0.33 AC8.81 AC 3.45 AC 0.27 AC 1.71 AC1.79 AC3.87 AC0.7 AC 0.06 AC 9.58 AC9.56 AC5 AC1.07 AC2.23 AC3.3 AC 9.91 AC 5 AC 1.56 AC61.1 AC 28 AC 3.21 AC 109.86 AC 7.4 AC 4.94 AC 7.3 AC 0.15 AC1.76 AC 35.84 AC 2.47 AC0.24 AC 32.65 AC 0.27 AC 0.43 AC 0.19 AC 0.18 AC 0.54 AC 1.99 AC0.19 AC 0.17 AC 0.16 AC 36.4 AC 0.16 AC 0.15 AC 0.18 AC34.62 AC 56.28 AC 3.5 AC18.36 AC 1.11 AC 154.54 AC 9.5 AC 5.9 AC 6 AC 31.4 AC 14.1 AC 0.85 AC 0.71 AC 22.66 AC 2 AC 2 AC 2600 290133012801 3401 26022401 3501 3500 33053300 2700 3100 340033023303330433063000 3700 2301 32002300 2101 2200 2000 1600 4001 15001601 1900 17001400 4003 1300 1200 1100 1000 900 200800 700 600 4000 500 400 3004004 4002 25002400 3600 100 102 103 104 101 1702 1701 1501 4100 2902 2102 2103 2104 001-13 001-03 SEE MAP18021600 SEE MAP18021400 SEE MAP18020900 SEE MAP18021433 SEE MAP18021000 SEE MAP18021100 SEE MAP18022200 SEE MAP18021300 SEE MAP18022211 SEE MAP18022320 SEE MAP18022100 SEE MAP18022300 FOR ASSESSMENT ANDTAXATION ONLY SECTION 15 T.18S. R.2W. W.M.Lane County1" = 400' CANCELLED17992100 18021500SPRINGFIELD SPRINGFIELD18021500 LCATDTO - 2022-09-30 14:51 REVISIONS06/07/2006 - LCAT130 - CONVERT MAP TO GIS06/07/2006 - LCAT130 - SEG 101-104 O.O. 100 & 1702 O.O 179904/30/2007 - LCAT115 - L.L.A. BETWEEN TL'S 1702 & 200010/15/2007 - LCAT155 - PTN 1200 & 1300 OUT TO JASPER ROAD10/03/2007 - LCAT113 - CORR: MERGE TL 1700, 179910/04/2007 - LCAT113 - AC CORR TL 1501, 160009/17/2010 - LCAT167 - ADDED "CO RD 2273" TO JASPER RD10/15/2018 - LCAT174 - NTL 410003/04/2022 - LCAT148 - CANC TL 2100 INTO 2022-P305009/30/2022 - LCAT187 - ADD TL 2902 NUM ANNO Submittal Transmittal AKS Engineering & Forestry LLC | 12965 SW Herman Rd. Suite 100 Tualatin, OR 97062 Page 1 of 2 FROM:Marie Holladay AKS Engineering & Forestry LLC 12965 SW Herman Rd. Suite 100 Tualatin, OR 97062 holladaym@aks-eng.com 503-563-6151 TO:PERMITCENTER@SPRINGFIELD-OR.GOV PERMITCENTER@SPRINGFIELD-OR.GOV PROJECT:Brand S Road - Springfield 9845 DATE SENT:2/21/2024 SUBJECT:Pre-Application Report ID:00031 PURPOSE:For Review VIA:Info Exchange REMARKS:Hello, Please follow the link below to download the Pre-Application Report package for 36443 Jasper Road, Springfield, OR. We would like to request an in-person meeting with a hybrid component. We will have ±8 people attending in-person. In addition, we would like to seek a 2-hour minimum time slot and for the City Attorney to be in attendance. A hard copy and a check for the fee in the amount of $4,620.00 will be delivered to your office. Please let us know if you have any issues accessing the file. Thank you. Kind regards, Marie Holladay AKS ENGINEERING & FORESTRY, LLC 12965 SW Herman Road, Suite 100 | Tualatin, OR 97062 P: 503.563.6151 Ext. 270 | www.aks-eng.com | holladaym@aks-eng.com Offices in: Bend, OR | Keizer, OR | The Dalles, OR | Tualatin, OR | Kennewick, WA | Vancouver, WA | White Salmon, WA NOTICE: This communication may contain privileged or other confidential information. If you have received it in error, please advise the sender by reply e-mail and immediately delete the message and any attachments without copying or disclosing the contents. AKS Engineering and Forestry shall not be liable for any changes made to the electronic data transferred. Distribution of electronic data to others is prohibited without the express written consent of AKS Engineering and Forestry. Submittal Transmittal DATE:2/21/2024 ID:00031 Page 2 of 2 CONTENTS QTY:DATED DESCRIPTION:ACTION: 1 2/21/2024 9845 20240220 Pre-App Package_FINAL Updated.pdf COPIES Marie Holladay (AKS Engineering & Forestry LLC) Sean Vermilya (AKS Engineering & Forestry LLC) Rand Waltz (AKS Engineering & Forestry LLC) Chris Goodell (AKS Engineering & Forestry LLC) Monty Hurley (AKS Engineering & Forestry LLC) Janelle Guiao (AKS Engineering & Forestry LLC) Lawrence Pankey (AKS Engineering & Forestry LLC) Springfield Planning (City of Springfield) Shannon Morris (City of Springfield) Andrew Limbird (City of Springfield)