HomeMy WebLinkAbout10. Private-Public Utility Plan_GansenJanuary 12, 2024
GANSEN GAME FARM RD ANNEXATION
Annexation Application
Map 17-03-22-12, Lot 02100
Map 17-03-22-13, Lot 20801
Public / Private Utility Plan [SDC 5.7-125(B)(12)]
SDC 5.7-125(B)(12) calls for: A public/private utility plan describing how the proposed affected territory
can be served by a full/minimum level of key urban facilities and services.
The Annexation Application calls for: A plan describing how the proposed annexation area can be served
by key facilities and services must be provided with the Annexation Agreement. Planning and Public
Works staff will work with the applicant to complete the Annexation Agreement.
In response, the Gansen Game Farm Road Annexation application includes the following Public/Private
Utility Plan. This Public/Private Utility Plan describes what is known regarding facility providers, existing
facilities, and anticipated service extension.
Existing Facilities, Providers and Service Extension
Key facilities and services as defined by the Metro Plan and how they will be met are as follows:
Stormwater Tax Lot 20801 - Vacant
Provider: City
Current: On-Site: None.
Off-Site: Public – City of
Springfield.
Future: On-Site: Private – Gansen.
Off-Site: Public – City of
Springfield.
Existing Facilities:
Private: None.
Public: Existing public system on the
eastern property line in Game
Farm. It is a 42-inch main.
Service Extension:
Private: The line will be extended from
Game Farm Road.
Public: No future extension. The
existing off-site public system
will continue to be utilized.
Existing Storm and Sanitary Infrastructure
City of Springfield
2023
Gansen Game Farm Rd Annexation Page 2 of 4
Annexation – Public/Private Utility Plan
January 12, 2024
The Satre Group 375 West 4th Avenue, Suite 201, Eugene, OR 97401 (541) 686-4540 www.satregroup.com
Stormwater Tax Lot 2100 – Single-Family
Provider: City
Current: On-Site: None.
Off-Site: Public – City of Springfield.
Future: On-Site: Private – Gansen.
Off-Site: Public – City of Springfield.
Existing Facilities:
Private: None.
Public: Existing public system in the eastern
section of Pheasant Dr. There is a catch
basin on both sides of the road.
Service Extension:
Private: The line will be extended from Pheasant
Drive to the property line.
Public: No future extension. The existing off-site
public system will continue to be utilized.
Existing Storm and Sanitary Infrastructure
City of Springfield 2023
Wastewater Tax Lot 20801
Provider: Current: None.
Future: City of Springfield.
Existing Facilities: No public wastewater system exists
on the subject property. There is,
however, existing public wastewater
infrastructure to the east, in Game
Farm Road.
Service Extension: Should wastewater infrastructure be
needed for the subject property in
the future, service would be
extended from Game Farm Road.
Existing Storm and Sanitary Infrastructure
City of Springfield
2023
Wastewater Tax Lot 2100 – Single-Family
Provider: Current: None.
Future: City of Springfield.
Existing Facilities: No public wastewater system exists
on the subject property. There is,
existing public wastewater
infrastructure to the north, in Ethan
Ct.
Service Extension: Should wastewater infrastructure
be needed for the north subject
property in the future, service could
be extended from Ethan Ct.
Existing Storm and Sanitary Infrastructure
City of Springfield
2023
Gansen Game Farm Rd Annexation Page 3 of 4
Annexation – Public/Private Utility Plan
January 12, 2024
The Satre Group 375 West 4th Avenue, Suite 201, Eugene, OR 97401 (541) 686-4540 www.satregroup.com
Transportation
Provider: Streets: City of Springfield.
Transit: Lane Transit District (LTD).
Existing Facilities: Streets: Existing streets nearest the subject property, and available for access,
are Game Farm Road to the east and Pheasant Blvd (to the northwest).
Transit: LTD provides service currently is in Gateway Street to the west.
Service Extension: Streets: There is no need to extend public street service. The subject property
has existing access.
Transit: Post annexation, LTD will continue to be the transit service provider.
Solid Waste Management
Solid waste service for un-annexed property is the responsibility of the property owner. Upon annexation,
service will be provided by a private service provider under contract with the City of Springfield. The
current service provider, under franchise agreement with the City of Springfield, is Sanipac.
Water Service
Provider: Springfield Utility Board (SUB).
Existing Facilities: Service is on and adjacent to the
subject property. Game Farm Road
and Pheasant Blvd both have
services in them that can be
extended.
Service Extension: Service is on site off Pheasant and
does not need to be extended. The
Game Farm Road water will require
extension of services.
Existing Water Infrastructure
Springfield Utility Board
2023
Electric Service
Provider: Springfield Utility Board (SUB).
Existing Facilities: Existing electric infrastructure is
adjacent to the subject property along
its eastern boundary.
Service Extension: The service would be extended to the
subject lot.
Existing Electric Infrastructure
Springfield Utility Board
2023
Gansen Game Farm Rd Annexation Page 4 of 4
Annexation – Public/Private Utility Plan
January 12, 2024
The Satre Group 375 West 4th Avenue, Suite 201, Eugene, OR 97401 (541) 686-4540 www.satregroup.com
Fire and Emergency Medical Services
Fire and emergency services are provided by Eugene Springfield Fire. Upon annexation, Eugene
Springfield Fire will continue to provide service.
Police Protection
The Lane County Sheriff provides service outside of the city limits. Upon annexation, service will be
provided by the Springfield Police Department for the subject property.
City Wide Parks and Recreation Programs
The site is within the boundaries of the Willamalane Park and Recreation District. Park and recreation
services are provided to the subject property currently and will continue to be provided after annexation.
Land Use Controls
The City of Springfield is the planning and building permit services provider. This service will continue
after annexation.
Communication Facilities
CenturyLink provides a land-line telephone service. Comcast provides a cable service. Annexation will
not change this.
Public Schools
The site is served by the Springfield School District. Annexation will not change this.