Marcola Meadows Commercial
Type I Final Site Plan Review
Date: January 2024
Submitted to: City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Owner/Applicant: Marcola Meadows Neighborhood, LLC
27375 SW Parkway Avenue
Wilsonville, OR 97070
AKS Job Number: 7736
Table of Contents
Findings for Compliance with Conditions of Approval ...........................................................................2
Exhibits
Exhibit A: City Application Forms and Checklists
Exhibit B: Final Site Plans
Exhibit C: Drinking Water Protection Exemption
Exhibit D: Operations and Maintenance Plan
Marcola Meadows Commercial
Type I Final Site Plan Review Application – City of Springfield
January 2024
Page 1
Marcola Meadows Commercial
Type I Final Site Plan Review Application
Submitted to: City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Applicant/Property Owner: Marcola Meadows Neighborhood, LLC
27375 SW Parkway Avenue
Wilsonville, OR 97070
Applicant’s Consultant:
AKS Engineering & Forestry, LLC
12965 SW Herman Road, Suite 100
Tualatin, OR 97062
Contact: Marie Holladay
Email: holladaym@aks-eng.com
Phone: (503) 563-6151
Applicant’s Transportation
Engineer:
Lancaster Mobley
321 SW 4th Avenue, Suite 400
Portland, OR 97204
Contact: Todd Mobley
Email: todd@lancastermobley.com
Phone: (503) 248-0313
Site Location: Marcola Road west of 28th Street
Lane County Assessor’s Map:
1703000; Adjusted Tax Lot 1804
Site Size: ±0.89 acres
Existing Springfield Land Use District:
Community Commercial (CC)
Marcola Meadows Commercial
Type I Final Site Plan Review Application – City of Springfield
January 2024
Page 2
Findings for Compliance with Conditions of Approval
Marcola Meadows Commercial Site Plan Review – Conditions of Approval
(Local Case No. 811-23-000164-TYP2; Decision Issued September 18, 2023)
Conditions Applicant’s Response
1. Prior to approval and issuance of Building Permits for the project, the applicant must obtain a Drinking Water Protection Permit or Exemption,
as applicable, for each portion of the building.
A Drinking Water Protection (DWP) Application
Exemption Request has been submitted, and is
currently under review with the Springfield Utility
Board.
2. Prior to approval of the Final Site Plan, the building floor plan must be revised to provide for a treated
and recessed concrete slab to provide secondary containment in the 4,000 ft.2 retail floor space. The secondary containment can be achieved by recessing the floor slab approximately 0.75”,
adding a Xypex C-500 admixture and sealing the joints in the concrete with Deck-O-Seal 150. Secondary containment areas comprised of sealed and recessed floors must not contain any floor
drains. Alternatively, the applicant must provide a secondary containment plan that meets or exceeds these provisions for the retail floor area of the building.
A Drinking Water Protection (DWP) Application
Exemption Request has been submitted and is
currently under review with the Springfield Utility
Board.
3. The construction plans for the project must include the Wellhead Protection notes listed in Finding 18
of the site plan review decision document.
The applicable Wellhead Protection notes are
shown on Sheet 03 of the Final Site Plans (Exhibit
B) and will be included on the construction plans
for the project. The condition is met. 4. The construction plans for the project must provide
for temporary installation of a standard Wellhead Protection sign at the construction entrance or an alternate highly-visible location for the duration of site construction.
The applicable Wellhead Protection sign is shown
on Sheet 03 of the Final Site Plans (Exhibit B) and
will be included on the construction plans for the
project. The sign is intended to remain in place for
the duration of site construction. The condition is
met.
5. The Final Site Plan must provide for permanent
installation of a standard Wellhead Protection sign
at the trash enclosure.
The Final Site Plans (Exhibit B) illustrate the sign
location near the trash enclosure. The condition is
met.
6. The Final Site Plan must depict a trash enclosure
floor drain that is plumbed to the sanitary sewer system and this drain must be installed at the time of site development.
The Final Site Plans (Exhibit B) demonstrate that
the trash enclosure floor drain is planned to be
plumbed to the sanitary sewer system. The
condition will be met.
7. The Final Site Plan must include the elevation details for the trash enclosure structure as depicted in Exhibit D of the applicant’s submittal.
The Final Site Plans (Exhibit B) include the
elevation details for the trash enclosure. The
condition is met.
8. The Final Site Plan must be revised to remove the linear stormwater infiltration planter along the southern edge of the property as shown on Sheet 11
and replace it with two parking lot infiltration
planters as depicted on Sheet 06.
The Final Site Plans (Exhibit B) illustrate the
parking lot infiltration planters, replacing the
stormwater infiltration planter previously located
within the PUE. The condition is met.
9. The Final Site Plan must be revised to provide a planting scheme for the two parking lot stormwater infiltration planters depicted on Sheet 06 of the applicant’s submittal.
The Final Site Plans (Exhibit B) include a planting
scheme for the parking lot infiltration planters.
Marcola Meadows Commercial
Type I Final Site Plan Review Application – City of Springfield
January 2024
Page 3
Marcola Meadows Commercial Site Plan Review – Conditions of Approval (Local Case No. 811-23-000164-TYP2; Decision Issued September 18, 2023)
Conditions Applicant’s Response 10. Prior to approval of the Final Site Plan, the
applicant must provide an Operations and
Maintenance Plan consistent with Appendix 3A-2 of the City’s EDSPM to ensure the long-term maintenance of and operation of the infiltration
planters.
The Operations and Maintenance Plan (Exhibit D)
is consistent with the City’s EDSPM. The condition
is met.
11. Prior to approval of the Final Site Plan, the
applicant must record a Notice of Operations and
Maintenance Agreement consistent with Appendix 3A-2 of the City’s EDSPM against the subject property and provide a recorded copy to the City as
evidence thereof.
The Notice of Operations and Maintenance
Agreement has been provided to the City. The
document will be recorded upon approval. The
condition can be met.
12. The Final Site Plan must depict the water line size
for the private fire hydrant in the northwest corner of the site. Because it is located on a dead-end line, a minimum 8-inch water line size if required for this hydrant.
Sheet 06 of the Final Site Plans (Exhibit B)
specifies the 8-inch water line for the fire hydrant.
The condition is met.
13. The Final Site Plan must show the location and dimensions of any required electrical easements for
the site.
No electrical easements are required for the site.
The condition is met.
14. The Final site Plan must specify a 12-foot mounting
height for the parking lot light in the northwest
quadrant of the site to meet the requirements of SDC 4.5.11(C)(3). Alternatively, the light pole must be relocated to a point at least 50 feet from the
northern property line.
The Final Site Plans (Exhibit B) demonstrate that
the parking lot lights are planned to be mounted
at 12 feet on the pole. The criterion is met.
Exhibit A: City Application Forms and Checklists Exhibit A: City Application Forms and Checklists
Revised 1/1/08 Molly Markarian 3 of 4
Final Site Plan Review Application Process
1. Applicant Submits a Final Site Plan Review Application to the Development Services
Department
• The application must conform to the Final Site Plan Review Submittal Requirements
Checklist on page 4 of this application packet.
• Planning Division staff screen the submittal at the front counter to determine
whether all required items listed in the Final Site Plan Review Submittal
Requirements Checklist have been submitted.
• Applications missing required items will not be accepted for submittal.
2. City Staff Conduct Detailed Completeness Check
• Planning Division staff conducts a detailed completeness check within 30 days of
submittal.
• The assigned Planner notifies the applicant in writing regarding the completeness of
the application.
• An application is not be deemed technically complete until all information necessary
to evaluate the proposed development, its impacts, and its compliance with the
provisions of the Springfield Development Code and other applicable codes and
statutes have been provided.
• Incomplete applications, as well as insufficient or unclear data, will delay the
application review process and may result in denial.
3. City Staff Review the Application & Issues Final Approval • This is a Type I decision and thus is made without public notice and without a public
hearing since there are clear and objective approval criteria and/or development
standards that do not require the use of discretion.
• Decisions address all the applicable approval criteria and/or development standards.
• Applications may be approved, approved with conditions, or denied.
• The City mails the applicant and any party of standing a copy of the decision, which
is effective on the day it is mailed.
• The decision issued is the final decision of the City and may not be appealed.
4. City Drafts a Development Agreement
• Applicant and City sign Development Agreement
• Final Site Plan and Development Agreement become null and void if construction
has not begun within two years of signing the Development Agreement.
5. City Conducts Final Site Inspection
• City authorizes provision of public facilities and services and issues Certificate of
Occupancy
Revised 1/1/08 Molly Markarian 4 of 4
Final Site Plan Review Submittal Requirements Checklist
NOTE: If you feel an item does not apply, please state the reason why and attach the
explanation to this form.
Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development Services
Department. The applicable application, technology, and postage fees are collected at the
time of complete application submittal.
Final Site Plan Review Application Form
Letter Addressing Conditions of Approval – lists and addresses each condition of
approval, detailing the actions taken and current status of each item.
Five (5) Copies of the Final Site Plan Sets incorporating all required modifications and
applicable conditions
Additional Documents requested as Conditions of Approval as part of the Site Plan
Review decision.
Exhibit B: Final Site Plans Exhibit B: Final Site Plans
Exhibit C: Drinking Water Protection Exemption Exhibit C: Drinking Water Protection Exemption
Date: 6/4/2019
To: Amy Chinitz – Water Resources Administrator
From: Lawrence Pankey, PE
Project Name: Marcola Meadows Commercial (City file no. 811-23-000164-TYP2)
AKS Job No.: 7736
Subject: Drinking Water Protection (DWP) Application Exemption Request Narrative
Purpose
The purpose of this memorandum is to provide a summary of how the applicant, Marcola Meadows
Neighborhood, LLC, intends to satisfy the requirements of and maintain compliance with the Drinking
Water Protection (DWP) Application Exemption Request.
Site Information
The Marcola Meadows Commercial site is located within the Marcola Meadows master planned area of
the City of Springfield near the intersection of Marcola Road and 31st Street. The intended use for the site
is a neighborhood convenience store and a drive through coffee shop. Typical to these uses, the quantities
of any potentially hazardous chemicals present on site are intended to be limited to in-house cleaning
supplies and a small amount of retail vehicle maintenance related substances.
Drinking Water Protection (DWP) Application Exemption Request
In order to satisfy the requirements of the DWP Application Exemption Request, the applicant intends to
maintain an inventory of less than 20 gallons of potentially hazardous chemicals on site at a given time in
accordance with the requirements of the exemption request. This will be accomplished by one or more,
but not limited to, the following:
• No dense non-aqueous phase liquids (DNAPLs) will be stored, transported, or used on site.
• Maintaining a detailed inventory list of any potentially hazardous chemicals present on site.
• Instituting a hazardous material management plan for any potentially hazardous chemicals
present on site.
• Keeping all Material Safety Data Sheets (MSDS) for any potentially hazardous chemicals located
on site in a readily available location for reference of staff or SUB inspectors.
• Training of staff in appropriate methods of storage, transport, and use of any potentially
hazardous chemicals to be present on site.
• Providing and maintaining a level of secondary containment, such as impermeable basins or tubs
or recessed flooring with impermeable treatment located beneath any areas where potentially
hazardous chemicals may be stored, transported, or utilized on site.
• Posting of a standard Wellhead Protection sign at a highly visible location on site.
Exhibit D: Operations and Maintenance Plan Exhibit D: Operations and Maintenance Plan
Appendix 3A-1 Rev 01/27/17 Page 1 of 1 EDSP Adopted December 03, 2012
Notice of Operations and Maintenance Agreement
Private Stormwater Management and Treatment System
The undersigned owner(s), is hereby given notice that stormwater runoff from the “Property” described below
requires stormwater management facilities to be located, designed, and constructed in compliance with the City
of Springfield’s Engineering Design and Procedures Manual. Said facilities shall be operated and maintained
in accordance with the Operations and Maintenance Agreement (O&M Agreement) on file with the City of
Springfield, Development and Public Works Department.
__________________________________________________________________ (Property Owner/Developer)
acknowledges and agrees to maintain private stormwater treatment facilities listed in this document. The
maintenance of the stormwater facilities listed in this document is required as part of the Development
Agreement with the City of Springfield. This facility will be operated and maintained in accordance with the
requirements stated in this document and in the latest edition of the City of Springfield Engineering Design
Standards and Procedures Manual, Chapter 3. The City reserves the right to enter and inspect any stormwater
facility located on the “Property” to ensure the facilities are operating as designed. Failure of the responsible
party to inspect and maintain the facilities can result in an adverse impact to the public stormwater system and
the quality of receiving waters.
The requirement to operate and maintain the stormwater treatment facilities in accordance with the approved
site development agreement and the site O&M Agreement is binding on all current and future owners of the
property. The Agreement and its O&M Plan may be modified under written consent of new owners with
written approval by and re-filing with the City. The O&M Agreement and O&M Plan for facilities constructed
pursuant to this notice are available at the Development and Public Works Department, 225 Fifth St, Springfield
Oregon, or call (541)-736-3753, between the hours of 8 a.m. and 5 p. m., Monday through Friday.
The Subject premises, is legally described as follows: (Tax lot number cannot be used to describe the property. Legal
descriptions may be obtained from the county assessor's office).
SEE EXHIBIT “A”
ATTACHED HERETO AND INCORPORATED HEREIN BY REFERENCE
By signing below, the signer accepts and agrees to the terms and conditions contained in the Operations and
Maintenance Plan and in any documents attached. This instrument is intended to be binding upon the parties
hereto, their heirs, successors, and assigns.
In Witness whereof, the undersigned has executed this instrument on this ________day of ________________,
20____.
Owner(s):
Signature ____________________________________ ___________________________________________
Print Name ___________________________________ ___________________________________________
STATE OF OREGON, County of Lane,
This instrument as acknowledged before me on ___________________________,
by _____________________________________________________________, owner(s) of the above
described premises.
This instrument as acknowledged before me on ___________________________,
by _____________________________________________________________,
as _____________________________________________________________
of _____________________________________________________________, owner(s) of the above described
premises.
_______________________________________________________ ___________________________________
Notary Public for Oregon My Commission Expires
RETURN TO: CITY OF SPRINGFIELD
DEVELOPMENT & PUBLIC WORKS DEPT.
225 FIFTH ST.
SPRINGFIELD, OREGON 97477
RESERVE THIS SPACE
FOR RECORDING STICKER
**Avoid $20 nonstandard doc FEE (font too small)… Print this form on Legal size paper.**
Appendix 3A-2 Rev 01/26/16 Page 1 of 1 EDSP Adopted December 03, 2012
Operations and Maintenance Agreement
Private Stormwater Management and Treatment System
Land Development Application Number:___________________________________________________
Owner's Name:________________________________________________________________________
Phone No.:___________________________________
Mailing Address:_______________________________________________________________________
City_____________________________ State_____________ Zip________________
Site Address:__________________________________________________________________________
City_____________________________ State_____________ Zip________________
Site Map and Tax lot No.:________________________________________________________________ (Or attach document with additional lot information if the facility crosses more than one lot)
Type of Facility(ies)____________________________________________________________________
Requirements
1) Stormwater Management Site Plan, (min. 8 1/2" x 11" attached to this form) showing the location of
the facility(ies) in relation to building structures or other permanent monuments on the site, sources of
runoff entering the facility(ies), and where stormwater will be discharged to after leaving the
facility(ies). Landscape and vegetation should be clear on the Plan submitted or submit a separate
Landscape Plan document showing vegetation type, location, and quantity (landscape plan). These
can be the same Plans submitted for development review.
The stormwater management facility(ies) shown on the Site Plan are a required condition of
development approval for the identified property. The owner of the identified property is required to
operate and maintain the facility(ies) in accordance with the Facility Specific Operation and
Maintenance Plan(s) (O&M Plan(s)) attached to this form and on file with the City. The O&M Plan
for the facility(ies) will be available at the Development and Public Works Department, 225 5th Street,
Springfield, Oregon between the hours of 8 a.m. and 5 p.m., Monday through Friday.
2) Financially responsible party (circle one):
Property Owner Homeowner Association Other (describe) __________________________
3) Party(ies) responsible for maintenance (only if other than owner).
Daytime phone no. (______) _______ -_______
Emergency/after-hours contact phone no. (______) _______ - _______
Maintenance Contact Party(ies) Name & Business Address: _____________________________
______________________________________________________________________________
4) Maintenance practices and schedule for the stormwater facility(ies) are included in the Facility
Specific O&M Plan(s) attached to this form and filed with the Development and Public Works
Department, City of Springfield. The operation and maintenance practices are based on the version of
the City of Eugene's Stormwater Management Manual in effect at the date of development
application, as modified by any plans attached to this document at the time of signing.
Application Date:
By signing below, Filer accepts and agrees to the terms and conditions contained in the Operations and
Maintenance Plan(s) and in any document executed by Filer and recorded with it.
Filer Signature:
Print Name:
Appendix 3A-3 Page 1 of 1 EDSP Adopted December 03, 2012
STORMWATER MANAGEMENT FACILITY
INSPECTION AND MAINTENANCE LOG
Property Address:
Inspection Date:
Inspection Time:
Inspected By:
Approximate Date/Time of Last Rainfall:
Type of Stormwater Management Facility:
Location of Facility on Site (In relation to buildings or other permanent structures):
Water levels and observations (Oil sheen, smell, turbidity, etc.):
Sediment accumulation and record of sediment removal:
Condition of vegetation (Height, survival rates, invasive species present, etc.) and record of
replacement and management (mowing, weeding, etc.):
Condition of physical properties such as inlets, outlets, piping, fences, irrigation facilities, and
side slopes. Record damaged items and replacement activities:
Presence of insects or vectors. Record control activities:
Identify safety hazards present. Record resolution activities:
Appendix 3A-4 Page 13 of 31 EDSP Adopted December 03, 2012
Stormwater Planters
Operations and Maintenance Plan
Stormwater Planters are designed to allow runoff to filter through layers of topsoil (thus capturing
pollutants) and then either infiltrate into the native soils (infiltration planter) or be collected in a pipe to be
discharged off-site (flow-through planter). The planter is sized to accept runoff and temporarily store the
water in a reservoir on top of the soil. The flow-through planter is designed with an impervious bottom or
is placed on an impervious surface. Water should drain through the planter within 3-4 hours after a storm
event. All facility components and vegetation shall be inspected for proper operations and structural
stability. These inspections shall occur, at a minimum, quarterly for the first 2 years from the date of
installation, 2 times per year thereafter, and within 48 hours after each major storm event. The facility
owner must keep a log, recording all inspection dates, observations, and maintenance activities. The
following items shall be inspected and maintained as stated:
Downspout from rooftop or sheet flow from paving allows unimpeded stormwater flow to the planter.
• Debris shall be removed routinely (e.g., no less than every 6 months) and upon discovery.
• Damaged pipe shall be repaired upon discovery.
Splash Blocks prevent splashing against adjacent structures and convey water without disrupting media.
• Any deficiencies in structure such as cracking, rotting, and failure shall be repaired.
Planter Reservoir receives and detains storm water prior to infiltration. Water should drain from
reservoir within 3-4 hours of storm event.
• Sources of clogging shall be identified and corrected to prevent short circuiting.
• Topsoil may need to be amended with sand or replaced all together to achieve a satisfactory
infiltration rate.
Filter Media consisting of sand, gravel and topsoil shall allow stormwater to percolate uniformly through
the planter. The planter shall be excavated and cleaned, and gravel or soil shall be replaced to correct low
infiltration rates.
• Holes that are not consistent with the design and allow water to flow directly through the planter to
the ground shall be plugged.
• Sediment accumulation shall be hand removed with minimum damage to vegetation using proper
erosion control measures. Sediment shall be removed if it is more than 4 inches thick or so thick as to
damage or kill vegetation.
• Litter and debris shall be removed routinely (e.g., no less than quarterly) and upon discovery.
Planter shall contain filter media and vegetation.
• Structural deficiencies in the planter including rot, cracks, and failure shall be repaired.
Overflow Pipe safely conveys flow exceeding reservoir capacity to an approved stormwater receiving
system.
• Overflow pipe shall be cleared of sediment and debris when 50% of the conveyance capacity is
plugged.
• Damaged pipe shall be repaired or replaced upon discovery.
Vegetation shall be healthy and dense enough to provide filtering while protecting underlying soils from
erosion.
• Mulch shall be replenished at least annually.
• Vegetation, large shrubs or trees that limit access or interfere with planter operation shall be pruned or
removed.
• Fallen leaves and debris from deciduous plant foliage shall be raked and removed if build up is
damaging vegetation.
• Nuisance or prohibited vegetation shall be removed when discovered. Invasive vegetation
contributing up to 25% of vegetation of all species shall be removed and replaced.
• Dead vegetation shall be removed to maintain less than 10% of area coverage or when planter
function is impaired. Vegetation shall be replaced within a specific timeframe, e.g., 3 months, or
Appendix 3A-4 Page 14 of 31 EDSP Adopted December 03, 2012
immediately if required to maintain cover density and control erosion where soils are exposed.
Debris and Litter shall be removed to ensure stormwater infiltration and to prevent clogging of overflow
drains and interference with plant growth.
Spill Prevention measures shall be exercised when handling substances that contaminate stormwater.
Releases of pollutants shall be corrected as soon as identified.
Training and/or written guidance information for operating and maintaining stormwater planters shall
be provided to all property owners and tenants. A copy of the O&M Plan shall be provided to all property
owners and tenants.
Access to the stormwater planter shall be safe and efficient. Egress and ingress routes shall be maintained
to design standards. Roadways shall be maintained to accommodate size and weight of vehicles, if
applicable.
• Obstacles preventing maintenance personnel and/or equipment access to the stormwater planter shall
be removed.
• Gravel or ground cover shall be added if erosion occurs, e.g., due to vehicular or pedestrian traffic.
Insects and Rodents shall not be harbored in the stormwater planter. Pest control measures shall be
taken when insects/rodents are found to be present.
• If a complaint is received or an inspection reveals that a stormwater facility is significantly infested
with mosquitoes or other vectors, the property owner/owners or their designee may be required to
eliminate the infestation at the City inspector’s discretion. Control of the infestation shall be
attempted by using first non-chemical methods and secondly, only those chemical methods
specifically approved by the City’s inspector. Acceptable methods include but are not limited to the
following:
i. Installation of predacious bird or bat nesting boxes.
ii. Alterations of pond water levels approximately every four days in order to disrupt mosquito larval
development cycles.
iii. Stocking ponds and other permanent water facilities with fish or other predatory species.
iv. If non-chemical methods have proved unsuccessful, contact the City inspector prior to use of
chemical methods such as the mosquito larvicides Bacillus thurengensis var. israeliensis or other
approved larvicides. These materials may only be used with City inspector approval if evidence
can be provided that these materials will not migrate off-site or enter the public stormwater
system. Chemical larvicides shall be applied by a licensed individual or contractor.
• Holes in the ground located in and around the stormwater planter shall be filled and compacted.
Appendix 3A-4 Page 26 of 31 EDSP Adopted December 03, 2012
Underground Detention Tanks, Vaults and Pipes
Operations and Maintenance Plan
Underground Detention Tanks, Vaults, and Pipes are designed to fill with stormwater during large
storm events, slowly releasing it over a number of hours. There are numerous components to each
system. Drain Inlet Pipes convey stormwater into the detention facility. The Detention Chamber is the
structure in which stormwater accumulates during a storm event. Orifice Structure/ Outlet Drain Pipe
restricts the flow out of the detention chamber, allowing it to fill up and slowly drain out. The orifice
structure is located at the downstream end of the detention chamber. Underground facilities shall be
inspected quarterly and within 48 hours after each major storm event. The facility owner must keep a log,
recording all inspection dates, observations, and maintenance activities. The following items shall be
inspected and maintained as stated:
Proprietary Structures such as oil-water separators, sedimentation manholes, grit chambers, etc. are
required to have an O&M plan submitted with material from the manufacturer for that specific product for
the O&M Agreement.
• If such material is not available or satisfactory for maintenance needs, city staff will assist
developer/property owner in preparing the O&M plan.
Drain Inlet Pipes shall be inspected for clogging or leaks where it enters the vault or basin during every
inspection and cleanout.
• Debris/sediment that is found to clog the inlet shall be removed, and disposed of in accordance with
applicable federal and state requirements.
Detention Chamber shall be inspected for cracks or damage during each inspection.
• The detention chamber shall be cleaned out yearly or after an inch of sediment has accumulated. If
there is a valve on the outlet pipe it shall be closed otherwise the outlet shall be plugged prior to
cleanout. Grit and sediment that has settled to the bottom of the chamber shall be removed during
each cleaning.
• Water and sediment in the detention chamber shall be removed, and disposed of in accordance with
regulations.
• Cleaning shall be done without use of detergents or surfactants. A pressure washer may be used if
necessary.
Orifice Structure/ Outlet Drain Pipe shall be inspected for clogging during unit inspections/cleanouts.
• Debris/sediment that is found to clog the inlet shall be removed, and disposed of in accordance with
applicable federal and state requirements.
Vegetation such as trees should not be located in or around the detention facility because roots from trees
can penetrate the unit body, and leaves from deciduous trees and shrubs can increase the risk of clogging
the intake pipe.
• Large shrubs or trees that are likely to interfere with detention facility operation shall be identified at
each inspection then removed.
Source Control measures typically include structural and non-structural controls. Non-structural controls
can include street sweeping and other good housekeeping practices. It is often easier to prevent pollutants
from entering stormwater than to remove them.
• Source control measures shall be inspected and maintained (where applicable).
Spill Prevention procedures require high-risk site users to reduce the risk of spills. However, virtually
all sites, including residential and commercial, present dangers from spills. Homes contain a wide variety
of toxic materials including gasoline for lawn mowers, antifreeze for cars, pesticides, and cleaning aids
that can adversely affect storm water if spilled. It is important for everyone to exercise caution when
handling substances that can contaminate stormwater. Spill prevention procedures shall be implemented
in areas where there is likelihood of spills from hazardous materials.
Training and/or written guidance information for operating and maintaining detention facilities shall
be provided to all property owners and tenants. A copy of the O&M Plan shall be provided to all property
Appendix 3A-4 Page 27 of 31 EDSP Adopted December 03, 2012
owners and tenants.
Access to the detention facility is required for efficient maintenance. Egress and ingress routes shall be
open and maintained to design standards.
Signage may serve to educate people about the importance or function of the site's stormwater protection
measures. Signs may also discourage behavior that adversely impacts the stormwater protection measures
and encourages behavior that enhances or preserves stormwater quality. If debris is a problem, a sign
reminding people not to litter may partially solve the problem. Signage (where applicable) will be
maintained and repaired as needed during or shortly after inspections.
Insects and Rodents shall not be harbored in the detention facility. Pest control measures shall be taken
when insects/rodents are found to be present
• If a complaint is received or an inspection reveals that a stormwater facility is significantly infested
with mosquitoes or other vectors, the property owner/owners or their designee may be required to
eliminate the infestation at the City inspector’s discretion. Control of the infestation shall be
attempted by using first non-chemical methods and secondly, only those chemical methods
specifically approved by the City’s inspector. Acceptable methods include but are not limited to the
following:
i. Installation of predacious bird or bat nesting boxes.
ii. Alterations of pond water levels approximately every four days in order to disrupt mosquito larval
development cycles.
iii. Stocking ponds and other permanent water facilities with fish or other predatory species.
iv. If non-chemical methods have proved unsuccessful, contact the City inspector prior to use of
chemical methods such as the mosquito larvicides Bacillus thurengensis var. israeliensis or other
approved larvicides. These materials may only be used with City inspector approval if evidence
can be provided that these materials will not migrate off-site or enter the public stormwater
system. Chemical larvicides shall be applied by a licensed individual or contractor.
• Holes in the ground located in and around the detention facility shall be filled.