Loading...
HomeMy WebLinkAboutMeeting Packet Planner 1/16/2024 Completeness Check Meeting Development and Public Works Department Conference Room 616 & Zoom COMPLETENESS CHECK MEETING DATE: Tuesday, January 23, 2024 11:00 a.m. - 12:00 p.m. DPW Conference Room 616 and Zoom Completeness Check Mtg (Replat Tentative) #811-24-000020-PRE 811-24-000005-PROJ LifePoint Health Assessor’s Map: 17-03-15-40 TL: 800, 900, 1000 & 1100 Address: Maple Island Way, Game Farm Rd. Existing Use: vacant Applicant has submitted plans to replat lots to create one lot for construction of rehabilitation center Planner: Andy Limbird Meeting: Tuesday, January 23, 2024 11:00 – 12:00 via Zoom and Conference Rm 616 SITE VICINITY MAP 811-24-0000120-PRE Completeness Check Meeting 17-03-15-40 TL 800, 900, 1000, 1100 Maple Island Way & Game Farm Rd. LifePoint Health DocuSign Envelope ID: D2F400FD-6F64-4742-AABE-DDFFC5832C3C December 21, 2023 LIFEPOINT/PEACEHEALTH HOSPITAL Major Replat Tentative Plan Map 17-03-15-40, Lots 0800, 0900, 1000, and 1100 WRITTEN STATEMENT In accordance with the Major Replat Tentative Plan submittal requirements, this written statement describes the proposed development and demonstrates that the proposal complies with Tentative Plan Criteria at SDC 5.12.125. I. LAND USE REQUEST A. Development Objective The applicant, LifePoint Health and PeaceHealth, Owner of the property, propose to develop a 50-bed rehabilitation hospital on the 4.99-acre property identified as Map 17-03-15-40, Tax Lot 1000, the southern portions of Tax Lots 800 and 900 and the western portion of Tax Lot 1100 (collectively, the Subject Property) located at the northeast corner of East Game Farm Road and Maple Island Road. Subject Property RLID Maps 2023 B. Project Directory Applicant Owner Gregory Thomas Grady Layman LifePoint Health PeaceHealth 4801 Olympia Park Plaza #1000 1255 Hilyard Street Louisville, KY 40241 Eugene, OR 97401 Phone: (502) 407-6684 Phone: (503) 522-4385 Email: Gregory.Thomas@lifepointhealth.net Email: glayman@peacehealth.org Landscape Architect (and Applicant’s Representative) Civil Engineer John Anderson, ASLA Matt Keenan, PE The Satre Group KPFF Engineering, Inc. 375 West 4th Avenue, Suite 201 800 Willamette Street, Suite 400 Eugene, OR 97401 Eugene, OR 97401 Phone: (541) 686-4540 Phone: (541) 684-4902 Email: johna@satregroup.com Email: matt.keenan@kpff.com Planner Surveyor Dan Halverson BLEW & Associates, P.A. The Satre Group 3825 N Shiloh Drive 375 West 4th Avenue, Suite 201 Fayetteville, AR 72703 Eugene, OR 97401 Contact: Phone: (541) 686-4540 Phone: (479) 443-4506 Email: dan@satregroup.com Email: survey@blewinc.com LifePoint Rehabilitation Hospital Page 2 of 6 Major Replat Tentative Plan December 21, 2023 The Satre Group  375 West 4th Avenue, Suite 201, Eugene, OR 97401  (541) 686-4540  www.satregroup.com II. THE SITE AND EXISTING CONDITIONS A. Development Site The site is located south of International Way, north of East Game Farm Road and east of Maple Island Road in the Gateway area of Springfield. It is comprised of one full tax lot (TL 1000) and portions of three additional tax lots (TLs 800, 900 and 1100) and totals approximately 4.99 acres in size1. The site abuts office facilities to the east, west and north. The project area is within the Springfield city limits. B. Planning Context 1. Planning and Zoning. The zoning is consistent with the Metro Plan, Gateway Refinement Plan, and Springfield Zoning Map, all of which designates the PeaceHealth property currently as Campus Industrial (CI). There is a Zone Change and Comp Plan amendment underway to change the designation to Commercial (C) and zoning to Community Commercial (CC). Additional Planning documents, including the Springfield Transportation System Plan, the Springfield Stormwater Facilities Master Plan and Wastewater Master Plan also apply. Also applicable is the Drinking Water Protection Overlay Zone (the site is within the 2-year Time of Travel Zone Concentrations). Tax Lot Map Excerpt RLID 2023 2. Transportation. a. The metro area adopted transportation plan; The Eugene-Springfield Transportation System Plan (TransPlan) shows future projects in the vicinity of the subject property (see below). b. Springfield 2035 Transportation System Plan. The City of Springfield’s transportation plan does not include any projects abutting the subject property. As with TransPlan, the Springfield TSP includes projects on nearby streets (new Minor Collector projects R-5 and R-6 at the nearby PeaceHealth RiverBend campus). These improvements will no impact on this proposal. Transportation System Plan City of Springfield August 2020 1 Concurrent with this Site Plan Review application submittal, is a Major Replat application submittal, which when approved, will replat the subject tax lots placing the proposed rehab hospital on its own tax lot. LifePoint Rehabilitation Hospital Page 3 of 6 Major Replat Tentative Plan December 21, 2023 The Satre Group  375 West 4th Avenue, Suite 201, Eugene, OR 97401  (541) 686-4540  www.satregroup.com c. Public Transit. The metro area’s public transit system, Lane Transit District (LTD), provides service near the development via the EMX Springfield route. LTD’s International Way route is just to the north of the subject property with a transfer station located in the center of International Way. 3. Utilities. a. Stormwater and Wastewater. The Subject Property is located in the North Gateway Stormwater Drainage Basin. The Springfield Stormwater Facilities Master Plan identifies one capital improvement project, “Low Priority CIP 43,” to address current issues around water quality from the campus industrial area. Existing Wastewater Infrastructure City of Springfield 2018 Existing Storm Infrastructure City of Springfield 2018 b. Wellhead Protection. The subject property is located in the Sports Way wellfield in the 2-year Time of Travel Zone (TOTZ). Any development will require approval of a Drinking Water Protection application. Wellhead Protection Areas Map Excerpt City of Springfield and Springfield Utility Board January 2013 c. Water and Electric infrastructure. Existing water and electric infrastructure exist on and adjacent to the subject site. LifePoint Rehabilitation Hospital Page 4 of 6 Major Replat Tentative Plan December 21, 2023 The Satre Group  375 West 4th Avenue, Suite 201, Eugene, OR 97401  (541) 686-4540  www.satregroup.com 4. Natural Resources. a. Area to the west and north of the Subject Property is in the Special Flood Hazard Area — Floodplain Zone A (the blue hatch). Zone A is the 100-year flood plain with base flood elevation determined. A larger portion (the southern section and Subject Property) of the site is in Zone X, areas of 500-year floodplain (the yellow hatch). Excerpt Floodplain Floodway Map City of Springfield 2019 III. TENTATIVE PLAN – APPROVAL CRITERIA This section is presented in the same order of applicable requirements found in Section 5.12.125, Tentative Plan Criteria of the Springfield Development Code. Applicable sections of the Code are in bold italics, followed by the applicant’s response in normal text. 5.12.125 Tentative Plan Criteria The Director shall approve or approve with conditions a Tentative Plan application upon determining that all applicable criteria have been satisfied. If conditions cannot be attached to satisfy the approval criteria, the Director shall deny the application. In the case of Partitions that involve the donation of land to a public agency, the Director may waive any approval criteria upon determining the particular criterion can be addressed as part of a future development application. (A) The request conforms to the provisions of this Code pertaining to lot/parcel size and dimensions. Response: The Major Replat includes Tax Lots 800, 900, 1000, and a portion of lot 1100. Upon approval of this replat application, these four tax lots will become two. The first lot, referred to as “Proposed New Lot” on the enclosed Major Replat Tentative Plan, will be comprised of the existing lot 1000, referred to as “Parcel C” on the tentative plan, and the southern majorities of existing lots 800 and 900, referred to as “Parcel A” and “Parcel B” on the tentative plan, and a small portion of existing lot 1100, referred to as “Parcel D” on the tentative plan. The second lot, referred to as “Parcel A, B, C, and D” on the tentative plan, will be comprised of the northerly remainder to existing tax lots 800 and 900 and the remainder of existing tax lot 1100. Proposed New Lot: (Community Commercial) 3.2.325 Base Zone Development Standards. Standard Lots/Parcels Standard Proposed Minimum Lot Area: 6,000 sq. ft. 217,364 sq. ft (4.99 acres) Minimum Street Frontage: 50 ft 430 ft at East Game Farm Rd 524 ft at Maple Island Rd Parcel A, B, C and D: (CI) 3.2.425 Base Zone Development Standards. Standard Lots/Parcels Standard Proposed Minimum Lot Area: 10,000 sq. ft. 1,252,745 sq. ft (28.76 acres) Minimum Street Frontage: 75 ft 647.59 ft at East Game Farm LifePoint Rehabilitation Hospital Page 5 of 6 Major Replat Tentative Plan December 21, 2023 The Satre Group  375 West 4th Avenue, Suite 201, Eugene, OR 97401  (541) 686-4540  www.satregroup.com (B) The zoning is consistent with the Metro Plan diagram and/or applicable Refinement Plan diagram, Plan District map, and Conceptual Development Plan. Response: Zoning is currently consistent with the Metro Plan diagram and applicable refinement plan diagram (the Gateway Refinement Plan). Upon approval of the in-process plan amendment and zone change, the subject property will still be consistent. (C) Capacity requirements of public and private facilities, including but not limited to, water and electricity; sanitary sewer and stormwater management facilities; and streets and traffic safety controls shall not be exceeded, and the public improvements shall be available to serve the site at the time of development, unless otherwise provided for by this Code and other applicable regulations. The Public Works Director or a utility provider shall determine capacity issues. Response: Public and private facilities are provided as follows: Storm: Stormwater service is available to the property through existing lines in International Way (15-inch trunk line), in Game Farm Road (15-inch trunk line), and in Maple Island Road (a 15-inch trunk line that extends along the western boundary to the tax lot to the north). Sanitary: Wastewater service is also available to the Subject Property via International Way (8- inch line), Game Farm Road (10-inch line), and Maple Island Road (10-inch line). Water: The site will receive water service with a connection to the existing line in Maple Island Road. Electric: Electric infrastructure is adjacent to the site along street frontages. Streets: International Way and Game Farm Road are major collectors; they have an existing right-of-way width of 72 feet and a curb-to-curb width of 48 feet. Maple Island Drive is a local street; it has an existing right-of-way of 50 feet and a curb-to-curb width of 24 feet. Fire: There are several existing fire hydrants in the vicinity – three on the south side of Game Farm Road and two on International Way. (D) The proposed land division shall comply with all applicable public and private design and construction standards contained in this Code and other applicable regulations. Response: International Way, Game Farm Road, and Maple Island Road are fully improved streets. The applicant is proposing improvements to the “Proposed New Lot”, the site of the new rehabilitation hospital. Public utilities are present in all streets. All proposed site improvements and new utilities will comply with applicable portions of the Springfield Development Code as well as the Springfield Engineering and Design Standards and Procedures Manual. (E) Physical features, including, but not limited to: steep slopes with unstable soil or geologic conditions; areas with susceptibility of flooding; significant clusters of trees and shrubs; watercourses shown on the WQLW Map and their associated riparian areas; other riparian areas and wetlands specified in Section 4.3-117; rock outcroppings; open spaces; and areas of historic and/or archaeological significance, as may be specified in Section 3.3-900 or ORS 97.740-760, 358.905-955 and 390.235-240, shall be protected as specified in this Code or in State or Federal law. LifePoint Rehabilitation Hospital Page 6 of 6 Major Replat Tentative Plan December 21, 2023 The Satre Group  375 West 4th Avenue, Suite 201, Eugene, OR 97401  (541) 686-4540  www.satregroup.com Response: There are no physical features on the subject property meeting this definition. Thus, this standard does not apply. (F) Parking areas and ingress-egress points have been designed to: facilitate vehicular traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity within the development area and to adjacent residential areas, transit stops, neighborhood activity centers, and commercial, industrial and public areas; minimize driveways on arterial and collector streets as specified in this Code or other applicable regulations and comply with the ODOT access management standards for State highways. Response: The proposed hospital will take access from Maple Island Drive and through a right in right out drive off Game Farm Road. Proposed driveways have been designed to facilitate vehicular traffic and provide connectivity to and from the development area to the adjacent street and then to adjacent areas in the neighborhood. Standard connectivity exists for pedestrians with a continuous street sidewalk. The EMX transit stop, and commercial district are both accessible via the existing developed street and sidewalk network. (G) Development of any remainder of the property under the same ownership can be accomplished as specified in this Code. Response: The property owner, PeaceHealth, is the owner of the property subject to this replat application and will remain the owner following the conclusion of this process. (H) Adjacent land can be developed or is provided access that will allow its development as specified in this Code. Response: Adjacent land on this subject block will retain existing access and/or street frontage and can be developed as permitted in the code. (I) Where the Partition of property that is outside of the city limits but within the City’s urbanizable area and no concurrent annexation application is submitted, the standards specified below shall also apply. Response: The proposed development is within the city limits. This standard does not apply. (J) Where the Subdivision of a manufactured dwelling park or mobile home park is proposed, the following approval criteria apply: Response: The proposal does not include the subdivision of a manufactured dwelling park or mobile home park. Therefore, this standard does not apply. IV. CONCLUSION Based on the information and findings contained in this written statement and accompanying plans and attachments, the proposed development meets the Major Replat Tentative Plan criteria of approval contained in the Springfield Development Code. Therefore, the applicant requests that the City of Springfield approve the proposal. If you have any questions about the above application, please do not hesitate to contact John Anderson at The Satre Group, 541-686-4540, or johna@satregroup.com. Sincerely, John Anderson John Anderson, ASLA, Partner The Satre Group Return to Clayton McEachern @ City of Springfield, email: cmceachern@springfield-or,gov, FAX: (541) 736-1021 CITY OF SPRINGFIELD, OREGON DEVELOPMENT AND PUBLIC WORKS 225 FIFTH STREET SPRINGFIELD, OR 97477 PHONE: 541.726.3753 FAX: 541.726.1021 www.springfield-or.gov STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK Project Name: Applicant: Assessors Parcel #: Date: Land Use(s): Phone #: Project Size (Acres): Fax #: Approx. Impervious Area: Email: Project Description (Include a copy of Assessor’s map): Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary: Proposed Stormwater Best Management Practices: Drainage Study Type (EDSPM Section 4.03.2): (Note, UH may be substituted for Rational Method) Small Site Study – (use Rational Method for calculations) Mid-Level Development Study – (use Unit Hydrograph Method for calculations) Full Drainage Development Study – (use Unit Hydrograph Method for calculations) Environmental Considerations: Wellhead Zone: Hillside Development: Wetland/Riparian: Floodway/Floodplain: Soil Type: Other Jurisdictions Downstream Analysis: N/A Flow line for starting water surface elevation: Design HGL to use for starting water surface elevation: Manhole/Junction to take analysis to: --------------------------------- (Area below this line filled out by the City and Returned to the Applicant) ---------------------------- (At a minimum, all boxes checked by the City on the front and back of this sheet shall be submitted for an application to be complete for submittal, although other requirements may be necessary.) ------------------------------------------------- (Area below this line filled out by Applicant) -------------------------------------------------- (Please return to Clayton McEachern @ City of Springfield Development and Public Works; Fax # 736-1021, Phone # 736-1036), email:cmceachern@springfield-or.gov Form Version 5: June 2015 COMPLETE STUDY ITEMS * Based upon the information provided on the front of this sheet, the following represents a minimum of what is needed for an application to be complete for submittal with respect to drainage; however, this list should not be used in lieu of the Springfield Development Code (SDC) or the City’s Engineering Design Manual. Compliance with these requirements does not constitute site approval; Additional site specific information may be required. Note: Upon scoping sheet submittal, ensure completed form has been signed in the space provided below: Interim Design Standards/Water Quality (EDSPM Chapter 3) Req’d N/A All non-building rooftop (NBR) impervious surfaces shall be pre-treated (e.g. multi-chambered catchbasin w/oil filtration media) for stormwater quality. Additionally, a minimum of 50% of the NBR impervious surface shall be treated by vegetated methods. Where required, vegetative stormwater design shall be consistent with design standards (EDSPM Section 3.02), set forth in Chapter 2 of the Eugene Stormwater Management Manual. For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified by the Eugene Stormwater Management Manual (Sec2.4.1). If a stormwater treatment swale is proposed, submit calculations/specifications for sizing, velocity, flow, side slopes, bottom slope, and seed mix consistent with City of Springfield or Eugene’s Stormwater Management Manual. Water Quality calculations as required in Section 3.03.1 of the EDSPM. All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall be provided with secondary containment or weather resistant enclosure. General Study Requirements (EDSPM Section 4.03) Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon. A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map. Calculations showing system capacity for a 2-year storm event and overflow effects of a 25-year storm event. The time of concentration (Tc) shall be determined using a 10 minute start time for developed basins. Review of Downstream System (EDSPM Section 4.03.4.C) A downstream drainage analysis as described in EDSPM Section 4.03.4.C. On-site drainage shall be governed by the Oregon Plumbing Specialty Code (OPSC). Elevations of the HGL and flow lines for both city and private systems where applicable. Design of Storm Systems (EDSPM Section 4.04). Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set. Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,000 lb load without failure of the pipe structure. Manning’s “n” values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to achieve a minimum velocity of three (3) feet per second at 0.5 pipe full based on Table 4-1 as well. Other/Miscellaneous Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site drains. Private stormwater easements shall be clearly depicted on plans when private stormwater flows from one property to another. Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs, with the exception of residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to the website: http://www.deq.state.or.us/wq/uic/uic.htm for more information. Detention ponds shall be designed to limit runoff to pre-development rates for the 2 through 25-year storm events. *This form shall be included as an attachment, inside the front cover, of the stormwater study. For Official Use Only: As the engineer of record, I hereby certify the above required items are complete and included with the submitted stormwater study and plan set. Signature Date . * IMPORTANT: ENGINEER PLEASE READ BELOW AND SIGN! ((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((( ((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((( (((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((( (((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((( R R R R (( ( ( ( ( ( ( ( ( ( (( ( (( ( ( ( ( ( ( ( ( ( ( ( ( ( ( (( ( ( ( ( ( ( ( ( ( ( ( ( (( ( ( ( (( ( ( ( R R S00°00'39"ES00°00'39"E154.16'289.28'S89°59'21"W26.21' S59°59'21"W3.46' APPROX1/4 COR 5' LC=460.81'68'68'N89°46'52"W 34'34' 377.16'44.91R=32 S 4 4 %3 7 ' 5 6 "E55'25'36'36'36'34'34'36'7'7'34'N89°46'52"W 34'50' N 89°56'00" E 1651.35' (CO. RD. 209) (CO. RD. 90)DEADMOND FERRY ROAD INTERNATIONAL WAY GAME FARM ROAD EAST ( C O . R D . 2 0 9) B A L DY V I E W DRI V EDEADMOND FERRY ROADMAPLE ISLAND ROADG A M E F A R M R D . N O R T H COUGAR - STATION "S" NO. 1 BONNEVILLE POW ER ADMINISTRATIO N 2 3 0 8 +1 6 . 3 =3 2 ° 3 4 ' 2 0 " RTW. RHEADLC 44 ESE CORA.C. STEVENSDLC 45 NE CORW. STEVENSDLC 46 SE COR DLC 45A.C. STEVENSNE COR S 89°59'20" E 1624.26' N81°41'47"W R=290.83' LC=290.83' '66 S 47°24'22" E 599.68' S 60°46'21" E 569.53' S 67°33'50" E376.94'91.87'N 89°56'00" E 3498.13' 52.84' 358.38'713.97'S 00°00'39" E975.37'S 00°00'39" E265.46'S 89°56'00" WN 00°00'39" W 975.55'34.96' 35.23' 27.01' N81°50'17" LC=276.44'R=966' 9=R'17.172=CL N 00°00'39" W 795.48'N 89°57'19" E 623.70'N 00°00'39" W 893.46'N89°59'50"E - 737.88' N89°46'52"W 376.98'S 00°31'00" W 803.96'N0°31'E - 640.19'659.85'115' N89°59'E 205'N89°59'E 973.55' N89°47'06"W - 1038.5'N44°56'12"W28.22'N0°12'07"E - 864.25'N45°12'31"E 28.28' S89°47'06"E 963.16'S0°30'45"W - 899.31'N67°52'28"WL C=71.11'LC=20.38'R=41.5'R=30'236.23'55.41'S85°06'32"E649.86' EAST 400.21'218.98'50'50'S89°13'30"W (B.P.A.) N 89°56'00" E S6°15'E - 488.6' (DEED)S89°55'E - 879.8'S6°15'E - 238.3'S89°44'E - 614.4' S 3 3 °3 4'E N89°44'W - 1605' S 3 3°4 4'2 4" E 64.26'123.28' S89°55'E N11°25'50"E-176.75'S1°45'20"W154'19.36' S89°55'E7.0' 160'268.21' 242' 34.05' 1 7 8.3 1' 162.54'N89°44'W150.86'9 6.3 1'231.95'81.54'65.76'225.5'SOUTHS 89°56'16" W - 231.53'55.4'S89°56'W - 275.81'175' 175'250'SOUTH60' 60'SOUTH250'(169.8') EAST (NORTH 274.2') 169.8'(274.2')81.6' 81.6'SOUTH274.2'85' 85'269.2'269.2'269.2'80' 80'N2 6 ° 3 8'W 3 0 6 . 6 ' N89°55'W 159' N 2 6 ° 3 8'W - 3 0 6 . 7' S 2 6 ° 3 8' E - 3 0 6 . 7' 159' 5 1 2'N2 6 ° 3 8'W - 5 1 2 ' 119.56' 119.56' S 2 6 ° 3 8' E - 3 8 8 . 4' 1 8 8 . 4 ' 2 0 0' EAST - 191' WEST - 251' 60' 109.5' 60' 315.53' 254.01'N0°00'39"W389.95'S 89°56'00" W 686.62'975.54'N 00°00'39" W216.94'233.35'N0°12'28"E - 1826.61'796.96'891.65'177.88'N0°09'28"EN89°56'E125.12' 237.55' 85.24' 283.61' N89°59'06"E 27'N0°00'54"WS77°07'54"E290.93' 227.65' 365.55'S 06°24'00" E 481.07'40'2 8 6.9' 440.2'N0°08'04"E362.17'NORTH - 27.64 CHS = 1824.24' (G.L.O.)NORTH LINE DLC NO. 45 WEST - 91.74 CHS = 6054.84' (G.L.O.) S 59° E 651' S 65° E 203' S 55° E 388' N 8 3 ° E 4 9 6 ' S 74° E 317'N 7 8 ° E 5 2 7 'S 6 3° E 66 2'132'S 73° E 585' N 8 0 ° E 1 4 2 5 ' S 66° E 726' S 61° E 462' N 8 0 ° E 3 8 3 'S 83° E 528'N 67 ° E 218 'SOUTH 310'SOUTH133.4'85'S 3 1 ° E 3 0 4' N 7 6 ° E 1 4 0 5 'N 55° W 785' S 72° E 1020'SOUTHS 89°46'52" E 377.34'S 00°31'00" W 580.53'35.53'S 45°13'30" W S 89°56'00" W 532.90' LC = 412.61'N 44°37'56" W = 90°17'52"R = 291.00'L = 458.61' 49.94'N 01°46'00" W 51.54'N 13°59'00" E 50.39'N 07°27'00" WN 00°31'00" E 751.39'121.08'N 47°28'15" E111.32' 22.30' 14.00'M/LR=60.00'S 05°17'29" WLC=78.07'R=100.00'S 29°26'33" WLC=41.45' R=100.00'S 43°19'13" WLC=38.49' R=35.00'S 30°47'35" WLC=20.83' R=112.00'N 67°52'51" ELC=41.01'R=65.00'S 72°02'55" E LC=52.25' R=45.00'S 61°22'39" ELC=22.06'N 00°00'39" W 326.40'N 11°39'21" E 227.48'240.08' 3 6 0.7 1' C/L BY DEEDVOL 412 PG 413 C/L BY S.20782 (1977)532.08'N 87°26'00" E 362.71'619.00'S 00°31'00" W215.00'N 89°46'52" W 328.50' 284.50' N 44°47'12" W 28.29'324.01'136.00'N 00°13'08" E213.92'614.99'330.49' N 89°58'03" W284.50' N 89°59'35" E379.08'204.28'345.50'213.00'N 00°00'58" E336.78'973.43'579.87'981.71'S01°41'36"W 277.23'S01°46'43"W 277.06'170.78'N12°41'22"W152.52' S89°56'00"W122.62' S 2 6 ° 3 9 ' 5 6 " E 1 6 6 . 4 5' N89°56'E81.42' 45'55.15'S49°42'26"W84.78'94-P050094-P050193-P04212008-P2297 15 14 22 23 279.24'11.53'31.83'61.88'35.43'7.01'137.00'3.20'6.0'4 8 .4 2 'N 8 4 °4 4 '4 3 "E L C =1 0 6 .2 0 'N 7 7 °0 7 '5 2 "E R =6 0 0 'R=50'LC=48.51'R=20'N36°26'30"E15.13'LC=15.51' N37°29'40"E R=30'LC= 13.83 S36°51'18"E R=26'LC=34.91'N68°08'34"WR=40'N0°0'39"W44.24' N83°48'24"E14.15' LC=22.08'N59°30'14"ER=27.00' LC=37.77'N26°33'59"ER=145.00'37.62'LC=41.58'N38°13'52"WR=50.00' 18.77'N84°44'56"W 102.51' 18.76'35.25'LC=44.02'S41°58'54"ER=70' LC=35.37'S16°48'48"ER=270' 26.12' 12.18' PCL 1 PCL 2 PCL 1 (PCL 2) PCL 3 PCL 1 PCL 2 PCL 1 PCL 2 1 2 3 4 5 MCKENZIE RIVER MAPLE ISLAND SLOUGH 80.60 ACS 12.04 ACS 1500 2200 300 61.92' R=1034' LC=295.89' S.32484 S.36978 360.87'360.87'42.70'S 0°7'16" W9.49' 27.0' 0.33' 11.27' N15°35'15"ELC=34.20'N20°03'56"E SOUTH40' S 2 6 ° 4 7 '0 0 " E - 3 1 1 . 0 5 ' 202.04'274.2'1 8 . 2 6 '264.87'(360.44')N 00°12'28" ELIBERTYPROFESSIONALCENTER94-P0502S89°58'03"E 331.42'100'100'2 2 . 6 0 ' S89°56'00"W EAST83.33' 6 5 . 3 3'1800 2022-P3057I.P. 3200 3400 3500 3300 9 8 1 .7 1 '459.96'644.93'N 89°46'52" W PCL 1 INITIALPOINT 2022-P3092S 45866 0.18 AC 0.36 AC 1.18 AC 0.31 AC0.21 AC 1.17 AC1 AC0.53 AC0.49 AC0.51 AC1.1 AC 0.35 AC0.9 AC0.33 AC0.55 AC 1.38 AC 0.3 AC 0.39 AC 13.01 AC22.1 AC 0.41 AC 6.31 AC 13.82 AC6.19 AC7.05 AC 14.09 AC 92.64 AC 1.38 AC 13.17 AC 13.55 AC 0.14 AC 0.72 AC 2.38 AC 10.29 AC 0.13 AC28002700 1300 14001502 16001700190020002100370023002400260029003000 1200 1000 11011100 900 800 100200500 600 400 2500 3100 700 3600 1501 1802 3201 1801 004-90019-00 004-01 004-04 004-78 004-62 004-22 004-22004-78 004-38 004-78 SEE MAP17031530 SEE MAP17031500 SEE MAP17031400 SEE MAP17032200SEE MAP17032220 SEE MAP17032212 FOR ASSESSMENT ANDTAXATION ONLY S.E.1/4 SEC. 15 T.17S. R.3W. W.M.Lane County1" = 200' CANCELLED3001500220018003500330034003200 17031540SPRINGFIELD SPRINGFIELD17031540 LCATJCG - 2023-01-03 16:58 REVISIONS06/03/2011 - LCAT113 - CONVERT MAP TO GIS05/14/2012 - LCAT174 - CORRECTION TO TAX CODE09/16/2014 - LCAT115 - CANC TL 1800 INTO 2014-P261402/26/2015 - LCAT115 - CODE CHANGE TL 250006/15/2015 - LCAT155 - LLA BETWEEN 2500 & 170322000040011/06/2018 - LCAT148 - CODE CHANGE TL 2300 & TL 240001/18/2019 - LCAT148 - CODE CHANGE TL 0170004/08/2020 - LCAT148 - CODE CHANGE TL 180004/09/2020 - LCAT148 - CODE CHANGE TL 60006/21/2021 - LCAT174 - LLA BETWEEN TL 3400 & TL 360005/25/2022 - LCAT174 - CANC TL 1800 INTO 2022-P305701/03/2023 - LCAT174 - CANC 3200,3300,3400,3500 INTO 2022-P3092