APPLICANT: BP Products North America, INC.
MEETING DATE/TIME: Tuesday- January 23, 2024 11:00am-12:00pm
PLACE: DPW Conference Room 615/616 and Virtual via Zoom
CONTACT PERSON: Kelly Notary
Current Planning Staff: L Miller, A Limbird, M Rust, K Notary, T Sievers
Stan Petroff, AIC City Engineer – DPW
Kristi Krueger, AIC Managing Civil Engineer – DPW
Ken Vogeney, Emergency Manager – DPW
Clayton McEachern, Civil Engineer, Development & Public Works
Matt Stouder, Environmental Services Div. Manager/MWMC General Manager
Kristi Krueger, Capital Engineering Manager, Development & Public Works
Michael Liebler, Transportation Planning, Civil Engineer, Development & Public Works
Gilbert Gordon, Deputy Fire Marshall 2, Fire & Life Safety Department
Ben Gibson, Maintenance Supervisor, Development & Public Works
Eric Adams, Planning, Willamalane Park and Recreation District
Ladd Boyce, Keoki Lapina, Springfield Utility Board (Water)
Greg Miller, Springfield Utility Board (Water)
Sanjeev King, Nick Amann, Springfield Utility Board (Electric)
Amy Chinitz, Springfield Utility Board (DWP)
Thomas Jeffreys, (EPUD) Emerald Peoples Utility District
Michael Wargo, Willamalane Park and Recreation District
Matt Caswell, Planning & Development Manager, ODOT, State Highway Division
(odotr2planmgr@odot.state.or.us)
Brad Rudler, (Electric) Eugene Water and Electric Board
Tyler Lindley, Eugene Water and Electric Board
Wallace McCullough, (Water), Eugene Water and Electric Board
Brett Yancey, Chief Operations Officer; Springfield Public Schools
Chris Reiersgaard, Asst. Director of Facilities & Operations; Springfield Public Schools
Safe Routes to School, Springfield Public Schools
Chris Carpenter, DPW Building Official
Andrew Shearer, Police Chief, Police Department
Tom Schwetz, LTD, Planning and Development Director
Luke Pilon, CenturyLink
Jeff Paschall, Community Development Manager – DPW
Jeremy Sherer, City Surveyor – DPW
Meghan Murphy, Program Coordinator, Environmental Services
Sasha Vartanian, Lane County Transportation - send to
LCPWTPReferrals@lanecounty.gov ONLY
Marie Longworth, Central Lane Communications 911
Monte Brown, Northwest Natural Gas
Jason McDonald, Comcast Cable
Jamie Porter, Rainbow Water District
Kristina Kraaz, City Attorney (Mary Bridget Smith upon specific request)
Allie Camp, Economic Development
Sarah Weaver, Administrative Specialist (DIM Annexations)
Please mark who you would like to attend this meeting and return form and
file to Shannon. Thanks!
Revised: 06/08/2020
X
DEVELOPMENT
INITIATION MEETING
DEVELOPMENT AND PUBLIC WORKS DEPARTMENT
SPRINGFIELD CITY HALL
225 FIFTH STREET
DPW Conference Room 615/616 + Zoom
Meeting Date: Tuesday, January 23, 2024 11:00 – 12:00
1. DEVELOPMENT INITIATION MTG #811-23-000287-PRE 811-23-000290-PROJ BP Products
North America, INC.
Assessor’s Map: 17-02-32-32 TL: 01701, 01702, 01703
Address: 4202 Main Street
Existing Use: Gas Station-ARCO ampm
Applicant has submitted proposal to update ARCO ampm to current brand standards with
limited site improvements.
Planner: Kelly Notary
The Development Issues Meeting informational packet for this meeting is available on-line for
you to review or print out @ Laserfiche website: www.springfield-or.gov/weblink8/browse.aspx
SITE
VICINITY MAP
811-23-000287-PRE DIM Meeting
17-02-32-32 TL 01701, 01702, 01703
4202 Main Street
BP Products North America, INC.
Revised 07/20/22 sm1 of 4
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Initiation Meeting (DIM)
Required Project Information (Applicant: complete this section)
Prospective
Applicant Name: Phone:
Company:
E-mail:
Address:
Prospective
Applicant’s Rep.: Phone:
Company:
E-mail:
Address:
Property Owner: Phone:
Company:
E-mail:
Address:
ASSESSOR'S MAP NO: TAX LOT NO(S):
Property Address:
Size of Property: Acres Square Feet
Description of
Proposal:
If you are filling in this form by hand, please attach your proposal description to this application.
Existing Use:
# of Lots/Parcels: Avg. Lot/Parcel Size: sf Density: du/acre
Prospective
Applicant:
Date:
Signature
Print
Required Project Information (City Intake Staff: complete this section)
Case No.: Date: Reviewed by:
Application Fee: $ Technical Fee: $0 Postage Fee: $0
TOTAL FEES: $ PROJECT NUMBER:
PREPARED FOR CLIENT ADDRESS
BP Products North America, Inc. P.O. Box 696049
San Antonio, TX 78269
Project Narrative –
Arco Springfield
PREPARED BY
Development Initiation Meeting
ARCO ampm
Barghausen Consulting
Engineers, Inc.
SITE ADDRESS JURISDICTION DATE PROJECT NO.
4202 Main Street
Springfield, OR
Springfield, OR 12/21/2023 1636
1 1636.001-DIM Narrative.docx
The following shall serve as our written statement of intent to accompany our application for a development
initiation meeting. This outlines the intended improvements proposed for this site and shall serve as the
project narrative. To accompany this narrative we have provide the following documents:
• ALTA Survey
• Title Report
• Proposed Development Permit Drawings
• Proposed Branding and Image Package
• Development Initiation Meeting Application
This narrative is submitted on behalf of our clients, BP Products North America, Inc. As a result of their
recent acquisition of a previously franchisee operated ARCO ampm, the intent of our proposed site
improvements it to bring the existing site up to current ARCO ampm brand standards . We would like to
request a Development Initiation meeting to discuss what permits are required to cover our desired scope
of work and what kinds of design review requirements may be necessary.
Site Overview
The site was originally developed as an ARCO ampm but was sold to a franchisee who rebranded the site
to a Mobile Station with Twenty Four 7 Market branded convenience store. Now, BP is re-acquiring the site
and returning it to the original branding.
We are not proposing any change of use, occupancy, or methods of operation. Existing site offerings, hours,
and employees will remain the same. The branding of both the fueling and the convenience store are to be
revised to show ARCO ampm standards which is illustrated in the provided preliminary signage package
by Perry Builders. The rebranding portion of our scope is what we assume will trigger design review
requirements.
The majority of the proposed improvements center on repairing and maintaining existing site conditions.
The existing fueling canopy, fuel dispenser islands, convenience store and bottle storage structures exist
to remain. An existing trash enclosure and bottle storage facility occupy a portion of the rear of the site and
will remain as part of this project. Proposed modifications are limited to painting it to match the convenience
store and replacing the exiting slats as required for maintenance. No proposed changes to parking.
Topography, site circulation and landscaping remain. Landscaping will be trimmed and re -mulched as
necessary to maintain a clean appearance.
Site upgrades include fueling dispenser replacement, grind and overlay of old asphalt, and remove and
replace cracked portions of existing asphalt. New security bollards are also to be installed along the front
of the convenience store. One of the existing fueling tanks will be converted to offer diesel fuel. This can
be done without ground disturbance.
All site lighting and interior lighting is to be upgraded to new, energy efficient LED fixtures, including new
wall mounted wall wash fixtures along the face of the building for their seasonal advertising signage..
The exterior of the convenience store is also to be repainted shades of beige including “Great Plains Gold,”
“Brandy Cream” and “Pewter”. A full list of material colors and textures can be found on the last page of the
Signage Permit Package prepared and provided by Perry Builders.
No structural changes are proposed to the convenience store, but the interior partitions will be altered in
several places. The existing interior finishes and millwork will be demolished and replaced with updated
brand standard finishes and graphics. The general layout will remain as-is with small changes. One of the
existing exterior accessed restrooms will be demolished to create an interior hallway that allows the
remaining restroom to be accessible from the inside of the store. Then the rear access door to the remaining
2 1636.001-DIM Narrative.docx
restroom will be infilled. This is for safety and security reasons. The existing walk-in cooler unit will remain
with new condensers and evaporating units. The access to the unit will be altered slightly so that the main
door is through the sales floor instead of the back of house. Then, the corner of the back of house space
will be enclosed to create a secure employee workstation.
All equipment will be replaced with the standard ARCO ampm offerings . The restroom will remain in its
current location and size but as required, amenities and fixtures will be moved to ensure ADA compliance.
All new interior equipment, gondolas and millwork will be ADA compliant. Interior finishes and materials are
also illustrated in the signage package provided by Perry Builders.
With this scope in mind, we have the following questions we would like to discuss with staff in our
Development Initiation Meeting:
• What type of design review is required to rebrand this location from a Mobil Station to an AMPM?
• According to the manual, the site is exempt from EC 9.762 because the project does not propose
to replace more than 1,000 square feet of impervious surface. Are there any other thresholds this
site would be subject to? Will grind and inlay, or pavement patching count toward total disturbance?
What is considered maintenance with pavement towards the disturbance threshold?
• Are there any critical area requirements for this site?
• Will the site require permitting by Oregon’s Department of Environmental Quality?
• What type of source control, stormwater, and operational requirements will apply to the new trash
enclosure?
The provided documents listed at the beginning of the narrative will further illuminate the scope of our
proposed site improvements. The priority of our project is to provide the highest quality service station to
our patrons that emphasizes safety, convenience, and best illustrates the ARCO ampm brand. Please don’t
hesitate to reach me at this office for further information as you review our application. Thank you for your
time and attention.
1
COVER LETTER
Sign Permit Application
All work to be done IAW 2022 OSSC, OFC, OESC Compliant.
APN#______________________
Zoning_____________________
Pages & Contents
Occupancy_______________
Construction Type_______________
Group M
Type II-B
1702323201701
Community Commercial
Pg. 1............................... Cover Letter
Pg. 2............................... Site Plan
Pg. 2............................... C-Store Elevations
Pg. 3............................... Canopy Elevations
Pg. 4............................... Dispenser Elevations
Pg. 5............................... GAS Pump Elevations
Pg. 6............................... MID Sign Elevations
Pg. 7...............................ARCO Color Specs
DESIGNED BY Perry Builders, Inc.PBI
Perry Builders, Inc.12405 Locksley Lane Auburn, Ca 95602
Phone (530) 745-0580
W W W .P E R R Y B U I L D E R S I N C .C O M
S t a t e L i c e n s e #7 3 1 5 6 9
REV:
REV:
REV:
REV:7
C23-00591812/07/2023 4202 Main St
Springfield, OR 97478
SP
R.O
ARCO/AMPM
2
APN: 383-092-14 P.L.83’ENTRANCESIDEWALKLANDSCAPEPLANTEREXISTING7-ELEVENSTORE P.L.P.L.CHAPMANENTRANCESIDEWALKLANDSCAPEPLANTERENTRANCESIDEWALKLANDSCAPEPLANTERENTRANCESIDEWALKLANDSCAPEPLANTERN 42ND STMONUMENTSIGN
VICINITY MAP
SCOPE OF WORK
BUILDING:
REMOVE EXISTING WALL SIGN AND INSTALL
NEW AMPM WALL SIGN PER ATTACHED SHEET.
REMOVE BRANDING ELEMENTS FROM PUMPS
AND RE-DECAL RE-IMAGE PER ATTACHED
SHEETS.
PAINT THE BUILDING PER ATTACHED SHEET
REMOVE EXISTING CANOPY SIGN AND ACM
AND INSTALL NEW SIGN AND ACM PER
ATTACHED SHEETS.
1.0
1.1
2.1
2.2
SITE PLAN
EXISTING6 MPDCANOPYEXISTING6 MPDCANOPY External Disconnect SwitchPer NEC, Article 600.6(A)(1)ALL SIGNS SHALL CONFORM WITH UL LISTINGSTANDARDS.UL LISTING NUMBERS WILL BE PROVIDEDONCE SIGNS HAVE BEEN MANUFACTURED.
SMITH LOOP
SMITH LOOPMAIN ST
EXISTING
C-STORE
EXISTING
GAS
CANOPYENTRANCE
ENTRANCE
LANDSCAPE
LANDSCAPESIDEWALKSIDEWALKLANDSCAPEP.L.P.L.P.L.LANDSCAPE
P.L.
P.L.P.L.1.1
1.0
CANOPY:
REMOVE EXISTING MID SIGN FACE AND
REFACE WITH NEW PER ATTACHED SHEETS.
3.1
MID SIGN:
2.1 2.2 3.1
DESIGNED BY Perry Builders, Inc.PBI
Perry Builders, Inc.12405 Locksley Lane Auburn, Ca 95602
Phone (530) 745-0580
W W W .P E R R Y B U I L D E R S I N C .C O M
S t a t e L i c e n s e #7 3 1 5 6 9
REV:
REV:
REV:
REV:7
C23-00591812/07/2023 4202 Main St
Springfield, OR 97478
SP
R.O
ARCO/AMPM
3
EXISTING C-STORE - FRONT EXISTING C-STORE - FRONT
C-STORE SOFT BRAND
PROPOSED C-STORE - FRONT PROPOSED C-STORE - FRONT
BENJAMIN MOORE
PEWTER 2121-30BENJAMIN MOORE
GREAT PLAINS GOLD 1077
BENJAMIN MOORE
PEWTER 2121-30BENJAMIN MOORE
GREAT PLAINS GOLD 1077
DESIGNED BY Perry Builders, Inc.PBI
Perry Builders, Inc.12405 Locksley Lane Auburn, Ca 95602
Phone (530) 745-0580
W W W .P E R R Y B U I L D E R S I N C .C O M
S t a t e L i c e n s e #7 3 1 5 6 9
REV:
REV:
REV:
REV:7
C23-00591812/07/2023 4202 Main St
Springfield, OR 97478
SP
R.O
ARCO/AMPM
4
EXISTING CANOPY IMAGE
PROPOSED CANOPY IMAGE
EXISTING CANOPY IMAGE
PROPOSED CANOPY IMAGE
DESIGNED BY Perry Builders, Inc.PBI
Perry Builders, Inc.12405 Locksley Lane Auburn, Ca 95602
Phone (530) 745-0580
W W W .P E R R Y B U I L D E R S I N C .C O M
S t a t e L i c e n s e #7 3 1 5 6 9
REV:
REV:
REV:
REV:7
C23-00591812/07/2023 4202 Main St
Springfield, OR 97478
SP
R.O
ARCO/AMPM
5
8"h X 24"w
6"h X 6"w
1.33 Sq.Ft.
.25 Sq.Ft.
Blue & Red
Vinyl Lettering
Blue & Red
Vinyl Lettering
EXISTING DISPENSER IMAGE PROPOSED DISPENSER IMAGE
DESIGNED BY Perry Builders, Inc.PBI
Perry Builders, Inc.12405 Locksley Lane Auburn, Ca 95602
Phone (530) 745-0580
W W W .P E R R Y B U I L D E R S I N C .C O M
S t a t e L i c e n s e #7 3 1 5 6 9
REV:
REV:
REV:
REV:7
C23-00591812/07/2023 4202 Main St
Springfield, OR 97478
SP
R.O
ARCO/AMPM
6
EXISTING MID IMAGE PROPOSED MID IMAGE
DESIGNED BY Perry Builders, Inc.PBI
Perry Builders, Inc.12405 Locksley Lane Auburn, Ca 95602
Phone (530) 745-0580
W W W .P E R R Y B U I L D E R S I N C .C O M
S t a t e L i c e n s e #7 3 1 5 6 9
REV:
REV:
REV:
REV:7
C23-00591812/07/2023 4202 Main St
Springfield, OR 97478
SP
R.O
ARCO/AMPM
7
DESIGNED BY Perry Builders, Inc.PBI
Perry Builders, Inc.12405 Locksley Lane Auburn, Ca 95602
Phone (530) 745-0580
W W W .P E R R Y B U I L D E R S I N C .C O M
S t a t e L i c e n s e #7 3 1 5 6 9
REV:
REV:
REV:
REV:7
C23-00591812/07/2023 4202 Main St
Springfield, OR 97478
SP
R.O
ARCO/AMPM