HomeMy WebLinkAboutMeeting Packet Planner 12/15/2023
DEVELOPMENT
INITIATION MEETING
DEVELOPMENT AND PUBLIC WORKS DEPARTMENT
SPRINGFIELD CITY HALL
225 FIFTH STREET
DPW Conference Room 615/616 + Zoom
Meeting Date: Thursday, January 4, 2024 1:30 – 2:30
1. DEVELOPMENT INITIATION MTG #811-23-000278-PRE 811-23-000280-PROJ Monkey Hero
LLC
Assessor’s Map: 17-03-26-31 TL: 00900
Address: 1620 5th Street
Existing Use: Residential property with existing home
Planner: Andy Limbird
The Development Issues Meeting informational packet for this meeting is available on-line for
you to review or print out @ Laserfiche website: www.springfield-or.gov/weblink8/browse.aspx
SITE
VICINITY MAP
811-23-000278-PRE Development Initiation Meeting
17-03-26-31 TL 00900
1620 5th Street
Monkey Hero LLC
Revised 07/20/22 sm1 of 4
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Initiation Meeting (DIM)
Required Project Information (Applicant: complete this section)
Prospective
Applicant Name: Phone:
Company:
E-mail:
Address:
Prospective
Applicant’s Rep.: Phone:
Company:
E-mail:
Address:
Property Owner: Phone:
Company:
E-mail:
Address:
ASSESSOR'S MAP NO: TAX LOT NO(S):
Property Address:
Size of Property: Acres Square Feet
Description of
Proposal:
If you are filling in this form by hand, please attach your proposal description to this application.
Existing Use:
# of Lots/Parcels: Avg. Lot/Parcel Size: sf Density: du/acre
Prospective
Applicant:
Date:
Signature
Print
Required Project Information (City Intake Staff: complete this section)
Case No.: Date: Reviewed by:
Application Fee: $ Technical Fee: $0 Postage Fee: $0
TOTAL FEES: $ PROJECT NUMBER:
TENTATIVE MAP NARRATIVE
December 7, 2023
Assessor’s Map: 17-03-26-31 Tax Lot 900
Applicants: Monkey Hero, LLC
(541) 896-0408
Applicant’s
Representative: The Favreau Group
3750 Norwich Ave.
Eugene, OR 97408
541-683-7048
Attn: Tony Favreau
LAND USE REQUEST
The applicant proposes to divide the subject 0.49 acre property to create 5 lots and to provide
all necessary infrastructure to support the development. The proposed residential use and
density (6-14 dwelling units/acre) are consistent with the existing Low Density Residential (LDR)
zoning and the City’s standards for development in the LDR zoning district, where a maximum
of 14 dwelling units/acre is permitted and the proposed is 10.2 units per acre.
The proposal does not include any improvements to 5th Street or Moffit Ln.
SITE AND SURROUNDING CHARACTERISTICS
The site is within an established Springfield residential neighborhood. The property is located at
1620 5th St. and has an existing home situated towards the front of the property. The Northern
property line abuts a drainage channel, the Western property line abuts Hamlin school. The
Southern and Eastern property lines abut Moffit Lane and 5th Street respectively. The site soils
are 2224A Courtney Gravelly Silty Clay Loam and #119 Salem-Urban Land Complex, soil group
D.
5.12-125 Tentative Plan Criteria
The Director shall approve or approve with conditions a Tentative Plan application upon
determining that all applicable criteria have been satisfied. If conditions cannot be attached to
satisfy the approval criteria, the Director shall deny the application. In the case of Partitions that
involve the donation of land to a public agency, the Director may waive any approval criteria
upon determining the particular criterion can be addressed as part of a future development
application.
A. The request conforms to the provisions of this Code pertaining to lot/parcel size
and dimensions.
Response: There are no lot minimum sizes or dimensions.
B. The zoning is consistent with the Metro Plan diagram and/or applicable
Refinement Plan diagram, Plan District map, and Conceptual Development Plan.
Response: The property is zoned Low Density Residential (LDR). The Metro Plan diagram for the
subject property is LDR.
C. Capacity requirements of public and private facilities, including but not limited to,
water and electricity; sanitary sewer and stormwater management facilities; and streets
and traffic safety controls shall not be exceeded and the public improvements shall be
available to serve the site at the time of development, unless otherwise provided for by
this Code and other applicable regulations. The Public Works Director or a utility
provider shall determine capacity issues.
Response:
a. Water: The proposed development is within the Springfield city limits and will receive
water service from the Springfield Utility Board (SUB). There is an existing 16”
waterline and 12” waterline in Moffit Lane.
b. Wastewater: There are 2 existing 8” wastewater systems. One in 5th St. and one I
Moffit Lane.
c. Storm Drain: There is an existing storm drain inlet in 5th St. at the northeast corner of
the site.
d. Streets: 5th Street and Moffit Lane are fully built and no improvements are proposed.
D. The proposed land division shall comply with all applicable public and private
design and construction standards contained in this Code and other applicable
regulations.
Response: See Response to part C.
E. Physical features, including, but not limited to: steep slopes with unstable soil or
geologic conditions; areas with susceptibility of flooding; significant clusters of trees
and shrubs; watercourses shown on the WQLW Map and their associated riparian areas;
other riparian areas and wetlands specified in Section 4.3-117; rock outcroppings; open
spaces; and areas of historic and/or archaeological significance, as may be specified in
Section 3.3-900 or ORS 97.740-760, 358.905-955 and 390.235-240, shall be protected as
specified in this Code or in State or Federal law.
Response: The Metro Area General Plan, Water Quality Limited Watercourse Map, State
Designated Wetlands Map, Hydric Soils Map, Wellhead Protection Zone Map, FEMA Maps, and
the list of Historic landmark sites have been consulted and with the exception noted below,
there are no features needing to be protected or preserved on this site. If any artifacts are
found during construction, there are state laws that could apply; ORS 97.740, ORS 358.905,
ORS 390.235. If human remains are discovered during construction, it is a Class “C” felony to
proceed under ORS 97.740.
The site is relatively level and drains to the north. The onsite driveway runoff will be treated via
pervious pavers. The houses on parcels 2 & 3 will have individual treatment facilities on each
parcel.
Criterion 6 is met. Physical features, including but not limited to significant clusters of trees and
shrubs, watercourses shown on the WQLW Map and their associated riparian areas, wetlands,
rock outcroppings, and historic features are not present on the site.
F. Parking areas and ingress-egress points have been designed to: facilitate
vehicular traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity
within the development area and to adjacent residential areas, transit stops,
neighborhood activity centers, and commercial, industrial and public areas; minimize
driveways on arterial and collector streets as specified in this Code or other applicable
regulations and comply with the ODOT access management standards for State
highways.
Response: 5th Street and Moffit Lane are fully built and no improvements are proposed.
G. Development of any remainder of the property under the same ownership can be
accomplished as specified in this Code.
Response: There is no other adjoining property under the same ownership that can be
developed.
H. Adjacent land can be developed or is provided access that will allow its
development as specified in this Code.
Response: There is no undeveloped land adjoining the property. Approval of the proposed
subdivision will not impede development of adjacent land.
I. Where the Partition of property that is outside of the city limits but within the
City’s urbanizable area and no concurrent annexation application is submitted, the
standards specified below shall also apply.
Response: This does not apply.
DIM Questions 1620 5th St
1. Can we abandon the onsite 6” WW lateral?
2. What is the minimum width for a driveway?
3. Do we need to provide any onsite parking for lot 4?
4. Lots 4 & 5 will share the existing driveway. Any issues with this?
5. Do you see any issues we need to address?