HomeMy WebLinkAboutMeeting Packet Planner 12/4/2023
1
AGENDA
DEVELOPMENT REVIEW
COMMITTEE
DEVELOPMENT SERVICES DEPARTMENT
225 FIFTH STREET
Conference Room 616 / MS Teams
Staff Review: Tuesday, December 19, 2023 9:00 – 9:30 a.m.
1. Site Plan Review 811-23-000262-TYP2 811-23-000156-PROJ Mike Schellenberg
Assessor’s Map: 17-02-34-42 TL: 4100
Address: 6364 Main Street
Existing Use: Church, vacant area
Applicant submitted plans for a parking lot expansion to the north.
Planner: Andy Limbird
Meeting: Tuesday, December 19, 2023 9:00 – 9:30 virtual meeting via Microsoft Teams
The Complete DRC Packet for this meeting is available online for you to review or print out
from the laserfiche website: https://www.springfield-or.gov/weblink8/browse.aspx
SITE
VICINITY MAP
811-23-000262-TYP2 Site Plan Review
17-02-34-42 TL 4100
6364 Main Street
Mike Schellenberg
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 1 of 14
TABLE OF CONTENTS
Page 2 PROJECT DESCRIPTION
Page 3 PROPOSAL
Page 4 REVELANT APPROVAL CRITERIA
MUNICIPAL CODE ANALYSIS
Page 5 SDC 5.17.110 Applicability
Page 6 SDC 5.17.125 Approval Standards
Page 12 SDC 3.2.200 Residential Districts (R-1, R-2, R-3)
Page 14 SDC 3.3.100 Overlay Districts
SUPPLEMENTAL DOCUMENTS
Copy of Property deed, provided by site owner.
Plans by SSW Engineers, (1) copies each:
G0.0 Title Sheet/Cover Sheet,
8 ½” x 11” and 24” x 36”
C1.0 Existing Conditions Site Plan,
8 ½” x 11” and 24” x 36”
C2.0 Site Development Plan,
8 ½” x 11” and 24” x 36”
C3.0 Paving & Grading Plan,
8 ½” x 11” and 24” x 36”
C4.0 Stormwater Details,
8 ½” x 11” and 24” x 36”
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 2 of 14
PROJECT DESCRIPTION
PROJECT LOCATION: Undeveloped North end of property
ADDRESS USED AT THIS LOCATION: 6364 Main Street, Springfield OR 97478
ASSESSOR’S MAP AND TAX LOT: 17-02-34-42, lot 04100
ZONING: R-1 – Low Density Residential Zone
REQUESTED PROCEDURE: Type 2 Land Use – Director Review
STATE PERMITS: None required nor proposed.
Site has an existing ODOT access permit for
site entry from Hwy 126 / Main Street, provided.
FEDERAL PERMITS: None required nor proposed.
TRAFFIC IMPACT ANALYSIS: None required, proposed site use will not change.
CONTACT INFORMATION
OWNER / APPLICANT: Thurston Community Baptist Church
6364 Main Street
Springfield, OR 97478
Contact: Mike Schellenberg
(541) 603-9411
paster.mike.s@outlook.com
APPLICATION PREPARED BY: SSW Engineers Inc.
2350 Oakmont Way, Suite 105
Eugene, OR 97401
Contact: Heather Mayfield
(541) 485-8383
heatherm@sswengineers.com
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 3 of 14
PROPOSAL
The applicant seeks a Type 2 Land Use - Director Review for a property located in a R-1 – Low
Density Residential Zone. Approval of this application will allow the applicant to seek a permit for
expansion of an existing parking lot at the North end of the site of an existing place of worship.
The property is a developed lot of approximately 0.75 acres which sits in the R -1 Low Density
Residential District Commercial Districts zone, The properties to the east and west of the site are
in the R-2 Medium Density Residential Use District; while properties to the north and south are
also in the R-1 district.
Currently the site has two (2) parking areas. The main parking area is to the south of the “Place of
Worship” building and can be accessed by entering from Main Street. The driveway for this
parking area continues north to the second parking lot, added in 2004 with the addition of a Multi-
Purpose Building. Vehicles can also access this lot from North “A” Street via a concrete apron to a
gravel driveway in the northeast corner of the site.
As attendance has grown, the need for overflow parking has increased. Often times, it is found
that people tend to start parking in the existing field at the north end of the site, including parking
in an existing stormwater grassy swale, put in place as part of the 2004 addition.
The applicant seeks to replace the existing gravel driveway with an asphalt one as well as
construct a parking lot extension over the northern grassy field and swale. The parking lot
extension would include site lighting as well as parking area landscape islands, some of which will
act as stormwater treatment infiltration raingardens. The existing swale will be scoured and filled
with drain rock for infiltration of stormwater coming from the treatment raingardens . The existing
berm & landscaping buffer along “A” Street, as well as fencing & landscaping along the east &
west property lines, would remain.
If approved site development will include:
• Replacement of the existing stormwater swale with drainage rock for stormwater infiltration,
• Paving for (24) new parking spaces, sloped to direct surface water to new landscape beds,
• Notched curbs at landscape beds allow them to serve as raingardens, a type of stormwater
treatment facility, which will pipe treated stormwater to drainage rock,
• New canopy trees & shrubs will be planted in landscape beds surrounding new paved
parking areas,
• New site lighting will be installed within parking area.
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 4 of 14
REVELANT APPROVAL CRITERIA - Springfield Development Code (SDC)
• Applicability SDC 5.17.110
• Approval Standards SDC 5.17.125 (A)
1. Permitted Uses SDC Table 3.2.210
2. Discretionary Uses SDC 5.9.100
3. Subject Property Land Use Standards:
Residential Districts (R-1, R-2, R-3) SDC 3.2.200
SDC 3.2.205 Purpose, Applicability, and Location
SDC 3.2.210 Permitted Land Uses
SDC 3.2.215 Lot Area and Dimensions
SDC 3.2.220 Setbacks
SDC 3.2.225 Lot Coverage and Impervious Surface Standards
SDC 3.2.235 Density
Overlay Districts SDC 3.3.100
4. Applicable Master, Facilities, or Refinement Plans, and/or Special Planned Districts
5. Infrastructure Standards - Transportation SDC 4.2.100
SDC 4.2.120 Site Access and Driveway Standards.
SDC 4.2.130 Vision Clearance Area.
SDC 4.2.140 Street Trees.
6. Infrastructure Standards - Utilities SDC 4.3.100
SDC 4.3.110 Stormwater Management.
SDC 4.3.120 Utility Provider Coordination.
SDC 4.3.125 Underground Placement of Utilities.
7. Landscaping, Screening, and Fence Standards SDC 4.4.100
SDC 4.4.105 Landscaping.
8. On-Site Lighting Standards SDC 4.5.100
SDC 4.5.110 Lighting Standards.
9. Motor Vehicle Parking, Loading, and Bicycle Parking Standards SDC 4.6.100
SDC 4.6.115 Motor Vehicle Parking - Parking Lot Design
SDC 4.6.120 Motor Vehicle Parking - Parking Lot Improvements
SDC 4.6.155 Bicycle Parking - Number of Spaces Required.
10. Specific Development Standards SDC 4.7.100 / 300
None Applicable
11. Temporary Use Standards SDC 4.8.100
None Applicable
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 5 of 14
MUNICIPAL CODE ANALYSIS
Chapter 5.17.110 – Applicability
SDC 5.17.110 (A) The Site Plan Review process is used for:
(1) The following categories of multiple unit housing, commercial, public and semi-public,
and industrial development or uses, including construction of impervious surfaces for
parking lots and storage areas:
b) Additions or expansions that exceed either 50 percent of the existing building gross floor
area or 5,000 square feet or more of new building gross floor area and/or impervious
surface area, except where a proposed development qualifies for a Minimum
Development Standards review according to SDC 5.15;
c) Additions, expansions, and changes of use, regardless of size or intervening use, that:
iv) Are located within 50 feet of property in a residential land use district or residentially
designated land (as measured from the property line of the subject property).
The Type 2 Site Review process is applicable for our proposed site improvements
under section SDC 5.17.110 (A) (1) (b), where the proposed includes a parking lot
expansion with new impervious area exceeding 5,000 square feet. Additionally, the
process is applicable under section SDC 5.17.110 (A) (1) (c) (iv), where the proposed
site improvements of a parking lot is on a site whose property line is within 50 feet of
property in a residential land use district.
SDC 5.17.110 (C) Existing lawfully developed sites that do not conform to the current standards
of this code are only required to meet current standards on the portions of the
site affected by the proposed alteration or expansion. Any alterations to the
site must meet current code standards.
The proposed parking lot expansion affects the existing gravel access from the existing
north parking area to North “A” Street, the existing stormwater grassy swale to the north
of said existing parking area, and replacement of some asphalt in the existing parking
area, which were developed to the codes of their time. All affected areas of
development will meet current code standards. Any portions of the site not affected by
this proposal shall not be held to current standards.
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 6 of 14
Chapter 5.17.125 - Approval Standards
SDC 5.17.125 (A) The Director must approve, approve with conditions, or deny a proposed Site
Plan Review application based on the following standards:
(1) The proposed land use is a permitted use or is allowed as a discretionary use in the land
use district.
The proposed site improvements of a parking lot is an expansion of an existing use
listed as allowed as both: “ D ” = Discretionary Use Permit Required, and “ S* ” = Site
Plan Required, Permitted in conformance with cited code standards per Table 3.2.210.
(2) If a use is allowed as a discretionary use, in addition to meeting the standards below, a
Discretionary Use application must be approved in conformance with the standards in
SDC 5.9.100.
A Discretionary Use Application shall be submitted for Type 3 Site Review if the
Jurisdiction so requires. Please verify applicability as an additional Type 3 review was
not discussed in our initial contact with the City. The Type 2 Site Review process is
applicable for our proposed site improvements as the improvements are an expansion
of existing conditions suitable for expansion considering it meets the requirements of
5.9.120 (B).
(3) The proposal complies with the standards of the land use district of the subject property.
The proposed parking lot expansion complies with the standards of its assigned land
use district. See analysis of SDC 3.2.200 - Residential Districts, page 11.
(4) The proposal complies with any applicable approved master plan, master facilities plan,
refinement plan, and/or special planned district.
The proposed site improvements are within the Low-Density Residential zoning district
zone. A purpose of the zone, as described in SDC 3.2.205 (A) (2), is to implement the
policies of the Springfield Comprehensive Plan and Metro Plan.
The approved 2019 Eugene-Springfield Metropolitan Area General Plan & the adopted
Diagram (2004) both designate the site as Low-Density Residential. As there are no
zoning changes anticipated, the proposal complies with intent of this section.
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 7 of 14
(5) The proposal complies with the applicable sections of SDC 4.2, Infrastructure
Standards-Transportation.
The proposed site improvements are subject to the following standards of this section:
SDC 4.2.120 Site Access and Driveway Standards.
The existing gravel driveway to be replaced with asphalt. An existing concrete
apron at North “A” Street will to remain and serve to accommodate the expanded
parking lot per section SDC 4.2.120(C)(3). Driveway apron changes are not
anticipated.
SDC 4.2.130 Vision Clearance Area.
Vision Clearance triangles are shown on the Site Plan to show compliance.
SDC 4.2.140 Street Trees.
Existing street trees line the site. No changes to existing planting strip or street
trees are anticipated.
(6) The proposal complies with the applicable sections of SDC 4.3, Infrastructure
Standards-Utilities.
The proposed site improvements are subject to the following standards of this section:
SDC 4.3.110 Stormwater Management
The proposed 13,607 sq ft development area includes 11,512 sq ft of new
asphalt, 288 sq ft curbing, and 1,655 sq ft new landscape beds. A portion of
these landscape beds will meet stormwater infiltration raingarden planting
standards. Installation of underground storage drain aggregate will meet the
detention needs for matching the existing conditions for the 25-year storm event
prior to connecting to the existing city infrastructure. The described stormwater
management system will be engineered to be compliant with the standards of
this section and Sections 4.03.1, 4.03.2, and 4.03.4 of the Engineering Design
Standards and Procedures Manual.
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 8 of 14
SDC 4.3.120 Utility Provider Coordination.
The proposed work will require the general contractor to coordinate with the City
and applicable utility providers for tapping of existing stormwater lines & feeding
of new electrical lines.
SDC 4.3.125 Underground Placement of Utilities.
The proposed utilities will be placed underground as applicable.
(7) The proposal complies with the applicable sections of SDC 4.4, Landscaping,
Screening, and Fence Standards
Existing setback areas and lot perimeter include established and mature planting areas.
No changes to existing perimeter landscaping are anticipated. Existing lot interior at the
project site consists of grass. This grass will be replaced with new parking lot plantings
and landscaping to meet the standards of this section. The proposed site improvements
are subject to the following standards of this section:
SDC 4.4.105 Landscaping
The proposed site improvements are to conform to the following subsections:
SDC 4.4.105 (C)
Required planting and irrigation materials and installation costs are not to
exceed 10 percent of the cost of parking facilities.
SDC 4.4.105 (D) (2)
Landscaping is required for parking lot areas.
SDC 4.4.105 (E)
Required planting areas to have at least 65 percent coverage within 5
years of installation. Living plant materials to be distributed throughout.
Plantings per 1,000 square feet required planting area shall consist of
those types listed in subsections (1) – (3).
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 9 of 14
SDC 4.4.105 (F)
Parking lot planting areas to include canopy trees & shrubs as designated
for plantings per 100 square feet.
SDC 4.4.105 (G)
Permanent irrigation system shall be installed for all new required planting
areas, unless planted with noninvasive drought tolerant species.
SDC 4.4.105 (I) – Planting Installation Standards
SDC 4.4.110 Screening
Screening is not required nor proposed.
SDC 4.4.115 Fences
Fencing is not required nor proposed.
(8) The proposal complies with the applicable sections of SDC 4.5, On -Site Lighting
Standards:
The proposed site improvements consist of new site lighting within the parking lot and
are subject to the following standards as applicable under section SDC 4.5.105 (B)(3).
Installation of new outdoor lighting fixtures are subject to the standards of SDC 4.5.110.
SDC 4.5.110 Lighting Standards
The proposed site improvements are to conform to the following subsections:
SDC 4.5.110 (A) (1)
Outdoor lighting to be full cut-off fixtures or have a shielding method to
direct light onto site and away from adjacent properties.
SDC 4.5.110 (A) (6)
Parking lot lighting to turn off at the end of the working day, except where
necessary for personal and building safety.
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 10 of 14
SDC 4.5.110 (B)
Parking lot lighting to meet illumination recommended practices as given
by the Illuminating Engineering Society (IES), formerly the Illuminating
Engineering Society of North America (IESNA).
SDC 4.5.110 (C) (3)
Free-standing parking lot lighting fixtures shall not exceed 12 feet.
(9) The proposal complies with the applicable sections of SDC 4.6, Motor Vehicle Parking,
Loading, and Bicycle Parking Standards.
Proposed parking shall conform to the design standards of this section.
SDC 4.6.115 Motor Vehicle Parking—Parking Lot Design.
Parking areas shall comply with the given dimensional standards.
SDC 4.6.120 Motor Vehicle Parking—Parking Lot Improvements.
Parking areas shall comply with the following improvement standards:
SDC 4.6.120 (A)
Parking lot to have a durable, dust free surfacing. Parking lot surfacing
must not encroach upon the public right-of-way.
SDC 4.6.120 (B)
Parking lot improvements to include an on-site stormwater management
system to eliminate sheet flow from site.
SDC 4.6.120 (C)
Parking spaces to include a 6 inch by 6 foot wheel stop set back 2 feet
from the front of the stall.
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 11 of 14
SDC 4.6.120 (E)
Parking spaces will be permanently and clearly marked.
SDC 4.6.120 (G)
The number, dimensions, and locations of parking spaces for people with
disabilities must be as specified in Chapter 11 of the Oregon Structural
Specialty Code.
SDC 4.6.125 Motor Vehicle Parking—Parking Space Requirements.
Parking areas shall comply with the following space requirements:
SDC 4.6.125 (A)
The site is located within 1/4 mile of a frequent transit route (Route 11
corridor) and is therefore exempt from minimum parking requirements of
Table 4.6.2 under the Climate-Friendly and Equitable Communities
(CFEC) rule.
SDC 4.6.125 (C)
Parking quantity will not exceed allowable, see analysis below.
SDC 4.6.155 Bicycle Parking—Number of Spaces Required.
Bicycle Parking is not required nor proposed. The proposed site development
project does not add to the existing occupancy, seating, or floor area.
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 12 of 14
(10) The proposal complies with the applicable sections of SDC 4.7, Specific Development
Standards.
The proposed site improvements are not of a use listed under SDC 4.7.100 - Specific
Development Standards, nor SDC 4.7.300 - Standards and regulations for certain
residential uses and certain uses in residential districts, therefore this section is non-
applicable.
(11) The proposal complies with the applicable sections of SDC 4.8, Temporary Use
Standards.
The proposed site improvements are not of a use listed under this section therefore this
section is non-applicable.
Chapter 3.2.200 - Residential Districts (R-1, R-2, R-3)
SDC 3.2.205 Purpose, Applicability, and Location
SDC 3.2.205 (A) Purpose
The proposed project qualifies in purpose and applicability in that approval of
expanding the existing parking lot would increase convenient access to an
existing “activity center” [ SDC 3.2.205(A)(5) ] in an existing low / medium density
neighborhood.
SDC 3.2.205 (B) Applicability
The Zoning Map designates the site of our proposed project as Low-Density
Residential Districts (R-1), as well as the sites north and south of the project.
Sites to the east and west are designated as Medium-Density Residential
Districts.
SDC 3.2.205 (C) Conflicts
No known conflict exists between applicability of this section and SDC 4.7.370:
Place of Worship and Property Owned by Religious Nonprofits.
SDC 3.2.210 Permitted Land Uses
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 13 of 14
The project site was developed for use as a church in 1978. The proposed development of a
parking lot is included as a primary use of “Place of Worship” (and associated parking lots), as
listed in the Public and Institutional Use category of Table 3.2.210. Listed under the R-1 District
column of said table, “Place of Worship” use is listed as allowed as both: “ D ” = Discretionary
Use Permit Required, and “ S* ” = Site Plan Required, Permitted in conformance with cited
code standards. Section SDC 3.2.210 (C), Exceptions, referring to use of non-conforming uses
being allowed to continue subject to SDC 5.8.100, Non-Conforming Uses, does not apply.
SDC 3.2.215 Lot Area and Dimensions
The proposed parking lot expansion is not subject to the Lot Area and Dimensions provisions
of this section as the existing use, a “Place of Worship”, is not a listed Residential Use. It is a
“Public and Institutional” use per Table 3.2.210.
SDC 3.2.220 Setbacks
The proposed parking lot expansion will not include any new structures subject to the setbacks
of this section. Vision Clearance Areas in compliance with SDC 4.2.130 will be shown on the
site plan.
SDC 3.2.225 Lot Coverage and Impervious Surface Standards
Existing lot coverage is non-conforming to the standards in this section. The applicant requests
approval for additional impervious surface despite already exceeding 45% impervious lot
coverage. The proposed site improvements mimic and formalize existing site use conditions.
The improvements will maintain existing site landscaping buffering along North “A” Street.
Other benefits of approving lot coverage expansion include improved safety and environmental
impacts.
If an extension is not approved, vehicles will continue to park on the existing grassy portion of
the lot when no formal parking spaces are available. This continuation of use negatively
impacts the neighborhood. Impacts include: 1) vehicles with low lying exhaust potentially
catching long dry grass on fire; 2) vehicles that leak fluids or oils and park on the grass
contaminate area soils; and 3) despite having a gravel driveway, cleanliness along “A” Street is
compromised with dust, mud, or other such debris from vehicles leaving the site.
Approval of this parking lot extension would eliminate or reverse those negative impacts listed
above. Other positive impacts include: 1) new asphalt will be sloped to stormwater treatment
landscaping areas; 2) below grade stormwater detention and infiltration reduces the impact of
heavy rains to the existing stormwater system; 3) perimeter parking landscaping islands with
Type 2 Land Use - Director Review For:
6364 MAIN STREET
SPRINGFIELD, OREGON
2350 Oakmont Way, Suite 105 Eugene OR 97401 (541) 485-8383
Page 14 of 14
canopy trees provide shade and breakup the impact of continuous impervious areas; and 4)
new site lighting in the parking area improves safety while traveling across the site after dark.
SDC 3.2.235 Density
As established in section SDC 3.2.210, the existing permittable use is listed under the category
of “Public and Institutional uses”. Section SDC 3.2.325(B)(4) lists “Public and Institutional uses”
as one use where net density requirements do not apply.
Chapter 3.3.100 - Overlay Districts
The Zoning Map does not list this project site as having an overlay district. It was advised to
include that the project site is in the “Zone of Concentration” (99-yr TOT) per May 2019
Standard Wellhead Protection Map, as it relates to SDC 3.3.220 Time of Travel Zones.
,,
e/ (/CJ f?
State of Oregon
'DEPARTMENT OF TRANSPORTATION
Highway Division
APPLICATION AND PERMIT TO
Road Approach P ermit No.
Form 81-734-3307
CONSTRUCT ROAD APPROACH 2306 5
Name and Address of Applicant
I Charity Bapctist Church of Springj'i~ld,InJ.
1692 Ridgefield
Eugene, Oregon
L _J
Sp·ecial Provisions
Applicant hereby applies to the Administr ator and
State Highway Engineer for permission to construct
an approach road connection to the __ N_o_r_t_h __ .
side of the . __ M_c_K_en_zi_· e __________ .
Highway No. --=l'-"-5 ________ L_an_e-'-_ County,
at Mile Post __ 6--' • ...,.9...,.9 ___ , Highway Engineers
Station 30 8 +50 as described herein.
Map Reference BB-35-10
1. Current Rules and Reg ulations governing Road Approach Permits as adopted by the S t a t e of Oregon, D epart~
ment of Transportation, Highway Division, are by this reference made a part of this permit. Copies of said
Rules and Regulations may be obtained from the District Enginee r. ·
2. The approach(es) shall be constructed in accordance with the Type IV Road Appr oach Sketch a ttache d
hereto and by this reference made a part hereof.
3 . The following additional drawings are attached hereto and by this reference m a de a part hereof ____ _
4. Facility served by approach(es) _C=h=ur=-:c=hce___ ________________________ _
5. Construction of the approach(es) shall commence on or after July 1 , 19 _7-'7-._1 a nd will be com~
pleted on or before July 1, , 19_Til,
6. Applicant or his contractor shall notify the District Engineer at 214]. -15th Ave. East
Eugene, Oregon 97403 , phone -686-761 /1 prior to commencing work and after completing
construction of the approach(es) covered by this permit. ·
7. T~e approach shall be constructed ·to the City of Springfield :Standards.
Or iginal Signed !J,,, David L J ones
Recommended for approval : ________________ _
Ass t t • Dis trict Engineer
lffi~!~~!7~~
AT EUGENE
MAINTENANCE OFFICE
. -
ORIGIN/1L ~IG[1ED BY J )'. WILSON
Regional Engineer
Applica nt decla res he is the owner or l essee of the real property abutting the above described highway and
has the lawful authority to apply for this permit. This permit is issued subject to the term~ and prov isions con-
tained herein and atta ched her eto; this permit is a c cepted and approved by the applicant subject to said terms
and provisions. . }
. Applicant Charity Baptist Church of Splfd. ADMIN TRATOR AND STATE HIGHWAY ENGINEER
By &,__tt,~f: 1Jb; /41 R('<--I fo.lJ -il,1c~,v T By (,$3.:ff4~_,iz_~~~~-----
Date of Applica tion --1.'.ehrnary 9, 1977 c.... // ,
-~fy I
I GENERAL NOTES: I I. W• width of drlvowoy. I
\, 2. K • distance from face of curb to
\ 0S•~ back of present or future walk or
\ Note 10 feet, whlc hover is I ea s.
\ 2 --table A below. \ 3. w,, see
W1 4. X, see table A below.
CLconc Curb A+J _JC Dimensions and specifications, this perm!•.
PLAN W• __ ?:_'i_' ___ W1 •_10~ X •--~ ___ K • __ 5~---_
TYPE A TYPE A-I
POJtTU,NO CEMENT ASPHALT OONCllETE Angle of Skew...9.9~---·Approach Type_...£1. ___ _ CONCRETE
l , ,-A,,M , i) s, .......... .
ftt:::;: ", '•' ,'4
SECTION 8-8
SECTION 0-r
[
101'1 OIUY(WAYS n,c AOIIA•I
w ...
..!!. " " -~ •• .!!.
~ ..
]I
" .!!.
4 ..
P"ORM 81·734-3307£
' '"'
•
•
•
l
r:~;: ,0 .. n•• ·~ i
SECTION 8-8
INSERT A
Kin fttl
$ I 6 I I • W,in htl
~~-" " ,,
" " " " " " " " " " " " n n .. ..
" .. .. ,. .. ,. " ..
" " .. .. .. .. .. ,.
" ,. " ..
" .. .. .. .. .. .. .. .. .. .. • •
curb Type_ A _________________ _
CONCRETE CURBS
MONOLITHIC CURB a GUTTER
TYPE A TYPE t,.. .. I
j :r-~ S••lolpo,
l_ .... , Po•,.,.,.,
u "" '"" ••• TYPE 9 .. 1
lo• AC"'"' ,o &C u,
GENERAL NOTES FOR CONCRETE CURBS
I tu1b E•poht"f"•7"no,,,.ol vo,1 ,u 1~o•n onplon1 or II dirtcltd
TYPE B
ro, •~ ,,,,., '".\C •••
2 ~ ""'"'"' OI •~o•n !or cub l)Pt Y••J u 1~0•" 011 plon1 or cu t111Uhl-
) Htighl 11 oor,oDI, ,n tbO•I! on pion, o• GI dHtclld
4. Jo,nl Spu,n9 E 1pon1lon, 200' "'°''""'"' and oU po,nh ol lon9tnCr; c~11ho_cr,011, 1~• "'0'"'-""'·
!5. ftoftJIIIO•t 1UU lit 111td ,11 col!ntcl,ni C111bJ of -ddhlfnl 1Jpo111rt1.,. { E II l~t lotol tttht~l <111111n• !~:~, •:,'~:;! ,:~•:.:-;•1~•:t,t,o,•:~:.° ;!~:e.• ol 1·1 or 11up1t). MJ1111~11"' dui,ob11 tra"♦ltion ltnglh
·w·1c11,bl Alt,A•l)•lll"110, ... 01 va,, a, lbO•II on pion, GI o, dittCltd.
Top1 of oU ~11•1>1 1htll 1!op1 10110<<f lh 1ood•o1 002'tll.nor"'ol ~nltUolUr111U 1~0.-11 or cu
dl1tcltd.
8 Qo•tll. Stt Nolt 8 for Cucnlt 111011<11.
NOTE:
All moteriol and workmanship shotl bo in accordance wlfh Iha current State of
0re90n Standard Speclfiation For Highway Construction.
OREGON STATE HIGHWAY DIVISON
TYPE 4 ROAD APPROACH
CURBED HIGHWAY
HWY._J1cfufil~--________ NO. __ l...5.... ___ _
SIDE OF HWY. ___ _!J..9!'._t._1!_ ___________ _
MILE POSL2.e.'z9 ____ ENGRS. STA.3..9§±2.0_=_
2:!0S::>