Loading...
HomeMy WebLinkAboutPermit Building 1994-02-14SPRINGFIELE) RESIDENTIAL PERM!T APPLICATION lnspections:726-3769 Office: 726-3759 JOB NUMBER 225 Fifth Street Spri ngf ield, Oregon 97 477 7ru- 6 TAX LOI o Zffi SUBDIVISION LOCATION OF PROPOSED WORK: ASSESSORS MAP: LOT:BLOCK: PHON E ZIP: -lt A.?ey0 4 q7L{7 rSTATE:Cr lvY /V 3q CITY: ADDRESS OWNER \\ ,an, I , D,r-- t^clt \ r^ Yno\D'. \ N nr,',.oDESCRIBE WORK: NEW - REMODEL ADDITION irtrr\lJANilr\At. ADDRESS EXPIRES PHONECONTRACTOR'S NAME ELECTRICAL: CONST. CONTRACTOR # G ENERAL: PLUMBING # OF BDRMS - OFFICE USE - WATER HEATER: ZONING CODE: FLOOD PLAINQUAD AREA: '9 OF BLDGS SECONDARY HEAT SQUARE FOOTAGE: CONSTR. TYPE: HEAT SOURCE: LAND USE: # OF UNITS OCCY GBOUP: r OF STORIES: To request an inspection, you must call 726-3769. ThiS is a24 hour recording. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS Temporary Electric Rough Mechanical - Prior to cover. Final Plumbing - When all plumbing work is complete. Site lnspection - To be made after excavation, but prior to setting forms. Rough Electrical - Prior to Final Electrical - When all electrical work is complete.cover. Underslab Plumbing/ Electrical / Mechanical - Prior to cover.Electrical Service - Must be approved to obtain permanent electrical power. Final Mechanical - When all mechanical work is complete. Footing - After trenches are excavated.Fireplace - Prior to facing materials and framing lnsp. Final Bullding - When all required inspections have been approved and building is completed.Masonry - Steel location, bond beams, grouting.X,raming - Prior to cover, OtherFoundalion - After forms are erected but prior to concrete placement.,W Wall/mtnsutation - Prior to cover, Underground Plumbing - Prior to filling trench.l--] Drywall - Prior to taping MOBILE HOME !NSPECTIONS Underlloor Plumbing/ Mechanical - Prior to insulation or decking.Wood Stove - After installation. Post and Beam - Prior to floor insulation or decking.lnserl - After fireplace approval and lnstallatlon of unit. Blocking and Set.Up - When all blocking is complete. Floor lnsulation - Prior to decki ng.Curbcut &Approach - After forms are erected but prior to placement of concrete. Plumbing Conneclions - When home has been connected to water and sewer. Sanitary Sewer - Prior to filling trench.Electrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Storm Sewer - Prior to filling trench. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in place. Water Line - Prior to filling trench.[-] Fence - When completed. Rough Plumbing - Prior to cover. Streel Trees - When all required trees are planted. Final - After all required inspections are approved and porches, skirting, decks, and venting have been installed. ?4r * S-,^t, o,l, *L/d) R v uJ ,r-.,- /< ( RANGE: tl E E E E tl E E E E tl r E Lot faces Lot sq. ftg. Lot coverage TopographY Total height Lot Type - lnterior - Corner - Panhandle - Cul-de-sac ,S THE PROPOSED WORK IN THE HISTORICAL DISTRICT, OR ON THE HISTOBICAL REGISTER? --- lf yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED: HSE GAR ACCP.L. N S E BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Spri ngfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances' Receipt Number:- Date Date Paid Received By Plan Check Fee BUILDING PERMIT VALUE q3tu_(A) 3ts Jo SQ. FT. X $/SQ. FT, 25oo ITEM Main Garage Carport Total Value Building Permit Fee state surcharge Total Fee Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. SYSTEMS DEVELOPMENT CHARGE (SDC) (B) ADDITIONAL COMMENTS ITEM Fixtures Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE (c) N0 FT. FT, FT. PLUMBING PERMIT Plumbing Permit State Surcharge Total Charge Wood Stove/ lnsert/ Fireplace Unit Dryer Vent (D) N0Vent Fan Mechanical Permit lssuance State Surcharge Total Permit MECHANICAL PERMIT Fu rn ace Exhaust Hood By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertalning to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify"that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I f urther agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. natu re 2-/4-?fDate X,N MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Miscellaneous Permits (E) //oy'b AMOUNT RECEIVED RECEIVED BY DATE PAID VALIDATION: RECEIPT NUMBER TOTAL AMOUNT DUE (excluding electrical) (A, B, C, D, and E Combined) t1,/+ptanJnEVGGo'ei ,4 h Vn f"z fr to>t'<