Loading...
HomeMy WebLinkAboutPermit Plumbing 1996-11-08SPRIl\lGFIELO RESIDENTIAL PERMIT APPLICATION lnspections: 726-3769 Office: 726-3759 LOCATION OF PROPOSED WORK: -. 31- JOB NUMBER 225 Fifth Street Springfleld, Oregon 97477 TAX LOT:ASSESSORS MAP:11 t'ttZ rla LOT:BLOCK:SUBDIVISION PHON E: srArE: 0 t?Ll7ztP: OWNER: ADDRESS: CITY: NEW - REMODEL ADDITION DEMOLISH OTHER DESCRIBE WORK: ADDRESS 77 EXPIFIES - PHONE ELECTRICAL: CONTRACTOB'S NAME MECHANICAL: PLUMBING: GENERAL: CONSI. CONTRACTOR # RANGF-: * OF BDRMS: _ OFFICE USE - LAND USE: WATER HEATER ZONING CODE: FLOOD PLAIN I OF UNITS: QUAD ABEA: r OF BLDGS: SECONDARY HEAT SOUARE FOOTAGE: OCCY GROUP: * OF STORIES: CONSTR. TYPE: HEAT SOUFICE; -lo request an inspection, you must call 726'3769. -i-his is a 24 hour recor<ling. All inspections requested before 7:00 a.m. wllt bemade the sarne working day, lnspections requested af ter 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS Temporary Electric Rough Mechanical - Prior to cover. Final Plumbing - When allplumbing worl< is complete. Site lnspection - To be made after excavation, but prior to setting forms. Rough Electrical - Prior to Final Electrical - When all electrical work is complete.cover. [-l Underslab Plumbing/ Etecrricat/ - Mechanical - Prior to cover.Electrical Service - Must be approved to obtain permanent electrlcal power. Final Mechanical - When alt mechanical work is complete. Footing - After trenches are excavated.Flreplace - Prlor to facing materlals and framing lnsp. Final Building - When ail required lnspeclions have beenapproved and building is completed.Masonry - Steel locatlon, bonci beams, groutlng.Framing - Prior to cover. Foundatlon - After forms are erected but prior to concrete placement.Wall/Ceiling lnsulation - Prior to cover. Underground Plumbing - Prior to filllng trench.[l Drywall - Prior ro taping. Underlloor Plumbing / Mechanical - Prior to insulatlon or decking. MOBILE HOME INSPE TIONS Wood Stove - After lnstallation Posl and Beam - Prior to floor insulation or decking.lnsert - After fireplace approval and installation of unit. Blocking and Set.Up - When allblocking ls complete. Floor lnsulation - Prior to decking.Curbcut & Alrprroach - After forms are erected but prior loplacemcnt of concretcr. Plumbing Connections - When home lras been connected towater and sewer. Sanitary Sewer - Prior to f illing trench. Storm Sewer - Prior to filling trench. Sidewalk & Driveway - After excav;rtion is complete, forms and sub-base material in place. Electrical Connection - Whenblocking, set-up, and plumbing inspections have been approvedand the home is connected tothe service panel. Water Line _. Prior to filling trench.[--l fence - When ccmpteted. fitreel Treos - When all required trees are planted. Final - After all requiredinspections are approved andporchcs, skirting, decks, and venting have been installed. Rough Plumbing - Prior to cover. I fl tl tl ffo,n",M E E E tl E rl Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Type - lnterior - Corner - Panhandle - Cul-de-sac P.L.HSE GAR ACC N S E IS THE PROPOSED WORK iN THE - HISTORICAL DISTRICT, OR ON T'iE HISTOFIICAL REGISTER? - ll yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED: I VALUE (A) X $/SQ. FT. Total Value Building Permit Fee State Surcharge Total Fec BUILDING PERMIT ITEM SQ. FT. Main Garage Carport BUTLDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the cxpress condition that the saidconstruction shall, in all respects, conform to the Ordinanceadopted by the City of Springfield, inctuding the Development Code, regulating the construction and use ofbuildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plans Rcviewed By Date Receipt Numbe Plan Check Fee: Date Paid Received By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. ITEM Fixtures Residential Bath(s) Sanitary Sgwer Water Storm Sewer Mobile Home FEE ?4- ,@a 2e(c) <9 N0 FT. 6 422"@-) ---=':+>r7 t.-z PLUMBING PERMIT FT. Plumblng Permit State Surcharge Total Charge ADDITIONAL COMMENITS Wood Stove/ lnsert/ Fi replace Unlt Dryer Vent MECHANICAL PERMIT (D) N0 Mechanical Permit lssuance State Surcharge Total Permit Fu rnace Exhaust Hood Vent Fan By slgnature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information hereon is true ancl correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUPANCy will be made of any structure without perrnission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this proiect. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card ls located at the front of the property, and the approved set of plans will remain son the site at all times durin const ruction. Date Slgnatu MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition Stale Surcharge Total Miscellaneous Perrnits (E) TOTAL AMOUNT DUE (excluding etectricat) (A, B, C, D, and E Combined) VALIDATION: REoEI PT NU M BER _-2722.r'q-_ -?- DATE PAID AMOUNT FIECEIVED BECEIVED BY ,/f FT.