Loading...
HomeMy WebLinkAboutPermit Mechanical 1995-01-25SPFlINGFIELD RESIDENTIAL PERMIT APPLICATION lnspections: 726.3769 Office: 726-3759 LOCATION OF PROPOSED WOBK: ASSESSORS MAP: LOT: JOB NUMBEB efr, 225 Fifth Street Springf ield, Oregon 97477 TAX LOT: YN BLOCK:SUBDIVISION OWNEB: CITY: ADD STATE: PHON E: ZIP: ADDITION D OLISH OTHER DESCRIBE WOFIK: NEW- REMODEL ADDRESS EXPIRES PHONECONTRACTOR'S NAME MECHANICAL: ELECTRICAL: CONST. CONTRACTOR # GENERAL: PLUMBING OUAD AB # OF BDRMS - oFFlcE usE - WATER HEATER: I OF BLDGS: RANGE: SECONDABY HEAT: SQUARE FOOTAGE: LAND USE: OCCY GROUP: * OF STOBIES: CONSTFI. TYPE HEAT SOURCE: # OF UNITS: _-- To request an inspectlon, you must call 726-3769. Thls ls a24hour recording. All inspections requested before 7:00 a.m. will bemade the same working dav, rnspections '".;;il;ffiii!#l-il_: the rorrowins work dav. Temporary Electric Rouglr Mechanical - Prior to cover. Final Plumbing - When allplumbing work is complete. Site lnspection - To be made after excavation, but prior to setting forms. Rough Electrical - Prior to Final Eleclrical - When all electrical work is complete.cover T Underslab Plumblng / Electrical / Mechanlcal - Prlor to cover.Electrical Service - Must be approved to obtaln permanent electrlcal power. Final Mechanical - When all mechanical work ls complete. Footlng - After trenches are excavated.Flreplace - Prlor to faclng materlals and framing lnsp. Final Building - When all requlred inspections have been approved and building isMasonry - Steel locatlon, bond beams, groutlng.completed. Framlng - Prlor to cover. Foundatlon - After forms are erected but prlor to concrete placement. ther Wall/Celling lnsulation - Prior to cover. Underground Plumbing - Prior to fllling trench.l-_l Drywall - prior to taping. Underlloor Plumblng/ Mechanicat - Prior to lnsulatlon or decking. MOBILE HOME INSPECTIONS Wood Stovo - After lnstallation Post and Beam - Prlor to floor lnsulation or decking.lnsert - After flreplace approval and installatlon of unlt. Blocking and Set.Up - When ailblocking is complete. Floor lnsulatlon - Prior to decklng.Curbcut & Approaclr - After forms are erected but prior toplacement of concrete. Plumbing Connections - When home has been connected to water and sewer. Sanitary Sewer - Prior to f llling trench. Storm Sewer - Prlor to filling trench. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in place. Eleclrical Conneclion - Whenblocking, set.up, and plumbing inspectlons have been approved and the home is connected tothe service panel. Water Llne - Prior to filling trench.l-l Fence - When compteted. Final - After all requiredinspections are approved andporches, skirting, decks, andventing have been installed. Rough Plumbing - Prior to c0ver.[-l Street Trees - When all required.J trees are planted. FLOOD PLAIN: ZONING CODE: _. E tl tl tf E Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Typ. - lnterior - Corner - Panhandle - Cul-de-sac bac PL.HSE GAR ACC N S E i lS THE PFTOPOSED WORK tN THE , HISTORICAL OISTRICT, OR ON THE HISTORICAL REGISTER? .--- lf yes, this application must be signedand approved by the Historical Coordinator prior to permit issuance. APPROVED: VALUE (A) BUILDING PERMIT Total Value Building Permit Fee State Surcharge Total Fee SO. FT. X $/SQ, FT.ITEM Main Garage Carport BUILDING VALUE, PLAN CHECKAND BUILDING PERMIT This permit is granted on the express condition that the saidconstruction shall, in all respects, conform to the Ordinanceadopted by the City of Springfield, including theDevelopment Code, regulating the construction and Lse ofbuildings, and may be suspended or revoked at any timeupon violation of ar-ry provisions of said ordinances. Plans Reviewed By Date Beceipt Numbe Plan Check Fee: Date Paid Fleceived By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. Residenrial Bath(s) Sanltary Sewer Water Storm Sewer Moblle Home FEE (c) N0 FT. Plumblng Permit State Surcharge Total Charge PLUMBING PERMIT ITEM Fixtures ADDITIONAL COMMENTS MECHANICAL PERMIT Fu rnace Exhaust Hood Vent Fan No Wood Stove/ lnsert/ Flreplace Unlt Dryer Vent t30/0 (D) Mechanical Permit lssuance State Surcharge Total Permit By slgnature, I state and agree, that I have caref ully examlned the completed application and do hereby cerilfy that all lnformation hereon is true and correct, and I f urther certlfy that any and all work performed shall be done in accordance with the Ordinanccs of the City of Sprlngfield, and the Laws of the State of Oregon pertainlng to the work descrlbed herein, and that NO OCCUPANCy will be made of any structure wlthout permission of the Building Safety Divislon. I further certify that only contractors and employees who are in compliance with ORS 701.0S5 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address ls readable from the street, that the permit card ls located at the front the approved set of plans will remain Date S on the site g constructlon.all ti esd of the prope MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut -- ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (excluding electric (A, B, C, D, and'E Combined) VALIDATION: RECEIPT NUMBER DATE PAID AMOUNT REC F- RECEIVED BY FT. FT. t