Loading...
HomeMy WebLinkAboutPermit Mechanical 1996-02-01SPRI1{GF IELI) RESIDENTIAL PERMIT APPLICATION lnspections: 726'3769 Office: 726-3759 Zfr, JOB NUMBER 225 Fifth Street Sprlngfleld, Oregon 97477 TAX LOT: SUBDIVISION: LOCATION OF PRO ASSESSORS MAP: LOT BLOCK: PHON E: ZIP:STATE: OWNER: CITY: AD ADDITION MOLISH OTHER DESCRIBE WOFIK: NEW - FIEMOD ELECTRICAL: - ADDRESS EXPIRES - PHONECONTBACTOR'S NAME MECHANICAL: CONST. CONTRACTOR # GENERAL: PLUMBING 5 WATER HEATEB r OF BDRMS:OCCY GROUP: _ OFFICE USE - ZONING CODE: FLOOD PLAIN , OF STORIES: ---BANGE: SECONDARY HEAT: SQUARF. FOOTAGE: QUAD AREA: 'I OF BLDGS: CONSTR. TYPE: HEAT SOURCE: # OF UNITS: - To request an lnspectlon, you must call 726-3769. Thls ls a 24 hour recordlng. All inspections requested before 7:00 a.m. wlll be made the same worklng day, lnspections requested after 7:00 a.m. wlll be made the followlng work day. REQUIRED INSPECTIONS Temporary Electrlc [-E]-RoughU cover. Ittscff-Shfcat - Prlor toqq5 Etec)*al - Prior to Final Plumbing - When all plumblng worl< ls complete. Slte lnspectlon - To lre made after excavation, but Prior to settlng forms. Rough Final Eleclrical - When all electrical work is complete.cover, Underslab Plumbing/ Electrical / Mechanical - Prior to cover. Electrical Service - Must be approved to obtain Permanent electrlcal power. f-ffinatU mech - When all ani work ls complete. Footlng - After trenches are excavated.Fireplace - Prlor to faclng materlals and framing lnsP. Final Building - When all required lnspections have been approved and building is completed.Masonry - Steel locatlon, bond beams, groutlng.Framlng - Prior to cover, lP'6therllFoundatlon - After forms are erected but Prlor to concrete placement. Wall/Ceiling lnsulatlon - Prlor to cover, Underground Plumbing - Prior to fllllng trench.J-l orywall - Prior to taPing MOBILE HOME INSPECTIONS Underlloor Plumblng/ Mechanical - Prior to lnsulatlon or decking. Posl and Beam - Prior to floor lnsulation or decklng.lnsert - After flreplace approvsl and lnstallatlon of unit. Blocking and Set-Up - When all blocklng ls complete. Floor lnsulation - Prlor to decking.Curbcut & Alrproach - After forms are erected but Prior to placemcnt of concrete. Plumbing Connections - When home lras been connected to water and sewer. Sanltary Sewer - Prior to filling trench.Electrical Connection - When blocklng, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Slorm Sewer.- Prior to filling trench. -t Sidewalk & Driveway - After excavation ls cornplete, forms and sub-base material in place. Water Lin'e - Prlor to {illing trerich. Fence - When completed Slreel Trees - When all requlred trees are planted. Final - After all required inspections are approved and porches, skirting, decks, and ventlng have been lnstalled.E Rough Plumbing - Prior to cover. LAND USE: E E E l--l Wood Stove - After lnstallatlon. tl tl E E E E tl Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Type - lnterior - Corner - Panhandle - Cul-de-sac Set IS THE PROPOSED WORK iN THE HISTORICAL DISTRICT, OR ON THE H ISTORICAL REGISTER? - lf yes, this applicatlon rnuit O" slgned and approved by the Historlcal Coordi nator prior tolpermit issuance. APPROVED; P.L.HSE GAR ACC N S E SO. FT. X $/SQ. FT. : VALUE BUILDING PERMIT (A) ITEM Main Garage Carport Total Value Building Permit Fee State Surcharge Total Fee BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the cxpress condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plans ReviewecJ t3y Date Recei pt Numbe Plan Check Fee Date Paid: Beceive<J By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City linrits which are being improved. ITEM Fixtures Flesidential Bath(s) Sanitary Sewer Water Storm Sewer Moblle Home FEE (c) No FT. FT. FT. PLUMBING PERMIT Plumbing Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/ Flreplace Unit nt uttrt+le- OO (D) N0 M Vent Fan ical Permit MECHANICAL PERMIT Fu rnace Exhaust Hood lssuance State Surcharge Total Permit By slgnature, I state and agree, that I have caref ully examlned the completed application and do hereby certlfy that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Sprlngfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUPANCY wlll be made of any structure without permission of the Building Safety Divislon. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on thls proiect. I further agree to ensure that all required inspections are requested at the proper time, that each address ls readable from the street, that the permit card ls located at the front of the property, and the approved set of Slgnatu o^r. 8- /-f 6 , ans will remaln flon the site at mes cons MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut --- ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (excludlng electrical (A, B, C, D, and E Combined) E DATE PAID AMOUNT H RECEIVED BY VALIDATION: RECEIPT NUMBE